Top Banner
19
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Car Parking System & Rotary Table by Sky Park Engineering, Mumbai
Page 2: Car Parking System & Rotary Table by Sky Park Engineering, Mumbai

PARKING SYSTEM’S MANUFACTURE

Page 3: Car Parking System & Rotary Table by Sky Park Engineering, Mumbai

PRODUCTSCar Stacker (1+1) Car Stacker (1+2)

Puzzle Parking Tower Parking

Page 4: Car Parking System & Rotary Table by Sky Park Engineering, Mumbai

CAR STACK (1+1) – DEPENDENT TYPE

Description:

• Hydraulic Driven or Mechanical

• Doubles the car space by stacking the cars one above the other.

Safety locks for safety

One Hydraulic unit for group of upto 5 Stack

• Simple installation• Operates on Single Phase 230VAC• Single point lock release

•Diamond plate runway and ramps for easy use

Page 5: Car Parking System & Rotary Table by Sky Park Engineering, Mumbai

CAR STACK (2+1)

 Standard Features :• Allow maximum car in same parking space ie.

Three    cars per system.

• Ground level car has to be remove to retrieve top

• Smooth & Quiet hydraulic operation.

• Four Pole Design make system more rigid & StableWide deck platform accommodates maximum car  variants.

• Durable construction for maximum stability.

Dual hydraulic cylinders combined with heavy    duty lifting chain & Equalizing mechanism. .Automatic safety lock. Maintenance free composite carriage bearings.

Pass 120% capacity dynamic load text and 150% static load test.

Page 6: Car Parking System & Rotary Table by Sky Park Engineering, Mumbai

PUZZLE Surface Type Puzzle Parking is fixed on

the Ground Level and could be used to fit in upto three cars one above the other i.e. two additional cars above the ground level also in one Column. Minimum 3 and Maximum of 6 such columns are possible which creates parking space for upto 19 cars where only 7 cars would have fit in.

Stack parking uses Micro-Processor Based logic controller along with a combination of various types of sensors and actuators to bring to you a parking solution that is robust and safe.

Semi Automatic.

Page 7: Car Parking System & Rotary Table by Sky Park Engineering, Mumbai

TOWER CAR PARKING

Tower Parking is a Fully automated parking solution where is a separate tower/Building is constructed

The lift moves vertically only and it stores the cars in multiple levels.

 micro processor based logic controller

Each car is stored on steel Pallet (movable platform) which is carried by lifts 

Page 8: Car Parking System & Rotary Table by Sky Park Engineering, Mumbai

TECHNICAL

Page 9: Car Parking System & Rotary Table by Sky Park Engineering, Mumbai

BIKE PARKING SYSTEM

Page 10: Car Parking System & Rotary Table by Sky Park Engineering, Mumbai

OUR FEATURES :-

Being manufacture we customize our all product as per client requirement

Me have done many project of stack parking, triple parking ,tower & puzzle .

Our all product are Indian made which make it easily serviceable .

We will give you onsite emergency service within 1 hr. as we are located in Thane.

We have repaired many unworkable foreign parking machine .

We will charge you 5% for Non Comprehensive AMC after 1 year.

Power consumption

Page 11: Car Parking System & Rotary Table by Sky Park Engineering, Mumbai

STRATEGY FOR TOTAL PLANNING

• Initial site survey: perform survey of the site proposed by the client including investigation of circumstances of neighboring area.

• Adoption: propose the best suited model of car parking system having befitting car accommodation capacity, by taking account of land area, its conditions, soil bearing capacity, ambient surroundings, etc.

• Schematic drawing and initial cost estimate: prepare optimal layout and work out preliminary cost estimate based on the initial survey and the result of the site selection. And also submit to client operation running cost estimate after commencement of operation of the car parking system.

• Confirmation of specification: Ask client to confirm specifications of the proposed parking system and scope of work. 11

Page 12: Car Parking System & Rotary Table by Sky Park Engineering, Mumbai

STRATEGY FOR TOTAL PLANNING

Contracting: Set up a contract with client after contract amount, specifications, production and construction schedule have been confirmed.

Construction & Schedule control: establish administrative structure and undertake construction work in accordance with progress schedule by placing top priority on safety.

Turnover of Car Parking System: Turnover to the client the pertinent and completed car system as soon as completion test and explanation on operation has been performed.

Maintenance and management services after completion and renewal of such car parking system.

12

Page 13: Car Parking System & Rotary Table by Sky Park Engineering, Mumbai

TOWER CAR PARKING

Tower car parking is of 30 cars in space of 3 car

Page 14: Car Parking System & Rotary Table by Sky Park Engineering, Mumbai

PUZZLE CAR PARKING

Page 15: Car Parking System & Rotary Table by Sky Park Engineering, Mumbai

STACK 1+1

Page 16: Car Parking System & Rotary Table by Sky Park Engineering, Mumbai

STACK (1+2)

Page 17: Car Parking System & Rotary Table by Sky Park Engineering, Mumbai

Cosmos Horizon 116Nos Mechanical car parking (Mechanical)—Thane

Marry Park Soc. 50Nos car parking (Mechanical)--Thane

Spring Soc. 64Nos car parking (Hydraulic & Mechanical)--Thane

Uthalsar Soc. 20Nos parking (Hydraulic)--Ahmdebad

Uday Industrial Complex. 32Nos parking(Puzzel Two layer)--Mumbai

Oasis Tower 44Nos parking (Puzzle Three Layer)--Mumbai

Parmeshwari Tower 12Nos (Rotary Car Parking)--Thane

Jagadesh complex 24Nos (Rotary Car Parking)--Mumbai

Parmeshwari Tower 30Nos (Hydraulic)--Noida

Dosti Group 34Nos (Tower Car Parking) –Mumbai

Cosmos Pride 28Nos (Tower Car Parking)--Thane

DHIL Group 32Nos. (Puzzel Car Parking 3 Layer)--Mumbai

Page 18: Car Parking System & Rotary Table by Sky Park Engineering, Mumbai

Chohan Construction 10Nos parking (Mechanical)-- Noida

Sankalp Construction 40Nos Parking ( Tower Car Parking) Mumbai

Nandhivardhan Construction 30 Nos parking (Puzzel Car Parking 4 level) Ahmdebad

Hardikar Hospital 22 Nos (Hydraulic Car Parking) – Pune

Shivtech Construction Pvt Ltd 24Nos (Puzzle Car Parking) -- Assam

Page 19: Car Parking System & Rotary Table by Sky Park Engineering, Mumbai