CANYON ISD – PINNACLE INTERMEDIATE CAMPUS AMARILLO, TX CANYON ISD – PINNACLE INTERMEDIATE CAMPUS Location: Amarillo, TX Construction Type: Educational / Athletic Facilities Construction Methods: Foundation includes structurally engineered foundation systems, reinforced concrete slab on grade and reinforced concrete slab on deck. Structural frame built using conventional structural steel, steel joists and decking, metal stud framing, and pre-cast concrete walls (storm shelter). Exterior veneer included insulated metal panels, CMU block and brick masonry, aluminum storefront windows and doors, and modified bitumen roofing. Square Footage: 99,708 s.f. Contract Amount: $21,530,111 (Construction Manager at Risk) Schedule/Duration: 16 Months Additional Notes: The first intermediate school in CISD’s district, which incorporated state of the art educational amenities. Gymnasium was constructed to meet FEMA Storm Shelter Guidelines. References for this project are available upon request. 223 SW 4th Avenue | Amarillo, Texas 79101 | Phone: 806.374.1050 | Fax: 806.374.2003 | www.swgc.net
1

CANYON ISD – PINNACLE INTERMEDIATE CAMPUS

Apr 27, 2022

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: CANYON ISD – PINNACLE INTERMEDIATE CAMPUS

C A N YO N I S D – P I N N AC L E I N T E R M E D I AT E C A M P U SA M A R I L L O , T X

CANYON ISD – PINNACLE INTERMEDIATE CAMPUSLocation: Amarillo, TX

Construction Type:Educational / Athletic Facilities

Construction Methods:Foundation includes structurally engineered foundation systems, reinforced concrete slab on grade and reinforced concrete slab on deck. Structural frame built using conventional structural steel, steel joists and decking, metal stud framing, and pre-cast concrete walls (storm shelter). Exterior veneer included insulated metal panels, CMU block and brick masonry, aluminum storefront windows and doors, and modified bitumen roofing.

Square Footage:99,708 s.f.

Contract Amount:$21,530,111(Construction Manager at Risk)

Schedule/Duration:16 Months

Additional Notes:The first intermediate school in CISD’s district, which incorporated state of the art educational amenities. Gymnasium was constructed to meet FEMA Storm Shelter Guidelines. References for this project are available upon request.