Case Study: Internal and External Refurbishment Refurbishing a listed building to tight timescale The Copsewood Trust Atherstone Campus formally the site of The Queen Elizabeth Secondary School in Warwickshire, required complete refurbishment of the three-storey Grade III listed building with bell tower. One of the greatest challenges was to restore the original look of the school buildings, which included essential timber repairs and re-painting of the rooftop bell tower, which had to be accessed by a bespoke scaffolding system. A full range of Zenith Contract Services Limited were contracted to include: minor works design and build for classrooms, washrooms and communal areas, general glazing repairs to the metal casement windows, new resin flooring for shower and change rooms, carpentry, rendering & plastering and finally complimented by internal and external painting and decorating. The school’s gymnasium also required need a tough durable paint product, so Johnstone’s PPG Technical Services department recommended their anti-graffiti product which has very good mark - resistant and washable properties. Client: Copsewood Educational Trust Project: Listed Building Refurbishment Contract period: 3 Months Further images are featured on the following page. Before Before Before Works carried out Painting & decorating (internal & external) Glazing Carpentry repairs Room partitioning New sanitaryware Restoration of radiators and handrails