Con Edison E. 13th Street Substation - ABB PASS Business case Pat Di Lillo, Technical Specialist, Consolidated Edison Company of NY, Inc. Andrea Martello , Marketing and Sales Engineer . ABB Inc. CANADA , MONTREAL , 3/27/2018 Infrastructure hardening after Sandy superstorm .
50
Embed
CANADA , MONTREAL , 3/27/2018 Con Edison E. 13th Street ... · Con Edison E. 13th Street Substation - ABB PASS Business case Pat Di Lillo, Technical Specialist, Consolidated Edison
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Con Edison E. 13th Street Substation - ABB PASS Business case
Pat Di Lillo, Technical Specialist, Consolidated Edison Company of NY, Inc.
Andrea Martello , Marketing and Sales Engineer . ABB Inc.
Con Edison PASS M0S 362 kV 13th Street , Transmission & Distribution ArticleImportance of PASS flexible design and IEC 61850 Digital ss
Success Story
March 29, 2018
Click on the link below to access the full Article:http://m.tdworld.com/distribution/con-edison-modernizes-substation-serving-nycSlide 41
“It was also going to be perhaps thelargest brownfield implementation ofits kind: an IEC 61850 protection andautomation system in a high-voltagesubstation serving a critical and high-density metropolitan area. The East 13th
Street substation provides power for220,908 meter customers inManhattan, which translates to almost1 million people.”
“The East 13th Street substation, whichis separated from the East River by onlya narrow highway, had suffered thebrunt of the storm’s fury.“-Sandy- “Itwas flooded by the storm surge andwas forced off-line.”
Some Issues
March 29, 2018 Slide 42
Some Issues
March 29, 2018 Slide 43
Hairline Crack
Some Issues
March 29, 2018 Slide 44
• Wiring to the LCC was very tight
• Over 1200 wires needed to be terminated in the LCC
• Tight Quarters + Many Terminations added time to complete
• Following Units utilizes plug connections
Other Storm Hardening Initiatives Perimeter Walls
45
• Interlocking metal sheet pile wall.
• 35 feet below grade
• 10 feet above grade
After
Before
Raise Protection Level
Increase height to meet FEMA 100 year flood level +3’