TURKISH CARGO LAUNCH ED THE BRA
WITH HIGH STAND
71.000 m
Total Floor Area Use
(Land and Air Si
1.2 MILLION TON NES
67.000 m
Total Con structio
Ar
43.000 m
Closed Warehou
Ar
Annual
Tonnage
Capacity
7/25/2019 Cargo_Terminal Presentation.pdf
3/12
TURKISH CARGO LAUNCH ED THE BRA
WITH HIGH STAND
7/25/2019 Cargo_Terminal Presentation.pdf
4/12
Simplicity during the accceptance of different and functional v
Modern waiting areas which are designed considering custom
CARGO ACCEPTANCE A
7/25/2019 Cargo_Terminal Presentation.pdf
5/12
Vehicle admission area having a width of 42 m.
Cargo admission and delivery through 53 gates
Gates dedicated to TK Plus and special cargo
Land Sid
for Vehi
Maneuv
11.0
Vehicle Admission Area42 m
CARGO ACCEPTANCE A
7/25/2019 Cargo_Terminal Presentation.pdf
6/12
STORAGE PROC
Increased inbound-outbound capacity of ULDs by 5.5
Import and export rack capacity may be increased by
7/25/2019 Cargo_Terminal Presentation.pdf
7/12
3 times bigger special storage
Racking system which can increasethe capacity by 6 times
39 separate storage rooms at 4different room temperature ranges for
9 different cargo types
1200 total ULD capacity
Special Storage Area
3.000 m
STORAGE PROC
7/25/2019 Cargo_Terminal Presentation.pdf
8/12
OPERATION PRO
Easier and more rapid Cargo build-up andbreak-down processes through the lowering
workstations
2.5 times more build-up and break-downworkstations for narrow-body and wide-body
aircrafts
7/25/2019 Cargo_Terminal Presentation.pdf
9/12
OPERATION PRO
Simplified and accelerated connection betweenwarehouses and between land and air sides
Comwill b
activ
Land Side Area for Vehicle Maneuver11.000 m
7/25/2019 Cargo_Terminal Presentation.pdf
10/12
Ware-houses
Every corner of the warehouseincluding the open areas in the airside
and landside are being watched andrecorded 24/7 by 330 cameras.
AirSide
OfficesVehicle
AdmissionArea
SpecialCargo
SECURITY
7/25/2019 Cargo_Terminal Presentation.pdf
11/12
Electricity production using naturalgas thanks to the Trijen system
The energy produced will be used forillumination, heating and cooling
U bag Warehouse
1.550 m
Rentable Offices
2.000 m
ADDITIONAL CONTR