Top Banner
Confidential CBD - Portofolio
10

CBD -Portofoliojcm.ekon.go.id/en/uploads/files/Document JCM/Presentation/Seminar on... · Proposal by Sharp by Aug 2015 MoU PDPDE –Sharp by Aug 2015 Location Permit By Sept 2015

Jun 15, 2019

Download

Documents

lyhanh
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: CBD -Portofoliojcm.ekon.go.id/en/uploads/files/Document JCM/Presentation/Seminar on... · Proposal by Sharp by Aug 2015 MoU PDPDE –Sharp by Aug 2015 Location Permit By Sept 2015

Confidential

CBD - Portofolio

Page 2: CBD -Portofoliojcm.ekon.go.id/en/uploads/files/Document JCM/Presentation/Seminar on... · Proposal by Sharp by Aug 2015 MoU PDPDE –Sharp by Aug 2015 Location Permit By Sept 2015

Confidential

Background of the Project

South Sumatra Government will host a part of ASIAN GAMES

in 2018 at Jakabaring Sports City, Palembang

“During Asian Games, we generated over 100MWh to Jakabaring Sport City

and Reduced over 420Ton CO2 Emission”

Green Sports City - Initiated by South Sumatra Government

・PDPDE, selected by South Sumatra Government

・Sharp, Technology Provider

・Joint Development by PDPDE and Sharp

・JCM Carbon Credit for the Project

・PPA with PLN

Project Background

Page 3: CBD -Portofoliojcm.ekon.go.id/en/uploads/files/Document JCM/Presentation/Seminar on... · Proposal by Sharp by Aug 2015 MoU PDPDE –Sharp by Aug 2015 Location Permit By Sept 2015

CONFIDENTIAL

2

Project’s Development Process

Proposal

by Sharp

by Aug

2015

MoU

PDPDE

– Sharp

by Aug

2015

Location

Permit

By Sept

2015

Principal

Permit

by Sept

2015

Revision

Location

Permit

by May

2017

PPA

PDPDE

– PLN by

May

2017

JCM Subsidy

Approval by

June 2017

Land filled

by PUCK

by June

2017

Land

Preparation

by PDPDE

by July-

Sept 2017

Construction

Start by Sept

2017

PDPDE-

Sharp

International

Consortium

Signed by

June 2017

Temporary

Power

Permit by

Feb 2017

PV Module

& BOS

System

Agreement

s Signed by

Sept 2017

HVR / PV

Construction

Complete by

Nov 2017

Installation

Grid

Connection

to PLN by

Dec 2017

Engineering Design &

PPA Process

Commercial

Operation Date

April 10, 2018

Page 4: CBD -Portofoliojcm.ekon.go.id/en/uploads/files/Document JCM/Presentation/Seminar on... · Proposal by Sharp by Aug 2015 MoU PDPDE –Sharp by Aug 2015 Location Permit By Sept 2015

3

We Start

here

We are here

Monday, Dec 31

2018, has reached

1,63 Giga Watt

hour power

generation and

779 Ton CO2

emission reduction

On-Grid

Time : 6.35Off-Grid

Time : 17.25

Automatically Operation

MONITORING PERFORMANCE

Page 5: CBD -Portofoliojcm.ekon.go.id/en/uploads/files/Document JCM/Presentation/Seminar on... · Proposal by Sharp by Aug 2015 MoU PDPDE –Sharp by Aug 2015 Location Permit By Sept 2015

CONFIDENTIAL

4

Monthly Performance

2018 Energy

(MWh)

CO2 Emission

(Ton CO2)

April – start 124.8 59.5

May 182.1 86.8

June 154.7 73.7

July 210.5 100.4

August 209.3 99.8

September 212.7 101.5

October 197.9 94.3

November 171.1 81,6

Desember 170.3 81,3

TOTAL 1,630.2 779,0

Since COD, Plant performance from April 10 – 31 December 2018 ; source –

Green Power Monitor SCADA

Page 6: CBD -Portofoliojcm.ekon.go.id/en/uploads/files/Document JCM/Presentation/Seminar on... · Proposal by Sharp by Aug 2015 MoU PDPDE –Sharp by Aug 2015 Location Permit By Sept 2015

CONFIDENTIALi

5

Lessons Learned From JCM Project

• Change our Business Culture

toward environmental

sustainability

• Change our chauvinism to be

thinking globally

• A trigger to more advanced

step

• Technology Transfer from

Experienced Japanese

Company

COMPANY VISION

COMPANY

ENVIRONMENT

• Educate our personnel’s

Mindset

• Success based on

workforce quality

• Skill full experienced

Staff in Planning, Design

& Implementation

During 3 year working with Japan team under JCM, It has

changed us to make better business atmosphere :

Page 7: CBD -Portofoliojcm.ekon.go.id/en/uploads/files/Document JCM/Presentation/Seminar on... · Proposal by Sharp by Aug 2015 MoU PDPDE –Sharp by Aug 2015 Location Permit By Sept 2015

CONFIDENTIALTo

6

Community Development Effect

PLTS 2MW Jakabaring or “Jakabaring Solar Farm” has turned to

be a “Public Education Center” for Developing Renewable

Energy from Solar Irradiation. Many stakeholders visited us to

learn the PLTS as the most proven project such as :

KODIKLATAU

TNI AU

Many

MORE

Page 8: CBD -Portofoliojcm.ekon.go.id/en/uploads/files/Document JCM/Presentation/Seminar on... · Proposal by Sharp by Aug 2015 MoU PDPDE –Sharp by Aug 2015 Location Permit By Sept 2015

CONFIDENTIAL

7

Our Developing Project

“From TWO to MUCH BIGGER”

IPP PLTS 2MW Jakabaring

Location Palembang

Offtaker : PT. PLN (Persero)

CO2 Emission Reduction :

1.303TonCO2/year

COD Year : April 2018

Solar Street Light “PDELight”

Location Palembang

Project Plan : 45.000units

CO2 Emission Reduction :

21.160TonCO2/year

Imlementation Year : 2019-2020

10MW Bangka Island Solar Project

Location : Air Anyir, Bangka

Offtaker : PT. PLN (Persero)

CO2 Emission Reduction :

8.046TonCO2/year

Construction Year : 2020

Status : Detail Engineering Design

100MW Pertamina’s Refinery Solar Project

Offtaker : Own Use

CO2 Emission Reduction :

80.460TonCO2/year

Status : Proposal

Page 9: CBD -Portofoliojcm.ekon.go.id/en/uploads/files/Document JCM/Presentation/Seminar on... · Proposal by Sharp by Aug 2015 MoU PDPDE –Sharp by Aug 2015 Location Permit By Sept 2015

Confidential

PDPDE Kelompok &Saham

We are Local Government Owned Company with main business field in Mine and Energy

ABOUT PDPDE

PI Ownership Gas & CNG Trader Bottling LPG & Transport

Oil Block : Rimau

Location : Kab. Musi Banyuasin

Share : 5%

Area : 1103 km2

Contract Completion : 2023

Operator : PT Medco E & P Indonesia

Contract Total 13,5 Mmbtud distributed to

offtakers below :

• CNG-Gas Engine PowerJakabaring (Daruma)

• Gas Station for vehicle(CHR)

• Industry Pulp & Paper (PDPDE GAS)

• Bottling LPG PSO 3 kg

• Bottling Non-PSO 5kg,12 kg

50kg

• Three LPG Trucking

• Partner : RadekatamaPirantinusa

Renewable Energy

1,6 MW Jakabaring Solar Plant

located at Jakabaring Sport City

and distributed to PLN WS2JB

EPC & Consultancy R e t a i l Bu s i n e s s

Services : SPBU, SPBG, KFC,

Workshop, Alfamart & Product

Agency Rest Area Demang

Lebar Daun

Expertise services :

� Construction Service

� Mechanical & Electrical

Service

� Design & Planning

� Feasibility Study & Environment

Page 10: CBD -Portofoliojcm.ekon.go.id/en/uploads/files/Document JCM/Presentation/Seminar on... · Proposal by Sharp by Aug 2015 MoU PDPDE –Sharp by Aug 2015 Location Permit By Sept 2015

Our Address :

PD. Pertambangan dan Energi (PDPDE)

Jl. Natuna No.05 Palembang

INDONESIA

Email : [email protected]

THANK YOU

9