Top Banner
1 Local, State & Federal Resources to Redevelop Blighted Properties Workshop October 2, 2014 (CASE STUDY)
21

(CASE STUDY) - Ohio EPAepa.ohio.gov/portals/30/sabr/docs/a_training/canton... · 2014-10-06 · (CASE STUDY) Cuyahoga River Corridor Brownfield Area 2 . Cuyahoga River Corridor Brownfield

Jun 19, 2018

Download

Documents

lyanh
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: (CASE STUDY) - Ohio EPAepa.ohio.gov/portals/30/sabr/docs/a_training/canton... · 2014-10-06 · (CASE STUDY) Cuyahoga River Corridor Brownfield Area 2 . Cuyahoga River Corridor Brownfield

1

Local, State & Federal Resources to Redevelop Blighted Properties Workshop

October 2, 2014

(CASE STUDY)

Page 2: (CASE STUDY) - Ohio EPAepa.ohio.gov/portals/30/sabr/docs/a_training/canton... · 2014-10-06 · (CASE STUDY) Cuyahoga River Corridor Brownfield Area 2 . Cuyahoga River Corridor Brownfield

Cuyahoga River Corridor Brownfield Area 2

Page 3: (CASE STUDY) - Ohio EPAepa.ohio.gov/portals/30/sabr/docs/a_training/canton... · 2014-10-06 · (CASE STUDY) Cuyahoga River Corridor Brownfield Area 2 . Cuyahoga River Corridor Brownfield

Cuyahoga River Corridor Brownfield Area

Negatives

Older industrial area with potential

environmental issues

Outdated industrial buildings that

did not appeal to modern

industrial users

Dilapidated parking lots

Lack of new investment (other

than Sheraton Suites Hotel)

Dated Industrial zoning

Positives

Adjacent to Route 8

Adjacent to Cuyahoga River and Gorge Park

Near Downtown Akron and University of Akron

Sheraton Suited Hotel

Available buildings and land

Existing low rate utilities

Walkable area with available public transportation

Underutilized parking lots that could be used for new development

3

Page 4: (CASE STUDY) - Ohio EPAepa.ohio.gov/portals/30/sabr/docs/a_training/canton... · 2014-10-06 · (CASE STUDY) Cuyahoga River Corridor Brownfield Area 2 . Cuyahoga River Corridor Brownfield

Cuyahoga River Corridor Brownfield Area

US EPA Pilot Assessment Grant

$200,000 US EPA Pilot Assessment

Grant (2003-2005)

Areawide Phase I and II

Environmental Assessments

Corridor Master Plan (Farr

Associates)

Cuyahoga Falls General

Development Plan & Code

$140,000 Master Plan/Code

Revisions (2003-2005)

Ward Charettes (Planning)

Created a Mixed-Use (MU-5)

Zoning District for the Corridor –

General Development Code

(Gould Evans)

4

Page 5: (CASE STUDY) - Ohio EPAepa.ohio.gov/portals/30/sabr/docs/a_training/canton... · 2014-10-06 · (CASE STUDY) Cuyahoga River Corridor Brownfield Area 2 . Cuyahoga River Corridor Brownfield

2004 Land Use Goals

Establish a new mixed-use

neighborhood.

Limit commercial use to mixed-use

structures

Create 500 to 1,000 new residential units

that includes condominiums, loft

apartments and town homes

Make the district more pedestrian friendly

and make the Cuyahoga River more

accessible to the district and adjacent

neighborhoods

Establish a new mixed-use zoning

classifications that promotes the three

crucial building patterns of an urban

village (build to the street, parking

behind the building and make the street

front permeable)

5

Page 6: (CASE STUDY) - Ohio EPAepa.ohio.gov/portals/30/sabr/docs/a_training/canton... · 2014-10-06 · (CASE STUDY) Cuyahoga River Corridor Brownfield Area 2 . Cuyahoga River Corridor Brownfield

6

Page 7: (CASE STUDY) - Ohio EPAepa.ohio.gov/portals/30/sabr/docs/a_training/canton... · 2014-10-06 · (CASE STUDY) Cuyahoga River Corridor Brownfield Area 2 . Cuyahoga River Corridor Brownfield

Targeted Areas

Contamination

Master Plan

Land Availability

Important Structures

7

Page 8: (CASE STUDY) - Ohio EPAepa.ohio.gov/portals/30/sabr/docs/a_training/canton... · 2014-10-06 · (CASE STUDY) Cuyahoga River Corridor Brownfield Area 2 . Cuyahoga River Corridor Brownfield

Highbridge Glens Brownfield Area

8

Page 9: (CASE STUDY) - Ohio EPAepa.ohio.gov/portals/30/sabr/docs/a_training/canton... · 2014-10-06 · (CASE STUDY) Cuyahoga River Corridor Brownfield Area 2 . Cuyahoga River Corridor Brownfield

9 2.8 million Clean Ohio Brownfield Redevelopment

Grant-High Bridge Glens Grant (2007-2011) – The

State of Ohio provided funding for groundwater

and soil remediation, asbestos removal,

acquisition and demolition of four industrial

buildings.

1.2 million High Bridge Glens Park (2007-2009) – City

and State funds created this one-acre park that

includes an overlook bridge and boardwalk into

the gorge.

$500,000 New Prospect Avenue (2009-2011) – City

CDBG funds were used to construct a new street

between Front Street and Second Street, across

from the High Bridge Glens Park. This new street

allows residents better access to the High Bridge

Glens Park and better access to the new

Watermark building.

10 million Watermark Mixed-Use Buildings (2010-

2012) – The Testa Companies constructed a new

mixed-use building, across the street from the High

Bridge Glens Park. The four-story building includes

44 senior apartments, 12 market rate condos and

9,000 square feet of ground floor commercial

space. Developed with private financing, housing

tax credits, property tax abatement and CDBG-

Recovery funds.

Page 10: (CASE STUDY) - Ohio EPAepa.ohio.gov/portals/30/sabr/docs/a_training/canton... · 2014-10-06 · (CASE STUDY) Cuyahoga River Corridor Brownfield Area 2 . Cuyahoga River Corridor Brownfield

Highbridge Glens Brownfield Area

10

Watermark

Prospect

Ave.

Highbridge Glen Park

Page 11: (CASE STUDY) - Ohio EPAepa.ohio.gov/portals/30/sabr/docs/a_training/canton... · 2014-10-06 · (CASE STUDY) Cuyahoga River Corridor Brownfield Area 2 . Cuyahoga River Corridor Brownfield

11

Triad

Trailhead/Parking Lot

Chestnut Trailhead-Gorge Terrace Brownfield Area

Page 12: (CASE STUDY) - Ohio EPAepa.ohio.gov/portals/30/sabr/docs/a_training/canton... · 2014-10-06 · (CASE STUDY) Cuyahoga River Corridor Brownfield Area 2 . Cuyahoga River Corridor Brownfield

Triad

Communications

Next Level

Interactive

1701 S. Front Street

Phase I & II Assessments -- $22,876

(NEFCO/US EPA)

Clean-Up -- $35,000 (CDBG)

Certified Local Government

Status/Local Landmark Designation

-- $25,000 (CDBG)

Soft Cost Loan -- $20,000 (CDBG)

Ohio Historic Tax Credits -- $240,000

Private Investment -- $1,000,000

12

Page 13: (CASE STUDY) - Ohio EPAepa.ohio.gov/portals/30/sabr/docs/a_training/canton... · 2014-10-06 · (CASE STUDY) Cuyahoga River Corridor Brownfield Area 2 . Cuyahoga River Corridor Brownfield

Chestnut Trailhead

& Parking Lot

1659 S. Front Street

Acquisition -- $138,000 (CF CIC)

Environmental Assessments -- $22,876 (NEFCO/US EPA)

Clean-Up & Demolition -- $43,350 (CDBG)

Design/Engineering -- $25,000

Construction -- $475,000 (CDBG)

13

Page 14: (CASE STUDY) - Ohio EPAepa.ohio.gov/portals/30/sabr/docs/a_training/canton... · 2014-10-06 · (CASE STUDY) Cuyahoga River Corridor Brownfield Area 2 . Cuyahoga River Corridor Brownfield

Chestnut Trailhead-Gorge Terrace Brownfield Area

14

Page 15: (CASE STUDY) - Ohio EPAepa.ohio.gov/portals/30/sabr/docs/a_training/canton... · 2014-10-06 · (CASE STUDY) Cuyahoga River Corridor Brownfield Area 2 . Cuyahoga River Corridor Brownfield

Riverwalk Mixed-Use Development

15

Riverwalk

Page 16: (CASE STUDY) - Ohio EPAepa.ohio.gov/portals/30/sabr/docs/a_training/canton... · 2014-10-06 · (CASE STUDY) Cuyahoga River Corridor Brownfield Area 2 . Cuyahoga River Corridor Brownfield

Proposed Riverwalk

Development (Testa

Companies)

1745-1783 S. Front Street

Acquisition Assistance -- $160,000 (CORF)

Environmental Assessments -- $22,3007 (NEFCO/ US EPA)

Clean-up & Demolition -- $52,000 (CDBG) $50,000 (CORF)

Private Financing -- $10,300,000

Community Reinvestment Tax Abatement -- 50%/15 years

16

Page 17: (CASE STUDY) - Ohio EPAepa.ohio.gov/portals/30/sabr/docs/a_training/canton... · 2014-10-06 · (CASE STUDY) Cuyahoga River Corridor Brownfield Area 2 . Cuyahoga River Corridor Brownfield

Riverwalk

17

Page 18: (CASE STUDY) - Ohio EPAepa.ohio.gov/portals/30/sabr/docs/a_training/canton... · 2014-10-06 · (CASE STUDY) Cuyahoga River Corridor Brownfield Area 2 . Cuyahoga River Corridor Brownfield

Projects in the Planning Stages

1734 S. Front Street 1620 -1710 S. Front Street

18

Page 19: (CASE STUDY) - Ohio EPAepa.ohio.gov/portals/30/sabr/docs/a_training/canton... · 2014-10-06 · (CASE STUDY) Cuyahoga River Corridor Brownfield Area 2 . Cuyahoga River Corridor Brownfield

Process by Activity

Planning

Pre-Construction

Redevelopment

19

Page 20: (CASE STUDY) - Ohio EPAepa.ohio.gov/portals/30/sabr/docs/a_training/canton... · 2014-10-06 · (CASE STUDY) Cuyahoga River Corridor Brownfield Area 2 . Cuyahoga River Corridor Brownfield

Process by Sources of Funds

Environmental Studies and Land

Use Planning

Acquisition, Clean-up & Demolition

New Construction & Rehabilitation

20

Page 21: (CASE STUDY) - Ohio EPAepa.ohio.gov/portals/30/sabr/docs/a_training/canton... · 2014-10-06 · (CASE STUDY) Cuyahoga River Corridor Brownfield Area 2 . Cuyahoga River Corridor Brownfield

Thank You

Fred Guerra, AICP Planning Director City of Cuyahoga Falls 2310 Second Street Cuyahoga Falls, Ohio 44221 330-971-8136 [email protected]

21