Case Study Westminster Lodge Leisure Centre
Case Study
Westminster Lodge Leisure Centre
CaseStudy-WestminsterLodge.indd 1 18/03/2013 15:27:29
Testimonial
“Staff are always willing and helpful.Deliveries are 99.9% on time.”
Linda Stanford — BuyerT R Freeman Ltd
Name of sub-contractor: T R Freeman Ltd
Name of main contractor: Willmott Dixon Construction Ltd
Architect: S & P Architects Ltd
Application: Flat roofi ng and wall cladding
Geographical area/Town/Road: St Albans
Building use: Leisure centre
Global Tube Washers Global Fasteners
DrillFast Standard DrillFast Stainless
DrillFast Low Profi le DrillFast for Timber
Rivets Sealant
Products for General Construction
Case Study
Westminster Lodge Leisure Centre
This bright, contemporary and modern centre offers everything that could be expected in a sports complex, replacing an old centre for the residents of St Albans and providing the latest equipment in a dedicated new building.
T R Freeman Ltd made full use of Fixfast’s wide product range for this work. Specialist fasteners for fl at roofi ng, cladding and timber to metal, rivets, sealant and more were all supplied to the job’s schedule, plus of course the usual urgent problem-solving deliveries on demand. DrillFast Standard DrillFast Stainless
DrillFast Low Profi le DrillFast for Timber
Rivets SealantRivets Sealant
... and more
Type of Fixfast products supplied:
CaseStudy-WestminsterLodge.indd 2-3 18/03/2013 15:27:48
FIXFAST
Merlin House
Seven Mile Lane
Borough Green
Sevenoaks
Kent
TN15 8QY
Enquiries0845 450 7483
Orderline0500 553 222
International+44 (0) 1732 882 387
Fax0845 450 7486
www.fixfast.com
CaseStudy-WestminsterLodge.indd 4 18/03/2013 15:27:48