C C CR R RO O OW W WD D DE E ER R RF F FR R RA A AM M ME E E ' ' '2 2 2 X X X 6 6 6 W W WA A AL L LL L L' ' ' M M MO O OD D DI I IF F FI I IC C CA A AT T TI I IO O ON N N I I IN N NS S ST T TR R RU U UC C CT T TI I IO O ON N N S S SH H HE E EE E ET T T F F FO O OR R R P P PO O OC C CK K KE E ET T T D D DO O OO O OR R R K K KI I IT T TS S S I I IN N NT T TE E EG G GR R RA A AT T TE E ED D D I I IN N N 2 2 2 X X X 6 6 6 W W WA A AL L LL L L C C CO O ON N NS S ST T TR R RU U UC C CT T TI I IO O ON N N #10 X 1-1/2" SELF DRILLING SCREWS (10) 1/4" - #14 X 2" HEX TEK SCREW (4) REPLACES (4) 3/4" HEX TEK SCREWS 2 X 6 FOOT BRACKETS (2) REPLACES STANDARD FOOT BRACKETS P P PA A AR R RT T TS S S L L LI I IS S ST T T (ADDITIONAL TO PARTS INCLUDED WITH STANDARD POCKET DOOR KIT) K K K. . .N N N. . . C C CR R RO O OW W WD D DE E ER R R M M MF F FG G G. . . I I IN N NC C C. . . 1220 BURLOAK DRIVE BURLINGTON, ONTARIO, CANADA, L7L 6B3 TELEPHONE: 905-315-9788 - FAX: 905-315-8090 TOLL FREE FAX: 1-800-567-0123 K K K. . .N N N. . . C C CR R RO O OW W WD D DE E ER R R I I IN N NC C C. . . 210 EIGHTH STREET SOUTH LEWISTON, NEW YORK, U.S.A. 14092 TELEPHONE: 1-716-754-8247 TOLL FREE FAX: 1-800-567-0123 WEBSITE: www.kncrowder.com --- E-MAIL: [email protected] S S ST T TE E EP P PS S S 1 1 1- - -9 9 9 FOLLOW STEPS FROM STANDARD POCKET DOOR KIT INSTRUCTIONS. F F FO O OR R R S S ST T TE E EP P P 8 8 8 U U US S SE E E 2 2 2 X X X 6 6 6 F F FO O OO O OT T T B B BR R RA A AC C CK K KE E ET T TS S S B B BE E EF F FO O OR R RE E E S S ST T TE E EP P P 1 1 10 0 0 CUT 1" X 1-3/8" PLYWOOD SHIMS TO CORRECT LENGTH IF REQUIRED. PRE-DRILL 5 HOLES ON THE 1-3/8" FACE OF EACH SHIM WITH 13/64" DRILL BIT. NOTE: PLACE HOLES WHERE THEY WILL NOT INTERFERE WITH THE UPRIGHTS. SCREW SHIMS TO HEADER WITH #10 X 1-1/2" SELF DRILLING SCREWS (10). S S ST T TE E EP P P 1 1 10 0 0 POSITION STEEL UPRIGHTS ON FOOT BRACKET WITH LARGE OVAL CLEARANCE HOLES FACING OUT. THE UPRIGHTS ARE PUNCHED SYMETRICALLY AND EITHER END CAN BE UP (OR DOWN). THE ROLLED SEAM ON THE SIDE WALL OF THE UPRIGHT SHOULD FACE THE BACK OF THE POCKET- OTHERWISE IT WILL BE DIFFICULT TO SCREW OPENING TRIM TO THE UPRIGHT. PLUMB THE UPRIGHTS VERTICALLY AND PRE-DRILL 1/4" CLEARANCE HOLE IN THE P P PL L LY Y YW W WO O OO O OD D D S S SH H HI I IM M MS S S O O ON N NL L LY Y Y. SECURE UPRIGHTS TO HEADER WITH 1/4" - #14 X 2" HEX TEK SCREWS (4) AND 5/16" EXTERNAL TOOTH LOCK WASHERS (4). NOTE: IMPACT DRIVER IS IDEAL FOR THIS STEP OR PRE-DRILL HEADER WITH 9/64" BIT IF DESIRED. S S ST T TE E EP P PS S S 1 1 11 1 1- - -2 2 20 0 0 FOLLOW STEPS FROM STANDARD POCKET DOOR KIT INSTRUCTIONS. 1" X 1-3/8" X 70" PLYWOOD HEADER SHIMS (2) 5-5/8" [143 mm] 2 2 2 X X X 6 6 6 W W WA A AL L LL L L C C CO O ON N NS S ST T TR R RU U UC C CT T TI I IO O ON N N P P PO O OC C CK K KE E ET T T D D DO O OO O OR R R K K KI I IT T T S S SE E EC C CT T TI I IO O ON N N V V VI I IE E EW W W 1" X 1-3/8" PLYWOOD SHIM WITH #10 X 2" SELF-DRILLING SCREWS 1/4" - #14 X 2" HEX TEK SCREWS 2 X 6 FOOT BRACKETS 1" X 1-3/8" PLYWOOD SHIM