Campo’s Renewable Energy
9

Campo’s Renewable Energy - NCSL · 2012. 11. 2. · Campo’s Renewable Energy • One of 12 Kumeyaay tribes • Over 350 tribal members • Approximately 64 miles from the City

Sep 01, 2021

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Campo’s Renewable Energy - NCSL · 2012. 11. 2. · Campo’s Renewable Energy • One of 12 Kumeyaay tribes • Over 350 tribal members • Approximately 64 miles from the City

Campo’s Renewable Energy

Page 2: Campo’s Renewable Energy - NCSL · 2012. 11. 2. · Campo’s Renewable Energy • One of 12 Kumeyaay tribes • Over 350 tribal members • Approximately 64 miles from the City

• One of 12 Kumeyaay tribes

• Over 350 tribal members • Approximately 64 miles

from the City of San Diego in Eastern San Diego County, California

• Located on the U.S.-

Mexico border

Page 3: Campo’s Renewable Energy - NCSL · 2012. 11. 2. · Campo’s Renewable Energy • One of 12 Kumeyaay tribes • Over 350 tribal members • Approximately 64 miles from the City

50 MW Wind Project completed in 2005, online in 2006

Electricity production of over 175 thousand megawatt hours in 2010

Largest utility-scale wind farm operating in Indian Country

Page 4: Campo’s Renewable Energy - NCSL · 2012. 11. 2. · Campo’s Renewable Energy • One of 12 Kumeyaay tribes • Over 350 tribal members • Approximately 64 miles from the City

Increased opportunity created with state and federal incentives for renewable energy projects

Transmission availability

4

Page 5: Campo’s Renewable Energy - NCSL · 2012. 11. 2. · Campo’s Renewable Energy • One of 12 Kumeyaay tribes • Over 350 tribal members • Approximately 64 miles from the City

August 2009 – Begin installation of met towers

December 2009 – Tribal Economic Development Bond

October 2010 – DOE grant funds confirmed

5

Page 6: Campo’s Renewable Energy - NCSL · 2012. 11. 2. · Campo’s Renewable Energy • One of 12 Kumeyaay tribes • Over 350 tribal members • Approximately 64 miles from the City

Phase I

Up to 250 MW

Wind and Solar

Phase II

40 MW

Wind and Solar

Page 7: Campo’s Renewable Energy - NCSL · 2012. 11. 2. · Campo’s Renewable Energy • One of 12 Kumeyaay tribes • Over 350 tribal members • Approximately 64 miles from the City

Draft EIS Nov. 5, 2012 Final EIS March 2012

Alt I = 250 MW Alt 2 = 200 MW Alt 3 = 160 MW

Page 8: Campo’s Renewable Energy - NCSL · 2012. 11. 2. · Campo’s Renewable Energy • One of 12 Kumeyaay tribes • Over 350 tribal members • Approximately 64 miles from the City

Remaining capacity

Most likely scenario

160 MW Phase I wind only

40 MW Phase II

wind and solar

Application for START grant approved 2012

8