CARTA DE CODELCO - Expomin · PDF fileFuture Plans of Codelco in China Emerging Markets Office • US$ 50,000,000 Codelco’s operational spend in China through Emerging Markets Office,

Feb 03, 2018

Download

Documents

danghuong
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: CARTA DE CODELCO - Expomin · PDF fileFuture Plans of Codelco in China Emerging Markets Office • US$ 50,000,000 Codelco’s operational spend in China through Emerging Markets Office,

1

Copyrights © 2010 by CODELCO-CHILE. All Rights Reserved. Copyrights © 2011 CODELCO-CHILE. Todos los Derechos Reservados. Copyrights © 2011 by CODELCO-CHILE. All Rights Reserved.

China: Codelco’s experience

Copyright @ CODELCO Todos Los Derechos Reservados. All Rights Reserved.

Page 2: CARTA DE CODELCO - Expomin · PDF fileFuture Plans of Codelco in China Emerging Markets Office • US$ 50,000,000 Codelco’s operational spend in China through Emerging Markets Office,

2

Copyrights © 2010 by CODELCO-CHILE. All Rights Reserved. Copyrights © 2011 CODELCO-CHILE. Todos los Derechos Reservados. Copyrights © 2011 by CODELCO-CHILE. All Rights Reserved.

2013

MH

Production*:

160,000 tonnes/year

CAPEX**:

US$ 2,430 million

2019

Andina Phase II

Production*:

306,400 tonnes/year

CAPEX**:

US$ 6,270 million

2018

El Teniente

New Mine Level Production*:

415,000 tonnes/year

CAPEX**:

US$ 3,200 million

2018

Chuqui

Underground Production*:

343,000 tonnes/year

CAPEX**:

US$ 3,830 million

Under Construction In Feasibility

Codelco’s Structural Mining Projects

Past and Future Capex Program Overview**

*: Average production for the first 10 years at regime capacity. Figures updated in August, except RT Sulphides Phase II, in December 2011. Preproduction CAPEX.

**: 2011 Business and Development Plan.

Codelco: An Unprecedented Investment Challenge US$ million, 2011 currency

Annual Average of Investments by Period Total Investments by Period

35 years 12 years

2016

RT Sulphides

Phase II Production*:

345,000 tonnes/year

CAPEX**:

Under study

In Prefeasibility

Page 3: CARTA DE CODELCO - Expomin · PDF fileFuture Plans of Codelco in China Emerging Markets Office • US$ 50,000,000 Codelco’s operational spend in China through Emerging Markets Office,

3

Copyrights © 2010 by CODELCO-CHILE. All Rights Reserved. Copyrights © 2011 CODELCO-CHILE. Todos los Derechos Reservados. Copyrights © 2011 by CODELCO-CHILE. All Rights Reserved.

Production Forecast

Page 4: CARTA DE CODELCO - Expomin · PDF fileFuture Plans of Codelco in China Emerging Markets Office • US$ 50,000,000 Codelco’s operational spend in China through Emerging Markets Office,

4

Copyrights © 2010 by CODELCO-CHILE. All Rights Reserved. Copyrights © 2011 CODELCO-CHILE. Todos los Derechos Reservados. Copyrights © 2011 by CODELCO-CHILE. All Rights Reserved.

China, Emerging Market

ost

Page 5: CARTA DE CODELCO - Expomin · PDF fileFuture Plans of Codelco in China Emerging Markets Office • US$ 50,000,000 Codelco’s operational spend in China through Emerging Markets Office,

5

Copyrights © 2010 by CODELCO-CHILE. All Rights Reserved. Copyrights © 2011 CODELCO-CHILE. Todos los Derechos Reservados. Copyrights © 2011 by CODELCO-CHILE. All Rights Reserved.

Emerging Markets Strategy

Suppliers & Products

Development

Continuous Category Analysis

Supply & Demand

Analysis at Local,

Regional and World Level

Identify trials & testing

opportunities with our end-

users

Business case and Added

Value Proposal

RFI & RFQ processes

Execution plan – trial &

logistic -

Goal

• Identify and development business opportunities in China .

Target

• Take advantage of industrial installed capacity

• Pursue lowest TCO.

Result

• Improve competitiveness throughout a much broader supply base.

Page 6: CARTA DE CODELCO - Expomin · PDF fileFuture Plans of Codelco in China Emerging Markets Office • US$ 50,000,000 Codelco’s operational spend in China through Emerging Markets Office,

6

Copyrights © 2010 by CODELCO-CHILE. All Rights Reserved. Copyrights © 2011 CODELCO-CHILE. Todos los Derechos Reservados. Copyrights © 2011 by CODELCO-CHILE. All Rights Reserved.

Emerging Markets Team and Project Engagement

Selina Zhang (China)

Maite Chen (China)

Peter Wang (China)

Diego Hu (China)

Infraestructural

Project

Assets:

Chuquicamata

Andina -RT Other Projects

Assets:

Ventanas –

Teniente - MH -

Salvador

Carolina Rocha (Chile) Carolina Conejeros (Chile)

Cathodes & anodes, tyres, conveyor belts, pulleys & idlers, slurry pumps & valves spare parts, chemicals, modular house , Nitrate of Ammonia, compressors, fans, blowers, instruments

Quality Assurance, Quality Control, Inland Logistic, Reporting

Cristhian Allende

Director Emerging Markets (China)

Grinding media, mill liners, refractory bricks & mortars, casting elements, LHD, off road trucks, steel plates, rebars, lighting-bulkhead & flood, cyclones, hydraulic gates, samplers, thickeners, dust extractor.

Flotation cells, crushers, mill, stacker, screen, transformers, steel structure, switchgear , piping, electrical cables, reclaim, feeders, drives.

Page 7: CARTA DE CODELCO - Expomin · PDF fileFuture Plans of Codelco in China Emerging Markets Office • US$ 50,000,000 Codelco’s operational spend in China through Emerging Markets Office,

7

Copyrights © 2010 by CODELCO-CHILE. All Rights Reserved. Copyrights © 2011 CODELCO-CHILE. Todos los Derechos Reservados. Copyrights © 2011 by CODELCO-CHILE. All Rights Reserved.

Trials: Working Together

Requirement Capture Strategy Definition Contracting Process Execution

• Well prepared Specs/Scope

• Dedicated resources

• Small funds allocated

Opportunity Identification Supplier Selection Sample/Field Trial Contract Execution

Key Differentiators

• Clearly & timely tech. clarifications

• Abilities to analysis the tech. alternative

• Clear sample test procedures

• Advanced plan for field trial

• Inspection plan

Page 8: CARTA DE CODELCO - Expomin · PDF fileFuture Plans of Codelco in China Emerging Markets Office • US$ 50,000,000 Codelco’s operational spend in China through Emerging Markets Office,

8

Copyrights © 2010 by CODELCO-CHILE. All Rights Reserved. Copyrights © 2011 CODELCO-CHILE. Todos los Derechos Reservados. Copyrights © 2011 by CODELCO-CHILE. All Rights Reserved.

Gerencia de Abastecimiento / VAF

Barriers

Language/

communications

Commercial Terms

Mining Experience

Technical Specifications

Local Chilean Representative

Production Standards

Solutions

Focus on supplier quality

Formal engagement/communication

plan

More technical

specifications details

Clear Testing protocols

Encourage Post Sale Service

In-house QA/QC support

Lessons Learned

Page 9: CARTA DE CODELCO - Expomin · PDF fileFuture Plans of Codelco in China Emerging Markets Office • US$ 50,000,000 Codelco’s operational spend in China through Emerging Markets Office,

9

Copyrights © 2010 by CODELCO-CHILE. All Rights Reserved. Copyrights © 2011 CODELCO-CHILE. Todos los Derechos Reservados. Copyrights © 2011 by CODELCO-CHILE. All Rights Reserved.

Successful Case: Refractory Bricks

2008 2007 2006 2009 2010 2011

Chinese

Supplier

Main

Supplier

Ending Trial Stage

% Vol Main

Supplier

% Vol Chinese

Supplier

26,19%

73,81%

14,42%

85,58%

49,19%

50,81%

47,16%

52,84%

73,68%

26,32%

84,53%

15,47%

Page 10: CARTA DE CODELCO - Expomin · PDF fileFuture Plans of Codelco in China Emerging Markets Office • US$ 50,000,000 Codelco’s operational spend in China through Emerging Markets Office,

10

Copyrights © 2010 by CODELCO-CHILE. All Rights Reserved. Copyrights © 2011 CODELCO-CHILE. Todos los Derechos Reservados. Copyrights © 2011 by CODELCO-CHILE. All Rights Reserved.

Successful Case: Tyres

• Codelco awarded in March 2010 to 2 Chinese supplier representatives (3 manufacture plants).

• Annual Spend KUS$ 90.000 all types.

• Awarded KUS$ 4.000 for Chinese suppliers only Giant tyres (57 ring)

"

5 identified Chinese suppliers

2 suppliers fail

Category Description

Desktop Research

RFI & Supplier Site Assessment

Supplier Recommend

-ation

RFQ & Clarificati

on

Contract Negotiation

PO Execution

Engaged 3rd party inspector for Codelco

Process Flow Chart

Done

Current Phase

• August 2011 arriving first Chinese tyres.

• If 49 ring trials are successful, spend could be increased in KUS$1,000.

Project Follow Up

Road Block / Solution

•Tyres performance/Monitoring

•Testing delays / Working closely with suppliers

Page 11: CARTA DE CODELCO - Expomin · PDF fileFuture Plans of Codelco in China Emerging Markets Office • US$ 50,000,000 Codelco’s operational spend in China through Emerging Markets Office,

11

Copyrights © 2010 by CODELCO-CHILE. All Rights Reserved. Copyrights © 2011 CODELCO-CHILE. Todos los Derechos Reservados. Copyrights © 2011 by CODELCO-CHILE. All Rights Reserved.

Future Plans of Codelco in China

Emerging

Markets Office

• US$ 50,000,000 Codelco’s operational spend in

China through Emerging Markets Office, no

including dealers.

• All selected divisional bidding process engaging

Chinese suppliers

• Identify and development business

opportunities in China market

• Build-up a strong supply base, securing of

supply in view of shortage times.

• Conduct on-site quality assessments and

develop suppliers as needed. On-going

process.

• No Procurement Agent. Being a service

provider for all our assets and projects.

• Work together with EPCM companies based in

China.

2012

Targets in place

Key Activities

Business Model

STRATEGY GOAL

Page 12: CARTA DE CODELCO - Expomin · PDF fileFuture Plans of Codelco in China Emerging Markets Office • US$ 50,000,000 Codelco’s operational spend in China through Emerging Markets Office,

12

Copyrights © 2010 by CODELCO-CHILE. All Rights Reserved. Copyrights © 2011 CODELCO-CHILE. Todos los Derechos Reservados. Copyrights © 2011 by CODELCO-CHILE. All Rights Reserved.

¡Gracias!

谢 谢!

Thank you!