1 CASE STUDIES: FOUNDATIONS OVER ARTESIAN GROUNDWATER FORMATIONS Christopher R. Byrum, Ph.D., P.E. Soil & Materials Engineers Inc Soil & Materials Engineers, Inc. Plymouth, MI Office
56

CASE STUDIES: FOUNDATIONS OVER ARTESIAN ...

Feb 03, 2017

Download

Documents

truonglien
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: CASE STUDIES: FOUNDATIONS OVER ARTESIAN ...

1

CASE STUDIES: FOUNDATIONS OVER ARTESIAN

GROUNDWATER FORMATIONS

Christopher R. Byrum, Ph.D., P.E.Soil & Materials Engineers IncSoil & Materials Engineers, Inc.Plymouth, MI Office

Page 2: CASE STUDIES: FOUNDATIONS OVER ARTESIAN ...

2

Formation of Artesian Conditions

From Dorr & Eschman “Geology of Michigan”

From Michael S. GaberMDEQ “Flowing WellHandbook”

Page 3: CASE STUDIES: FOUNDATIONS OVER ARTESIAN ...

3

GENERAL:

*3% of MI Wells

First Reports 1100A.D.In Belgium/Netherlands

Key to Winter SurvivalBefore Electricity

Inspired Well DrillingTechnology

Extreme-Alvin, Texas120 feet of Head!

Rose City:270 gpm 2” dia

Cedar, MI:450 gpm, 4” dia.69 feet above groundg

Page 4: CASE STUDIES: FOUNDATIONS OVER ARTESIAN ...

4

Naubinway:Highest in MI !84 feet above groundg

Some Other Well Known Spots.

CASE 1Huron River:20-30 feet aboveRiver Level

Page 5: CASE STUDIES: FOUNDATIONS OVER ARTESIAN ...

5

CASE 2Tobacco River:≈ 10 feet aboveRiver Level

BRIDGE HOT SPOTS

*Lakebed/TillInterface ZoneWith GlacialSpillway Channels.

*Glacial SpillwaysInland.

BLUES = Ancient Glacial LakebedGREENS/BROWNS = Glacial Moraine Ridges

Off-WHITE = Glacial Spillway Channels

SITE 1

Page 6: CASE STUDIES: FOUNDATIONS OVER ARTESIAN ...

6

Old Dixboro Road over Huron River

Ambulances were often stuck waiting for the Trains

Existing Bridge

Page 7: CASE STUDIES: FOUNDATIONS OVER ARTESIAN ...

7

Relocated Roadway

Existing Bridge

New Bridge:Spans River, RR andSewage Plant Drive

Page 8: CASE STUDIES: FOUNDATIONS OVER ARTESIAN ...

8

N

HURON RIVER

HURON RIVER

Page 9: CASE STUDIES: FOUNDATIONS OVER ARTESIAN ...

9

Artesian Zone

HURON RIVER

Fort Wayne

Initial Glacial Lakebed Clay Deposition

From Dorr & Eschman “Geology of Michigan”

Fort WayneDefiance

Glacial Re-Advance, Over-Consolidates initial Lakebed Clay New Lakebed Clay Deposition

Upper Clays SPT = 10-30 bpfLower Clays SPT = 50-100+ bpf

From Dorr & Eschman “Geology of Michigan”

Page 10: CASE STUDIES: FOUNDATIONS OVER ARTESIAN ...

10

Fort WayneDefiance

Inter-Lobate Zone

Head Below Lakebed Clays

Huron Channel Cuts Through Lakebed at Some Places

From Dorr & Eschman “Geology of Michigan”

Year 1904Artesian Water Map

A850

D700

C750

B800

SITE

River Water Elev. ≈735 Feet (-25)

Artesian Elev. ≈760 Feet

Bridge Footing Elev. ≈720 Feet (-40)

Green = Artesian Pressure Head Contours

Ann Arbor

YpsilantiSITE 720 Feet ( 40)

Top of Clay Cover. ≈708 Feet (-52)

Clay Cover Thickness10-20 feet

Natural Barrier GradientΔH/ ΔL = 25/10 = 2.5> 1.0 unstable

p

Saline

Year 1904Artesian Water Map

A850

D700

C750

B800

SITE

River Water Elev. ≈735 Feet (-25)

Artesian Elev. ≈760 Feet

Bridge Footing Elev. ≈720 Feet (-40)

Green = Artesian Pressure Head Contours

SITE 720 Feet ( 40)

Top of Clay Cover. ≈708 Feet (-52)

Clay Cover Thickness10-20 feet

Natural Barrier GradientΔH/ ΔL = 25/10 = 2.5> 1.0 unstable

Implies Head-Loss Through theCover Soils in the Spillway

Page 11: CASE STUDIES: FOUNDATIONS OVER ARTESIAN ...

11

Evaluating Chance of Artesian Being Present

SITE

4 Miles

Ice Margin Lateral Spillway

SITE

Primary Interlobate Spillway

950 920

850

830

800

880

950 850900

4 Miles

SITE=730

748730

870

770

750

850770

770

790

880

Page 12: CASE STUDIES: FOUNDATIONS OVER ARTESIAN ...

12

General Dixboro Artesian ConditionsElev 900-950

Ground Elev 730Artesian Elev 760

From Dorr & Eschman “Geology of Michigan”

4 Miles

Probable Artesian Was Identified BeforeGeotechnical Evaluation, SO:

Artesian Drilling Protocol Was Used:

1. Do not poke a hole into the artesian within the proposed cofferdam limitsproposed cofferdam limits.

2. Do not poke a hole into the artesian where you cant seal it (Barge Test Hole performed in the middle of a River).

Artesian Drilling Protocol Was Used:

3. Use Special Drill Rigs with ability to grout and drive casing (Water Well Rigs).

4 Do poke a few holes into the Artesian in select areas4. Do poke a few holes into the Artesian in select areas that can be sealed and measure:

A. the static head and flow rate.B. the cover soil type/thickness.C. the artesian soil type and thickness.D. depth to hard bottom below the artesian soil.

Page 13: CASE STUDIES: FOUNDATIONS OVER ARTESIAN ...

13

Dixboro- We Never Found The BottomTwo deep holes were attempted (each side of the river)

but terminated within the artesian sands because:

1. 14-18 hours per test hole (Tough Holes).

2. Artesian formation was very dense to extremely dense sands with low production ratessands with low production rates .

3. Erosion was getting bad after drilling almost 50 feet into the artesian formation.

4. Drill Crew Chief Said.. Seal it “Now or Never”.

SOIL BORING LOCATION DIAGRAM

N

N

Page 14: CASE STUDIES: FOUNDATIONS OVER ARTESIAN ...

14

Beach Sands

Erosion Wash

Peat Marsh

Channel AlluviumElev. 820 ft

Existing River

Natural ground line

Huron River Valley Section Along New Roadway

Silty Clay Cover

Sand with High Artesian Pressure

Elev. 690 ft

Clay Cover is Thin Below RiverGlacial Spillway Scour Limit

Sta. 0+240 mSta. 1+060 m

Artesian conditions were close to the Ground Surface and intense at this site

Flow out of SB5 Casing

Flow out of SB5 Casing created the “SME Creek”

Artesian Flow and Casing at SB5

Page 15: CASE STUDIES: FOUNDATIONS OVER ARTESIAN ...

15

SB5

Engineered Scour Countermeasure

Artesian water has high mineral content.

•SB5 did not flow during or just after completion of drillingp g

•It took a few months for piping instability to develop through the bore hole

Page 16: CASE STUDIES: FOUNDATIONS OVER ARTESIAN ...

16

Piping Instability- Hydraulic Gradient, i =

Sand- Atmospheric

LHΔΔ

HΔG.W.T.

Artesian Pressure Head

Piezometers

Clayey Cover

Artesian Sand

LH

ΔΔ

= in-situ barrier gradient

Piping Instability- Hydraulic Gradient, i =

Sand- Atmospheric

LHΔΔ

HΔG.W.T.

Artesian Pressure Head

Partial Penetration Holes

Clayey Cover

Artesian Sand

1LΔ2LΔ

3LΔ4LΔ

1LH

ΔΔ

4LH

ΔΔ

= in-situ = approaching ∞

IF:

Hydraulic Gradient, i = > Piping Threshold

THEN:

LHΔΔ

Piping will eventually Blow Through !!!!

Who knows how long it will take !!!

Page 17: CASE STUDIES: FOUNDATIONS OVER ARTESIAN ...

17

Erosion Equilibrium – Hydraulic Shear Stress “Particle Plucking”

How Does Piping Initiate ? Something Like This.

Time

3LΔ4LΔ

2LΔ

1LΔ

Piping Instability- Hydraulic Gradient, i =

Sand- Atmospheric

LHΔΔ

HΔG.W.T.

Artesian Pressure Head

Partial Penetration Holes

Clayey Cover

Artesian Sand

1LΔ2LΔ

3LΔ4LΔ

1LH

ΔΔ

4LH

ΔΔ

= in-situ = approaching ∞

CRITICAL PENETRATION?

Erosion Equilibrium – Hydraulic Shear Stress “Plucking”

How Does Piping Initiate ? Something Like This.

“Blow-Holes” Become filled in with coarser sands under hydrostatic uplift = QUICK SAND

Time

3LΔ4LΔ

2LΔ

1LΔ

Page 18: CASE STUDIES: FOUNDATIONS OVER ARTESIAN ...

18

30 to 40 ft

From Michael S. GaberMDEQ “Flowing WellHandbook”

10-ft

Page 19: CASE STUDIES: FOUNDATIONS OVER ARTESIAN ...

19

Hammer = Very Simple Single Piston Diesel Engine

Exhaust

Driving a Crane onto a Floating Barge

Driving a Crane onto a Floating Barge

Page 20: CASE STUDIES: FOUNDATIONS OVER ARTESIAN ...

20

Pier 4 Cofferdam

Pier 3 Cofferdam

Pier 3 Cofferdam

Page 21: CASE STUDIES: FOUNDATIONS OVER ARTESIAN ...

21

Pier 3 Cofferdam

Pier 2 Cofferdam

Jet Grouting Equipment and Platform (crane mats on I-beams) resting on the Pier 2 Cofferdam

Page 22: CASE STUDIES: FOUNDATIONS OVER ARTESIAN ...

22

Jet-Grouting Equipment

Jet-Grouting Equipment

Jet-Grouting Equipment

Page 23: CASE STUDIES: FOUNDATIONS OVER ARTESIAN ...

23

Jet-Grouting Equipment

Jet-Grouting Equipment

Jet-Grouting Equipment

Page 24: CASE STUDIES: FOUNDATIONS OVER ARTESIAN ...

24

Jet-Grouting 100% Overlapping Pattern/Sequence

By Hayward Baker, Inc.

Jet-Grouting Cross Section

Settlement

By Hayward Baker, Inc.

Reduction and Cofferdam Seal “All-In-One”

Pier 1- Jet Grout Soil-Cement Testing Summary

0

200400

600800

1000

1200

1400

16001800

2000

0 7 14 21 28 35Sample Age days

Unc

onfin

ed C

ompr

essi

ve S

tren

gth,

psi

ws-Col.3-5.5'ws-Col.3-0.5'ws-Col.19-5.0ws-Col.19-4.0ws-Col.8-4.0ws-Col.8-3.0ws-Col.6-6.0ws-Col.6-5.0ws-Col.3-2.5ws-Col.3-3.5ws-Col.4-2.5ws-Col.4-3.5ws-Col.5-2.0ws-Col.10-3.5ws-Col.10-1.5ws-Col.9-3.0ws-Col.9-2.0C1-Run2-Part3C2-Run1-Part1C2-Run1-Part3C3-Run1-Part1aC3-Run1-Part1bC3-Run2-Part2C3-Run2-Part3

updated 12/27/2004Sample Age, days updated 12/27/2004

Pier 1 Grout Strengths

0500

1000150020002500300035004000

11/17 11/18 11/19 11/20 11/21 11/22 11/23

Construction Date

Com

pres

sive

Str

engt

h,

psi

71428

Test Age, days4230

Page 25: CASE STUDIES: FOUNDATIONS OVER ARTESIAN ...

25

Median Soil Cement and Grout Strength Values

10001500200025003000350040004500

Unc

onfin

ed C

omp.

psi

P1 S.C.P1 GroutP2 S.C.P2 GroutP3 S.C.P3 Grout

0500

0 7 14 21 28

Wet Sample Age, days

U Design Minimum Strength = 300 psi

Hayward-Baker Staff Recover a Jet-Grouted Soil Cement Core

Jet-Grouted Soil-Cement Core

Page 26: CASE STUDIES: FOUNDATIONS OVER ARTESIAN ...

26

Column Interface is Well Bonded

Stiff-Hard Clay and Jet Grouting Don’t Mix Well

Pier 4 Cofferdam

Page 27: CASE STUDIES: FOUNDATIONS OVER ARTESIAN ...

27

Tremie-Poured Concrete Mud-Mat ?

1. Placed Underwater like a Tremie Seal.

2. However, too thin to meet Tremie Design Criteria for Required Bond + Weight to manage River head.

Pier 4 Cofferdam

Observed Artesian FlowDuring Sheet Removal

Short Sheet Removed“Vent Sheet?”

Pier 4 Cofferdam

White/Gray Flour Color is Eroding Gray Lakebed Clays !!

Cofferdam Contractor new something was wrong when water inside didn’t “clear up”

Page 28: CASE STUDIES: FOUNDATIONS OVER ARTESIAN ...

28

While Attempting First Dewatering of Cofferdam--

Pier 4 Cofferdam Dewatered to top-of-tremie

Uncontrollable 300-500 GPM flow blew under the mud mat and out the far side causing obvious major erosion beneath the footing mud mat.

Page 29: CASE STUDIES: FOUNDATIONS OVER ARTESIAN ...

29

Cofferdam SheetsAnd Mud Mat

Old River Bank Sea-Wall

Cofferdam Sheets

Old River Bank Sea-WallInitial Flow

Cofferdam Sheets

Page 30: CASE STUDIES: FOUNDATIONS OVER ARTESIAN ...

30

Old River Bank Sea-WallInitial Flow

Cofferdam Sheets

Major Erosion Beneath One of the Two Pier Columns.

Sheet-Pile Cofferdam

normal river level

Sea Wall SheetingArtesian head

Before Dewatering Artesian Sands

Clay Cover

Original Flow Hole Up Sea Wall

Sheet-Pile Cofferdam

normal river level

Artesian head

After Dewatering Artesian Sands

Clay Cover

Finds New “Path of Least Resistance”After dewatering cofferdam

Page 31: CASE STUDIES: FOUNDATIONS OVER ARTESIAN ...

31

Do we need an Artesian Dewatering Well?

OR

Can we install the foundation without Lowering the Artesian Pressure Head?

Artesian Dewatering Well-REQUIRED

Pressure Grouting of Mud Mat-REQUIRED

**Too much flow to pour concrete, and obvious erosion under mud mat going on

Artesian Dewatering Well

Page 32: CASE STUDIES: FOUNDATIONS OVER ARTESIAN ...

32

800 gpm Artesian Dewatering Well

800 gpm Artesian Dewatering Well

Artesian worm-hole outlet needed special attention

Page 33: CASE STUDIES: FOUNDATIONS OVER ARTESIAN ...

33

Lots of Silty Clayey Erosion Mud Flowed out on top of Mud Mat

218

220

222

224

226

Dow

n El

ev, m

Draw Down Estimates - NAVFAC

212

214

216

218

0 5 10 15 20

Distance from Well, m

Dra

w D

Page 34: CASE STUDIES: FOUNDATIONS OVER ARTESIAN ...

34

218

220

222

224

226

Dow

n El

ev, m

B.O.F.T.O.F.

Draw Down Estimates - NAVFAC

212

214

216

218

0 5 10 15 20

Distance from Well, m

Dra

w D

0 228.2575 226.8

Draw Down Elev = -0.0193(Flow Rate) + 228.25

218220222224226228

atio

n, m

eter

s

Flow Rate vs. Draw Down Estimates - NAVFAC

212214216218

0 200 400 600 800Flow Rate, gpm

Ele

va

To get 213 m use min. 800 gpm well

Dixboro Rd over Huron RiverArtesian Well Draw-Down

216

218

220

222

224

226

228

Hea

d El

ev. m

212

214

216

0-Jan 1-Jan 2-Jan 3-Jan 4-Jan 5-Jan 6-Jan 7-Jan 8-Jan

Date

Actual Well Reached 213 meters at about 6 days at constant flow averaging 800- 1,000 gpmThis is about 8,000,000 Gallons

Page 35: CASE STUDIES: FOUNDATIONS OVER ARTESIAN ...

35

Pier 4 Footing Pour

Pier 4 Footing Pour

800 gpm Artesian Dewatering WellFlows reduces to about 100-200 gpm when fully developed

Pier 4 Footing Pour

Page 36: CASE STUDIES: FOUNDATIONS OVER ARTESIAN ...

36

Pier 4 Footing Pour

Pier 4 Footing Pour

Pier 4 Footing Pour

Page 37: CASE STUDIES: FOUNDATIONS OVER ARTESIAN ...

37

Pier 4 Footing Pour

Pier 4 Footing Pour

Pier 4 Footing Pour

Page 38: CASE STUDIES: FOUNDATIONS OVER ARTESIAN ...

38

Pier 4 Footing Pour

Pier 4 Footing Pour

Pier 4 Footing Pour

Page 39: CASE STUDIES: FOUNDATIONS OVER ARTESIAN ...

39

Grouting of Artesian Erosion Damage to Pier 4 Footing

Grouting of Artesian Erosion Damage to Pier 4 Footing

Grouting of Artesian Erosion Damage to Pier 4 Footing

Page 40: CASE STUDIES: FOUNDATIONS OVER ARTESIAN ...

40

Grouting of Artesian Erosion Damage to Pier 4 Footing

Grouting of Artesian Erosion Damage to Pier 4 Footing

Grouting of Artesian Erosion Damage to Pier 4 Footing

Page 41: CASE STUDIES: FOUNDATIONS OVER ARTESIAN ...

41

Grouting of Artesian Erosion Damage to Pier 4 Footing

Grouting of Artesian Erosion Damage to Pier 4 Footing

Grout Volume Pumped was Roughly Equal to a 1-ft diameter Tube, 60 Feet Long.

This matched the Eye-Ball Reality Check Factor

Pressure Gage Broke, So we Grouted until we “Heard Cofferdam Walls/Welds Make Noises”Heard Cofferdam Walls/Welds Make Noises

This is Not The Best Way to Control Grouting.

Page 42: CASE STUDIES: FOUNDATIONS OVER ARTESIAN ...

42

Pier 4 Settlement

-20

-15

-10

-5

0

5

ttlem

ent,

mm Beams

Deck Steel/Forms

Concrete Deck

Pier Weight2 mm

15 mm12 mm

Settlement Monitoring Required !!

-35

-30

-25

3/9 3/29 4/18 5/8 5/28 6/17 7/7 7/27 8/16 9/5

Date

Set

East

West

Avg.

Concrete Deck

Concrete Barrier and Initial Live LoadEst.

24 mm27 mm

Pier 4 Settlement

-20

-15

-10

-5

0

5

ttlem

ent,

mm Beams

Deck Steel/Forms

Concrete Deck

Pier Weight2 mm

15 mm12 mm

Settlement Monitoring Required !!

-35

-30

-25

3/9 3/29 4/18 5/8 5/28 6/17 7/7 7/27 8/16 9/5

Date

Set

East

West

Avg.

Concrete Deck

Concrete Barrier and Initial Live LoadEst.

24 mm27 mm

Allowable Footing Pressure based on 1” (25.4 mm)predicted settlement

Pier 4 Settlement

-20

-15

-10

-5

0

5

ttlem

ent,

mm Beams

Deck Steel/Forms

Concrete Deck

Pier Weight2 mm

15 mm12 mm

Settlement Monitoring Required !!

-35

-30

-25

3/9 3/29 4/18 5/8 5/28 6/17 7/7 7/27 8/16 9/5

Date

Set

East

West

Avg.

Concrete Deck

Concrete Barrier and Initial Live LoadEst.

24 mm27 mm

Differential Settlement (left vs. right) = 5-6 mmBeing greater on the undercut/weak clay side

Page 43: CASE STUDIES: FOUNDATIONS OVER ARTESIAN ...

43

Page 44: CASE STUDIES: FOUNDATIONS OVER ARTESIAN ...

44

Page 45: CASE STUDIES: FOUNDATIONS OVER ARTESIAN ...

45

Permanent Artesian Vent

Permanent Artesian Vent

Completed New Dixboro Road Bridge

Page 46: CASE STUDIES: FOUNDATIONS OVER ARTESIAN ...

46

Completed New Dixboro Road Bridge

Completed New Dixboro Road Bridge

Completed New Dixboro Road Bridge

Page 47: CASE STUDIES: FOUNDATIONS OVER ARTESIAN ...

47

ARTESIAN FLOW CASE STUDY: Lang Road Bridge over theMiddle Branch Tobacco River

Christopher R. Byrum, Ph.D., P.E.Soil & Materials Engineers IncSoil & Materials Engineers, Inc.Plymouth, MI Office

SITE

SITE

Page 48: CASE STUDIES: FOUNDATIONS OVER ARTESIAN ...

48

SITE

SITE

SITE

Page 49: CASE STUDIES: FOUNDATIONS OVER ARTESIAN ...

49

SITE

GLACIAL LAKEBED LIMITS

SITE

SITE

Page 50: CASE STUDIES: FOUNDATIONS OVER ARTESIAN ...

50

DIXBOROLANG

Head Below Lakebed Clays

Huron Channel Cuts Almost ThroughAnd Probably Does Cut Through at Some Places

From Dorr & Eschman “Geology of Michigan”

SITE (low res. image)

Page 51: CASE STUDIES: FOUNDATIONS OVER ARTESIAN ...

51

Artesian Drilling Protocol was used! WHY?

Existing Artesian Pond located about 150 feet from bridge, with water at about 5-10 feet above River, and pipe sticking out of the ground with flowing artesian water.

Aerial Photos showing lots of Houses with Ponds

This caused me to check MDEQ Well Logs near the bridge–All were flowing wells, encountering the artesian flows.

Artesian Drilling Protocol was used! WHY?

RESULTS- Clay was too hard to drill through so we hit auger refusal at less than 30 feet deep, before encountering any artesian layers.

We didn’t know how deep it was but we new it was there.

Footing Design Recommendations

1. Use spread footings on hard clays, set as high as possible. Do not drive or pre bore deep piling down towards the Artesian. (Standard Convention would be Pre-Bored Piling)

2. Use permanent sheeting cofferdams with toe as high as practical, and tremie poured seals. (Standard Convention would be Mud Mat for this type of soil, with no toe limits)

3. If scour is deep, set footings higher and use permanent sheeting special designs to deal with scour design depth.

Page 52: CASE STUDIES: FOUNDATIONS OVER ARTESIAN ...

52

First Unusual Signs at the Site

TEST HOLES

Cofferdam Sheets in this Area Drove Deep with little Resistance

About 2 Days after Dewatering, Artesian Blew Through Here.

Page 53: CASE STUDIES: FOUNDATIONS OVER ARTESIAN ...

53

EROSION VOID

Page 54: CASE STUDIES: FOUNDATIONS OVER ARTESIAN ...

54

Grouting Results

1. Grout take was large and grout did appear on outside of cofferdam sheeting.

2. Grout stayed in place in all ports accept the port closest to the flow SOURCE HOLE.

3. Decided to create a permanent vent over SOURCE HOLE, out through rip rap. Design a……….

PERMANENT PREFERRED FLOW LOCATION

Page 55: CASE STUDIES: FOUNDATIONS OVER ARTESIAN ...

55

For the West Side, Artesian Blew Through Here.

Grouting NOT Required Here- Middle of Ftng Likely will “bridge”

Grouting Required Here- Edge of Ftng/Wing Wall Could Separate

Page 56: CASE STUDIES: FOUNDATIONS OVER ARTESIAN ...

56

Possible Cracks/Fissures Through Lakebed Clay

Michigan’s State Fossil:MASTADONPost-GlacialFurry Beast

M E I d zd x

=2

2