Page 1 of 69 CAPACITY BUILDING PLAN FOR WORLD BANK FUNDED COMMUNITY IRRIGATION PROGRAM, JALA SAMVARDHANA YOJANA SANGA SUBMITTED BY SRIJAN, Bangalore office 2 nd January 2003 (Coordinated by Mr.S.Ananthanarayana Sharma, team leader with Mr.Shubham Singh and Mr.Ramachandra Rao)
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1 of 69
CAPACITY BUILDING PLAN
FOR
WORLD BANK FUNDED COMMUNITY IRRIGATION PROGRAM,
JALA SAMVARDHANA YOJANA SANGA
SUBMITTED BY
SRIJAN,
Bangalore office
2nd
January 2003
(Coordinated by Mr.S.Ananthanarayana Sharma, team leader
with Mr.Shubham Singh and Mr.Ramachandra Rao)
- -
2
2
Chapter One: INTRODUCTION
1.1 The Karnataka Community Tank Management Project
The Jala Samvardhane Yojana Sangha (JSYS) is a registered society set up by the Government of Karnataka in October 2000 to serve as the nodal agency in the state for community based tank management. It has been formed to facilitate the transfer of irrigation tank system development and management from the state back to (village) communities via user groups. (see pg.9 of PAD). The first project taken up is a World Bank funded “Karnataka Community Based Tank Management Project”. The project proposes to cover two thousand tanks to demonstrate the viability of a community-based approach to tank improvement and management. The formal project development objective has been framed as “ improve rural livelihoods and reduce poverty by developing and strengthening community based approaches to improving and managing selected tank systems”. (see pg. 2 of PAD). The proposed budget for the program is $125 million, (or Rs.6, 250 million); spread over seven years, starting July 8th 2002. The JSYS has selected thirty four taluks in nine districts for implementation of the program. These talukas have been selected on the criterion of economic and social backwardness, and in a sense represent the some of the “poorest of the poor” in the state. Two thousand and five village tanks are expected to be rehabilitated through the program. The district wise distribution of tanks as planned in the PIP is as under
District Planned Number
of Tanks
%age
1. Kolar 1024 51
2. Tumkur 397 20
3. Chitradurga 72 4 4. Haveri 228 11
5. Bellary 53 3 6. Raichur 158 8
7. Bagalkote 26 1
8. Koppal 21 1 9. Bidar 26 1
TOTAL 2,005 100
Around 1,600 tanks (eighty percent of the tanks under the project) would be having a command area between four to forty hectares. (also called Zilla Panchayat tanks). The remaining four hundred tanks (twenty percent of the total) would be having a command area greater than forty hectares up to four hundred hectares. (also called MI tanks)
The program design involves the placing of a Cluster Facilitation Team at the taluk level. This team will consist of five professionals and two support staff – namely, a social scientist (preferably the team leader), a an engineer (preferably civil), an agriculture scientist, a gender expert, a tribal and rehabilitation specialist. The support staff would be an accountant and a data entry operator. The CFT would be “hosted” by a Non Government Organistion, which would have the “credibility” with the villages, to enable “initial entry” into the village. The CFT is expected to organise the Tank Users Groups in the villages, build up their capacity to plan and implement an
- -
3
3
“Integrated Tank Development Plan”, and to do the later Operations and Maintenance. Each CFT is expected to organise atleast forty tanks in five years in their taluk. Twenty five CFTs are in place as under –
DISTRICT CLUSTER FACILITATION TEAM (with taluk in brackets)
The CFTs in turn are to be supported by “Anchor Non Government Organisations” which operate at a regional level (typically a few districts). The ANGO team is expected to build up the capacity of the CFTs in their area. So far four ANGO teams have been placed as under
Anchor NGO
Districts/ region covered
Oxfam (India) Kolar and Bagalkote
BAIF (Karnataka) Tumkur and Chitradurga
BAIF (K) – Bellary Haveri and Bellary Prerna, Raichur Raichur, Koppal and Bidar
Srijan, Bangalore has been contracted as the nodal capacity building organisation for the project. The funding for the project, flows from the World Bank through the Government of India, and Government of Karnataka to the Jala Samvardhane Yojana Sangha (JSYS), Bangalore, State Project Unit. (SPU). The SPU has established nine district project units (DPUs) for the nine districts. These DPUs are the “nodal” agency for receiving the Integrated Tank Development Plans from the TUGs, appraising and sanctioning them, and arranging for transfer of funds from the SPU. Conceptually, thus funding can be depicted as a “top down” flow, while capacity building can be seen as a “bottom up” process (if CB has to be done on user needs). In addition, the ANGOs are expected to liase with the DPUs intensively, and Srijan with the SPU. Thus the project design can be conceptually visualised as under –
- -
4
4
Funding Information flow for
Capacity Building
The PIP also envisages specialised institutions to be brought in for capacity building. All agriculture related activities are to be handled by the University of Agriculture Sciences (UAS), Bangalore and Dharwar campuses. Similarly, legal issues are to be handled by the National Law School, Bangalore. The final CB plan would also incorporate their inputs. (Presently the contracts have just been signed, and it is too early for these institutions to design CB inputs, for this plan). Other specialised institutions like Water and Land Management Institute (WALMI) are also proposed to be tapped for issues relating to legal aspects of turnover of tanks from the MI department to the TUG.
1.2 Context of this plan
The project philosophy has always been to ensure close coordination amongst the project partners and stake holders. The preparation of the PIP which was a one and half year participatory process, was one activity which came out of this philosophy. Similarly the need was felt to coordinate a planning exercise for the Capacity Building plan, to mesh in the activities and the needs of all the project partners and the stake holders. The purpose was also to ensure a common understanding about the CB activities, and level of competency to implement the plan.. The World Bank mission also realised this need for coordination, and highlighted the need for such a comprehensive plan in the Aide-memoire of its first supervisory mission (September 5th to 12th 2002). (see page 9). 1.3 Process of developing the CB Plan The PIP states that the project policies will “always learn from experience”. (page 116 of July 2002 version). ,The guiding principle behind developing the CB plan has been of “ Learning by Doing”. A consequent guiding principle has been to given the maximum weight to “implementation based experience, while designing any plan or activity”. Thus the following were the experiential inputs which went into the plan
a) The assessment of CFT members, by SPU and Srijan. A rough indication of the training needs was one of the outputs of the assessment exercise, which covered every CFT member. ( held in May – June)
b) The first round of orientation to all CFT members, held in June and July in Bangalore. This covered every CFT member twice – first for a general orientation workshop (for two/three days) and second for a specialised thematic workshop related to the subject matter they specialised in (for two to four days). The training needs as thrown up by the assessment process was one of the design inputs. The workshop classroom (and in some cases, field work)
TUG
DPU
SPU
CFT
ANGO
SRIJAN
- -
5
5
components, created some insights into the present capacity of the CFT team members. The formal feedback sought, and the the insights gained by the facilitators (all SPU or Srijan staff) also created data for clarifying CB issues
c) The first round of TUC orientations to TUGs, which were anchored by ANGOs with design inputs from Srijan (August – September) also generated a lot of field data on CB issues. Some of the CFT members also participated as facilitators, which went in some way to create a shared understanding of the problems across all the CB agencies.
d) The ITDP review cum standardisation of formats workshop (20/21 Sept), for the first time brought a common understanding on the methodologies and formats to be used for ITDP preparation in the village. The standardisation of ITDP formats also led to sharper clarity on the tasks and responsibilities of the CFTs and TUGs for the implementation, atleast in terms of data requirements and analysis.
e) The revised Operations Manual (October to December) also had a lot of inputs directly from the field (CFTs and ANGOs). The interactive process of redesigning the manual, also threw up CB issues, and clarification on sharing of responsibilities. In a sense, the OM and the CB plan literally have progressed together.
f) The first CB plan workshop held on 13/14 November at Srijan Bangalore office, brought together the SPU CB team and the ANGOs for discussing the evolution of the CB plan. A lot of the experiential data of the ANGOs in hand holding the CFTs in the field implementation process, and of the SPU CB team, in administrating their districts and the project, was used to prioritise issues, and decide on methodologies and frameworks. The first draft report was circulated by the ANGOs to their respective CFT members for discussions and comments. Srijan staff also used this opportunity to discuss the frameworks and the OM with CFTs and TUGs in Kolar and Raichur districts. The different level of CB needs (village, taluka, district, state), linking CB needs to specific expectations/ outputs for implementation, and ,the framework of the TUG level CB emerged from this workshop
g) The second CB plan workshop held on 26/27 November at Srijan office, took this planning process forward. The CFT CB needs, the coordination and other issues at the district and state level, creating an environment for “learning”, methodologies/androgogies were some of the issues discussed. The earlier version of TUG orientation was redone with the inputs of the CFTs via the ANGOs. The second round of TUG orientations which were in progress, presumably added experiential data to the ANGO sharing of experiences.
h) The report of the second workshop was circulated to the ANGOs and the SPU specialists. Srijan staff also directly interacted with three CFT teams after a village grama sabha experience in Kolar district. The comments of the ANGOs, who in turn, interacted with the CFTs, the . SPU specialists, and the discussions in Kolar went into the final draft report.
i) The initial five day PRA camp for CFT members. The planning for this was done by the SPU in a workshop in SRIJAN and tested in Chunchadenahalli village in early December. This exercise also brought in the need to mesh in participatory exercises with the ITDP preparation.
The present Capacity Building plan is the result of these experiential data, processed and abstracted for learnings. . This plan is still a draft which would be circulated to the partners to get their inputs, after which it would be finalised. After all inputs have been received, the formal ToR for the CB Plan would be signed for implementation. This would also bring in supplementary contracts to be signed with the partners. The content (or the training material) for the modules is in the process of being developed. This pace would be speeded up with the finalisation of the draft CB plan. .
- -
6
6
The CB plan would be revisited in June 2004 to gain from the first two years of implementation experiences and further revised.
1.4 Conceptualising the CB Plan
The present plan can be conceptualised as working at four levels, which correspond to the geographical spaces at which the project operate – a) The village level, where the TUG is expected to plan and implement the ITDP b) The taluka level, where the CFT is expected to operate over the next five years c) The district level, where the DPU is expected to be in charge d) The state level, where the SPU is expected to be in charge
The four levels, also have corresponding CB issues for the Government line departments and for the political system. For the sake of visualisation, the following matrix has been drawn up.
Level Project Implementation
Partners
Government Line
Departments Elected Representatives
(Political System)
1. Village TUG , TUC, Sub committees, office bearers
Village accountant, village agriculture worker, etc
Gram Panchayat
2. Taluka CFT and HNGO head Tahsildar, executive officer, etc
4. State SPU staff and Srijan team State secretariat staff in Minor Irrigation, Agriculture, etc
Ministers.
The following chapters follow this order, in presenting CB plans for various levels.
It is important to note that much of the experiential data relate to the only the first and second stages. Hence a lot of detail has been gone into, especially for the TUG and the CFT CB plans. The other two levels, do not have much experiential data to go by. These plans will necessarily evolve with implementation experience. Hence these CB plans, would be very tentative and sketchy in nature.
- -
7
7
Chapter Two : CAPACITY BUILDING PLAN AT THE VILLAGE LEVEL
2.1 Context
The “village” level is where the physical implementation of the plan will take place. The village Tank Users Group is expected to be responsible for planning and implementing the ITDP. The PIP envisages five clear phases in village project implementation. These are –
A) Preparatory – where the village is energised to start the ITDP process B) Pre Planning – where the village institutions are created, and preliminary technical and social
data collected C) Planning – where through a participatory process the ITDP is drawn up and ratified by the
TUG, for sanction by the DPU D) Implementation – where the TUG physically implements the ITDP E) Post Implementation – where the TUG takes over the responsibility for Operations and
Maintenance of the tank. The CB plans have to necessarily mesh in with these project phases. Hence, the CB plan has been distinctly divided for these phases. The TUG CB plans have some experiential data to back it. However the CB plans for the line departments and the Panchayat Raj Institutions (PRI) have been presently based on conjecture, keeping in view, the requirements of the TUG in implementation. Hence, the first part, the TUG CB Plan has much detail. The other two, of Gram Panchayat functionaries and of the Village level workers of the Government line departments, are sketchy and would be concretised after the project conducts some CB activities and gains experience.
2.2 CB Plan For Tank Users Group
The village level tank users group is responsible for the implementation of the program. It is expected to use the services of the taluka level Cluster Facilitation team for creating the Integrated Tank Development Plan and of implementing it. However the fact remains that while the enthusiasm and commitment for tank rehabilitation is very high in project villages, it is not matched by an understanding of the technical and social issues.. The CFT thus has an increased responsibility for building up the capacity of the TUG for implementation. In fact, from a CB perspective the only job of of the CFT would be to “build up the capacity of the TUG for project implementation”. The following CB modules for building the capacity of the TUG over the various phases, is detailed below.Much of it would be directly implemented by the CFT members.
- -
8
8
2.2.1 PREPARATORY PHASE – MODULE A : Project Introduction This becomes a sort of awareness camp cum Grama Sabah. . Key villagers need to be identified to make them “informants”. The awareness camp should make the people recall the past, understand the importance of the tank, the objectives of the project, the components, principles and processes of the KCBTMP, and the various partners for the TUG. The methodology should be that suitable for mass dissemination – including video cassettes, audio cassette before the grama sabha, organising jathas and street plays. (Should cultural team take
charge of this component?). It would be a one day exercise, with the entire CFT in attendance. The output of the module would be a general willingness on the village to take up the project – measured by progress made in convening the Grama sabha to discuss institutional options. MODULE B : Institutional options
This also becomes a sort of grama sabha. Different focus group discussions by different stake holders (command area farmers, catchment area farmers, vulnerable groups, women, encroachers) would be held on the project. Issues of possible command area contributions, membership fees (which should be linked to cost of registration), (both entrance and annual), would be discussed. A grama sabah resolution would be passed on the Resettlement Action Plan. (RAP). This too would be a one day program.)
The support required for the preparatory phase would be media material, laminated posters, video and
audio cassettes, charts, etc. for display in public spaces in the village. Handbills would also need to be
printed and distributed
Pre Planning phase MODULE C: Bye laws Interested members and key leaders would need to be present for this module. CBO leaders, Gram Panchayat members, and village level workers would also need to be involved. Around forty to fifty members would need to participate in the program. This would be a one day program in the village, with lunch and two teas provided. Some more information on the project and on the institutional options would be provided. Quick discussions would be held on the byelaws, and the changes suggested for the peculiar village context, and for the institutional option proposed. Salient features of the various acts, - societies registration, panchayati raj, land revenue, forest conservation, minor irrigation, bank regulations would be explained. NRM experiences would also be shared. The output of this module should be the convening of a formal Grama Sabha (probably the very next day) for formal ratification of the byelaws and selection of the TUC. Support required would be simple teaching material (flip charts/posters/ handbills) for explaining the
project, the implication of the institutional option chosen, the various laws, and for the model byelaws.
- -
9
9
MODULE D: Exposure trip
After selection of the TUC, a one day exposure would be arranged for the TUC members and for some five to ten key leaders. The trip would be to a successfully implemented ITDP within the district or taluka. Two vans need to be hired, and food provided for.
MODULE E : First round of accounts training
The one day training would be conducted after registration of the TUG and opening of the bank account. The CFT accountant would provide this training for half a day to all the TUC members. The cheque signatories, and the secretary/ accountant., would be given an additional half a day training. Simple accounting formats relating to receipts, vouchers, cash book, bank book, and using the bank pass book to monitor funds receipt and withdrawal would be covered. The success of this module would be judged by the correct entry of membership fees and contributions, initial expenses, and of the utilization of the initial administrative grant of five thousand rupees. Support required would be the creation of simple teaching modules with mock exercises for semi
literate TUC members, and literate accountant/ secretary.
- -
10
10
2.2.2 PLANNING PHASE (These modules have to link up with the ITDP surveys – engineering, agriculture and environment,
and social)
MODULE F :General orientation on ITDP preparation This will be a two day orientation in the class room on the ITDP for all TUC members and sub committee members.
MODULE G –1 : Thematic orientation on engineering issues
This will be a three-day field orientation, concurrent with the engineering surveys undertaken. The relevant subcommittees would be given some orientation on the instruments used, and the various surveys being undertaken. The orientation would end concurrently with the technical surveys.CFT engineer would be coordinating the exercise MODULE G –2: Thematic orientation and PRA exercises on environmental and agriculture issues This would be a two day field exercise, after the silt estimates have been made. The agriculture specialist would discuss with the relevant sub committee, catchment treatment measures, proposed during the engineering survey, other measures including foreshore plantations to reduce silt inflow to the tank, and the silt utilization plan. The specialist would also conduct PRA exercises for the command area treatments for pest and nutrient management, fodder and livestock planning, fisheries plan and the afforestation/ horticulture plan. The CFT agricultural specialist would be coordinating this exercise MODULE G –3: PRA based orientation on social issues This will be a two day field PRA exercise to facilitate the collection of data for the gender and vulnerable groups plan. The output of the exercises would be the completion of all data collection and the initiation of the gender and the vulnerable group action plan. The CFT gender expert would be coordinating this exercise.
MODULE H: Orientation on preparation of estimate
This would be a one day exercise after the preparation of the drawings and rough estimates. These would be discussed with the TUC and the subcommittees. Their feedback would be sought for fine-tuning the estimates, as also to orient them. The social scientist and the engineer would be coordinating the exercises. The estimate preparation would be the starting point for collection of the 3% contribution by the TUC.
MODULE I : Procurement planning
After collection of the 3% contribution, this planning exercise would be conducted in the village.. The exercise coordinated by the social scientist, along with the engineer and the accountant. The estimate would be broken down into “works” – which would be planned for in terms of in terms of procurement procedures to be followed. This would be a one or two day exercise
- -
11
11
MODULE J : Ratification of the ITDP This would be a one day classroom exercise for all the main stakeholders.- the TUC, the subcommittees, and key village leaders. The final ITDP to be submitted would be explained and the ratification sought by the TUC. The TUC would formally convene the Grama Sabha the next day, to ratify the ITDP, before submission to the DPU.
MODULE K : Second round of Accounts training
After approval of the ITDP by the DPU, the CFT accountant would organize the classroom exercise. The TUC and the subcommittees would be given a half a day orientation on the various books of account to be maintained during project implementation. The secretaries would be given a two day or more classroom input, consisting of mock exercises. The responsibility for the TUG CB for each of the CFT members , can be depicted as under – Engineer Agriculture Gender R&R Social
Support required would be mainly in methods of capacity building/ adrogogy. The contents would be
specific to each tank.
- -
12
12
2.2.3 IMPLEMENTATION PHASE
MODULE - L : Exposure trip to TUC members within state
After approval of the ITDP by the DPU, the TUC members would be taken to a successfully completed ITDP outside the district. This would be a two day orientation apart from the actual time of travel. The TUC members would be exposed to a TUG which has successfully completed an ITDP, and the systems adopted for this output. MODULE - M : Thematic modules
The respective CFT specialists would conduct the following thematic modules for their relevant sub committees,. These one day/ two day modules would be directed towards ensuring completion of plans, within time and costs, of required quality. MODULE M – 1:Thematic module on procurement and accounts
This would be a common one day module for all the TUC members and the sub committees. Implementation issues in following the World Bank norms for procurement at the village level, and fulfilling the mandated accounting systems for audit and control would be discussed. The CFT social scientist would coordinate this with the CFT engineer and the accountant. .This would be followed by another one day specialized training for the accountant/ secretary at the taluka level. MODULE M - 2 :Thematic module on engineering measurements and measurement books
The relevant subcommittee and the secretary would be exposed through mock exercises to measuring machine time, labour time material utilization and the final completed works. The writing of these measurements in the relevant measureent and log books , wold also be taught through through mock exercises. It would also include quality control issues. This workshop would be for two days. MODULE M - 3 :Thematic module on agriculture and environment measures The relevant sub committee and the secretary would be exposed to the implementation processes for the y catchment area works and the foreshore plantations, which would form part of the environmental protection plan. Emphasis would be on the utilization of silt, which would be the responsibility of this sub committee. – the pre measurement, the measurement of desilting and the accounting for its utilization. The implementation issues in the command area nutrient and pesticide management plan, the fodder and livestock plan, the fisheries plan and the afforestation/horticulture plan would be discussed. The engineering and the agriculture specialist would coordinate the thematic exposure – whose length would depend on the plans made.
MODULE M – 4 : Thematic module on encroachment and vulnerable group plan implementation The relevant subcommittee to rehabilitate the encroachers and to create tank based livelihoods for the vulnerable groups would be oriented to the implementation issues in the plan. The R&R specialist would coordinate this one day module.
- -
13
13
MODULE M - 5 : Thematic module on gender plan implementation
The relevant subcommittee to create tank based livelihoods for the women in the village would be exposed to the implementation issues in the plan. Another component would be strengthening awareness for increasing the participation of women in the ITDP implementation. The CFT gender t would coordinate this two day module. MODULE M -6 :Thematic module on formats for monitoring and learning and GIS This module would be coordinated by the CFT documentation specialist. MODULE N :Workshop on Internal management systems and team building The two day program would be coordinated by the social scientist, for the TUC and the sub committees. Issues of delegation of responsibilities, and legal issues would be covered under the internal management system component. Conflict resolution, institutional development of norms like transparency and accountability, leadership tasks, and networking with other project partners would be discussed in the team building component. Problems arising during implementation would be picked up for discussion during this workshop, to be ideally held at a location outside the village. . MODULE O :Workshop on Operations and Maintenance (O&M)
The one day module would be coordinated by the social scientist, with the engineering and agriculture specialist – around the third milestone implementation. Issues for sustainable utilization of the tank system would be discussed – including the engineering maintenance, the water usage, the collection of water fees, the appointment and payment of the “Neerganthi”, protection of tank based livelihoods for women and vulnerable groups, ensuring no further encroachments etc. Support required would be common frameworks for analysis of implementation experiences and for
methods/androgogy for transferring mainly implementation related skills and attitudes. The contenst
would evolve for the particular tank context.
- -
14
14
2.2.4 POST IMPLEMENTATION
MODULE P : Exposure trip to TUC representatives outside state Two TUC representatives from each TUG would be given an exposure to a successful post rehabilitation tank/ federation outside the state. This exposure would be arranged after successful completion of the ITDP and settlement of all bills. MODULE Q :Operations and Maintenance The TUC members and the Neerganthi would be exposed to issues regarding operations and maintenance, in the village. The one day program would focus on issues arising out of the maintenance of the tank post rehabilitation. MODULE R :Forming a federation
The TUC representatives would be given a one day orientation on the advantages of forming a federation. This would be coordinated at the taluk/district level, with TUC members of other TUGs. Support required would be mainly for facilitation of expectations, creating a positive attitude towards
cooperation, etc. A lot of the post implementation activities would depend on the signals from the JSYS
and the Government, which policies, fall outside the purview of the present CB plan.
Page 15 of 69
SUMMARY SHEET FOR CAPACITY BUILDING FOR TUGs:
ITDP PHASE OUTPUT TUG CB PLAN
Preparatory (0 Month)
Creation of a favourable village environment,membership fee collection, choice of instiutional option and registeration
a) Project Introduction b) Institutional Options c) Bye laws & Registration
Pre planning (2nd month)
Setting up systems for accounting and ITDP
d) Exposure visit within the Taluk e) First round of accounts training
Planning Formal Preparation of ITDP 3% contribution collection.
f) General orientation on ITDP g) (i) Thematic orientation on engineering
surveys (ii) Thematic orientation & PRA exercises on environmental and agriculture surveys (iii) PRA exercises for social issues
h) Orientation on preparation of estimates i) Procurment planning j) Ratification of the ITDP k) Second round of accounts training
Implementation Completion of ITDP within time and costs of required quality Collection of second 3% contribution
l) Exposure trip for TUC members within state m) Thematic modules
1. Procurement &accounts 2. Engineering measurement and books 3.Agriculture/environment 4. Encroachment and Vulnerable groups 5. Gender 6. M&L and GIS n) Internal management systems and team
building o) Operations and Maintenance
Post implementation
Sustainable Operations and Maintenance (O&M)
p) Exposure trip to TUC representatives outside state
q) Operations and Maintenance r) Forming a federation
- - 16
SUMMARY OF CB PLAN FOR Tank User groups/Committees/Office Bearers
Title of
the
Program
me
(Module)
Contents Expected
Outcome
Methodology Numbe
r of
days
Participants Responsible
agency/
person in CFT
PREPARATORY PHASE
A. Project Introduction
Past history of the tank and culture of tank based agriculture villages. Importance of tank for village political economy Objectives of the project Components, principles and processes of the project
Awareness of the need for the project Willingness of the village to take up project. Deciding on a date for the next Grama Sabha to decide institutional options
Mass dissemination techniques – use of video and audio cassettes before grama sabha, organising jathas, and street plays
One Whole village, with emphasis on CBO leaders, traditionaleaders, elders, PRI members
All members Culture team in DPU?
- - 17
B. Institutional Options
• Four institutional options
• Legal issues
• Membership fees and contributions
• Project experience with options
• Internalise concept of decision making in gram sabha
• Consultation with different stakeholders for choosing institutional options
• Commitments for membership fees and contributions
• Commitment on RAP
• Grama Sabha resolutions to this effect
• Posters, flip charts on each option
• Focus group discussions
• Large Scale Interactive Process (LSIP)
One Whole village with emphasis on CBO leaders, PRI members traditional leaders, elders, command and catchment area farmers, gender leaders, encroachers
All members DPU culture team?
- - 18
PREPLANNING PHASE
Title of
the
Program
me
(Module)
Contents Expected
Outcome
Methodology Numbe
r of
days
Participants Responsibl
e agency/
person in
CFT
C. Bye - Laws Registration Bank Account
• Relevant state government laws
• Model bye law of JSYS
• Registration procedures
• Bank account operation procedures
• Evolving bye laws
• TUC member selection and sub committees
• Membership fee collection
• Registration of TUG
• Opening of bank account
Lectures Flip charts and posters Focus group discussions Participatory exercises Facilitating sharing of other project experiences.
One Around fifty people .Village leaders, PRI representatives, elders, representatives of command and catchment farmers, gender leaders, vulnerable group leaders and encroachers
Social scientist, R&R specialist, gender specialist
D. Exposure
Visit to successful ITDP village
• Motivation of TUC members to start ITDP planning
Exposure trip to a successfully completed ITDP in district. Debriefing on lessons learnt
One Around fifty. people. TUC & sub committees, command and catchment farmers, gender leaders, vulnerable group leaders and encroachers
R&R specialist, Gender
E. Accounts and book keeping
Various accounts books and procurement procedures prescribed for ITDP by JSYS
• Orientation to various books
Mock exercise One TUC members and members of sub committees
Cooperative attitude towards participative planning process. Collection of 3% contribution
Use of flip charts., posters Focus group discussions
All TUC and sub committee members
Two All
G 1. Thematic orientation on engineering
Engineering plan
Participation in process of engineering planning for ITDP
Transect walk and exposure to engineering instruments and surveys
Relevant sub committee and TUC office bearers, catchment and command area farmers
Three Engineer
G –2 Thematic orientation and PRA on agriculture an environment.
Agricultural and Environmental plans Silt utilisation plan
Participation in process of agriculture and environment planning for ITDP
Transect walk, resource mappings, time lines, seasonalities, participatory development of agriculture technology
Relevant sub committee and TUC office bearers Catchment and command area farmers
Two Agriculture specialist.
- - 20
G-3 PRA based orientation on social issues.
Gender plan, Vulnerable people plan, Resettlement plan
Participation in creation of these plans
Participatory exercises for collection of relevant data and for planning action
Members of TUC and catchment area and command area farmers, leaders of SHG/WIG , vulnerable group leaders, and encroachers
Two Social scientist, gender specialist resettlement specialist
H Orientation on preparation of estimates
Estimate preparation for ITDP
Understanding of numbers and works in estimate
. Mock exercises for small works and for silt utilisation plan
Members of TUC and relevant sub committees
One Social scientist, engineer, accountnant, agriculture specialist (for silt).
I Procurement Planning
Village Resource mobilisation plan Procurement plan Cash flow plan Bar/Gannt chart for implementation
.Participative plan for ITDP implementation
Participative planning techniques. Use of posters and flip charts for analytical tools like gannt chart and cash flow plans, and procurement procedures
Members of TUC and relevant sub committees
One/ two
Social scientist, engineer, accountant, agriculture specialist (for silt).
- - 21
J Ratification of the ITDP
Ratification of ITDP by TUG/gram sabha
Discussions for next day grama sabha
Facilitation of planning for ratification in the grama sabha
TUC members One day
Social scientist, gender specialist, R&R specialist
K Second round of accounts training
Accounting for procurement and implementation
Posters and flip charts on various accouting formats and procedures
Mock exercises with formats
TUC members and relevant sub committee for half day Accountant/ secretary for two days
Half + two
Social scientist, engineer, accountant, agriculture specialist (for silt).
- - 22
Title of
(Module)
Contents Expected
Outcome
Methodology Participants Number of
days
Responsible
person in CFT
IMPLEMENTATION PHASE L Exposure trip to TUC members
Exposure to a successful ITDP outside district
Motivation to complete ITDP within time and costs,
Interaction with TUC members of a successful ITDP implementation process Debriefing on lessons learnt
All TUC members Two R&R specialist and gender specialist? (SS is busy
M THEMATIC MODULES M –1 Procurement and accounts
Procurement plan and account formats
Taking responsibility for procurement process and its accounting by TUC
Mock exercises All TUC members and one member of each subcommittee
Two/ three Social scientist, engineer, accountant.
M- 2 Engineering measurements and measurement books (especially silt measuremnt)
Engineering plan in ITDP Measurements, of works, Silt pre measurement and post measurement
Understanding of rights and responsibilities during implementation of engineering component
Practical demonstrations on measurement and recording in relevant books
Relevant sub committee members, interested TUC members and office bearers
Two – three Engineer
M-3 Agriculture and environment
Agriculture and environment plans in the ITDP
Understanding of rights and responsibilities during implementation of plans.
Practical exercises in farmers field schools
Relevant sub committee members, interested TUC members and office bearers
Two Agriculture specialist
M-4 Encroachment and Vulnerable
Resettlement Action Plan and Vulnerable Groups Action Plan
Responsibility for implementation
Practical exercises in planning and monitoring
Relevant sub committee members,
One R&R specialist
- - 23
groups plan sanctioned in ITDP of plan. implementation interested TUC members, encroachers vulnerable group representatives and office bearers
M-5 Gender action plan
Gender action plan sanctioned in ITDP
Responsibility for implementation of plan
Practical exercises in planning and monitoring implementation
SHG/WIG leaders, interested sub committee members, interested village women leaders, invited TUC members, and office bearers
One day Gender specialist.
M-6 Monitoring and learning and GIS
M& L formats and GIS for monitoring
Appreciation of formats and GIS
Practical exercises in use of formats
Relevant subcommittee members interested TUC members and office bearers
One day Documentationist and DPU staff trained for this purpose.
N Internal management systems and team building
Delegation of responsibilities Conflict resolution Institutional values of transperancy, accountablility, etc Legal issues Networking
Team work for completing ITDP within village Initiation and maintenance of appropriate linkages
Behavioural exercises set in ITDP contexts Using events and data from ITDP implementation for these exercises
TUC members, sub committee members, office bearers
One/ Two Social scientist, gender expert, R&R specialist
O Operations and Maintenance
O& M plan post ITDP Appreciation of issues, and outline of O&M plan
Visioning exercises and goal setting for performance
TUC members, sub committee members, office bearers
One Social scientist, engineer, accountant
- - 24
Title of
(Module)
Contents Expected
Outcome
Methodology Participants Number of
days
Responsible
person in CFT
POST IMPLEMENTATION
Exposure trip outside state
Exposure to a successful Federation outside state
Motivation to form a federation of TUG Concept clarity on federation system
Interaction with board members of a successful tank federation Debriefing on lessons learnt
Two representatives
Four Social Scientist
Operations and Maintenance
Issues in O&M. O&M implementation structure
Discussions on issues of O&M. Budgets and responsibilites
TUC members and Neerganthi
One Social scientist, engineer,agriculture specialist accountant
Federation Formation Process in forming a federation
Positive attitude and commitment towards forming a federation
Discusions on advantages and disadvantages of federating.
TUC members and Neerganthi
One Social scientist, agriculture specialist, accountant
- - 25
2.5 CB needs for PRIs/elected representatives
An indicative list of issues are listed for capacity building of the village Panchayat Raj representatives for the program. 2.6 CB issues for village level line Department functionaries
Some line department functionaries are a part of the ITDP process, and their orientation would be vital for the success of the project. These would include –
a) The village revenue surveyor. b) The village agriculture officer c) The village accountant. d) Neerganthi, if paid by the MI department e) Forest watcher, (if forest land in foreshore).
Other village functionaries pertaining to milk cooperatives, women SHG group formation, anganwadi workers, health care workers could also be given a special orientation on the ITDP.
Introduction on project concept (counselling on their importance and role and institutional options as also CPR,NRM) (one day) Workshop on ITDP components (transperancy in use of funds) Field visits to ITDP villages Exposure visits to other ITDPs in talukastates Neerganthi and O&M issues
- - 26
Chapter Three: CAPACITY BUILDING PLAN AT THE TALUKA LEVEL
3.1 Context
The CB plan for the CFT members rest on their primary responsibility to work with the villages in planning and implementing the ITDP. The CB needs hence flow from the previous chapter, which details the TUG CB needs. 3.2 Responsibilities of individual CFT members for ITDP implementation
Through a series of participative exercises involving the ANGOs and selected CFTs in Kolar and Raichur districts, the following “job chart” has been arrived at – which specifies which CFT member is responsible for which aspect of ITDP implementation.
- - 27
Responsibilities of the CFT members for the Capacity Building Programme of the village institutions.
-Federation -Women involvement -Ensure participation -Benefits continue after Project ends
-Linkages with line department -No further encroachments -Renewal of TUG Society
--Federation Audit TUG Renewal
Page 28 of 69
3.3 CB Planning for the CFT members
Many exercises were organised in the two Srijan office workshops, for identifying the CB needs of the CFT members. However the participants were ANGOs, Srijan and the CB team of SPU. The crucial issues regarding “accounts/ procurement/finance” and “engineering/estimates/works breakup for procurement planning”, could not be completely analysed – as the SPU specialists for these themes were not a part of the planning. Hence the following list generated, can be termed a “tentative list” of CFT training needs – which has also been ratified through discussions with some CFTs in Kolar and Raichur. The SPU specialists including Agriculture, Engineering, Finance, Monitoring and Learning, and Hydrlogy have also given their comments and suggestions, through the CB specialist, Mrs.M.Chandrakantha, which too have been incorporated/ The following table gives an indicator of the range of issues which needs to be addressed for CB for the CFTs. It may be noted that the technical “subject matter-thematic” CB has been attempted with varying degrees of success for all the CFT members. These experiences have been incorporated in the following table. However further detailing would require the involvement of respective subject matter specialists at the DPUs, under the leadership of the SPU specialists. Some indicative planning on the lines of the TUG plan is attached at the end of the report.
Page 29 of 69
SUMMARY SHEET OF CAPACITY BUILDING MODULES FOR CFTs (linked to various issues which would emerge for TUGs during
implementation and should be ideally scheduled as such)).
MODULES Social
scientist
Engineer
(11 days only
engineering)
Agriculture
specialist
Gender
specialist
R&R
specialist
Accounta
nt
Data
entry
operator
1. Project orientation (includes accounts systems) and TUG/TUC( 2 days)
2. Thematic workshop (3 days) Organising SHGs
5 days on surveying skills, estimates
7 days by UAS
Gender in tank contexts
Preparing RAP
Accounting in ITDP
M&L formats for ITDP
3. Exposure trips outside district and outside state
4. PRA exercises for planning (5 days)
Related to TDP
5. Finance and Accounts modules (for social scientist and accountant) ( 2 days)
Financing and accounts for ITDPs
Formats for TUG a/cs
6. Training on tank based livelihoods( 2 days) (
Increasing Resource base for tank based livehhoods.
Gender based livelihoods
Livelihoods for vulnerable groups
7. Procurement workshop (2 days) (with social scientist, engineer and accountant).
with engr.. & Accountant
With Soc Scien. & a/ctnt
With Soc Scien. & engr.
8. Institution Building) ToT for HRD, team building, androgogy,(2 days)
9. TUG Management systems for
- -
30
ITDP implementation (ToT for imparting managerial skills to TUC) (2 days)
10. Networks,& federations and institutional Sustainability (3 days)
One day exclusively for O&M
11. Operations and Maintenance and institutional sustainability
12. Experience sharing at ANGO level
(Process documentation skills?) and learnings from other projects
13. Functional literacy 14. Foundation course on
facilitating learning for adults (androgogy?)
15. Training on agriculture by UAS(2-3 days)
16. WALMI legal systems for tank O&M
17. Exposure on GIS To attend To attend To attend 18. Finance and procurement
19. Engineering aspects of O&M
(Note – this is an indicative exercise. Will be frozen after feedback from Specialists, ANGOs along with the calendar of events for Capacity Building)
Page 31 of 69
3.4 CB planning for Panchayat Raj Institutions and elected representatives
Karnataka state has a system of elected representation at the taluka level – called that taluka panchayat. This is usually understood to be a federation of village or grama panchayats. The taluka panchayats in turn federate to a district or a Zilla panachayat. (ZP). The following table illustrates some of the issues This geographical space is also roughly inhabited by a directly elected representative to the Legislative Assembly (termed the MLA – Member of the Legislative Assembly). An indicative table below Some indicative CB exercises for PRI representatives at the taluka level is given below.
Title of the Programme Project Orientation and Ground Water Awareness
Venue of the workshop Meeting Hall Taluk Panchayat Office or Any hall in taluka headquarter
Participants GP Presidents, TP Members, local ZP members and MLAs
No. Of Participants 80
Implementing Agency DPU in collaboration with ANGOS
Duration Main Subject General Objectives Content Outlines Expected
Outcome Methodology Resource person
1 hour Inauguration and introduction
To familiarize with project Importance of Project – background and purpose of the programme
To realize the importance of the programme
Lighting of Lamp by MLA/MP – Speeches – mutual introduction
MC of the Programme -CFT representative
One Hour Project Orientation
To make Taluk level and GP presidents to understand the working of schemes
Objectives of KCBTMP-target area-criteria for selection-stake holder analysis-Demand Driven approach-Capital cost sharing-O & M-
Clarity on Project and support to the project
Lecture cum LCD presentation - discussion, Charts and posters-
SPU and DPUs
1 ½ Hour ITDP components
To bring about an awareness on essential components of the Project.
ITDP components- institutional options-flow of fund-transparency- Technical and financial
Clarity on Project components and fund flow mechanism
Chart presentation- discussion
DPU staff
- -
32
1 ½ Hour Ground Water Management
To crate awareness about the importance of Ground water management
Comparison of Rainfall data and extraction of ground water – analysis of ground water situation in Karnataka and issues related to drinking water and irrigation, ground water recharge, source protection,
Understand about the importance of ground water recharge and economy of water harvesting
Chart presentation with statistics
ANGO or some resource Person
1 Hour Role & Responsibilities of Elected representatives
To make GP and TP members about the role and responsibilities related to ground water and Tank management
O & M of tank project – Role of GP and TPs related ton water sector
Clarity about GP and TP members involvement in Tank project
Group Discussion and presentation – finalizing the role and responsibilities of elected representatives.
People participation Capital cost sharing Supervision
Better understanding of the implementation issues
Interview Dialogue
GP, ZP TP members
ANGO
Exposure visits to other districts/ states
Strategic plan Participatory approach Developmental programme
Understanding of the NRM sector & role of people’s organisations
Interview Dialogue
GP, ZP TP members, MLAs
ANGO
Page 33 of 69
3.5 CB needs for the line departments at the taluka level
An indicative exercise for listing the line departments and their tasks vis a vis the ITDP implementation, is given below. The CB needs would flow out of these tasks.
Line Department Project orientation- role in ITDP
Study of village ITDPs to help plan linkages
Role in followup Preparing proposals
How to support TUGs post implementation
Minor Irrigation � � � � Revenue � � � �
Agriculture � x � � Horticulture � � � �
Forestry � � � � Animal Husbandry
� � � �
Fisheries � � � � Women & child � � � �
All caste corporations
� � � �
An indicative CB plan is given below
- -
34
34
Title of
the
Program
me
Contents Expected
Outcome
Method
ology
Durati
on
(Tenta
tive)
Participant
s
Bud
get
Other
suppo
rt
Respo
nsible
agenc
y
Project Orientation on ITDP
Project Orientation Importance of their role in implementation Stage of ITDP
Clarity on project and support to the project
Through discussions with project partners
1 day All line depts., VA, Vill Health worker, Forest Guard, Agri Extn Officer, Anganwadi worker
ANGO
Follow up on role of Line depts. In linkages
Institutional Options Transparency of fund flow
Clarity on respective project components & linkages
Discussion
1 day GP, ZP TP members
ANGO
Workshop on post implementation linkages
How to support TUGs post implementation
Linkage plan for ITDP Mobilisation of Govt. resources
Discussion
1 day
O&M and water regulation issues
O&M plan Water act
O & M Action plan
Presentation, discussion
1 day Neergantis
Line Departments are : MI, Revenue, Agriculture, Horticulture, Forestry, Animal Husbandry, Fisheries, Women & Child, All corporations
- -
35
35
Chapter Four CAPACITY BUILDING PLAN AT THE DISTRICT/ REGIONAL LEVEL
4.1Context
The PIP has detailed to some extent the staffing profile for the DPU and the responsibilities it should undertake. However none of the DPUs have been staffed to full capacity. The handing over of supervisory role for ITDP implementation is slowly happening from the SPU to the DPU Hence it is too early to visualise the sort of implementation problems that are likely to occur – and the CB strategies required for the purpose. Some indicative exercises, on the direction the CF strategy should be heading for is listed below. 4.2 Projecting CB needs over the next six months An exercise by the ANGO staff, and the SPU facilitated by Srijan, indicated that the following would be tasks expected to be performed immediately – and the CB needs that evolve out of these tasks.
TASKS `CAPACITY BUILDING NEEDS (over next 6
months).
Project orientation Training to develop shared vision, develop district plan
Role clarity Building facilitation skills for ANGO –CFT-TUG (active listening)
Liasoning with line departments and PRIs/ MLAs/ MPs Networking with project partners
Liason with line departments, PRIs, to identify need visavis TUG (ITDP) Creating forums/mechanisms for interface
FUND FLOW
MANAGEMENT
(most important)
Understanding financial systems, flows, audits. Attitudes towards cash flows.
District Plan Planning skills
Coordinate audit Understanding audit requirements MIS – monitoring progress on ground
Reporting systems and MIS and M&L., both for SPU and for District Commissioner
ITDP Appraisal ->approval (important)
Skills for appraisal – ITDP/SOE for technical and attitudinal (experiences so far on appraisal
Facilitate selection of tanks Support role Coordinate functioning of various committees
Team building, role clarity, inter personal skills
Ennabling role to create a supporting environment for CB through understanding field reality
Facilitating skills, media management
Reporting to SPU
- -
36
36
From this exercise, an attempt was made to extract the Knowledge, Skills and Attitude issues that emerged for Capacity Building
Knowledge issues
• Various Government Programmes
• Panchayat Raj Institutions
• The JSYS project
• Project Orientation
• Potential Linkages with line departments
• Procedures for releasing funds to TUGs, CFTs, & ANGOs
Attitude issues
• Team Work, team building
• Team Building
• Role Clarity
• Responsive/ Sensitive to TUG Needs
• Attitudinal orientation on Facilitation/ Enabling role
• Interpersonal skills
• Attitudinal changes involve closely with PRIs/ MLAs/ MPs to avail support to implement the district plan
• Skill/ attitude of facilitation implementation of ITDPs by TUGs
• Responding to control needs of SPU, GoK, WB, Cas without affecting project implementation
• Implementation support including finance
• Visioning for the District Planning for future years
• Keeping touch with elected representative and reporting to DC and SPU
- -
37
37
Based on the above some indicative CB planning for DPUs has been done listed below. 4.3 CB planning for ANGOs
Some indicative issues were thrown up for CB for ANGO staff.. These are listed below –
a) 1 Workshop to standardise training material b) 2. Experience Sharing to reach common understanding of hand holding
c) 3. Vision Building Workshop
d) 4. Preparation of Training Manuals e) 5. Standardisation of ToT
• Planning Tools to create a Mini PIP at the district
• Facilitation Skills – for project partners
• ITDP Appraisal Skills
• Project Management Tools for planning & monitoring of project acivities (systemic approach skills)
• Planning & Analysing skills for effective monitoring at field level
• Finance Management estimating cash flows and indents
• Understanding/ analysing working system of CFT, TUG and ANGO
• Understanding/ Administrative skills of gauging demand of physical implementation at TUG level – translating into plans, indent for funds, materials, information, other resources
•
Page 38 of 69
CB PLAN FOR JSYS District Project Units
Title of the
Programme
Contents Expected
Outcome
Methodolog
y
Duration
(tentative
)
Participants Responsi
ble
agency
1. Project Orientation & Visioning
Orientation to the project and its vision Skills on creating a Dist Plan
Understanding of the project
Lecture cum discussion
2 days All DPU Staff JSYS/SRIJAN
. Team Building, Role Clarity & Inter personal skills
Preparation of job chart-conflict resolution – mutual appreciation skill
Clarity on individual & team roles
SWOT analysis-
3 days All DPU Staff SRIJAN JSYS
2.1 Building Facilitation Skills among project partners
• Listening skills
• Attitudinal issues
Coordination skills
Good moderation skill
Group Discussion Mirror exercise
2 days All DPU Staff SRIJAN JSYS
2.2 Liasoning Skills (for Line Depts., PRIs, MLAs etc)
• Understanding Line Dept functioning, budgeting
• Coordination skills
Coordination and rapport Building -Resource mobilisation
Net working OD Plan and strategies for formation of federation O & M
3 days
Page 40 of 69
Chapter Five : CAPACITY BUILDING AT THE STATE LEVEL
5.1Context
The direct –project partners at the state level, the SPU and Srijan have essentially followed an approach of responding to field events as they occur. This is tune with the “process approach” adopted by the project leadership for evolving the PIP and the intial setting up of the organisation. 5.2 CB plans for SPU
The CB needs of the SPU can only stabilise after all the DPUs have started functioning - in terms of appraising ITDPs sanctioning funds, monitoring use of funds, and physical progress, etc. Till such time, the SPU will need to essentially “learn by doing” and indulging in intense reflection of whatever scraps of data which are thrown up by field implementation. An indicative list of CB needs which emerged during an exercise with the SPU staff and ANGOs facilitated by Srijan is listed below
CB Needs for SPU
Team Building
Revisiting Vision through a retreat
Decentralisation, Delegation, Demystification Induction/ Orientation for new SPU specialists
Mutual appreciation of sectoral roles Exposure – within and outside state
Seminars, workshops at state level on project issues which have implication beyond immediate implementation targets
Clairty on legal issues
5.3 CB needs for Srijan
Srijan as a state level nodal capacity building organisation for all the NGO partners, is to possess some fundamental skills to impart to others. However it needs to be noted that there is no end to “learning”. It is hence useful to list the issues where Srijan had to concentrate,- for which some sort of “self learning “ processes has to be done. – or learning experiences sought which relate to these needs. .
- -
41
41
Tasks CB Needs
Facilitate experiences from ANGOs to SPU
Exposure to water projects, especially those driven by the – community.
Preparation of Operations Manual (from TUG upwards)
Developing technical writing skills
Standardisation of training material Appreciation of social , technical and / economic issues in tank programme
Facilitate sharing of other projects NRM Team building – inter personal skills
Evolving HRD policy for partners – assessment, design of performance appraisal
Field orientation - farmers’ perspective
Feedback on NGO training programmes Expertise on training design/ development of training material
Assist in Recruitment & Selection Exposure visit – outside state
Team Building at all levels Stake holders workshops
Vision Building Demonstrate experiential learning
Project Information collection, cataloguing accessing
Reviewing CB strategy
Standardisation of ToT
5.5 CB needs for State level political entities
Much of this occurs through the regular interaction of the JSYS policy staff with the Chief Minister and the Irrigation Minister, and other important political functionaries. The Speaker and the District Minister is actively involved with the MLAs in Kolar district, through the mediation of the District Commissioner. Ministers, MPs and MLAs, and sometimes Central Government ministers and MPs are involved in inaguration of district programs. However some sort of consolidation of implementation experience is required before designing some sort of “orientation”/ advocacy strategy for the higher level political functionaries.
Page 42 of 69
Chapter Six: BUDGETS FOR CB PLANS
Tank Users Group Capacity Building ProgrammeTank Users Group Capacity Building ProgrammeTank Users Group Capacity Building ProgrammeTank Users Group Capacity Building Programme Budget for various CB Training Programme
CB No. Title of the Programme Duration of each
programme
Total no. of Training programme
Cost of each training
programme Total cost
Responsible agency for implementing
Remarks
Preliminary Orientation 2 day 2000 4,000-00 80,00,000 CFTs
Exposure trip with in the district 1 day 2000 5,400-00 1,08,00,000 CFT
Orientation on Accounts for the TUC ½ day 2000 1,000-00 20,00,000 CFT
First round Project orientation for TUCs 2 days 2000 3,500-00 70,00,000 CFT
Thematic Orientation for sub groups 1. Procurement & Finance 2. WIG 3. Social group 4. M & L 5. Environment/Agriculture
Technical/Engineering Survey 3 days 2000 1,300-00 26,00,000 CFT
PRA Exercise 2 to 3 days 2000 3,700-00 74,00,000 CFT
Exposure Trip within the State 3 days 500 40,000-00 2,00,00,000 ANGO
Procurement and Accounts Training for TUC
2 days 2000 2,600-00 52,00,000 CFT
Accounts Training for Secretaries 2 days 200 12,250-00 24,50,000 ANGO
Accounts training for TUC 1 2000 1,300-00 26,00,000 CFT
Internal Management 2 days 2000 2,400-00 48,00,000 CFT
Thematic wise workshop and O & M planning
1 day 2000 1,500-00 30,00,000 CFT
Sustainability of TUG and O & M Plan 2 days 2000 2,400-00 48,00,000 CFT
Exposure Trip to Outside the state 5 days 200 55,000-00 1,10,00,000 ANGO
Total 9,76,50,000
Page 43 of 69
Tank Users Group Capacity Building ProgrammeTank Users Group Capacity Building ProgrammeTank Users Group Capacity Building ProgrammeTank Users Group Capacity Building Programme CB No. TUG/ Title of the programme Orientation on Accounts for new TUC Sequence Pre-planning phase Location of the Programme Village level Duration ½ day No. Participants 25 Type of participants TUC members Implementing Agency
CFT
No. Particulars Units Unit Price Amount
1. Food Expenses( light refreshment) 25 person Rs.15-00 (per head)
375-00
2. Course materials Lump sum 250-00 250-00
3. Miscellaneous/report Lump sum 375 375-00
Total 1,000-00
Total no. of programme 2,000 Rs.1,000-00 Rs.20,00,000
(Rupees twenty lakhs only)
Tank Users Group Capacity Building ProgrammeTank Users Group Capacity Building ProgrammeTank Users Group Capacity Building ProgrammeTank Users Group Capacity Building Programme
CB No. TUG/ Title of the programme: Project Orientation Sequence Planning phase Location of the Programme Village level Duration Two days No. Participants 40 Type of participants TUC members, GP elected representatives, Key leaders Implementing Agency
Tank Users Group Capacity Building ProgrammeTank Users Group Capacity Building ProgrammeTank Users Group Capacity Building ProgrammeTank Users Group Capacity Building Programme CB No. TUG/ Title of the programme Orientation on Thematic for Sub- committees Sequence Planning phase Location of the Programme Village level Duration 1 day No. Participants 8 per group Type of participants TUC members Implementing Agency
CFT
No. Particulars Units Unit Price Amount
1. Food Expenses (Lunch + light refreshment)
8 person Rs.30-00 (per head)
240-00
2. Course materials Lump sum 12 100-00
3. Miscellaneous/report Lump sum 260-00 260-00
Total Per batch 600-00
5 batches Rs,600-00 Rs.3,000-00 {
Total no. of programme 2,000 Rs.3,000-00 Rs.60,00,000
(Rupees sixty lakhs only)
Tank Users Group Capacity Building ProgrammeTank Users Group Capacity Building ProgrammeTank Users Group Capacity Building ProgrammeTank Users Group Capacity Building Programme CB No. TUG/ Title of the programme Technical Survey Programme Sequence Planning phase Location of the Programme Village level Duration 3 day No. Participants 10 per group Type of participants TUC members Implementing Agency
2. Miscellaneous /report) Lump sum Rs.400-00 400-00
Total 1.,300-00
Total no. of programme 2,000 Rs.1,300-00 Rs.26,00,000
(Rupees twenty six lakhs only)
- -
45
45
Tank Users Group Capacity Building ProgrammeTank Users Group Capacity Building ProgrammeTank Users Group Capacity Building ProgrammeTank Users Group Capacity Building Programme CB No. TUG/ Title of the programme PRA Exercises Sequence Planning phase Location of the Programme Village level Duration 2 day No. Participants 40 persons Type of participants TUC members and key leaders, GP members Implementing Agency
CFT
No. Particulars Units Unit Price Amount
1. Food Expenses (Lunch + light refreshment)
40 person for 2 days
Rs.30-00 (per head)
2,400-00
2. Stationary (Brown sheets, marker, PRA materials, pens, tape etc.)
Lump sum Rs.500 1,000-00
3. Miscellaneous/ report Lump sum Rs.300-00 300-00
Total 3,700-00
Total no. of programme 2,000 Rs.3,700 Rs.74,00,000
(Rupees seventy four lakhs only)
Tank Users Group Capacity Building ProgrammeTank Users Group Capacity Building ProgrammeTank Users Group Capacity Building ProgrammeTank Users Group Capacity Building Programme CB No. TUG/ Title of the programme Tank Exposure with in the State Sequence Planning phase Location of the Programme With in the state Duration 3 days No. Participants 40 members from 4 TUGs (10 per TUG) Type of participants TUC members, GP members Implementing Agency
ANGO
No. Particulars Units Unit Price Amount
1. Food Expenses (Breakfast, lunch, dinner)
40 person for 3 days
Rs.100-00 (per head per day)
12,000-00
2. Traveling Expenses 750 KM X Rs.5/- X 4 vehicles 15,000-00
3. Lodging facilities 40 members Rs.100/- per day for two days
12,000-00
4. Miscellaneous/Report wiritng Lump sum 1,000-00 1,000-00
Total 40,000-00
Total no. of programme 500 40,000-00 2,00,00,000
(Rupees two crore only)
- -
46
46
Tank Users Group Capacity Building ProgrammeTank Users Group Capacity Building ProgrammeTank Users Group Capacity Building ProgrammeTank Users Group Capacity Building Programme
CB No. TUG/ Title of the programme: Procurement and Accounts Training Sequence Planning phase Location of the Programme Village level Duration Two days No. Participants 25 Type of participants TUC members, GP elected representatives, Key leaders Implementing Agency
CFT
No. Particulars Units Unit Price Amount
1. Food Expenses (Lunch + light refreshment)
25 person X two days
Rs.30-00 (per head per day)
1,500-00
2. Course materials 25 30-00 per head 750-00
3. Miscellaneous/report writing Lump sum 350-00
Total 2,600-00
Total no. of programme 2,000 2,600-00 52,00,000
(Rupees fifty twenty lakhs)
TankTankTankTank Users Group Capacity Building Programme Users Group Capacity Building Programme Users Group Capacity Building Programme Users Group Capacity Building Programme CB No. TUG/ Title of the programme Orientation on Accounts and Book keeping Sequence Planning phase Location of the Programme Central /Taluk level Duration 2 days residential programme No. Participants 25 Type of participants Secretary and President from each TUG Implementing Agency
5. Course materials (files pads, pen and printed materials) actual
25 40 1,000-00
6. Miscellaneous/report writing Lump sum 425-00 475-00
Total 12,250-00
Total no. of programme 200 Rs.12,250-00 Rs.24,50,000
(Rupees twenty four lakhs fifty thousand only)
- -
47
47
Tank Users Group Capacity Building ProgrammeTank Users Group Capacity Building ProgrammeTank Users Group Capacity Building ProgrammeTank Users Group Capacity Building Programme CB No. TUG/ Title of the programme Accounts Training for TUC Sequence Implementation phase Location of the Programme Village/Tank level Duration 1 day No. Participants 25 Type of participants TUC members Implementing Agency
CFT
No. Particulars Units Unit Price Amount
1. Food Expenses (Lunch + light refreshment)
25 person Rs.30-00 (per head)
Rs.750-00
2. Course materials Lump sum 300 300-00
3. Miscellaneous/report writing Lump sum 250-00 250-00
Total 1,300-00
Total no. of programme 2000 Rs.1,300 Rs.26,00,000
(Rupees twenty six lakhs only)
- -
48
48
Tank Users Group Capacity Building ProgrammeTank Users Group Capacity Building ProgrammeTank Users Group Capacity Building ProgrammeTank Users Group Capacity Building Programme CB No. TUG/ Title of the programme Internal Management System Sequence Implementation phase Location of the Programme Village/Tank level Duration 2 day No. Participants 25 Type of participants TUC members/Sub Committee Implementing Agency
CFT
No. Particulars Units Unit Price Amount
1. Food Expenses (Lunch + light refreshment)
25 person Rs.30-00 (per head) per day
1,500-00
3. Course materials 25 Lump sum 500-00
4. Miscellaneous Lump sum 400-00 400-00
Total 2,400-00
Total no. of programme 2000 Rs.2,400-00 Rs.48,00,000
(Rupees forty eightlakhs only)
Tank Users Group Capacity Building ProgrammeTank Users Group Capacity Building ProgrammeTank Users Group Capacity Building ProgrammeTank Users Group Capacity Building Programme CB No. TUG/ Title of the programme Sub- Committee (Thematic) wise O & M Training Sequence Implementation phase Location of the Programme Village/Tank level Duration 1 day No. Participants 25 Type of participants TUC members Implementing Agency
CFT
No. Particulars Units Unit Price Amount
1. Food Expenses (Lunch + light refreshment)
25 person Rs.30-00 (per head) per day
750-00
2. Course materials Lump sum Lump sum 400-00
4. Miscellaneous Lump sum 350-00 350-00
Total 1,500-00
Total no. of programme 2000 Rs.1,500 Rs.30,00,000-00
(Rupees thirty lakhs only)
- -
49
49
Tank Users Group Capacity Building ProgrammeTank Users Group Capacity Building ProgrammeTank Users Group Capacity Building ProgrammeTank Users Group Capacity Building Programme CB No. TUG/ Title of the programme Sustainability of TUG and O & M Action plan Sequence Post Implementation phase Location of the Programme Village/Tank level Duration 2 day No. Participants 25 Type of participants TUC members Implementing Agency
CFT
No. Particulars Units Unit Price Amount
1. Food Expenses (Lunch + light refreshment)
25 person 2 days
Rs.30-00 (per head) per day
1,500-00
3. Course materials Lump sum Lump sum 500-00
4. Miscellaneous Lump sum 400-00 400-00
Total 2,400-00
Total no. of programme 2000 Rs.2,400-00 Rs.48,00,000
(Rupees forty eight lakhs only)
Tank Users Group Capacity Building ProgrammeTank Users Group Capacity Building ProgrammeTank Users Group Capacity Building ProgrammeTank Users Group Capacity Building Programme CB No. TUG/ Title of the programme Tank Exposure outside of the State Sequence Post Implementation Phase Location of the Programme Outside the state Duration 5 days No. Participants 30 members ( 3 per TUC) Type of participants TUC office bearers Implementing Agency
ANGO
No. Particulars Units Unit Price Amount
1. Food Expenses (breakfast, lunch and dinner)
30 person for 5 days
Rs.100-00 (per head per day)
15,000-00
2. Traveling Expenses 5 days Rs.800-00 per head
24,000-00
3. Lodging facilities 4 days Rs.100/- per night per person
12,000-00
4. Miscellaneous Lump sum 4,000-00 4,000-00
Total Per batch 55,000-00
Total no. of programme 200 55,000-00 1,10,00,000
(Rupees one crore ten lakhs )
- -
50
50
TIME LINE FOR CB INPUTS FOR TUG
Activity Timeframe
(for an
ITDP)
(Month)
Indicative for
present 25
ITDP under
implementation
Indicative
for next
round of 75
ITDPs
Indicative
for next
round of 400
ITDPs
PREPARATORY
a) Project Orientation First FEB03 b) Institutional options Second
PREPLANNING c) Byelaws, registeration, bank a/c Second
d) Exposure within district Second
e) Accounting First round Third
PLANNING
f) General ITDP orientation Fourth g -1) Thematic orientation on engineering g-2) Thematic and PRA based orientation on environement and agriculture g-3) PRA based orientation on social issues
Fifth
h) Orientation on preparation of estimate.
Fifth
i) Procurement Planning Sixth j) Ratification of ITDP ?
k) Second round on accounts
IMPLEMENTATION JUNE 03 l) Exposure to TUC members within state
Seventh
m) Thematic modules m-1) Procurement and accounts m-2) Engineering measurements and measurement books m-3) Agriculture and environment m-4) Encroachment and vulnerable group planimplementation m-5) Gender plan implementation. m-6) Formats for M&L and GIS
Seventh
n) Internal management systems and team building
o) Operations and Maintenance
- -
51
51
POST IMPLEMENTATION
p) Exposure trip to TUC representatives outside state
Eight
q) Operations and Maintenance After finishing civil works
r) Forming a federation ?
- -
52
52
TIME LINE FOR CB INPUTS FOR CFT
MODULES Indicative
for old 19
CFTs
Indicative
for new 6
CFTs
Indicative for
next round of
15 CFTs
1. Project orientation (includes accounts systems) and TUG/TUC( 2 days)
2. Thematic workshop (3 days)
3. Exposure trips outside district and outside state
4. PRA exercises for planning (5 days)
5. Finance and Accounts modules 6. (for social scientist and accountant)
( 2 days)
7. Training on tank based livelihoods( 2 days) (
8. Procurement workshop 9. (2 days) 10. (with social scientist, engineer and
accountant).
11. Institution Building) ToT for HRD, team building, androgogy,(2 days)
12. TUG Management systems for ITDP implementation
13. (ToT for imparting managerial skills to TUC) (2 days)
14. Networks,& federations and institutional Sustainability (3 days)
15. Operations and Maintenance and institutional sustainability
16. Experience sharing at ANGO level 17. (Process documentation skills?)
and learnings from other projects
18. Functional literacy
19. Foundation course on facilitating learning for adults (androgogy?)
20. Training on agriculture by UAS(2-3 days)
21. WALMI legal systems for tank O&M
22. Exposure on GIS
23. Finance and procurement 24. Engineering aspects of O&M
- -
53
53
EXHIBITS FOR CFT CB PLANS.
CB PLAN FOR CFT Tribal , R&R Specialist
Title of
the
Progra
mme
Contents Expected
Outcome
Methodo
logy
Durat
ion
(tenta
tive)
Partici
pants
Time
Line
Bud
get
Ot
he
r
su
pp
ort
Respon
sible
agency
Project Orientation
• Overview of Project
• Gender Perspective
• Vulnerable groups and NRM
• Social skills for-organizing HRD skills-
• Confidence to carry on pre-planning activities
• Clarity on Project
• Concept of PAFs
• Involve vulnerable groups participation in preplanning
Village immersion in ITDP implementation village
2 days
Along with Full team at regional level
0 month (at the beginning)
ANGOs
Thematic Workshop
• Outline of TDP & RAP
• Situation analysis
• Visiting line departments
• In-depth subject knowledge
• O & M issues in all plans
• Clarity on R&R issue and TDP component of ITDP
Classroom module on tools and techniques Lectures by resource people in line departments Field visit to ITDP village
3 days Along with other R&R, Tribal specialists at regional level
After 1 month
ANGOs
Participatory
• Participatory
• Draft RAP
Use various
5 days Along with
After 2
ANGOs
- -
54
54
Planning (PRA module)
tools
• Field exercises
• Draft TDP
• Draft ITDP
PRA techniques to generate RAP, TDP and ITDP
full team
months
Training on Tank Based Livelihoods
• Economic programmes
• Training
• Resource Mobilisation
• Linkages with Line depts
• Convergence with ITDP
• Market Linkages
• Preparation of project proposals
• Effective implementation of RAP & TDP
• Involvement of vulnerable sections in ITDP
Classroom module for tools and techniques – one day and Interaction with Line department Field exercise on tank
2 days
Gender, R&R & Agri. Specialist
Before release of First Instalment to a TUG
ANGOs
Institutional Building
• Organising & Facilitating
• M&L
• Team Building
• Conflict Resolution
• Leadership
• OD
• ANGOs
- -
55
55
Internal Management Systems
• Delegation of responsibilities
• Sub committees
• Decision making
• Review, M&L, reporting,
• Payments
• Conducting meetings
• Smooth functioning of TUG
ANGOs
Federations & Institutional Sustainability
• Federation structure, scope, functions
• Organising cluster forums
• Issues of sustainability, O&M
• Clarity on federation
2 days Full team
August 2003 onwards
ANGOs
a) Experience sharing at ANGO level
• Process Documentation research
• Process Documentation skills
ANGOs
b) Functional
• •
- -
56
56
literacy
c) Foundation course on ToT
• • ANGOs
d) Training on Agriculture by UAS
• • 2- 3 days (tentative?)
- -
57
57
CB PLAN FOR CFT Agriculture Specialist
Title of
the
Progra
mme
Contents Expected
Outcome
Methodo
logy
Durat
ion
(tenta
tive)
Partici
pants
Time
Line
Bud
get
Oth
er
sup
port
Respon
sible
agency
Project Orientation
• Overview of Project
• Agriculture & NRM issues
• Orientation on Sustainable, Low cost agriculture
• Social skills for-organizing HRD skills-
• Confidence to carry on pre-planning activities
• Clarity on Project
• Importance of Agriculture in the project
•
Village immersion in ITDP implementation village
2 days
Along with Full team at regional level
0 month (at the beginning)
ANGOs
Thematic Workshop
• Outline of Agri Plan, INM, IPM
• Situation analysis
• Visiting line departments
• In-depth subject knowledge
• O & M issues in all plans
• Clarity on R&R issue and TDP component of ITDP
•
7 day residential programme to be conducted by UAS (ANGOs to give inputs on content, SRIJAN on design )
7 days After 1 month
ANGOs
Participatory Planning (PRA module
• Participatory tools
• Field exercises
• Draft Agri Plan
• Draft ITDP
Use various PRA techniques to
5 days Along with full team
After 2 months
ANGOs
- -
58
58
)
generate Agri Plan
Training on Tank Based Livelihoods
• Economic programmes
• Training
• Resource Mobilisation
• Linkages with Line depts
• Convergence with ITDP
• Market Linkages
• Preparation of project proposals
• Effective implementation of RAP & TDP
• Involvement of vulnerable sections in ITDP
Classroom module for tools and techniques – one day and Interaction with Line department Field exercise on tank
2 days
Gender, R&R & Agri. Specialist
Before release of First Instalment to a TUG
ANGOs
Institutional Building
• Organising & Facilitating
• M&L
• Team Building
• Conflict Resolution
• Leadership, OD
• ANGOs
Internal Management Systems
• Delegation of responsibilities
• Sub committees
• Decision making
• Review, M&L,
• Smooth functioning of TUG
ANGOs
- -
59
59
reporting,
• Payments
• Conducting meetings
Federations & Institutional Sustainability
• Federation structure, scope, functions
• Organising cluster forums
• Issues of sustainability, O&M
• Clarity on federation
2 days Full team
August 2003 onwards
ANGOs
a) Experience sharing at ANGO level
• Process Documentation research
• Process Documentation skills
ANGOs
• •
b) Foundation course on ToT
• • ANGOs
c) WALMI legal systems for Tank O&M.
• •
e) Exposure on GIS
• •
Note: CFT Agriculture Specialist will undergo a 7 day specialised Capacity Building with UAS.
- -
60
60
CB PLAN FOR CFT Social Scientist
Title of
the
Progra
mme
Contents Expected
Outcome
Methodo
logy
Durat
ion
(tenta
tive)
Partici
pants
Time
Line
Bud
get
Oth
er
sup
port
Respon
sible
agency
Project Orientation
• Overview of Project
• Community Participation in NRM
• Orientation on Gram Sabhas,
• Social skills for-organizing HRD skills-
• Confidence to carry on pre-planning activities – Organising the community
• Clarity on Project
Village immersion in ITDP implementation village
2 days
Along with Full team at regional level
0 month (at the beginning)
ANGOs
Thematic Workshop
• Outline of ITDP
• Situation analysis
• Participatory techniques
• Visiting line departments
• In-depth subject knowledge
• O & M issues in all plans
• Clarity on ITDP, role of the TUG/ TUCs
• Clarity on Institutional Options
•
•
Classroom module on tools and techniques Lectures by resource people in line departments Field visit to ITDP village
3 days After 1 month
ANGOs
Participatory Planning (PRA module
• Participatory tools
• Field exercises
• Integration of all plans
• Draft ITDP
Use various PRA techniques to
5 days Along with full team
After 2 months
ANGOs
- -
61
61
)
generate ITDP
Training on Tank Based Livelihoods
• Economic programmes
• Training
• Resource Mobilisation
• Linkages with Line depts
• Convergence with ITDP
• Market Linkages
• Preparation of project proposals
• Effective implementation of RAP & TDP
• Involvement of vulnerable sections in ITDP
Classroom module for tools and techniques – one day and Interaction with Line department Field exercise on tank
2 days
Gender, R&R & Agri. Specialist
Before release of First Instalment to a TUG
ANGOs
Institutional Building
• Organising & Facilitating
• M&L
• Team Building
• Conflict Resolution
• Leadership, OD
• Improvement in facilitation skills
• Rapport building skills
• Conflict resolution skills
Exercises Case studies
3 days CFT Specialists
ANGOs
Internal Management Systems
• Delegation of responsibilities
• Sub committees
• Decision making
• Review, M&L, reporting,
• Smooth functioning of TUG
• Transparacy
• Managerial skills
Exercises 3 days CFT specualist
ANGOs
- -
62
62
• Payments
• Conducting meetings
Federations & Institutional Sustainability
• Federation structure, scope, functions
• Organising cluster forums
• Issues of sustainability, O&M
• Clarity on federation
• O&M knowledge
2 days Full team
August 2003 onwards
ANGOs
a) Experience sharing at ANGO level
• Process Documentation research
• Process Documentation skills
ANGOs
• •
b) Foundation course on ToT
• • ANGOs
c) Finance & Procurement
• • 2 days Along with Engineer & Accountant
e) Exposure on GIS
• • Along with Engineer
- -
63
63
CB PLAN FOR CFT Engineer
Title of
the
Progra
mme
Contents Expected
Outcome
Methodo
logy
Durat
ion
(tenta
tive)
Partici
pants
Time
Line
Bud
get
Oth
er
sup
port
Respon
sible
agency
Project Orientation
• Overview of Project
• Community Participation in NRM
• Orientation on Gram Sabhas,
• Social skills for-organizing HRD skills-
• Confidence to carry on pre-planning activities – Organising the community
• Clarity on Project
Village immersion in ITDP implementation village
2 days
Along with Full team at regional level
0 month (at the beginning)
ANGOs
Thematic Workshop
• Outline of ITDP
• Engineering surveys for catchment, tank bed, tank bund, sluices, waste weir.
• Converting survey data into drawings, and estimates
• O & M issues in all plans
• Design aspect
• ITDP engineering plan for an ITDP village tank
• Know how on standardised designs
Classroom module on tools and techniques Field surveys in an ITDP tank village. Field visit to ITDP village
5 days After 1 month
Srijan and ANGOs
Participatory Planning (PRA
• Participatory tools
• Field exercises
• Integration of all plans
• Draft
Use various PRA techniqu
5 days Along with full team
After 2 months
ANGOs
- -
64
64
module)
ITDP
es to generate ITDP
Procurement Planning
• • Skills in collaborative procurement planning
Classroom, and analysis of one live ITDP with TUC
3 days Along with Social Scientist, Accountant
SRIJAN & ANGOs
Procurement & Finance
• Organising & Facilitating implementation of engineering programs
• M&L related to engineering
• Operational Procurement & Finance systems
Field Exercise on site and at TUG Office
2 days Along with Social Scientist accountant
Srijan and ANGOs
Review of Engineering Implementation
• • 1 day with Srijan and ANGOs
Along with accountant & Social Scientist
Internal Management Systems
• Delegation of responsibilities
• Sub committees
• Decision making
• Review, M&L, reporting,
• Payments
• Conducting meetings
• Smooth functioning of TUG
Along with accountant
Srijan and ANGOs
Operations and Maintenance
• Resources to be raised
• Expenditures to be
• Operational O&M
1 day Along with accountant
Srijan
- -
65
65
made
• Minimum maintenance of physical structures
Federations & Institutional Sustainability
• Federation structure, scope, functions
• Organising cluster forums
• Issues of sustainability, O&M
• Clarity on federation
2 days Full team
August 2003 onwards
ANGOs
a) Experience sharing at ANGO level
• Process Documentation research
• Process Documentation skills
Annual event for one day with entire team?
ANGOs
b) Foundation course on Toot
• • ANGOs
c) Finance & Procurement
• Consultation with TUF for converting estimates and drawings into procurement plan
• Participatory management of procurement plan
• 3 days Along with Social scientist and Accountant
- -
66
66
with TUC.
e) Exposure on GIS
• • 2 Along with agriculture and social scientist
Note: CFT Engineer will undergo 11 days of specialised Capacity Building with SRIJAN & JSYS Engineering Team
Page 67 of 69
CB PLAN FOR CFT GENDER Specialist
Title of the
Programme
Contents Expected
Outcome
Methodolog
y
Dura
tion
(tent
ative)
Participants Time
Line
after
joining
Budge
t
Other
suppo
rt
Responsibl
e agency
Project Orientation
• Overview of Project
• Gender Perspective
• Gender and NRM
• Social skills for-organizing HRD skills
• Confidence to carry on pre-planning activities
• Clarity on Project
• Involve women participation in preplanning
Village immersion in ITDP implementation village
2 days
Along with Full team at regional level
0 month (at the beginning)
Thematic Workshop
• Outline of GAP
• Situation analysis
• Visiting line departments
• In-depth subject knowledge
• O & M issues in all
• Clarity on Gender component of ITDP
•
Classroom module on tools and techniques Lectures by resource people in line departments Field visit to ITDP village
3 days
Along with other Gender specialists at regional level
After 1 month
- -
68
68
plans
Participatory Planning (PRA module)
• Participatory tools
• Field exercises
• Draft GAP
• Draft ITDP
Use various PRA techniques to generate GAP and ITDP
5 days
Along with full team
After 2 months
Training on Tank Based Livelihoods
• Economic programmes
• Training
• Resource Mobilisation
• Linkages with Line depts
• Convergence with ITDP
• Market Linkages
• Preparation of project proposals
• Effective implementation of GAP
• Involvement of women in ITDP
Classroom module for tools and techniques – one day and Interaction with Line department Field exercise on tank