    CA

    PROJECT : EPC FOR NE

  • 7/26/2019 Cause and Effect Format

    2/19

    REVISION HISTORY

    NO DESCRIPTION

  • 7/26/2019 Cause and Effect Format

    3/19

  • 7/26/2019 Cause and Effect Format

    4/19

    E AND EFFECT DIAGRAM

    OC NO: 29-PP-163-1001

    ERTIL JETTY ETHYLENE VAPOUR RETURN ARM

  • 7/26/2019 Cause and Effect Format

    5/19

    PROJECT TITLE:

    NEW FERTIL JETTY VAPOUR RETURN A

    REPARED BY CHECKED APPROVED

    CAUSE AND EFFECT DIAGRAMDOCUMENT TITLE:

    BOROUGE CONTRACT NO: GOGAS DOCUMENT NO:

    29-PP-163-1001

  • 7/26/2019 Cause and Effect Format

    6/19

  • 7/26/2019 Cause and Effect Format

    7/19

  • 7/26/2019 Cause and Effect Format

    8/19

    RM

    SHEET 1 OF 3

    REV A

  • 7/26/2019 Cause and Effect Format

    9/19

  • 7/26/2019 Cause and Effect Format

    10/19

    SHEET INDEX

    PAGE NO DESCRIPTION SL.NO SYMBOL

    1 COVER SHEET 1 M

    2 INDE ! LEGEND SHEET 2 ST

    3 CAUSE AND EFFECT CHART 3 T

    -- ATTACHMENT 1: CAUSE AND EFFECT MATRI OF LOADING ARM BY VENDOR " D

    # SP

    6 I$

    % S$

    & IA

    9 AH

    10 AD

    11 P

    12 OP

    13 CL

    SL NO. SYMBOL

    1 CRM

    2 DCS

    3 FLD

    " F' G

    # SYS

    6 LOG

    % MCC& PKG

    9 ESD

  • 7/26/2019 Cause and Effect Format

    11/19

    SL NO. ABBREVIATION

    1 VOTING

    2 PO

    3 MO

    NOTES

  • 7/26/2019 Cause and Effect Format

    12/19

  • 7/26/2019 Cause and Effect Format

    13/19

    CAUSE AND EFFECT SYMBOLS

    DESCRIPTION

    MANUALY INITIATED ACTION (START!STOP!TRIP!OPEN!CLOSE)

    AUTOMATIC START

    AUTOMATICALLY INITIATED TRIP

    AUTOMATICALLY INITIATED DELAYED TRIP-EFFECT DOES NOT OCCUR IF CAUSES CLEAR BEFORE THE EPIRY OF THE TIME DELAY

    AUTOMATIC STOP

    DCS INTERLOCK ACTION *ITH SUPERSCRIPT AS INTERLOCK NUMBER

    ESD INTERLOCK ACTION *ITH SUPERSCRIPT AS ESD NUMBER

    INHIBIT ACTION

    HARD*IRED ALARM ! LAMP INDICATION ! HOOTER

    ALARMS ON DCS INITIATED BY ESD !FGS! PLC

    PERMISSIVE ACTION

    AUTOMATIC OPEN

    AUTOMATIC CLOSE

    LOCATION SYMBOLS

    DESCRIPTION

    CONTROL ROOM LOCATED PANEL (JETTY CONTROL ROOM)

    DCS INTIATED

    FIELD LOACTED (ETHYLENE LOADING BIRTH)

    HARD*IRE INPUT FROM FIRE AND GAS SYSTEM

    INTERNALLY GENERATED BY PLC HARD*IRE

    LOGIC GENERATED INTERNAL TAG

    HARD*IRE INPUT ! OUTPUT FROM MCCHARD*IRED INPUT ! OUTPUT FROM PACKAGE PLC -VENDOR PANEL

    EMERGENCY SHUTDO*N SYSTEM

  • 7/26/2019 Cause and Effect Format

    14/19

    OTHER ABBREVIATIONS

    DESCRIPTION

    1 OO 2: ONE OUT OF T*O VOTING SYSTEM+T*O SENSORS ARE USED IN PARALLEL TO DETECT A CONDITION, 2 OO 3: T*O OUT OF THREE VOTING SYSTEM+ THREE SENSORS ARE USED IN PARALLEL TO DETECT A CONDITIO

    PROJECT TITLE:

    NEW FERTIL JETTY VAPOUR RETURN A

    CAUSE AND EFFECT DIAGRAMDOCUMENT TITLE:

    BOROUGE CONTRACT NO: GOGAS DOCUMENT NO:

    29-PP-163-1001

    PROCESS OVERIDE SYSTEM: THE TEMPORARY SUPPRESSION OF THE PARTICULAR CAUSES SO AS TO FACILITATE PLANT STARTUP OR SHUTDO*N, THESE OVERIDES SHALL BE AUTOMATICALLY CANCELLED *HEN THE TRI*HEN THE PROCESS IS IN NORMAL OPERATING CONDITION

    MAINTENANCE OVERRIDE SYSTEM: THE TEMPORARY SUPPRESSION OF THE PARTICULAR CAUSES+ SO AS TO FACILITATE MAINTENANCE, THESE OVERRIDES SHALL BE CANCELLED MANUALLY+ MOS SHALL BE REALI.ED THPROTECTION,

  • 7/26/2019 Cause and Effect Format

    15/19

  • 7/26/2019 Cause and Effect Format

    16/19

  • 7/26/2019 Cause and Effect Format

    17/19

    N, THE ACTION ONLY BEING TAKEN *HEN AT LEAST T*O OF THEM AGREE,

    RM

    SHEET 2 OF 3

    REV A

    P BECOMES HEALTHY OR AT THE EPIRY OF THE ALLO*ED OVERRIDE TIMER

    OUGH SOFT*ARE S*ITCHES AND SHALL BE PROVIDED *ITH PASS*ORD

  • 7/26/2019 Cause and Effect Format

    18/19

  • 7/26/2019 Cause and Effect Format

    19/19

    EFFECT

    SLNO

    1 2

    LOCN

    ESD

    ESD

    ESD

    ESD

    DCS

    DCS

    DCS

    DCS

    DCS

    PID

    "0-PP-1#2-1102

    "0-PP-1#2-1102

    29-PP-1#2-1101

    29-PP-1#2-1101

    29-PP-1#2-1101

    29-PP-1#2-1101

    29-PP-1#2-1102

    29-PP-1#2-1102

    "0-PP-1#2-11"1

    DESCRIPTION

    ETHYLENESHIPPINGPUMP

    ETHYLENESHIPPINGPUMP

    LOADINGARMESDVALV

    E

    JETTYENDPIPELINECO

    OLDO*NESDVALVE

    LO*N

    ITROGENPRESS

    UREALARM

    ALARMINDCS

    LO*N

    ITROGENPRESS

    UREALARM

    ALARMINDCS

    ETHYLENEMETERINGS

    TATION

    CAUSE

    TAGN

    O.

    "0-PC-103B

    "0-PC-103A

    29-V-0003

    29-V-0006

    29-PAL-0006

    29-A-0011

    29-PAL-001&

    29-A-0022

    "0-A-110

    SL# TAG NO. DESCRIPTION P&ID NO. LOCN VOTING OVERIDE INTERLOCK

    1 29-S-000& LOADNG ! RETURN ARM ESD ACTIVATED 29-PP-1#2-1101!02 PKG 1 T T

    2 29-HS-0009 ERC MANUALLY ACTIVATED 29-PP-1#2-1101 PKG T T

    3 29-PAL-0006A

    " 29-A-0010

    #

    6 29-PAL-001&A

    %

    NOTES

    S 1001

    S 1001

    NOTES