+46 479 177 00 Fax +46 479 177 25 [email protected] www.osbyparca.se Box 93, 283 22 Osby 2011-11-18. All rights reserved. Information subject to change without notice. The Professional´s choice since 1935 Location Biomass boiler case study E.ON district heating plant Broby Description Fuel used Scope of supply Date delivered CO2 saving Output delivered Operation Village of Broby, Sweden Dual setup with Biomass boilers PB2 delivering 3MW and 1MW of hot water for district heating of village. The boilers are fed with briquettes from an underground fuel pocket Briquettes from wood waste November 2006 13GWh/year 3,500 tonnes/year 2x Biomass boilers PB2, 3MW & 1MW with all associated sensors & switches and control system. Flue gas equipment consisting of multi cyclone and flue gas fan. Ash container and chimney. The boilers are part of a big facillity featuring in total five Osby Parca boilers. The smaller 1 MW PB2 boiler caters to low summer loads. Automatic ash handling transports the ash from the boiler out to an ash bin. The flue gases are cleaned with an multi cyclone assuring that local emission protocoll is met.