Cameron Meadows Marsh Creation and Terracing (CS-66) Julia Wall, E.I. Engineering Division May 6, 2014 committed to our coast committed to our coast Coastal Protection and Restoration Authority of Louisiana 1
10

Cameron Meadows Marsh Creation and Terracing (CS-66) Julia Wall, E.I. Engineering Division May 6, 2014 committed to our coast Coastal Protection and Restoration.

Dec 15, 2015

Download

Documents

Dominique Sarff
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Cameron Meadows Marsh Creation and Terracing (CS-66) Julia Wall, E.I. Engineering Division May 6, 2014 committed to our coast Coastal Protection and Restoration.

Cameron Meadows Marsh Creation and Terracing(CS-66)Julia Wall, E.I.Engineering DivisionMay 6, 2014

committed to our coastcommitted to our coast

Coastal Protection and Restoration Authority of Louisiana

1

Page 2: Cameron Meadows Marsh Creation and Terracing (CS-66) Julia Wall, E.I. Engineering Division May 6, 2014 committed to our coast Coastal Protection and Restoration.

Coastal Protection and Restoration Authority of Louisiana

VICINITY MAPLocation: • Calcasieu –

Sabine Basin• Cameron

Parish• 5 mi. NE of

Johnson’s Bayou

• 5 mi. N of the Gulf of Mexico

2

Page 3: Cameron Meadows Marsh Creation and Terracing (CS-66) Julia Wall, E.I. Engineering Division May 6, 2014 committed to our coast Coastal Protection and Restoration.

• CWPPRA PPL 22• Federal Sponsor: NMFS• Avg. water elevation: 1.5 feet• Landloss rate: -0.94%/yr. (USGS, 1984-2010 )

• Create/restore over 350 acres of coastal marsh habitat• Create approximately 35,000 LF of earthen terraces• Re-establish hydrologic connectivity

Coastal Protection and Restoration Authority of Louisiana

PROJECT BACKGROUND

3

Page 4: Cameron Meadows Marsh Creation and Terracing (CS-66) Julia Wall, E.I. Engineering Division May 6, 2014 committed to our coast Coastal Protection and Restoration.

Coastal Protection and Restoration Authority of Louisiana

PROJECT MAP

4

Page 5: Cameron Meadows Marsh Creation and Terracing (CS-66) Julia Wall, E.I. Engineering Division May 6, 2014 committed to our coast Coastal Protection and Restoration.

Coastal Protection and Restoration Authority of Louisiana

CAUSES

• Rapid fluid and gas extraction

• Hurricanes• Saltwater

intrusion• Subsidence• Hydrologic

alterations

5

Page 6: Cameron Meadows Marsh Creation and Terracing (CS-66) Julia Wall, E.I. Engineering Division May 6, 2014 committed to our coast Coastal Protection and Restoration.

MARSH CREATION

Coastal Protection and Restoration Authority of Louisiana

6

• Restore 352 acres• Borrow from the

Gulf of Mexico• Pump via

pipeline, ~6 mi.• Target marsh

elevation +1.5 ft.• 20,000 ft.

containment dike• Planted

8.222 ft. shoreline

5,191 ft. shoreline

15,300 ft. shoreline

7,920 ft. subline

Page 7: Cameron Meadows Marsh Creation and Terracing (CS-66) Julia Wall, E.I. Engineering Division May 6, 2014 committed to our coast Coastal Protection and Restoration.

TERRACING

Coastal Protection and Restoration Authority of Louisiana

7

• Construct 35,000 LF of earthen terraces

• +2.5 ft. NAVD 88

• 15 ft. crown width

• Planted

Page 8: Cameron Meadows Marsh Creation and Terracing (CS-66) Julia Wall, E.I. Engineering Division May 6, 2014 committed to our coast Coastal Protection and Restoration.

RE-ESTABLISH HYDROLOGIC

CONNECTIVITY

Coastal Protection and Restoration Authority of Louisiana

8

• Clean out 30,000 LF of canals

• Drainage canals filled in with debris due to hurricanes

B1 Canal

Page 9: Cameron Meadows Marsh Creation and Terracing (CS-66) Julia Wall, E.I. Engineering Division May 6, 2014 committed to our coast Coastal Protection and Restoration.

PROJECT FUTURE

Coastal Protection and Restoration Authority of Louisiana

• Engineering and Design: 2014-2015• Hydrodynamic modeling• Topographic, bathymetric, and magnetometer survey• Geotechnical investigation• Offshore borrow site investigation

• Compete for CWPRRA Phase II Funding: December 2015

9

Page 10: Cameron Meadows Marsh Creation and Terracing (CS-66) Julia Wall, E.I. Engineering Division May 6, 2014 committed to our coast Coastal Protection and Restoration.

Coastal Protection and Restoration Authority of Louisiana

QUESTIONS

10