Top Banner
Case Study - DRAX Ecostore Biomass Conversion Kingfisher were sub contracted the project worth a circa of £3m, to manufacture and install the dust emmision system and pneumatic trans- fer lines on the Drax Biomass Ecostore Project. Project included a full turnkey service provision consisting of: Design and fabrication of wear resistant pneumatic conveying system, bridges, trestles & extraction ducting Confined space working Onsite assembly of access platforms Erection of gantries, bridges, trestles & pipe work Kingfisher can undertake a 100% supply and erection of steel structures, fabrication , pipe work both (lined and unlined) utilising our owninternal resources and have demonstrated this at U.K. power stations over the last 20 years. Fully qualified to fabricate and manufacture steel structure’s to both ISO 3834 - 2 & ISO 1090 - 1 Protecting Industry Worldwide www.kingfisher-industrial.com
1

Case Study - DRAX Ecostore Biomass Conversion - Kingfisher · Case Study - DRAX Ecostore Biomass Conversion Kingfisher were sub contracted the project worth a circa of £3m, to manufacture

Apr 25, 2020

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Case Study - DRAX Ecostore Biomass Conversion - Kingfisher · Case Study - DRAX Ecostore Biomass Conversion Kingfisher were sub contracted the project worth a circa of £3m, to manufacture

Case Study - DRAX Ecostore Biomass Conversion

Kingfisher were sub contracted the project worth a circa of £3m, to manufacture and install the dust emmision system and pneumatic trans-fer lines on the Drax Biomass Ecostore Project.Project included a full turnkey service provision consisting of:

Design and fabrication of wear resistant • pneumatic conveying system, bridges, trestles & extraction ducting

Confined space working• Onsite assembly of access platforms• Erection of gantries, bridges, trestles & pipe work•

Kingfisher can undertake a 100% supply and erection of steel structures, fabrication , pipe work both (lined and unlined) utilising our owninternal resources and have demonstrated this at U.K. power stations over the last 20 years.

Fully qualified to fabricate and manufacture steel structure’s to both ISO 3834 - 2 & ISO 1090 - 1