© Developing Environmental Law Champions, Train-the-Trainers (TTT) Program 2016. All rights reserved by ADB and IUCNAEL. STRENGTHENING CAPACITY FOR ENVIRONMENTAL LAW IN THE ASIA-PACIFIC: DEVELOPING ENVIRONMENTAL CHAMPIONS Putrajaya, 9 th – 13 th May, 2016 Case study on the Bakun Dam, Malaysia Presented by Hanim Kamaruddin, 1 LH Lye, APCEL, NUS
14

Case study on the Bakun Dam, Malaysia

Feb 26, 2022

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Case study on the Bakun Dam, Malaysia

©DevelopingEnvironmentalLawChampions,Train-the-Trainers(TTT)Program2016.AllrightsreservedbyADBandIUCNAEL.

STRENGTHENINGCAPACITYFORENVIRONMENTALLAWINTHEASIA-PACIFIC:DEVELOPINGENVIRONMENTALCHAMPIONSPutrajaya,9th – 13th May,2016

CasestudyontheBakunDam,Malaysia

PresentedbyHanimKamaruddin,

1LHLye,APCEL,NUS

Page 2: Case study on the Bakun Dam, Malaysia

©DevelopingEnvironmentalLawChampions,Train-the-Trainers(TTT)Program2016.AllrightsreservedbyADBandIUCNAEL.

TheBakun Dam,Sarawak,EastMalaysiaPurposeofthiscasestudy- toexamine:

- applicationofEIAlaws- conflictsbetweenfederalandstatejurisdiction- publicparticipationandrightsofindigenouspeoples- thedevelopmentvsconservationdilemma- goodgovernance

Materialstobestudied:- backgroundinformation– seehttp://www.internationalrivers.org/campaigns/bakun-dam- KajingTubekvEkranBhdcase(HighCourt&CourtofAppealdecisions)-

2LHLye,APCEL,NUS

Page 3: Case study on the Bakun Dam, Malaysia

©DevelopingEnvironmentalLawChampions,Train-the-Trainers(TTT)Program2016.AllrightsreservedbyADBandIUCNAEL.

TheBakun Dam

3LHLye,APCEL,NUS

Page 4: Case study on the Bakun Dam, Malaysia

©DevelopingEnvironmentalLawChampions,Train-the-Trainers(TTT)Program2016.AllrightsreservedbyADBandIUCNAEL.

Bakun Dam,Sarawak• TheconstructionoftheRM15billiondamisthemostexpensiveprivatized

projectinMalaysiatodate.• 207metreshighand300metreswide,floodinganareaof700sqkm,the

sizeofSingapore– BakunisthelargesthydroelectricdamprojectinSoutheastAsia&thesecondtallestdamintheworld.

• 10,000indigenouspeoplesfromvariousethnicgroupswillbeuprootedfromtheirancestrallands.

• Projectwasproposedin1970s,shelvedin1990s• 1994:awardofprojecttoSarawaktimbertycoon’scompany,Ekran

Berhad;althoughneitherhenorhiscompanyhadbuiltadambefore• Singledam,generating2400MW,cost$7billionCanadian,RM13.6Billion• IntendedtosupplypowertomainlandMalaysiaviaunderseacables

4LHLye,APCEL,NUS

Page 5: Case study on the Bakun Dam, Malaysia

©DevelopingEnvironmentalLawChampions,Train-the-Trainers(TTT)Program2016.AllrightsreservedbyADBandIUCNAEL.

Controversies• EIAswerebrokeninto4parts(reservoir,dam,transmissionlines,

underseacable),sothateachcomponentcouldbeseparatelyapproved.• First3partswerenotreleasedtothepublic(FebtoApril1995)• FinallyreleasedinMay1995- CritiqueofBakunEIAbyIRN:

- failedtoexplainwhythedamwasneeded- failedtoadequatelyconsiderthe‘nodam’alternatives,othersourcesofenergy- didnotevaluatelongtermimpacts,orinteractionsbetweendifferentimpactsegeffectofwaterqualityonfisheries- didnotadequatelyestimatelifespanofproject- technicalworriesre:cablesthatdeliverpowertomainland:howlongthesewilllast,howmuchtheycost,howmuchpowerwillbelosttravellingthroughthecableetc.

5LHLye,APCEL,NUS

Page 6: Case study on the Bakun Dam, Malaysia

©DevelopingEnvironmentalLawChampions,Train-the-Trainers(TTT)Program2016.AllrightsreservedbyADBandIUCNAEL.

KajingTubek v.EkranBhd&Ors [1996]HighCourt

• June1995Actionby3nativessuingEkranBerhad,DirectorGeneralofEnvironmentalQualityandGovtofMalaysia,claimingbreachofthe1974EnvironmentalQualityAct(EQA)inthattheEIAswerenotmadeavailabletothepublicandtheywerethusdeprivedofopportunitytocommentontheproposal.

• Federallaws- EQAs.34AandEnvironmentalQuality(PrescribedActivities)(EIA)Order1987requiredEIAforlargedamprojects.

• SarawakNaturalResourcesOrdinance1949requiredEIAtobesubmittedtoSarawakNaturalResourceBoardforreview.

• 1994SarawakstategovtpassedNaturalResources&EnvironmentOrder(PrescribedActivities)Orderlistingdamprojectsasprescribedactivities

6LHLye,APCEL,NUS

Page 7: Case study on the Bakun Dam, Malaysia

©DevelopingEnvironmentalLawChampions,Train-the-Trainers(TTT)Program2016.AllrightsreservedbyADBandIUCNAEL.

Kajing Tubek v.Ekran Bhd &Ors [1996]HighCourt(contd)

• 27March1995,Ministerde-prescribedlistofactivitiesrequiringEIAsfromEQAinrelationtotheStateofSarawak,gazettedon20April1995.

• 5July1995– SarawakOrderenacted- theprescribedactivitiesunderEQAshallnotapplytoSarawak;toberetrospectiveasfrom1st Sept.94.

• Deftsarguedinteralia:the3plaintiffshadnolocusstandiastheyhadnotsufferedanyspecificordirectdamagewhichwasdifferentfromothermembersofthepublic.

• HeldbyHighCourt(JamesFoongJ)(1)UndertheGuidelines,allowingforpublicparticipationre:theEIAwasmandatory,commentingbythepublicwasthusaright;(2)plaintiffshadlocusstandiasdestructionoftheforestswoulduprootandimmenselyaffecttheirlives;AmendmentOrderforSarawakwasinvalid.

7LHLye,APCEL,NUS

Page 8: Case study on the Bakun Dam, Malaysia

©DevelopingEnvironmentalLawChampions,Train-the-Trainers(TTT)Program2016.AllrightsreservedbyADBandIUCNAEL.

Relocationofindigenoustribes

• ManySarawaknativeshavebeenrelocatedtoalonghousesettlementnamedSungaiAsapinBakun.Mostofthemweresubsistencefarmers.Eachfamilywaspromised3acresoflandbutmanyfamiliesstillhavenotbeencompensated.

• Basiccommunityproblemsfacedbydisplacedindigenouspeoplesuchasthelackoflandareasforfarmingandhunting,lackofeducational,medical,andtransportfacilities

• Watersarecontaminatedbyindustrialactivitiesnearby• Watersalsodamagedbyrottingtimber&vegetationthatfell

intothewaterswithdestructionoftheprimaryforests,foulsmellpervades

8LHLye,APCEL,NUS

Page 9: Case study on the Bakun Dam, Malaysia

©DevelopingEnvironmentalLawChampions,Train-the-Trainers(TTT)Program2016.AllrightsreservedbyADBandIUCNAEL.

DecisionofCourtofAppeal• DeputyPMAnwarIbrahimstatedthatthepreliminaryworkonBakuncan

goonasplanned,despitetheHighCourt’sdecision,asthecourtrulingwasontechnicalprocedures;ithadnotdirectedthatworkbestopped.DecisionwhethertostopworkorproceedlieswithEkran.

• Onappeal:18Feb1997- CourtofAppealheld:StateofSarawakhadexclusivejurisdictionoveritslands,Sarawakhaditsownenvironmentallaws;FederalConstitutionplaceslandasasubjectundertheStateslist.SincetheprojectrelatedtolandandriverwithinSarawak,itwastheSarawaklawandnotFederalEQAthatapplied.

• Plaintiffsonlyhadthresholdlocusstandi,butnotsubstantivelocusstandi,notrepresentativeincharacter(thiswasnotaclassaction),theyhadsufferednospecialinjury.

• HighCthadfailedtoconsiderthepublicandnationalinterestsinvolved.• Coststobebornebybothparties,asnativeswere“confused”bythelaws.

9LHLye,APCEL,NUS

Page 10: Case study on the Bakun Dam, Malaysia

©DevelopingEnvironmentalLawChampions,Train-the-Trainers(TTT)Program2016.AllrightsreservedbyADBandIUCNAEL.

SuspensionandRevivalofProject• 1997projectsuspended– economiccrisis• March2001– MalaysianFinanceMinisterannouncesthattheDamwill

proceed,onthesamescale,withacapacityof2,400megawattsbutwithoutcableslinkingittothemainlandpeninsula.

• ThiswillresultinascalingdownofcostsfromRM13.5billiontoRM9billion.

• ThedamwouldsupplyelectricitytoSarawak,Sabah,BruneiandpossiblyKalimantaninIndonesia.

• Fundingwouldbetappedfrominternationalsources.• Meanwhile– critiquebySwissactivistBrunoManser(forthePenans,an

indigenoustribe),seerepliesfromMalaysianPMDrMahathir“ThePenandTheSaw”.ManserdisappearedinFeb2000andwaslaterdeclareddead.

10LHLye,APCEL,NUS

Page 11: Case study on the Bakun Dam, Malaysia

©DevelopingEnvironmentalLawChampions,Train-the-Trainers(TTT)Program2016.AllrightsreservedbyADBandIUCNAEL.

Evaluation• TheDamisnowcompleted• Therearereportsitisunsafe,asChinesecontractorsadmittedcuttingcorners,

mixedcementwithwater,poorqualitycontrol,lackofinspections• Q– whowillbuytheelectricity?Aluminium&otherhighlypollutivecompanies• “ThetotaldemandforelectricityinSarawakisonly500megawattsannually,and

thestatealreadygenerates700megawattsannually,sothereisexcessdemand”perDrKuaKiaSoong,spokesmanforConcernedGroupsforBakun.(1995)

• Damnowhas8turbines,eachgenerating300megawattsofpowerbutreporton1Jan2014saysonly6unitsinoperation,eachgeneratinghalfload(150mgw)=900megawatts.

• Sarawakhasannounceditwillbebuilding12newdams!• http://www.sarawakreport.org/2014/01/bakun-turbines-running-at-just-50-

capacity-exclusive/• TransparencyInternationalincludesBakunDaminits'Monumentsofcorruption'

GlobalCorruptionReport2005.

11LHLye,APCEL,NUS

Page 12: Case study on the Bakun Dam, Malaysia

©DevelopingEnvironmentalLawChampions,Train-the-Trainers(TTT)Program2016.AllrightsreservedbyADBandIUCNAEL.

RevivalofsubmarinecablestosupplyenergytoWestMalaysia

• Theproposedconceptisfor2x800MWcablesbeinglaidabout660 kmundertheSouthChinaSea fromtheSarawakshoretoYongPengonPeninsularMalaysia

• Thecableisplannedtotransport1600MWofpowerfromtheBakunDamtoYongPeng,Johor[40] viaunderseaHVDCpowercablesandthenvialandlineontotheMalaysianNationalGrid.

• TheuseofHVDCcableswouldensuretheenergylossisminimal,atabout5%to6%only.

• ThecostoftheunderseacableisestimatedatRM9billion.

12LHLye,APCEL,NUS

Page 13: Case study on the Bakun Dam, Malaysia

©DevelopingEnvironmentalLawChampions,Train-the-Trainers(TTT)Program2016.AllrightsreservedbyADBandIUCNAEL.

Questions• Whatlessonscanbelearntfromthiscasestudy?• Shoulddamprojectsbeundertaken?Ifso,howbestshould

theyberegulated?Whatsafeguardsshouldtherebe?• Havetherightsofindigenouspeoplesbeenviolatedinthis

case?Whatrightsdotheyhave?• Howcanthelawspromotebettergovernance?Whatlaws

wouldyoucraft?• Giveargumentsfor/againsttheDam– representing(a)the

government(b)thetribes(c)conservationgroups

13LHLye,APCEL,NUS

Page 14: Case study on the Bakun Dam, Malaysia

©DevelopingEnvironmentalLawChampions,Train-the-Trainers(TTT)Program2016.AllrightsreservedbyADBandIUCNAEL.

References• ChanWingCheong“EnvironmentalProtectioninMalaysia–

LessonsfromtheBakunHydroelectricprojectlitigation[1998]• http://www.internationalrivers.org/campaigns/bakun-dam• http://www.cleanbiz.asia/news/sarawaks-bakun-raises-

development-corruption-questions• Sevensinsofdambuilding

http://www.wwf.eu/?207987/7-sins-of-dams• ToDamorNottoDam?

http://d2ouvy59p0dg6k.cloudfront.net/downloads/2045.pdf• OfficialPortalministryofNaturalResourcesandEnvironment

www.nre.gov.my• DepartmentofEnvironmentMalaysia www.doe.gov.my

14LHLye,APCEL,NUS