CARBON PARTNERSHIP FACILITY 1 CARBON PARTNERSHIP FACILITY APRIL 2014 SELLER PARTICIPANT TRAINING MONITORING AND VERIFICATION
Feb 09, 2016
CARBON PARTNERSHIP FACILITY 1
CARBON PARTNERSHIP FACILITY APRIL 2014 SELLER PARTICIPANT TRAINING
MONITORING AND VERIFICATION
CARBON PARTNERSHIP FACILITY 2
Topics of the session
Monitored data
Monitoring process Verification Issuance
• Data flow• Calculations• CDM aspects
• Objectives• Organization• Roles and
responsibilities• Means of
control
• Preparation Stakeholders
• Audit process• MR Writing• Documents
• UNFCCC process
CARBON PARTNERSHIP FACILITY 3
1. Monitored data
• Data flow• Calculations• CDM aspects
CARBON PARTNERSHIP FACILITY 4
Monitored data
Physical phenomenon
(Flow, temp, etc…)
CDM instrument
Automatic MeasurementData Logger
Manual MeasurementManual Log
CDM database
Data Record
Back Up databaseBack up policy
Scans
Description of data flow in CDM
CARBON PARTNERSHIP FACILITY 5
Monitored dataLandfill gas projects
CARBON PARTNERSHIP FACILITY 6
Monitored data
Flow, %CH4, pressure, temperature, efficiency
of destruction, electricity consumption
Flow meter, gas analyzer, T & P sensors, thermocouple,
electricity meter
Automatic MeasurementData Logger
Manual Measurement(electricity consumed) Manual Log
CDM database
Data Record
Back Up databaseBack up policy
Scans
Data flow: landfill gas projects
CARBON PARTNERSHIP FACILITY 7
Baseline emissions: Amount of CH4 actually destroyed
- Principle: amount of LFG x % of CH4 in LFG x efficiency of the destruction - Formula: LFGflare,y x wCH4 x DCH4 x FE
Electricity generation (quantity of tCO2 “avoided”) - Principle: quantity of electricity actually delivered to the grid x emissions factor
of the grid- Formula: ELLFG (MWh) x EFEL (tCO2/MWh)
Project emissions: Electricity consumption
- Principle: quantity of electricity actually consumed x emissions factor of the grid- Formula: PEEC,y = ECPJ,y x EFEL x (1 + TDLy)
Fuel consumption- Principle: quantity of fuel actually consumed x emissions factor of the fuel - Formula: PEFC,y = FCi,j,y x NCVi,y x EFCO2,i,y
Understanding the logic behind data
CARBON PARTNERSHIP FACILITY 8
Monitored parameters must be: Recorded automatically when
continuous monitoring is required
Exhaustive
Consistent
Analyzed
Unalterable
Auditable
Backed up
Archived
CDM aspect of data and calculations
Calculations must be: • Reproducible
• Strictly compliant with the PoA-DD / CPA-DD
• Computed on a regular basis (monthly or weekly)
• You must be able to know almost in real time how much CERs are generated
• You must be able to spot an inconsistency and take a corrective action as quick as possible
CARBON PARTNERSHIP FACILITY 9
Inconsistencies: Record of 105% methane in the LFG Flare temperature of 1999°C Inconsistent daily electrical consumption because the reading was
monitored in kVAr instead of kWh Negative electricity consumption based on manual readings Flow recorded when flare / genset off Fuel consumption much higher than diesel generators’ technical
specifications (due to fuel robbery) Fixed value of flow every minute for several days, etc.
Loss of data: Failure of the memory card Signal disruption Reset of the system Loss of the onsite computer where the system was installed and data
stored
Potential data issues: examples
CARBON PARTNERSHIP FACILITY 10
2. Monitoring process
• Objectives• Organization• Roles and
responsibilities• Means of control
CARBON PARTNERSHIP FACILITY 11
Objectives: Generate ER at CPA level and issue CERs for the overall program for
all CPAs Ensure monitored data is controlled and inconsistencies are
spotted out immediately Implement a standard organization and reporting for all CPAs of the
program Define clear monitoring responsibilities Maintain direct communication between CME and CPA Operators Maintain CPA / PoA database up to date Avoid calibration delays Manage the Information Systems:
- Automated data capture / Machine-To-Machine protocols- Back up policy (at CME level)
Monitoring process
CARBON PARTNERSHIP FACILITY 12
CDM Expert
CDM PoA Manager
CDM & Carbon Finance Director
Monitoring Manager
LFG planttechnician and
manager
CPA 1 CPA 2 CPA-3
World Bank
CME – main responsibilities: CDM, financing, management
CPA Implementers – main responsibilities: plant operations
Support
Monitoring Manager
Monitoring Manager
Organizational structure
Monitoring process
LFG planttechnician and
manager
LFG planttechnician and
manager
IT officer
CARBON PARTNERSHIP FACILITY 13
Roles and responsibilities: CPA level Plant technician and manager: operation and maintenance
- Network adjustment: wells regulation, leak inspection, cover, etc.- Monthly and daily reports - Manual logs - Calibrate equipment or organize external calibration- Ensure availability of spare parts- Extract raw data from data logger - Etc.
Monitoring manager: centralize and analyze CDM information from site operations- Prepare monitoring records - Compute CER calculations- Upload CDM information in data base- Prepare calibration planning at CPA level- Focal point for communication with CME
Monitoring process
CARBON PARTNERSHIP FACILITY 14
Roles and responsibilities: PoA level CDM PoA Manager: CDM compliance and CDM documentation of the PoA
- Verify the CDM compliance of each CPA- Verify that CDM documents are available and up to date in the database- Means of control: fill in QA/QC checklist - Focal point with the Monitoring Manager at CPA level - Prepare the Monitoring Report- Manage verification with DOE- Inclusion of new CPA
IT administrator: management of data base - Create a documents repository: data base shared between CPA Implementers
and the CME- Prepare a folder structure - Manage write / read only access- Back up policy
Monitoring process
CARBON PARTNERSHIP FACILITY 15
Roles and responsibilities:
The World Bank: CDM expertise- Information on CDM updates- Advice on selection of DOE- Technical review- Sporadic help or advice for PoA management
Monitoring process
CARBON PARTNERSHIP FACILITY 16
CDM PoA Manager
CDM & Carbon Finance Director
CDM equipment
CMECPA Operator
Monitoring Manager
Planttechnician
Monitoring information: from CPA to CME
Monitoring process
Data logger
Manual logs, operations
mainte-nance
Monitoring records
QA / QC Checklist
SupervisionManagement
PoA Database
CARBON PARTNERSHIP FACILITY 17
Means of control : At CPA Level: Monitoring Records
For each CPA, synthetic means of information which is relevant for CDM and verification. - CER Production- Electricity consumed (and generated if applicable) - Calibration - Instruments ID- Accreditation and training
At CME level: QA / QC checklistExcel tool to verify every month that: - Information from site operations is reported in the Monitoring Records- Documents are available in the data base shared between CPA
Implementers and the CME- Problems on site are reported and followed
Monitoring process
CARBON PARTNERSHIP FACILITY 18
Means of control: Steering committees
- Regular direct communication between CME and CPA Implementers- Review progress- Solve investment related issues
Spot checks and mock verifications - There is no better way than to go onsite to understand the project- CME should organize “real case” quality control: onsite check of the CPA- Pre-audit: verify the level of CDM issuance readiness of the project- Ensure that the plant is operated and monitored as described in the
CPA-DD
Monitoring process
CARBON PARTNERSHIP FACILITY 19
3. Verification
• Preparation • Stakeholders• Audit process• MR writing• Documents
CARBON PARTNERSHIP FACILITY 20
Coordination- CME / World Bank: choice of DOE and timing
Align verification with ERPA and previous verification - CME / CPA Operator(s): readiness, availability
Organization and responsibilities - The CME will focus on CDM management
- Manage DOE- Write and modify MR- Make sure supporting evidences and monitored data are available
- The CPA Operator will focus on site operations- History of project operations- Prepare all supporting evidences- Organize logistics on site (transportation, accommodation, meals)
Audit preparation
CARBON PARTNERSHIP FACILITY 21
Site visit The CDM PoA Manager of the CME should go onsite prior to the DOE to: - Verify the project operations - Ensure CDM equipment is in place and properly functioning - Collect last minute missing documents - Trains the CPA operator staff:
- How to answer to auditor’s questions- No document should be given to the auditor because they will all be
channeled by the focal point at the end of the visit
Verification documents - Exhaustive - Up to date - Available on a DEDICATED shared directory
Audit preparation
CARBON PARTNERSHIP FACILITY 22
Stakeholders for the verification
CPA
CME
DOE
UNFCCC
WB
CARBON PARTNERSHIP FACILITY 23
Audit process
1. CME prepares the MR ; WB helps and reviews the MR
2. CME sends MR and ER summary to DOE
3. If MR is ok, DOE uploads MR to UNFCCC website
4. Wait 2 weeks before site visit
5. CME sends initial package of documents to DOE
6. Site visit
7. CME, CPA Implementer and DOE discuss issues found on site (preliminary findings)
8. DOE officially sends findings / protocol to CME
9. CME answers requests and prepares and gathers additional documents
10. CME sends everything in one shot: duly answered protocol + supporting evidences
11. DOE reviews the responses and prepares the DVR
12. When all CAR and CL are closed, auditor sends the DVR to I/TR for internal / technical review
13. New questions raised by TR 2nd round of questions and answers
14. When 2nd round (or more) is closed, DOE prepares the FVR
15. CME, World Bank and DOE review the final documents to correct errors and inconsistencies
16. DOE final review and approval
17. DOE sends final documents to UNFCCC: MR, FVR, ER
CARBON PARTNERSHIP FACILITY 24
Audit process
Highlights: Basic principle of audit: all information must be supported by an evidence
All information provided to the DOE must be clearly denominated in English
Key information should be translated in English if available only in other language: dates, justifications, explanations etc.
Give to the auditor only documents that you (the CME) have checked
Focal point: there is only one channel of communication with the DOE
Send the DOE all the answers + documents in one shot
The style of answers to the CAR / CL should be formal and neutral
Refer to the VVS (p 43-63) to understand the DOE’s questions
Facilitate the work of the auditor: clear package of documents, information easy to verify, anticipate the questions etc.
CARBON PARTNERSHIP FACILITY 25
How to prepare a MR?
Refer to the following documents:
Monitoring Report writing
MR formMR
guidelinesCPA-DD
registeredMonitoring information
Methodo-logy and
toolsVVS
- Raw data- Calibration certificates- Serial numbers and replacement dates - Electricity consumed-Etc.
CARBON PARTNERSHIP FACILITY 26
Monitoring Report writing
Highlights: Use the latest MR template. Refer to the UNFCCC website:
https://cdm.unfccc.int/Reference/PDDs_Forms/index.html#proj_cycle “F-CDM-MR - Monitoring report form”.
For a PoA, one or two MR can be submitted for the monitoring period
The MR form cannot be altered (font, headings etc.)
English only
International System of Units: dates dd/mm/yyyy and numbers 1,000.00
The style should be formal and neutral
The MR guidelines give the precise information required by the UNFCCC: don’t add any further information
CARBON PARTNERSHIP FACILITY 27
Monitoring Report writing
Key content Section A: general information on the project
Refer to the CPA-DD Section A. Information also available on the project webpage at cdm.unfccc.int
Section B: implementation of the project- Describe the state of operations at the time of verification (e.g. only one
flare has been installed yet). - Describe the official post-registration changes: corrections, deviations
etc.
Section C: description of the monitoring system- Diagram showing the different points of measurements- Short description of the recording system (data logger, etc.)
CARBON PARTNERSHIP FACILITY 28
Monitoring Report writing
Key content Section D: data and parameters
- D.1: fixed parameters refer to section B.5.1 of the registered CPA-DD. Put only the parameters that are used for the monitoring period. For example, for landfill projects: include GWPCH4 or DCH4, but not φ, OX, DOCf, MCF, k…
- D.2: monitored parameters refer to section B.6.2 of the CPA-DD. List the same parameters and provide technical specifications of the instruments used to monitor the parameters. This is the main section.
Section E: calculation of ER- Report the main formulas (copy/paste from CPA-DD)- Report the end result of BE, PE and ER for the monitoring period.
CARBON PARTNERSHIP FACILITY 29
Verification documents
Organize documents by “package”: 1. Monitoring report and ER summary
Compilation / summary of monthly BE / PE / ER result for each CPA and total BE / PE / ER for the monitoring period for each CPA
2. Raw data – if applicable Monthly files extracted from the data logger in Excel format. Should be directly traceable to the original source
3. Emissions reductions calculations Monthly ER calculation spreadsheets for the entire monitoring period, per CPA
4. One folder per CDM instrument, each one containing: - Manual verify manufacturer, type, model, accuracy, calibration information - Calibration reports verify calibration dates and validity - Information on calibration frequency if not included in the manual
CARBON PARTNERSHIP FACILITY 30
Verification documents
Organize documents by “package”: Other documents
- Commissioning certificate- Training certificates- Organizational documents, e.g. procedures, operation manual - Main equipment specifications (flare, genset) - Electricity invoices for cross-check
CARBON PARTNERSHIP FACILITY 31
4. Issuance
UNFCCC Process
CARBON PARTNERSHIP FACILITY 32
From verification to issuance
What happens when the verification is over?
1. DOE uploads FVR, MR and ER to UNFCCC website. The project is visible in this section: http://cdm.unfccc.int/Issuance/completeness_check.html but the documents are not visible
2. RfI starts after a few weeks of waiting line (“awaiting scheduling”), usually 1 month
3. Then 1 week of Completeness Check
4. 3 weeks of Information and Reporting Check
5. 4 weeks of Issuance Request, the project documentation is now publicly available
6. Issuance of credits
TOTAL 3 months at the UNFCCC
CARBON PARTNERSHIP FACILITY 33
Training on CDM Operations Plans and Sub-ERPA Contracting
Washington D.C., USA, 2nd April 2014