Case Study: Internal and External Refurbishment Refurbishing a listed building to tight timescale The Copsewood Trust Atherstone Campus formally the site of The Queen Elizabeth Secondary School in Warwickshire, required complete refurbishment of the three-storey Grade III listed building with bell tower. One of the greatest challenges was to restore the original look of the school buildings, which included essential timber repairs and re-painting of the rooftop bell tower, which had to be accessed by a bespoke scaffolding system. A full range of Zenith Contract Services Limited were contracted to include: minor works design and build for classrooms, washrooms and communal areas, general glazing repairs to the metal casement windows, new resin flooring for shower and change rooms, carpentry, rendering & plastering and finally complimented by internal and external painting and decorating. The school’s gymnasium also required need a tough durable paint product, so Johnstone’s PPG Technical Services department recommended their anti-graffiti product which has very good mark - resistant and washable properties. Client: Copsewood Educational Trust Project: Listed Building Refurbishment Contract period: 3 Months Further images are featured on the following page. Before Before Before Works carried out Painting & decorating (internal & external) Glazing Carpentry repairs Room partitioning New sanitaryware Restoration of radiators and handrails
3

Case Study: Zenith Refitment Extending the car park at ...

Jun 01, 2022

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Case Study: Zenith Refitment Extending the car park at ...

Case Study: Internal and External Refurbishment

Refurbishing a listed building to tight timescale

The Copsewood Trust Atherstone Campus formally the site of The Queen Elizabeth Secondary School in Warwickshire, required complete refurbishment of the three-storey Grade III listed building with bell tower.

One of the greatest challenges was to restore the original look of the school buildings, which included essential timber repairs and re-painting of the rooftop bell tower, which had to be accessed by a bespoke scaffolding system.

A full range of Zenith Contract Services Limited were contracted to include: minor works design and build for classrooms, washrooms and communal areas, general glazing repairs to the metal casement windows, new resin flooring for shower and change rooms, carpentry, rendering & plastering and finally complimented by internal and external painting and decorating.

The school’s gymnasium also required need a tough durable paint product, so Johnstone’s PPG Technical Services department recommended their anti-graffiti product which has very good mark - resistant and washable properties.

Client: Copsewood Educational Trust

Project: Listed Building Refurbishment

Contract period: 3 Months

Further images are featured on the following page.

Before

Before

Before

Works carried outPainting & decorating (internal & external)GlazingCarpentry repairsRoom partitioningNew sanitarywareRestoration of radiators and handrails

Page 2: Case Study: Zenith Refitment Extending the car park at ...

With completion required for the beginning of the next school year, the project had tight timescales with Zenith increasing their workforce in order to accommodate. The tight deadline has also entailed working on site alongside other contractors.

After

AfterAfter

After

ContactFor more information, please call us on 024 7668 7167 or email [email protected]

Page 3: Case Study: Zenith Refitment Extending the car park at ...

After

After

After

Unit 4, 205 Torrington Avenue, Coventry, CV4 9UT

T: 024 7668 7167 E: [email protected]