Top Banner
Prof. Hongguang JIN Institute of Engineering Thermophysics, Chinese Acad emy of Sciences 17 April, 2011 CCS Challenges for PRC CCS Financing Roundtable , Singapore, 2011
9

CCS Financing Roundtable (H.jin)0602

Apr 08, 2018

Download

Documents

kmozoa
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: CCS Financing Roundtable (H.jin)0602

8/7/2019 CCS Financing Roundtable (H.jin)0602

http://slidepdf.com/reader/full/ccs-financing-roundtable-hjin0602 1/9

Prof. Hongguang JIN 

Institute of Engineering Thermophysics,

Chinese Academy of Sciences

17 April, 2011

CCS Challenges for PRC

CCS Financing Roundtable, Singapore, 2011

Page 2: CCS Financing Roundtable (H.jin)0602

8/7/2019 CCS Financing Roundtable (H.jin)0602

http://slidepdf.com/reader/full/ccs-financing-roundtable-hjin0602 2/9

Tianjin IGCC + CCS power plant

Huaneng Group

GreenGen project 

Stage I: 2006-2009

Stage II: 2010-2015

Stage III: 2016-2020

250MW IGCC Demo Plant

Start to construction in 6 July 2009

Key equipments in construction

To be in operation by 2012

Page 3: CCS Financing Roundtable (H.jin)0602

8/7/2019 CCS Financing Roundtable (H.jin)0602

http://slidepdf.com/reader/full/ccs-financing-roundtable-hjin0602 3/9

Existing CCS technologies in world

Energy Penalty: 7~15% Cost: 20~60 $ / t CO2

If China adopts these approaches

Additional energy input - 700 millions of tce/y in China of 2050

Energy security will be more serious!

Also, Hundred billions US$ per year 

Challenge: Is it sustainable?

Challenge of CCS in China

Page 4: CCS Financing Roundtable (H.jin)0602

8/7/2019 CCS Financing Roundtable (H.jin)0602

http://slidepdf.com/reader/full/ccs-financing-roundtable-hjin0602 4/9

Cost Reduction Potential of IGCC/CCS

Current 2100$/kW

800~1000$/kW

Catch up PC+CCS:40GW

Around 40$/t

Around 25$/t

Contribution effects:capacity increment: 40~50%localization: 15~35%efficiency upgrade: 10~20%

CO2 cost in IGCC/CCS lower than in PC/CCS

(TA 7286_PRC of ADB)

Page 5: CCS Financing Roundtable (H.jin)0602

8/7/2019 CCS Financing Roundtable (H.jin)0602

http://slidepdf.com/reader/full/ccs-financing-roundtable-hjin0602 5/9

The learning effect and localizationlearning effect and localization are t he key factors for t he cost 

reduction of IGCC/CCS, which may reduc e t he CO2 avoi ded co st fro m

t he c urrent 38$/t  to 20~25$/t  in  China  in  the fut ure.

The in vest ment  of   IGCC/CCSIGCC/CCS (when  ca pacit y higher than  40GW 40GW ) can  can  

be co mpetiti ve with P C/CCSbe co mpetiti ve with P C/CCS; CO2 a voi ded co st  in  IGCC/CCS will be

lo wer than  that  in P C/CCS.

W ith lo wer en erg y penalt y co mpar ed to  that  of  P C/CCS, IGCC/CCSIGCC/CCS

ma y sa ve b illion  ton s of   coal ma y sa ve b illion  ton s of   coal , which will  l ea d to  the d o minating  CCS

t echnolog y of   China  in  f  ut ur e.

Key Findings

Page 6: CCS Financing Roundtable (H.jin)0602

8/7/2019 CCS Financing Roundtable (H.jin)0602

http://slidepdf.com/reader/full/ccs-financing-roundtable-hjin0602 6/9

Coal based Polygeneration system for production of alternativeCoal based Polygeneration system for production of alternativeliquid fuel and power with COliquid fuel and power with CO22 recoveryrecovery

Coal

CO2

Removal

CO2

Pre-combus

Post Gasifier Post Gasifier 

CO2

%

Gasification

50% 20%

New PreNew Pre--combuscombus

Post Synthesis ReactionPost Synthesis Reaction

Partial Cycle

Liquid Fuel

CO2

5~10%

Combined CycleCombustionCO2

Removal

CO2

30%

20~30%

Energy Penalty

PostPost--combustion capturecombustion capture

Page 7: CCS Financing Roundtable (H.jin)0602

8/7/2019 CCS Financing Roundtable (H.jin)0602

http://slidepdf.com/reader/full/ccs-financing-roundtable-hjin0602 7/9

Specific CCS target for China

Suitable

for future

Suitable for 

developing countries

Suitable for 

developed countries

Page 8: CCS Financing Roundtable (H.jin)0602

8/7/2019 CCS Financing Roundtable (H.jin)0602

http://slidepdf.com/reader/full/ccs-financing-roundtable-hjin0602 8/9

Key points

� Based on special issues of China, high carbon energy Vs.low carbon tech, global insight from energy resource and

economic for S.T. Develop.;

� Need to develop innovative CCS in long term, instead of existing CCS tech, unacceptable for developing

countries;

� Focus on low energy penalty, instead of zero emission;

� Targets of CCS: low energy penalty with less than 5

points, low cost with less than 10 $/ ton CO2;

� Successful demons. of CCS in developed countries.

Page 9: CCS Financing Roundtable (H.jin)0602

8/7/2019 CCS Financing Roundtable (H.jin)0602

http://slidepdf.com/reader/full/ccs-financing-roundtable-hjin0602 9/9

Thanks for supporting from

GCCSI, ADB, NDRC!