CC ENERGY DEVELOPMENT BLOCKS 3 & 4 DEVELOPMENT OMAN ECONOMIC FORUM APRIL 23 RD 2012
19

CC Energy Development Blocks 3 & 4 Development

Feb 24, 2016

Download

Documents

ting

CC Energy Development Blocks 3 & 4 Development. Oman Economic Forum April 23 rd 2012. FARHA SOUTH FIELD. Block 3. SAIWAN EAST FIELD. Block 4. Blocks 3 & 4 History. EPSA for Blocks 3 & 4 signed on February 9, 2003 by Encana . - PowerPoint PPT Presentation
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: CC  Energy  Development Blocks 3 & 4 Development

CC ENERGY DEVELOPMENTBLOCKS 3 & 4 DEVELOPMENT

OMAN ECONOMIC FORUMAPRIL 23RD 2012

Page 2: CC  Energy  Development Blocks 3 & 4 Development

FARHA SOUTH FIELD

SAIWAN EAST FIELD

2

Block 3

Block 4

Page 3: CC  Energy  Development Blocks 3 & 4 Development

BLOCKS 3 & 4 HISTORY• EPSA FOR BLOCKS 3 & 4 SIGNED ON

FEBRUARY 9, 2003 BY ENCANA.

• CCED TOOK OVER 50% OF THE ASSET FROM ENCANA IN NOVEMBER 2007.

• EXPLORATION COMMENCED IN 2009.

3

Page 4: CC  Energy  Development Blocks 3 & 4 Development

BLOCK 3

BLOCK 4

0 50 Km

BLOCK 51

BLOCK 42

BLOCK 6

BLOCK 64

1972-1984

1983-1986

1985-1990

1991

1992-1994

1999

2001

2005-2007

2009-2012

Page 5: CC  Energy  Development Blocks 3 & 4 Development

CCED ACHIEVEMENTS1. BUILT EARLY PRODUCTION FACILITIES TO

PRODUCE OIL WITHIN 5 MONTHS AFTER THE GREEN LIGHT FROM MOG.

2. PREPARED AND SUBMITTED THE FIELD DEVELOPMENT PLAN TO MOG.

3. IDENTIFIED FURTHER EXPLORATION OPPORTUNITIES AND INITIATED A PLAN TO EXPLORE

5

Page 6: CC  Energy  Development Blocks 3 & 4 Development

EARLY/ PERMANENT

PRODUCTION FACILITIES

2

Abandoned Alam Station

ALAM METERING

STATION

FARHA

OIL PROCESSING & MOVEMENT

SAIWAN PF

QA PDO Station

SAIWAN WIFEXISTING

Early Production

Facility

FUTUREQARN ALAM METERING

STATION

8” P

DO

16”(16 Km)

FUTURENEW

8”

6

Page 7: CC  Energy  Development Blocks 3 & 4 Development

7

DRILLING PROGRAM

NOTE: 24 WELLS WERE SUCCESSFUL OUT OF 30 DRILLED EXPLORATION/APPRAISAL/DEVELOPMENT PRODUCERS WELLS - 80% SUCCESS

WELLS DRILL AS OF FEBRUARY 2012 FURTHER WELLS TO BE DRILLED

PRODUCER INJECTOR WATER SOURCE DRYHOLE PRODUCER INJECTOR WATER

SOURCE

BLOCK 3 24 5 1 3 31 20 10

BLOCK 4 6 0 0 3 2 0 0

TOTAL 30 5 1 6 33 20 10

Page 8: CC  Energy  Development Blocks 3 & 4 Development

PRODUCTION FIGURES

8

0.00

20,000.00

40,000.00

60,000.00

80,000.00

100,000.00

120,000.00

140,000.00

160,000.00

180,000.00

200,000.00

220,000.00

240,000.00

260,000.00

280,000.00

300,000.00

320,000.00

340,000.00

360,000.00

380,000.00

400,000.00

Jul-10 Aug-10 Sep-10 Oct-10 Nov-10 Dec-10 Jan-11 Feb-11 Mar-11 Apr-11 May-11 Jun-11 Jul-11 Aug-11 Sep-11 Oct-11 Nov-11 Dec-11 Jan-12 Feb-12 Mar-12

Farha Saiwan

20112010 2012

15,865. 13,741.36

44,784.62

28,283.13

36,693.74

22,588.0513,949.93

21,006.01

32,943.75

80,500.63

104,396.39

131,692.23

151,966.82

191,862.11

215,924.17

195681.17

254,972.96

327,323.01

315,004.66

377,946.85

MMBO

CCED OMANMONTHLY OIL PRODUCTION

Page 9: CC  Energy  Development Blocks 3 & 4 Development

9

OVER 7,000,000 KM DRIVEN (CRUDE HAULAGE) WITH ONLY ONE RTA.

OPERATION STARTED WITH FOUR (4) TANKERS AND INCREASED TO THIRTY ONE (31).

HIGHEST DAILY VOLUME TRANSPORTED; 14,498 BARRELS.HIGHEST DAILY NUMBER OF TANKERS OFFLOADED IN ALAM IS

63.HIGHEST MONTHLY VOLUME TRANSPORTED; MARCH 2012

MTD 377,947 BARRELS. HIGHEST MONTHLY KM DRIVEN FEBRUARY 2012 MTD 542,174

KM.

CRUDE OIL TRUCKING OPERATION

9 9

Page 10: CC  Energy  Development Blocks 3 & 4 Development

10

PERMANENT PRODUCTION FACILITIES

Page 11: CC  Energy  Development Blocks 3 & 4 Development

11

PERMANENT PRODUCTION FACILITIES

Page 12: CC  Energy  Development Blocks 3 & 4 Development

WHY CCED IS A SUCCESS1. TEAM WORK2. TEAM EMPOWERMENT3. LEADERSHIP4. SKILLED PEOPLE5. PLANNING, PLANNING, PLANNING6. COMMUNICATION7. RELATIONSHIP8. SIMULTANEOUS APPRAISAL AND DEVELOPMENT

12

Page 13: CC  Energy  Development Blocks 3 & 4 Development

HEADCOUNT 2008-2012

13

2008 2009 2010 2011 410000

20

40

60

80

100

120

140

160

LocalsExpats

Page 14: CC  Energy  Development Blocks 3 & 4 Development

OMANIZATION PLAN 2008 - 2015

2008 2009 2010 2011 2012 2013 2014 20150

10

20

30

40

50

60

70

80

90

Local %Expat %

YEAR

PERC

ENT

(%)

14

Page 15: CC  Energy  Development Blocks 3 & 4 Development

EMPLOYEE TOTALSDescription Number of Employees

as of 21st April 2012

OMANI NATIONALS CURRENTLY WORKING IN CCED 141 (52 Muscat + 89 Field)

EXPATS CURRENTLY WORKING IN CCED 67

OMANIZATION % 68%

OMANI NATIONALS TO BE RECRUITED 2012

46Operators & Technicians

EXPATS TO BE RECRUITED IN 2012

19Managers/Technical

15

Page 16: CC  Energy  Development Blocks 3 & 4 Development

16

BLOCKS 3 & 4 INVESTMENT

INVESTMENT 2010 – 2012:

OVER $ 300 MILLION USD

PLANNED INVESTMENT 2013 – 2017:

OVER $ 500 MILLION USD

Page 17: CC  Energy  Development Blocks 3 & 4 Development

ENHANCED OIL RECOVERY1. PRIMARY

2. WATER INJECTION AS SECONDARY RECOVERY – PILOT STARTED.

3. CHEMICAL, SURFACTANT OR MICROBIAL AS TERTIARY RECOVERY

17

Page 18: CC  Energy  Development Blocks 3 & 4 Development

ENHANCED OIL RECOVERY4. VAST EXTRA HEAVY OIL

RESERVES WHICH REQUIRES THE UTILIZATION OF THERMAL RECOVERY METHODS.

18

Page 19: CC  Energy  Development Blocks 3 & 4 Development

TOTAL NEW FIELD EXPLORATION IN THE WORLD

$120

$100

$80

$60

$40

$20

$0

$/BA

RREL

IN 2

007

USD

70,000

60,000

50,000

40,000

30,000

0

NU

MBE

R O

F N

EW F

IELD

WIL

DCAT

S DR

ILLE

D IN

THE

WO

RLD

$140

20,000

10,000

Data Source – IHS

MAJOR

INDEPENDENT

NOCs

OIL PRICE

1992-1996

75%

8%24,623

17%

1987-1991

75%

8%36,062

17%

1982-1986

84%

6%63,935

10%

1977-1981

84%

6%61,943

10%

2002-2006

87%

6%35,954

7%

1997-2001

76%

10%22,299

14%

19