Top Banner
Expo Technologies Purge and Pressurization Enclosure
11

Case study ethylene pilot plant

Apr 13, 2017

Download

Engineering

Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Case study ethylene pilot plant

Expo Technologies

Purge and Pressurization Enclosure

Page 2: Case study ethylene pilot plant

Case Study:Ethylene Pilot Plant

Page 3: Case study ethylene pilot plant

www.expoworldwide.comPurge + Pressurization + Innovation

Watch the Expo Technologies team in action. • This time-lapse video demonstrates weeks of work in just

2 minutes

Page 4: Case study ethylene pilot plant

www.expoworldwide.comPurge + Pressurization + Innovation

Client• Our client is a major producer of fine and speciality

chemicals in Germany

Our Experience

Page 5: Case study ethylene pilot plant

www.expoworldwide.comPurge + Pressurization + Innovation

Equipment• A small scale ethylene pilot plant purged with nitrogen

within the company’s factory premises

Page 6: Case study ethylene pilot plant

www.expoworldwide.comPurge + Pressurization + Innovation

The Challenge• To design a purge and pressurization enclosure to house the

ethylene pilot plant• To build an enclosure that could be dissembled to fit through

factory doors and re-assembled in a Zone 2 hazardous area

Our Experience

Page 7: Case study ethylene pilot plant

www.expoworldwide.comPurge + Pressurization + Innovation

The Solution• The purge and pressurized enclosure was designed to

separate into 2 parts, so that it could pass through the factory doors

• The purge system was tailor-made for the enclosure and included features such as:

• Over-sized valves to accommodate low-pressure supply• Automatic change-over of purge gas to a secondary supply• A 2 hour purge timer

Page 8: Case study ethylene pilot plant

www.expoworldwide.comPurge + Pressurization + Innovation

The Solution• Additional features included:

• Internal heat exchanger • Reactor vessel, which operates at 600 DegC and 300 bar

• In the event of any rupture or major process line failure, the reactor vessel is protected by a N2 blowdown system

Page 9: Case study ethylene pilot plant

www.expoworldwide.comPurge + Pressurization + Innovation

Customer Benefits

• A custom designed system with enhanced safety features

• These safety features allows the client to produce ethylene in a laboratory environment within a Zone 2 hazardous area

Design• The Expo Technologies team used:

• More than 80 sheets of technical drawings in the design of the system

• Parts included:• 52 door locks• 276 stainless steel bosses • 40m of door seal gasket• 26mm thick laminated glass windows

Page 10: Case study ethylene pilot plant

www.expoworldwide.comPurge + Pressurization + Innovation

Page 11: Case study ethylene pilot plant

www.expoworldwide.comPurge + Pressurization + Innovation