At the beginning there were two canals: Canal Forth and Clyde was built in 1777 between harbors Grangemouth and Falkirk connecting Glasgow with west cost of Scotland. Canal Union between Falkirk and Edinburgh was finished in 1822. Because of geographical difficulties, which created a difference of 79ft.in elevation, the two canals were connected by 11 locks.
24
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Canal

At the beginning there were two canals:Canal Forth and Clyde was built in 1777 between harbors Grangemouth and Falkirk connecting Glasgow with west cost of Scotland. Canal Union between Falkirk and Edinburgh was finished in 1822. Because of geographical difficulties, which created a difference of 79ft.in elevation, the two canals were connected by 11 locks.

Page 2: Canal
Page 3: Canal

In 1963, after 150 yrs of existence of this water way with 11 locks the construction of a huge water carousel started. This extraordinary idea was finished in 2002 and became a symbol of Scotland. This invention saves not only time but also energy.

Page 4: Canal
Page 5: Canal
Page 6: Canal

This is the only rotational boat transporter in the world. It has two arms and each arm forms a kind of huge tub filled with water. Boats enter the tub, then the tub locks up and the huge arm starts rotating .

Page 7: Canal

lower canallower canal

Page 8: Canal

Entrance to lower canalEntrance to lower canal

Page 9: Canal

A Boat is approaching the “tub”A Boat is approaching the “tub”

Page 10: Canal
Page 11: Canal

There are boats in both “tubs” There are boats in both “tubs” upper and lowerupper and lower

35 m35 m

Page 12: Canal

Rotation is startingRotation is starting

Page 13: Canal

Boats in both rotating armsBoats in both rotating arms

Page 14: Canal

rotationrotation

Page 15: Canal

Otáčení...Otáčení...

Page 16: Canal

Just before “landing”Just before “landing”

Page 17: Canal
Page 18: Canal
Page 19: Canal

Closing the gate , regulation of level of water and “tubs” rotationTakes 15 min. only.

Page 20: Canal
Page 21: Canal

One “tub” 78ft. Long with water and boat weights about 300 tons. One “tub” 78ft. Long with water and boat weights about 300 tons.

Page 22: Canal

The “tubs” are filled according the Archimedes’ Law.So the weight of “tubs” are balanced.

To open the upper and lower lock and turn the whole system by 180◦ they need an engine of 22.5 kW which only use 1.5 kWh