Top Banner
CAPITAL PROJECTS UPDATE TO SENATE CALIFORNIA STATE UNIVERSITY, CHICO
11

CAPITAL PROJECTS UPDATE TO SENATE · MASTER PLAN FRAMEWORKS An Inclusive Chico State: Promote an inclusive environment by fostering a welcoming campus, access to robust support services,

Aug 16, 2020

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: CAPITAL PROJECTS UPDATE TO SENATE · MASTER PLAN FRAMEWORKS An Inclusive Chico State: Promote an inclusive environment by fostering a welcoming campus, access to robust support services,

CAPITAL PROJECTS UPDATE TO SENATE

CALIFORNIA STATE UNIVERSITY, CHICO

Page 2: CAPITAL PROJECTS UPDATE TO SENATE · MASTER PLAN FRAMEWORKS An Inclusive Chico State: Promote an inclusive environment by fostering a welcoming campus, access to robust support services,

MASTER PLAN FRAMEWORKS

An Inclusive Chico State:

Promote an inclusive environment by fostering a welcoming campus, access to robust support services, and facilities reflective of a diverse population

Provide new and renovated facilities and open space to reflect today’s student

An Experiential Chico State

Dedicate the campus core to the student experience

Enhance opportunities for campus activity beyond classroom hours

Improve and expand facilities

A Learning Chico State

Transform the academic environment for today’s student

Maximize existing academic space

Increase facilities to improve the academic and research environment 2

Page 3: CAPITAL PROJECTS UPDATE TO SENATE · MASTER PLAN FRAMEWORKS An Inclusive Chico State: Promote an inclusive environment by fostering a welcoming campus, access to robust support services,

3

~33% of our buildings!

~913,155 GSFRequires Total Renovation or Complete Replacement

Critical Building Needs

0.00‐0.10Excellent

Typically new construction

0.11‐0.20Good

Maintained within lifecycle

0.21‐0.30Fair

Normal renovations needed

0.31‐0.50Below AvgMajor renovations

needed

0.51‐0.60Poor

Total renovation needed

> 0.60Complete

replacement indicated

FACILITY CONDITION ASSESSMENT

Page 4: CAPITAL PROJECTS UPDATE TO SENATE · MASTER PLAN FRAMEWORKS An Inclusive Chico State: Promote an inclusive environment by fostering a welcoming campus, access to robust support services,

NEW SCIENCE BUILDING

4

Page 5: CAPITAL PROJECTS UPDATE TO SENATE · MASTER PLAN FRAMEWORKS An Inclusive Chico State: Promote an inclusive environment by fostering a welcoming campus, access to robust support services,

5

Page 6: CAPITAL PROJECTS UPDATE TO SENATE · MASTER PLAN FRAMEWORKS An Inclusive Chico State: Promote an inclusive environment by fostering a welcoming campus, access to robust support services,

TEAM CONTINUITY

6

Page 7: CAPITAL PROJECTS UPDATE TO SENATE · MASTER PLAN FRAMEWORKS An Inclusive Chico State: Promote an inclusive environment by fostering a welcoming campus, access to robust support services,

POTENTIAL MASSING

7

Page 8: CAPITAL PROJECTS UPDATE TO SENATE · MASTER PLAN FRAMEWORKS An Inclusive Chico State: Promote an inclusive environment by fostering a welcoming campus, access to robust support services,

8

Page 9: CAPITAL PROJECTS UPDATE TO SENATE · MASTER PLAN FRAMEWORKS An Inclusive Chico State: Promote an inclusive environment by fostering a welcoming campus, access to robust support services,

Current Footprint = 89,075 GSF

Current usage

3 Computer labs

24 Lecture spaces

161 Offices

7 Conference rooms

6,000 sf of teaching labs

4th floor IT personnel, data center, and communications hub

Construction schedule:

Summer 21 to Summer 239

BUTTE REMODEL

Page 10: CAPITAL PROJECTS UPDATE TO SENATE · MASTER PLAN FRAMEWORKS An Inclusive Chico State: Promote an inclusive environment by fostering a welcoming campus, access to robust support services,

DESIRED OUTCOMES

Align with Master Plan

Academic icon for campus

More efficient use of space catering to active learning

Hazmat abatement

Mechanical, Electrical, and Plumbing upgrades

Aim for a Net ZERO building

Additional 10,000 sf for student “hang out” space

Exterior and landscape upgrades

Transition all or portions of the 4th floor to academics

Site logistics and traffic flow will be key10

Page 11: CAPITAL PROJECTS UPDATE TO SENATE · MASTER PLAN FRAMEWORKS An Inclusive Chico State: Promote an inclusive environment by fostering a welcoming campus, access to robust support services,

CURRENT TIMELINE

Summer 2020: Complete New Science Building

Start Old Physical Science remodel

Summer 2021: Complete Old Physical Science remodel

Start Butte remodel

Summer 2023: Complete Butte remodel

11