1 CCS & CIA of River Basins SI. No. River Basin Status(completed/ongoing) Arunachal Pradesh 1. Bichom River Completed in April , 2015 2. Subansiri River Completed in April , 2016 3. Siang River Completed in March, 2015 4. Tawang River Completed in Feb, 2016 5. Lohit River Report received and being placed in next EAC meeting. 6. Kameng River Going on 7. Dibang River Report received and being placed in next EAC meeting. MoEF&CC
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
1
CCS & CIA of River Basins
SI. No.
River Basin Status(completed/ongoing)
Arunachal Pradesh
1. Bichom River Completed in April , 2015
2. Subansiri River Completed in April , 2016
3. Siang River Completed in March, 2015
4. Tawang River Completed in Feb, 2016
5. Lohit River Report received and being placed in next EAC meeting.
6. Kameng River Going on
7. Dibang River Report received and being placed in next EAC meeting.
• River Valley & Hydroelectric Projects-Use of river waters by constructing dams, barrages, weirs etc. for hydropower generation and to provide irrigation, flood control and drinking water facility.
• Category ‘A’ Project- > 10,000 ha of culturable command area and HEP > 50 MW.
• Category ‘B’ Project- < 10,000 ha of culturable command area having no submergence/inter-State domain and HEP from 25 MW upto 50 MW.
• Category ‘B’ project treated as category ‘A’- If located within 10 km from protected area under Wildlife Act/ Critically Polluted area/International and interstate Boundaries.
• Issue of TOR/EC-20 no of ToR and 11 ECs issued in last year.
• MoP filed affidavit on 05/05/2016 agreeing the stand taken by MOEF.MoWR filed on 31st May 2016 but it is not in agreement with the stand taken by the MoP and MoEF.
• Cabinet secretary reviewed with all the three secretaries on 17th June 2016.Secretaries from MoP, MoWR and MoEF deliberated on 28th June,2016.
• In order to have a consensus, meeting was held in chamber of Hon. FM 0n 8th July 2016.
7 Etalin Jindal 3097 EC and FC-I linked to Dibang Basin Study. BSR awaited
8 Talong (Londa)
GMR 225 EC is approved but will be issued only after grant of FC-I.
9 Tato – II# Reliance 700 EC granted. The project requires major modification in view of reduction in FRL and to maintain minimum free flow as per Siang Basin Study Report(BSR).
10 Siyom# Reliance 1000 The project requires major modification in view of reduction in FRL and to maintain minimum free flow as per Siang Basin Study Report(BSR).
11 Hirong# Jaiprakash 500 Modification in project is required due to BSR.
12 Naying# DS Constrn. 1000 Modification in project is required due to BSR.
Flood Plain rivers : Rivers flowing at less than 300 m elevation until the formation of Delta close to sea level a) Prohibited Activities Zone (RCZ-PA)
Extend from river bank upto 500m from HFL without embankments. Extend from river bank upto 100m from HFL with embankments Entire area available on both sides of the river banks for ecologically sensitive area, National parks, Wild life Sanctuary etc.
b) Restricted Activities Zone (RCZ-RAI) Extend upto one kilometre from outer limits of RCZ-PA. (1.5 km from HFL) with out embankments. Extend upto 1.1 kms from existing embankment.(1.1 km from HFL) with embankments.
c) Regulated Activities Zone (RCZ-RAII) Extend upto three kilometres from outer limits of RCZ-RAI.
• Permanent constructions • Construction of new embankments • Land reclamation • Dumping of solid wasters/ creation of landfills • Withdrawal/diversion of water
RCZ-RAI and RCZ-RAII-
• Hazardous waste producing industries and chemical industries
Mountain rivers and hill streams
• Permanent constructions • Dumping of solid waste
River Regulated Zone (RRZ) Restricted and Regulated activities
RCZ-PA
• Construction of strategic importance • Construction of sewage or effluent treatment plants (<5MLD) • Temporary constructions in case of emergency • Repair and maintenance of existing road/bridges
RCZ-RAI
• Construction of residential/ institutional/commercial buildings; schools, dispensaries, recreational facilities, public toilets
RCZ-RAII.
• All kinds of industries discharging wastewater with toxic pollutants and heavy metals