Owner Tanjung Bin Energy Issuer Bhd. Client Mudajaya Corporation Berhad Chimney EPC Contractor Zelan BEC Consortium Lining System Pennguard Borosilicate Block Lining System Project Participants Challenges Significantly tapered external windshield design with off-centered single flue. Constructed on reclaimed land. Large 10.5m ID internal steel flue. Detail of work by BEC BEC was awarded the Design & Build package for the chimney, including pile cap, slipform, heavy lifting of roof, floors and flue, installation of internal rack and pinion hoist, AWLs, internal lighting, lightning conductor, earthing works and Pennguard borosilicate block protection lining system to the inside face of the flue. But the steel structural were fabricated by Zelan and installed by BEC. Tanjung Bin 4 Project Tanjung Bin Energy Issuer Berhad has a proposed 1 x 1000-megawatt (MW) coal-fired power plant for construction in Negeri Johor Darul Takzim, The new 1000 MW base load power facility will provide a reliable power source to the Malaysia community. . Tanjung Bin Energy Issuer Berhad was constructing a 1000-megawatt coal-fired power plant in Negeri Johor Darul Takzim , Malaysia. Mudajaya Corporation Berhad was the main EPC contractor for this project. TANJUNG BIN 4 PROJECT CASE STUDY TANJUNG BIN 4 PROJECT BEC Group of Companies c/o 18 Boon Lay Way #10-159/162 TradeHub 21 Singapore 609966 Tel: +65 6778 6858 Fax: +(65) 6690 9259 Website: www.be-con.com Email: [email protected]