U.S. Customs and Border Protection Infrastructure Update Transportation Border Working Group October 27, 2010
Jan 22, 2016
U.S. Customs and Border ProtectionInfrastructure Update
Transportation Border Working GroupOctober 27, 2010
U.S. Customs and Border ProtectionInfrastructure Update
Transportation Border Working GroupOctober 27, 2010
CBP Land Port of Entry ProgramConditions at ARRA Ports
Boundary, WA (CBP) Los Ebanos, TX (CBP)
Van Buren, ME (GSA – flooded)Whitetail, MT (CBP)
3
Existing LPOE
End State Rendering
PINNACLE ROAD, VT
Above: Foundation work is 98% complete
4
CHURUBUSCO, NY
Above: Bollard concrete pour
Below: Utility installation at the Government Garage
Above: Sand backfill and stockpile
Below: Installation of floor drain
5
PITTSBURG, NH
Existing LPOE
End State Rendering
Above: Erecting steel frame of building
FOREST CITY, ME
6
CBP archaeological specialists excavate the site of the proposed Forest City, ME LPOE.
7
WALHALLA, ND
Existing LPOE
End State Rendering
Above: Stem walls in place
8
WESTHOPE, ND
Existing LPOE
End State View from South
Above: View of electrical and plumbing work
Right: Curbs in place for lanes
9
SHERWOOD, ND
Existing LPOE
End State Rendering
Above: Curbs installed prior to asphalt paving
10
ANTLER, ND
Right: View of LPOE looking North
Left: Excavating for electrical in drive islands
11
MORGAN, MT
Above: Drive lane looking south at booth
Below: Housing module moving into final position
Above: Installation of roof sheathing on east side of LPOE
Below: Truss installation at south residential unit
12
WILD HORSE, MT
Right: Asphalt edge clean up and site grading
Left: Fire Suppression distribution lines being installed
13
CARBURY, ND
Existing LPOE
End State RenderingRight: View of newly set roof trusses and exterior of LPOE
Left: View from inside the LPOE
14
HANSBORO, ND
Existing LPOE
End State Rendering from South
Above: Foundation work at the port
15
NECHE, ND
Existing LPOE
End State Rendering
Left: Foundation work continues
Right: Installation of main building underslab plumbing and electrical
16
FRONTIER, WA
Above: Vapor Barrier installed at LPOE depressed slab
Below: Finishing concrete for slab-on-grade at Main Port Building
Above: Spreading crushed base rock for asphalt paving
17
WILLOW CREEK, MT
Control closet, camera, and monitor installed at the Willow Creek, MT LPOE, one of seven LPOEs receiving BSDP equipment.
NOONAN, ND
Above: Bypass lane with RPM bollards in the background
Below: Culvert under Highway 40
Above: View of the LPOE looking North
1919