DESIGNING FOR PERFORMANCE FAY SCHOOL BOARDING DORMS !"#$% ’ $( The S / L / A / M Collaborative
36

Case Study: Designing for Performance at Fay School

May 19, 2015

Download

Real Estate

The impact of the green building movement will largely be determined by the next generation of building professionals. Pinck & Co. presents a case study on Fay School’s new LEED Gold dormitories, emphasizing the role that students and teachers have on the operational performance and educational value of green buildings.

The new, village-style dorms feature the latest in environmental design principles, including the use of recycled or rapidly renewable materials, solar energy for heating water, and reuse of storm water runoff for landscaped plantings. The building used materials that came from within 500 miles of the site in order to reduce the use of fossil fuels.

The Fay School dormitories earned its LEED Gold rating for a variety of green features: the building’s landscaping and irrigation systems use water from a non-potable source; a storm-water management system significantly reduces storm water runoff; innovative waste water technologies that treat waste water on site; and low-flow fixtures reduce water use by more than 20 percent. The energy usage savings are 25 percent annually.

Fay School’s many green features serve a purpose beyond preserving the environment and promoting good student and teacher health. The creativity and collaboration of the school’s designers and faculty resulted in a school where eco-friendly design has opened up a new world of teaching opportunities. A measurement and monitoring system ensures the mechanical systems are performing as intended, and allows the students to compete on reducing energy use. The project team was: Fay School (Owner), Pinck & Co. (Project Manager), S/L/A/M Collaborative (Architect) and Erland Construction (Contractor).

1.5 AIA and GBCI CE are offered for attending this event. Refreshments will also be available. Learn more at http://www.nexusboston.org/news/casestudyroundtables.
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Case Study: Designing for Performance at Fay School

DESIGNING FOR PERFORMANCEFAY SCHOOL BOARDING DORMS

!"#$%&'&$(The S / L / A / MCollaborative

Page 2: Case Study: Designing for Performance at Fay School

FAY SCHOOL HISTORY

Southborough, MA

Founded in 1866, oldest junior boarding school in US

Situated on 30 acre main campus in the center of town

A balance of academics, social involvement, arts and athletics

Page 3: Case Study: Designing for Performance at Fay School

FEASIBILITY STUDY

Developed List of Concerns

Out of date health facility

Inadequate on-campus faculty housing

Out of date septic field

Improve campus entrance

Increase student population

Improve pedestrian circulation

Page 4: Case Study: Designing for Performance at Fay School

MASTER PLAN

Relocate wellness center to 1st floor of Steward Dormitory

Construct two new dormitories

Construct a new wastewater treatment facility to address septic issues

Relocate maintenance facility

Construct new Primary School

Renovate Lower School to accommodate additional students

Page 5: Case Study: Designing for Performance at Fay School

FAY SCHOOL DORMS

!

Two identical 10,000 SF dormitoriesEight rooms for sixteen students, three faculty apartments

Page 6: Case Study: Designing for Performance at Fay School

FAY SCHOOL DORMS

One female dorm & one male dorm Each dorm has a common living room with kitchen and shared bathrooms

Page 7: Case Study: Designing for Performance at Fay School

LEED CERTIFICATION

Certification: LEED Gold

LEED New Construction v2.2

Construction Completed: Spring 2009

Date Certified: Spring 2010

!

Page 8: Case Study: Designing for Performance at Fay School

SUSTAINABLE SITES

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

Page 9: Case Study: Designing for Performance at Fay School

SITE SELECTION

Page 10: Case Study: Designing for Performance at Fay School

DEVELOPMENT DENSITY & COMMUNITY CONNECTIVITY

Fay SchoolVillage Dorms

Southborough, MA

DevelopmentDensity & Community Connectivity

LEED SS Credit 2Option 2

98 Magazine StreetBoston MA 02119

T 617.445.3555F 617.445.3511

pinck-co.com

1

3

24

6

7 8

9

1011 12

13

14

15

16

17

18

19

20

1/2 MILE RADIUS

Fay School

Basic Services

5

Basic Service Number Name Address Distance Bank 1 Sovereign Bank 11 Main St .49 Miles

2 Marlborough Bank 6 E Main St .61 MilesPlaces of Worship 3 St. Mark’s Episcopal Church 27 Main St .21 Miles

4 Pilgrim Congregational Church 15 Common St .20 Miles5 Chapel of Cross 9 Cordaville Rd .34 Miles

Grocery 6 Culinary Underground 10 Hillside Ave .83 MilesDay Care 7 Kidsborough 9 Main St .5 MilesFlorist 8 English Garden Florists 1 E Main St .58 MilesCleaners 9 Super Cleaner & Tailor 14 Main St .45 Miles

10 Fabric Cleaners 3 Main St .56 MilesFire Department 11 Southborough Fire Department 21 Main St .37 MilesLibrary 12 Southborough Library 25 Main St .33 MilesSenior Care Facility 13 Southborough Senior Center 9 Cordaville Rd .34 MilesPharmacy 14 Walgreens Pharmacy 24 Newton St .84 MilesRestaurants 15 Southborough House of Pizza 5 Main St .54 Miles

16 Mauro’s Village Cafe 2 Main St .57 MilesSchools 17 Woodward Middle School 28 Cordaville Rd. .38 Miles

18 St. Mark’s School 25 Marlboro Rd .40 MilesCommunity Center 19 Community House 28 Main St .30 MilesMuseum 20 Historical Society’s Museum 25 Common St .17 Miles

Page 11: Case Study: Designing for Performance at Fay School

ALTERNATIVE TRANSPORTATIONLOW-EMITTING FUEL EFFICIENT

Signage

Special signage was created for credit compliance

Campus Wide Parking Plan

Generous amount of parking spaces were provided

for Low-emitting & fuel efficient vehicles

!"#$%#&!$!

'()*+(,-./0112-'(134/5

Page 12: Case Study: Designing for Performance at Fay School

WATER EFFICIENCY

!"#$%& '#%&() '#%&()*+",% -.($)/*!"#$%&! "#$%&'&$($&'! ")*+,$#-./0+1*$2)134/)5016 !& "#$%!'7 8119:)*0:+$")4*+;)*+,$<+/=19>960+4$ &! "#$%?'&$($?'! ")*+,$@4+$A+3B/*091 !

Page 13: Case Study: Designing for Performance at Fay School

INNOVATIVE WASTEWATER TECHNOLOGIES

Waste Water Treatment Facility

1,200 SF Facility located on site

100% Waste Water Treatment

20,000 gallons per day capacity

Earned 2 Points

WE Credit 2.0 & Innovation & Design Credit

Page 14: Case Study: Designing for Performance at Fay School

WATER EFFICIENT LANDSCAPE

Draught tolerant plants

All new landscaping included draught tolerant plantings

Bio-Retention Pond

Three Bio-retention ponds

One underground infiltration system

No stormwater drains directly from site

Page 15: Case Study: Designing for Performance at Fay School

ENERGY & ATMOSPHERE

!"#$%& '#%&() '#%&()*+",% -.($)/*!"#$%&! "#$%&'($) *+,-./',0.1$23//45543,4,6$37$08'$9+41-4,6$",'&6:$;:50'/5 <! "#$%&'($= >4,4/+/$",'&6:$%'&73&/.,?' <! "#$%&'($@ *+,-./',0.1$A'7&46'&.,0$>.,.6'/',0 <B "#$2)(< CD04/4E'$",'&6:$%'&73&/.,?' )<= "#$2=(< C,F;40'$A','G.H1'$",'&6: @) "#$2@(< ",8.,?'-$23//45543,4,6 )< "#$2B(< ",8.,?'-$A'7&46'&.,0$>.,.6'/',0 I30$#00'/D0'-) "#$2J(< >'.5+&'/',0$K$L'&4M?.043, )< "#$2N(< O&'',$%3G'& I30$#00'/D0'-

Page 16: Case Study: Designing for Performance at Fay School

ON SITE RENEWABLE ENERGY

Solar Thermal System

Provides 72% of the annual domestic water heating requirement

Photovoltaic Not Cost Effective in this application

Savings

Total $1400 dollars in gas consumption for the 09’-’10 winter season.

Page 17: Case Study: Designing for Performance at Fay School

!"#$%& '#%&() '#%&()*+",% -.($)/*!"#$%&! "#$%&'($) *+,&-.'$/$0,11'2+3,4$,5$#'2621-71'8 99 "#$0)()$:$)(; <=31>34.$#'=8' ?,+$@++'AB+'>9 "#$0)(C <=31>34.$#'=8'D$?,4$*+&=2+=&-1 ?,+$@++'AB+'>; "#$0;(9 0,48+&=2+3,4$E-8+'$"-4-.'A'4+ ;9 "#$0C(9 #'8,=&2'$#'=8' ?,+$@++'AB+'>; "#$0F(9 #'2621'>$0,4+'4+ ;; "#$0G(9 #'.3,4-1$"-+'&3-18 ;) "#$0H(9 #-B3>16$#'4'I-71'$"-+'&3-18 )9 "#$0J(9 0'&+3K'>$E,,> ?,+$@++'AB+'>

MATERIALS & RESOURCES

Page 18: Case Study: Designing for Performance at Fay School

STORAGE & COLLECTION OF RECYCLABLES

Student Run Program

Maintained and Run by Grade Students

Collection Locations

Each dorm has a separate collection area, centrally located

Campus Wide Recycling Program

Recycling program was implemented campus wide and added to Primary School

!"#$#%&'()*+%%"#,&+')-."/

Page 19: Case Study: Designing for Performance at Fay School

RECYCLED CONTENT, REGIONAL MATERIALS & RAPIDLY RENEWABLE

Recycled Content

A high percentage of all products and materials within the dorms contain recycled content. Products included: insulation, carpeting, fabrics, shingles, metal door & frames.

Regional Materials

Changed specified framing material to meet regional material requirements. Others materials included: drywall, insulation, asphalt pavement and concrete.

Rapidly Renewable

Bamboo flooring was used in the design throughout the dorm. Marmoleum and rubber flooring was also used for credit compliance.

Page 20: Case Study: Designing for Performance at Fay School

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

INDOOR ENVIRONMENT QUALITY

Page 21: Case Study: Designing for Performance at Fay School

CONSTRUCTION IAQ MANAGEMENT

Comprehensive Plan

Plan was developed with contractor & reviewed by each trade for specific requirements

Ductwork Protection & Monitoring

All ductwork was monitored for adequate protection, filters were added to all AHU equipment

PreOccupancy Flush-out

Testing was used in lieu of flush-out requirement

Page 22: Case Study: Designing for Performance at Fay School

INNOVATION & DESIGN

!"#$%& '#%&() '#%&()*+",% -.($)/*!"#$%&! "#$%!&! "''()*+,('$-$#./,0'1$"''()*+,).$2*/+.3*+.4$5.67'(8(0,./$$

!99:$2*/+.3*+.4$54.*+.;$<'=/,+.$!

! "#$%!&> "''()*+,('$-$#./,0'1$?@A8,6$B;@6*+,('$?4(04*C !! "#$%!&D "''()*+,('$-$#./,0'1$E4..'$%8.*','0$?4(04*C !! "#$%>&9 FBB#$G664.;,+.;$?4(H.//,('*8 !

Page 23: Case Study: Designing for Performance at Fay School

DAYLIGHT & VIEWS, 90% VIEWS

Clearstory glass in common rooms

Double hung windows

All dorm rooms have a minimum of three windows to allow ample daylight penetration

Page 24: Case Study: Designing for Performance at Fay School

PUBLIC EDUCATION PROGRAM

Implemented a system to monitor energy consumption within each floor of the dorms

Healthy competition now occurs between floors and between the boy’s and girl’s dorms

Information is accessible to teachers and is currently used by the science department in discussions about carbon footprint

Information is also accessible online to all of the fay community

Page 25: Case Study: Designing for Performance at Fay School

PUBLIC EDUCATION PROGRAM

Fay SchoolEngaging Students

• LEED Signage! Educational facts on display describing

‘green building features’

• Energy Display Panel! Web-based program integrated with the

Building Management System! Intra & Inter-Dorm Electrical Energy

Student CompetitionsStudent Competitions

Page 26: Case Study: Designing for Performance at Fay School

PUBLIC EDUCATION PROGRAM

Fay SchoolEngaging Students

Page 27: Case Study: Designing for Performance at Fay School

PUBLIC EDUCATION PROGRAM

Fay SchoolEngaging Students

Page 28: Case Study: Designing for Performance at Fay School

PUBLIC EDUCATION PROGRAM

Fay SchoolEngaging Students

Page 29: Case Study: Designing for Performance at Fay School

PUBLIC EDUCATION PROGRAM

Fay SchoolEngaging Students

Page 30: Case Study: Designing for Performance at Fay School

PUBLIC EDUCATION PROGRAM

Fay SchoolEngaging Students

Page 31: Case Study: Designing for Performance at Fay School

PUBLIC EDUCATION PROGRAMFay SchoolEngaging Students

Page 32: Case Study: Designing for Performance at Fay School

GREEN CLEANING PROGRAM

Healthy Performance Cleaning

Fay School is committed to implementing program campus wide

Educational Tool for Students

Learn about the impacts of hazardous chemicals on the environment

Campus Wide Implementation

Improves indoor air quality & occupant health

Page 33: Case Study: Designing for Performance at Fay School

PRIMARY SCHOOL

LEED Certification in process

Goodnow House reused

Learning Garden for students

Recycling Program implemented

Project utilized same materials

Sustainable education begins at early age

Page 34: Case Study: Designing for Performance at Fay School

WELLNESS CENTER

Renovation of 1st floor into Health & Wellness Center

Did not seek LEED certification but met the LEED standards

Wellness Center also provides classroom space for Leadership Program

Improved handicap accessibility to building

Page 35: Case Study: Designing for Performance at Fay School

PROJECT GOALS COMPLETED

Master Plan Concerns Addressed

Out of date health & wellness facility | Relocated facility

Inadequate on-campus faculty housing | Dormitories constructed

Out of date septic field | WWTF

Improve campus entrance | Ceremonial entranced added

Increase student population | Primary School constructed

Improve pedestrian circulation | Improved walking paths

Page 36: Case Study: Designing for Performance at Fay School