Drawing No.: Title: Drawn: Scale: Date: Status: Plot Date: Drawing: Amendments: Rev: Date: Legend: Detail: Bar Scale: Client: Project No: Project: North Point: 08:16 Project Name: Alterations Stage 2: San Clemente Catholic High School SRB/LE CC 31/03/09 carste STUDIO PTY LTD All information, concepts and ideas contained herein are the property of Carste Studio Pty Ltd and may not be distributed and/ or reproduced without express permission from Carste Studio Pty Ltd. It is the responsibility of the builder to check and verify all dimensions on-site prior to the commencement of work and to notify Carste Studio Pty Ltd of any errors and omissions. Do not scale drawing. Do not use drawing for consrtuction purposes unless issued by Carste Studio Pty Ltd for construction. ABN 16122394450 trading as ACN 122394450 p: (02) 4951 2578 m: 0427 432 720 f: (02) 4950 0591 e: [email protected] a: PO Box 149 Wallsend 2287 stephen booker architect Architects and Heritage Consultants 30.08.08 CATHOLIC SCHOOLS OFFICE Diocese of Maitland - Newcastle 1st Floor Refurbishment Plan 78 Havelock Street Mayfield 1:100 08:16-CC A-04 N 1.07 STAFFROOM CPT 125.00m2 1.18 STAFFROOM (SEPARABLE PORTION) CPT W07 Sill 1,800 1,780 700 W08 Sill 1,800 1,780 700 036 2,050 950 035 2,100 1,495 033 950 2,050 029 2,050 900 027 2,988 785 031 2,988 1,095 045 2,050 990 026 950 2,050 044 2,050 1,015 W06 Sill 0 2,657 1,210 030 1,000 2,400 032 2,050 950 028 900 2,050 043 850 2,400 025 2,100 950 034 950 2,050 71 72 73 74 67 68 69 70 59 60 61 62 88 89 90 91 75 76 77 78 80 81 82 83 84 85 86 87 63 64 65 66 13 14 15 16 02 Stair 01 A A A1 A1 F F 1,690 1,400 8,230 90 2,000 90 8,210 600 2,000 1,200 1,640 735 1,640 735 1,500 1,800 600 2,200 1,350 995 965 4,675 2,025 79 INFILL EXISTING OPENING AND PROVIDE NEW DOOR INSTALL NEW WALL NEW TOILET PARTITIONS W.C. SUITES, WALL TILES, URINALS, WASH BASINS & HAND DRYERS REFURBISH TEA AREA BAG RACKS INFILL OPENING AND MAKE GOOD REPAIR CORNICE AND CEILING CLEAN AND PAINT ORNATE CORNICE AND CEILING EXISTING PELMET TO REMAIN REPAIR GUTTER NEW FLOOR INFILL NEW POLYCARBONATE ROOF NEW PLASTERBOARD CEILING CPT1 NEW BAG RACKS INFILL CAVITY BRICK NEW FACE BRICKWORK SERVICE HOB TO EACH BENCH DUCTED SKIRTING TO DETAIL MODIFY HANDRAILS AS PER DETAIL A-13 CLEAR GLAZE DOOR BAG RACK HOOKS NEW BRICKWORK AND RENDER SET SOLID WALL TO 1200h TWO ROOF VENTILATORS RELOCATE RELOCATE NEW PLASTERBOARD CEILING NEW PLASTERBOARD CEILING NEW CARPET COLOUR T.B.A. MODIFY HANDRAILS AS PER DETAIL A-13 REPAIR WALL WHERE PANELLING REMOVED REVERSE DOOR HANDLING REMOVE SHELVING NEW SHELVING BY OTHERS R.L. + 23.600 R.L. + 23.600 200 STEP Louvres Louvres Louvres Louvres FE AC AC AC Patch Panel Patch Panel CPT1 CPT1 CPT1 CPT1 SV CPT1 SV AC NEW LOCATION AC NEW LOCATION NEW F.C. CEILING REMOVE HEATER NEW SKIRTING TO MATCH EXISTING 120x25 BULLNOSED REPLACE CEILING, INSTALL OVER FORMER CEILING AFTER REMOVING CORNICE NEW SHADOW MOULD CORNICE 1.15 (D7): SCIENCE LAB SV 1.05 EXISTING STAIR 1.14 TECHNICAL AND APPLIED STUDIES CPT 1.13 GENERAL PURPOSE LEARNING AREA CPT 1.11 GENERAL PURPOSE LEARNING AREA CPT 1.12 GENERAL PURPOSE SECURE STORE CPT 9.65m 2 EXISTING STAIRS 1.06 WC: MALE CT EXISTING STAIR 1.09 GENERAL PURPOSE LEARNING AREA CPT 1.08 GENERAL PURPOSE LEARNING AREA CPT 1.01 MEETING/ CONFERENCE ROOM CPT EXISTING LIGHTWELL 1.04 NEW STAIR 01 TO DETAIL 02 - A-13 C4 CPT m 2 C2 CPT m 2 1.04 STAFF KITCHENETTE CPT 1.03 W.C. CT 1.10 CORRIDOR CPT NO NEW WORK IN THIS AREA NEW AIRLOCK SV HALL CPT CPT 1.02 CORRIDOR CPT NO NEW WORK IN THIS AREA NO NEW WORK IN THIS AREA NO NEW WORK IN THIS AREA SERVER ROOM 1.08 GENERAL PURPOSE LEARNING AREA CPT 037 2,050 950 INFILL EXISTING OPENING DOOR NG BUILDING 041 885 2,050 042 885 2,050 038 2,050 895 040 890 2,050 039 2,050 890 96 97 98 99 92 93 94 95 88 89 90 91 270 5,675 270 5,800 270 5,675 6,340 1,223 4,495 950 230 6,340 18,765 270 735 1,640 735 1,640 735 1,640 735 1,500 3,725 1,770 1,100 470 600 600 4,675 2,025 1,100 EXISTING FUME CUPBOARD fall EXISTING FUME CUPBOARD NEW LOCKS & FURNITURE & VISION PANEL EXISTING CUPBOARD TO REMAIN SAFETY SHOWER AND EYEWASH SERVICE HOB TO EACH BENCH DUCTED SKIRTING TO DETAIL DEMONSTRATION BENCH NEW LOCK FURNITURE & VISION PANEL REPAIR BRICKWORK POINTING MODIFY HANDRAILS AS PER DETAIL A-13 DEMONSTRATION BENCH NEW BENCHES CPT Extent of shower spray FW Extent of shower spray FW 1.17 (D6): SCIENCE LAB SV 1.15 (D7): SCIENCE LAB SV 1.16 (P): PREPARATION ROOM - REFURBISHMENTS TO INCLUDE THE INSTALLATION OF NEW PBD CEILING SV SAFETY SHOWER EXISTING CONSTRUCTION ACOUSTIC WALL - PBD EQUIV TO BORAL T1616F 230 BRICK. SEE SCHEDULE OF FINISHES FOR SURFACE FINISH 270 BRICK SEE SCHEDULE OF FINISHES FOR SURFACE FINISH = BRICK BK = STUD (TIMBER OR STEEL) ST 0 1 2 3 4 5