    SD-018239-01

    Page 1 of 110 Rev. 01

    Section 2 Installation Procedures

  • 8/17/2019 Cameron - Installation Procedures

    2/110

    SD-018239-01

    Page 2 of 110 Rev. 01

    This Page

    Intentionally Left Blank

  • 8/17/2019 Cameron - Installation Procedures

    3/110

    SD-018239-01

    Page 3 of 110 Rev. 01

    Section 2.1Installation Procedures for Full Size Wells with 20"

    Lower Casing Head Housing

  • 8/17/2019 Cameron - Installation Procedures

    4/110

    SD-018239-01

    Page 4 of 110 Rev. 01

    This Page

    Intentionally Left Blank

  • 8/17/2019 Cameron - Installation Procedures

    5/110

    SD-018239-01

    Page 5 of 110 Rev. 05

    Sequence of Operations for Full Size Wells

    Description Page

    Procedures for the installation of the bell nipple and 720" nom. lower casing head housing

    Installation of 20" nom. riser adaptor 13

    Running and retrieval of 20" nom. BOP test tool 17

    Running and retrieval of 20" nom. wear bushing 21

    Installation of 13.5/8" nom. 2 stage compact housing 25

    Installation of 13.5/8" nom. riser adaptor 31

    Running and retrieval of 13.5/8" nom. BOP test tool 35

    Running and retrieval of 13.5/8" nom. lower wear bushing 43

    Installation of 10.3/4" casing hanger 47

    Washout of compact housing lower seal areas 51

    Installation and testing of casing hanger seal assembly 55

    Running and retrieval of 13.5/8" nom. BOP test tool 61

    Running and retrieval of 13.5/8" nom. upper wear bushing 65

    Washout of compact housing upper seal areas 69

    Installation and testing of tubing hanger 73

    Termination of control lines 79

    Installation and testing of xmas tree 81

  • 8/17/2019 Cameron - Installation Procedures

    6/110

    SD-018239-01

    Page 6 of 110 Rev. 07

    Description (continued) Page

    Removal of xmas tree and retrieval of tubing hanger 86

    Installation of 20" nom. emergency lowermost housing 87

    Installation of 13.3/8" emergency sliplock connector 91

    Installation of 9.5/8" or 10.3/4" emergency slip bowl assembly 97

    Installation and testing of 9.5/8" or 10.3/4" emergency seal assembly 101

    Final A and B-annuli wellhead configuration and connection pressure

    testing 106

  • 8/17/2019 Cameron - Installation Procedures

    7/110

    SD-018239-01

    Page 7 of 110 Rev. 01

    Procedure for the installation of the bell nipple and 20 " nom. lower casinghead housing

    Bell nipple, 28 " I/D x 38 " O/D slotted flange, etc. Customer supply

    Equipment

    One 20 " nom. lower casing head housing, Part no. 2263490-01-12Fastlock hub top x 18.5/8 " pup joint

    One 20 " nom. lower housing running tool, Part no. 2125904-0121.25 "-2 TPI LH stub acme x 20 " buttress

    One Crossover, 20 " buttress x 18.5/8 " buttress Part no. 2205444-01

  • 8/17/2019 Cameron - Installation Procedures

    8/110

    SD-018239-01

    Page 8 of 110 Rev. 07

    Conductor Base Plate

    5"

    Fig 1 – I beams and flange arrangement

    3m

    O/DFlange

    'I' beam

    O/D

    Conductorpipe

    12"

    Slotted bolt holes for bellnipple

  • 8/17/2019 Cameron - Installation Procedures

    9/110

    SD-018239-01

    Page 9 of 110 Rev. 07

    Fig 2 – Bell nipple stack up

    7.65m

    Ground Level

    Cellar Floor

    Bell Nipple

    1.22m

    O/D Conductor

    1.9m

    Rotary beams

    Trolley beams2.2m 2.5m

    2.13m

    4 pad eyes to centralize and hold risertied to substructure (welded on site)

    36” O/D x 1” flange rubber seal

    38” O/D x 1” flange

  • 8/17/2019 Cameron - Installation Procedures

    10/110

    SD-018239-01

    Page 10 of 110 Rev. 07

  • 8/17/2019 Cameron - Installation Procedures

    11/110

    SD-018239-01

    Page 11 of 110 Rev. 07

    Procedure for the installation of the bell nipple and 20" nom. lowercasing head housing

    1.0 Install two 5" x 12" x 3m 'I' beams on the cellar as Fig 1 (see page 8). Theconductor pipe will be pre-installed by site construction contractor whenconstructing the cellar.

    2.0 Pick up 38" O/D x 1" flange with 4 slotted bolt holes and install over conductorpipe until it rests on the 'I' beams.

    3.0 Cut conductor pipe excess.

    4.0 Weld 38" O/D x 1" flange to conductor pipe and tack weld to beams.

    5.0 Install rubber seal on 38" O/D x 1" flange.

    6.0 Nipple up riser bell nipple with pre-welded 36" O/D x 1" flange, 4 pad eyes, 4bolts and hole for 13.3/8" flow line as Fig 2 (see page 9).

    7.0 Install 13.3/8" flow line.

    8.0 Drill for the 18.5/8" casing.

    9.0 Nipple down riser bell nipple.

    10.0 Run 18.5/8" casing. If casing becomes stuck and emergency lowermost isrequired, refer to page 87.

    11.0 Pick up 18.5/8" buttress pin x 18.5/8" RL4S pin casing joint.

    12.0 Make up pre-assembled 20.3/4" nom. casing head housing (completed withcrossover adaptor 18.5/8" x 20" API buttress and 20" nom. lower casing headhousing running tool) to 18.5/8" landing joint.

    13.0 Check that the outlet orientation conforms to site requirements.

    14.0 Land casing head on 38" O/D x 1" flange at cellar level.

    15.0 Remove running tool by right hand rotation (approx. 4.1/2 turns). Lift tool slowlyto ensure that the tool has disengaged.

    16.0 Rig up to cement 18.5/8" casing.

  • 8/17/2019 Cameron - Installation Procedures

    12/110

    SD-018239-01

    Page 12 of 110 Rev. 01

    This Page

    Intentionally Left Blank

  • 8/17/2019 Cameron - Installation Procedures

    13/110

    SD-018239-01

    Page 13 of 110 Rev. 01

    Installation of 20" nom. drilling adaptor

    Equipment

    One 20" nom. 3000 psi drilling adaptor, Fastlock Part no. 2125907-01Connector bottom x 20.3/4" API 3000 psistudded top

    One 'CF-21' gasket Part no. 2034005-02-02

    One RX-74 gasket Part no. 702002-07-42

    One Torque wrench and 1" A/F hex. socket Service tools

  • 8/17/2019 Cameron - Installation Procedures

    14/110

    SD-018239-01

    Page 14 of 110 Rev. 07

  • 8/17/2019 Cameron - Installation Procedures

    15/110

    SD-018239-01

    Page 15 of 110 Rev. 01

    Installation of 20" nom. drilling adaptor

    1.0 Thoroughly clean 'CF-21' gasket prep on bottom of 20-3/4" 3,000 psi drilling riseradaptor and top of lowermost housing.

    Note: The drilling riser adaptor should already be connected to the rig BOP.

    2.0 Ensure segments of fastlock connector are fully retracted prior to make-up to thelowermost housing.

    3.0 Lightly grease seal preps and gaskets.

    4.0 Install 'CF-21' gasket into 20-3/4" lowermost housing hub and lower BOP with

    drilling riser adaptor onto connection.

    5.0 Make-up the fastlock connector by tightening each drive screw in sequence and tothe correct torque specification. The correct sequence is to tighten opposite screwsin pairs to 200 ft.lbf and work around the connector in a right hand or left handdirection. A second application of torque at the correct torque specification shouldbe applied in the same sequence to ensure make-up. The torque for each drivescrew is 600 ft.lbf.

    6.0 When the fastlock connector is fully made up, the ends of the drive screws shouldbe flush or just below flush with the end of the bushings.

    7.0 If necessary, fill the area around the segments with a general purpose grease usingthe fitting on the body. A vent fitting is located opposite the grease fitting torelease any trapped air. Fill the connector with grease until all the air is displacedand grease begins coming out of the vent fitting.

  • 8/17/2019 Cameron - Installation Procedures

    16/110

    SD-018239-01

    Page 16 of 110 Rev. 01

    This Page

    Intentionally Left Blank

  • 8/17/2019 Cameron - Installation Procedures

    17/110

    SD-018239-01

    Page 17 of 110 Rev. 01

    Running and retrieval of 20" nom. BOP test tool

    Equipment

    One 20" nom. combination tool, BOP tester and Part no. 2125905-01wear bushing running tool, NC50 threadstop and bottom

  • 8/17/2019 Cameron - Installation Procedures

    18/110

    SD-018239-01

    Page 18 of 110 Rev. 07

  • 8/17/2019 Cameron - Installation Procedures

    19/110

    SD-018239-01

    Page 19 of 110 Rev. 01

    Running and retrieval of 20" nom. BOP test tool

    1.0 Make up NC50 handling joint into combination tool with pins facing up (seedrawing).

    Note: Do not tong on seal areas. Use minimum make up torque as the handling joint will need to be backed out to test the blind rams. Make upwith chain tongs.

    2.0 Check 'O' ring for damage and replace as necessary.

    3.0 Lightly grease 'O' ring.

    Note: Ensure the tiedown screws in the riser adaptor are fully retracted (4.00" from O/D) and gland nuts are re-made tight before continuing with the next stage.

    4.0 Lower tool through BOP stack and riser and land on lowermost housing shoulder.

    Note: Compare stick up above rotary table with that calculated to ensure at correct depth.

    5.0 Fill stack full of water and close pipe rams around handling joint. Open the valvein the lowermost housing below the combination tool to monitor any fluidpassing.

    6.0 Apply test pressure to BOP down the string with pressure entering BOP throughported test joint to allow testing of lower rams for required hold period.

    Note: Maximum test pressure is 3,000 psi or equal to the maximum working pressure of the lowest rated item in the stack.

    7.0 Release pressure and retract BOP rams.

  • 8/17/2019 Cameron - Installation Procedures

    20/110

    SD-018239-01

    Page 20 of 110 Rev. 01

    Blind Ram Test

    8.0 Back out handling joint from combination tool.

    9.0 Fill stack full of water and close blind rams.

    10.0 Apply test pressure to BOP through kill line for required hold period. Comparevolumes pumped with records from previous tests above.

    Note: Maximum test pressure is 3,000 psi or equal to the maximum working pressure of the lowest rated item in the stack.

    11.0 Release pressure, ensure no check valve is in the kill line. Retract blind rams.Close the valve in the lowermost housing below the combination tool. Retrieve

    the combination tool.

  • 8/17/2019 Cameron - Installation Procedures

    21/110

    SD-018239-01

    Page 21 of 110 Rev. 01

    Running and retrieval of 20" nom. wear bushing

    Equipment

    One 20" nom. wear bushing, 17.597" min. bore Part no. 2055808-01

    One 20" nom. combination tool, BOP tester and Part no. 2125905-01wear bushing running tool, NC50 threadstop and bottom

  • 8/17/2019 Cameron - Installation Procedures

    22/110

    SD-018239-01

    Page 22 of 110 Rev. 07

  • 8/17/2019 Cameron - Installation Procedures

    23/110

    SD-018239-01

    Page 23 of 110 Rev. 07

    Running of wear bushing

    1.0 Check that 'O' rings on wear bushing are in good condition. Replace as necessary.Lightly grease 'O' rings.

    2.0 Make up combination tool with pins down onto an NC50 handling joint, avoidtonging on seal area.

    3.0 Insert the combination tool into the wear bushing and rotate tool approx. 90° righthand to fully latch into the wear bushing.

    Note: Ensure the tiedown screws in the riser adaptor are fully retracted (4.00" from O/D) and gland nuts are re-made tight before continuing with the next stage.

    4.0 Lower wear bushing through BOP stack and riser and land off on housingshoulder.

    Note: Compare stick up above rotary table with that calculated to ensure at correct depth.

    5.0 Lock wear bushing in place by engaging the two tiedown screws into the recess ofthe wear bushing. To do this, the glands must be first loosened by turning lefthand with a 2-1/4" wrench approx. 2 turns. The tiedown screws can then berotated right hand with a 3/4" wrench until they come into contact with bushingwall (approx 6 turns). Back off the tiedown screws 45º (1/8th turn) and re-tightenthe glands to 250 ft.lbf torque.

    6.0 Rotate running tool left hand approx. 90º to disengage from 'Breech' connectionand retrieve tool.

    Note: To ease rotation, some or all of the hang-off weight should be taken up by the elevators.

    7.0 Drill for the 13.3/8" casing.

  • 8/17/2019 Cameron - Installation Procedures

    24/110

    SD-018239-01

    Page 24 of 110 Rev. 07

    Retrieval of wear bushing

    8.0 Make up combination tool onto an NC50 handling joint.

    9.0 Lower combination tool into lowermost housing and land on wear bushing.Slowly rotate tool right hand to locate ‘Breech’ connection until it drops 2.50".

    Note: Compare stick up above rotary table with that calculated to ensure at correct depth.

    10.0 Continue rotating tool right hand approx 90º until it is fully engaged.

    Note: Ensure the tiedown screws in the riser adaptor are fully retracted (4.00"

    from O/D) and the gland nuts are re-made before continuing with the next stage.

    11.0 Retrieve wear bushing and running tool. Pick up slowly to ensure bushing is free.

    Note: Overpull should not be required. Check tiedown screws if the wear bushing does not come free.

  • 8/17/2019 Cameron - Installation Procedures

    25/110

    SD-018239-01

    Page 25 of 110 Rev. 07

    Installation of 13.5/8" nom. 2 stage 'SSMC' compact housing

    Equipment

    One 13.5/8" nom. 'SSMC' 2 stage compact, Part no. 2115330-16complete with annulus equipment

    One Compact housing running tool Part no. 2125909-01

    Four 1.1/2" nom. outlet blanking plug Part no. 268689-01(Service tools)

    Three Control line outlet flush plug 2125647-01(Service tools)

    Four Installation studs (1/2" UNC x 3" long Service toolscrewed bar) for hold down ring

  • 8/17/2019 Cameron - Installation Procedures

    26/110

    SD-018239-01

    Page 26 of 110 Rev. 07

  • 8/17/2019 Cameron - Installation Procedures

    27/110

    SD-018239-01

    Page 27 of 110 Rev. 01

    Installation of 13.5/8" nom. 2 stage compact housing

    1.0 Run 13.3/8" casing to depth. If casing becomes stuck and the emergency sliplockconnector is required, refer to page 87.

    2.0 Ensure the compact housing annulus equipment is removed and fit temporaryblanking plugs to all outlets.

    3.0 Ensure that the compact housing is made up onto the housing running tool awayfrom rig floor before it is required, using 100 ft.lbf of torque maximum. Thread is2 TPI left hand stub acme, approximately 3-1/2 turns anti-clockwise make up.When fully made up tool shoulders out in recess of housing.

    4.0 Make up the pre-assembled 13.5/8" nom. compact housing and running tool ontothe last joint of casing.

    5.0 In order to confirm correct landing position of the compact housing, paint a 1/4"wide band on the tonging neck of the compact housing. This band should bepositioned 1.38" below the shoulder of the housing.

    6.0 Open valve and drain riser. If orientation of outlets is required, paint two verticalwhite lines down the centre of the outlets and one horizontal line through thelower outlets. The compact housing can then be observed through the drain valve.

    7.0 Land compact housing on 45º shoulder inside the lowermost housing. Correctlanding of the housing can be viewed through the lowermost housing. The bandpainted on the tonging neck should appear in the centre of the outlet.

    8.0 Rig up to cement 13.3/8" casing. Cement through the landing string taking returnsthrough the 3" LP outlets in the lowermost housing.Flow area of two off outlets = 16in²

    9.0 Retrieve running tool by rotating right hand approximately 3-1/2 turns and pullingvertically. Lift slowly to ensure the tool has fully disengaged.

    10.0 Nipple down riser.

    11.0 Test between the compact seals through test port in the lowermost housing (seedrawing) to 3,000 psi for required hold period.

    12.0 After successful test, release pressure and re-install fittings (see section 3.7).

    13.0 Ensure threads on the 20" nom. lowermost housing are free of debris and greased.

  • 8/17/2019 Cameron - Installation Procedures

    28/110

    SD-018239-01

    Page 28 of 110 Rev. 07

  • 8/17/2019 Cameron - Installation Procedures

    29/110

    SD-018239-01

    Page 29 of 110 Rev. 07

    14.0 Pass the hold down ring over the compact housing and thread into the 20" nomlower housing by turning left hand using the 1/2" installation studs (approx. 3turns) until it bottoms out on the shoulder of the compact housing body.

    15.0 Install inner and outer 'O'-ring seals onto the hold down ring for debris protection.

    16.0 Remove blanking plugs, clean out and re-install outlet equipment as required. Forthe final A and B annuli outlet configuration and connection pressure testing seepage 106 to 109.

    Note: If a pressure test is required on the annulus equipment, run a VR pluginto the outlet and pressure test against it. Alternatively this equipment can be

    tested when conducting the BOP tests, see page 35.

    17.0

    Remove the temporary control line plugs and replace them with Control LineBlind Flange part number 2715951-01. The Blind Flange connections will bepressure tested when conducting the BOP tests, see page 35.

  • 8/17/2019 Cameron - Installation Procedures

    30/110

    SD-018239-01

    Page 30 of 110 Rev. 01

    This Page

    Intentionally Left Blank

  • 8/17/2019 Cameron - Installation Procedures

    31/110

    SD-018239-01

    Page 31 of 110 Rev. 01

    Installation of 13.5/8" nom. riser adaptor

    Equipment

    One 13.5/8" nom. 5000 psi drilling adaptor, Part no. 2205286-01Fastlock connector bottom x 13.5/8"API 5000 psi studded top

    One 'CF-13' gasket Part no. 2162890-01-01

    One BX-160 gasket Part no. 702003-16-02

    One Torque wrench and 1" A/F hex. socket Service tool

  • 8/17/2019 Cameron - Installation Procedures

    32/110

    SD-018239-01

    Page 32 of 110 Rev. 07

  • 8/17/2019 Cameron - Installation Procedures

    33/110

    SD-018239-01

    Page 33 of 110 Rev. 01

    Installation of 13.5/8" nom. riser adaptor

    1.0 Thoroughly clean 'CF-13' gasket prep on bottom of 13.5/8" 5,000 psi drilling riseradaptor and top of compact housing.

    Note: The drilling riser adaptor should already be connected to the rig BOP.

    2.0 Ensure segments of fastlock connector are fully retracted prior to make-up to thecompact housing.

    3.0 Lightly grease seal preps and gaskets.

    4.0 Install 'CF-13' gasket into compact housing hub and lower BOP with drilling riser

    adaptor onto connection.

    5.0 Make-up the fastlock connector by tightening each drive screw in sequence and tothe correct torque specification. The correct sequence is to tighten opposite screwsin pairs to 200 ft.lbf and work around the connector in a right hand or left handdirection. A second application of torque at the correct torque specification shouldbe applied in the same sequence to ensure make-up. The torque for each drivescrew is 600 ft.lbf.

    6.0 When the fastlock connector is fully made up, the ends of the drive screws shouldbe flush or just below flush with the end of the bushings.

    7.0 If necessary, fill the area around the segments with a general purpose grease usingthe fitting on the body. A vent fitting is located opposite the grease fitting torelease any trapped air. Fill the connector with grease until all the air is displacedand grease begins coming out of the vent fitting.

  • 8/17/2019 Cameron - Installation Procedures

    34/110

    SD-018239-01

    Page 34 of 110 Rev. 01

    This Page

    Intentionally Left Blank

  • 8/17/2019 Cameron - Installation Procedures

    35/110

    SD-018239-01

    Page 35 of 110 Rev. 05

    Running and retrieval of 13.5/8" nom. BOP test tool

    Test Connection (Gate Valves Annulus A & B + drilling Adapter +BOP Rams)

    Equipment

    One 13-5/8 nom combination tool, BOP tester Part no. 2125910-04and wear bushing running tool, withNC50 (4-1/2 IFTJ) box thread top and bottom .

  • 8/17/2019 Cameron - Installation Procedures

    36/110

    SD-018239-01

    Page 36 of 110 Rev. 07

  • 8/17/2019 Cameron - Installation Procedures

    37/110

    SD-018239-01

    Page 37 of 110 Rev. 06

    Running & retrieval of BOP test tool.

    Test Connection (Gate Valves Annulus A & B + drilling Adapter + BOPRams)

    Note: The test using this Combination Tool (P/N: 2125910-04) will test ALLOUTLETS.

    1.0 Check ‘O-rings on BOP test tool for damage and replace if necessary. ‘O’ringPart No. 718033.

    Note: For this operation, only the lower ‘O’ring is required. Pipe Plug ½” NPT (P/N M103989) should be installed.

    2.0 Make up NC50 handling joint into combination tool with pins facing up (seedrawing).

    3.0 Lightly grease 'O' ring.

    Note: Ensure the tiedown screws in the riser adaptor are fully retracted (4.25" from O/D) and gland nuts are re-made tight before continuing with the next stage.

    Note: Installation of Combination Tool may require the use of two stands of heavy weight drill pipe, hung from the underside of the Running Tool.

    Note: Do NOT apply pressure below the BOP Test Tool.

    Note: The pressure test must be performed by applying pressure through Choke / Kill Lines. Ensure upper side pipe plug is correctly installed.

    4.0 Lower BOP Test Tool into Compact Housing, through BOP stack and RiserAdapter and land on 45° shoulder in the Compact Housing. Close upper andlower outlets.

    Note: Compare stick up above rotary table with that calculated to ensure correctlanding position of the combination tool.

    5.0 Fill the stack full of water and close the pipe rams around the handling joint.

    6.0 Apply test pressure to the stack and hold for the required period. Monitor openend of drill pipe for any leakage past the test plug.

    Note: 1) Maximum test pressure equals maximum working pressure of thelowest rated item in the stack. Pressure test to 5000 psi max.

    Note: 2) Any leakage past the tester seal will be visible back up the drill string.

    7.0 Bleed off pressure, retract pipe rams and retrieve the combination tool.

  • 8/17/2019 Cameron - Installation Procedures

    38/110

    SD-018239-01

    Page 38 of 110 Rev. 05

    This Page

    Intentionally Left Blank

  • 8/17/2019 Cameron - Installation Procedures

    39/110

    SD-018239-01

    Page 39 of 110 Rev. 05

    Blind Ram Test

    Equipment

    One 13.5/8" nom. combination tool, BOP tester and Part no. 2125910-01wear bushing running tool, NC50 threads topand bottom

  • 8/17/2019 Cameron - Installation Procedures

    40/110

    SD-018239-01

    Page 40 of 110 Rev. 07

  • 8/17/2019 Cameron - Installation Procedures

    41/110

    SD-018239-01

    Page 41 of 110 Rev. 07

    Blind Ram Test

    1.0 Make up NC50 handling joint into combination tool with pins facing up (seedrawing).

    Note: Do not tong on seal areas. Use minimum make up torque as the handling joint will need to be backed out to test the blind rams. Make upwith chain tongs.

    2.0 Check 'O' rings for damage and replace as necessary.

    3.0 Lightly grease 'O' rings.

    Note: Ensure the tiedown screws in the riser adaptor are fully retracted (4.25" from O/D) and gland nuts are re-made tight before continuing with the next stage.

    4.0 Lower tool through BOP stack and riser and land on compact housing shoulder.

    Note: Compare stick up above rotary table with that calculated to ensure at correct depth.

    5.0 Back out handling joint from combination tool.

    6.0 Close upper outlet valve and open lower outlet valve. Fill stack full of water andclose blind rams.

    7.0 Apply test pressure to BOP through kill line for required hold period. Monitoropen lower outlet valve for any leakage past the test plug.

    Note: Maximum test pressure is 5,000 psi or equal to the maximum working pressure of the lowest rated item in the stack.

    8.0 Release pressure, ensure no check valve is in the kill line. Retract blind rams.Close the lower valves on the compact housing. Retrieve the combination tool.

  • 8/17/2019 Cameron - Installation Procedures

    42/110

    SD-018239-01

    Page 42 of 110 Rev. 07

    This PageIntentionally Left Blank

  • 8/17/2019 Cameron - Installation Procedures

    43/110

    SD-018239-01

    Page 43 of 110 Rev. 01

    Running and retrieval of 13.5/8" nom. lower wear bushing

    Equipment

    One 13.5/8" nom. lower wear bushing, Part no. 2125911-0112.300" min. bore

    One 13.5/8" nom. combination tool, BOP tester Part no. 2125910-01and wear bushing running tool, NC50threads top and bottom

  • 8/17/2019 Cameron - Installation Procedures

    44/110

    SD-018239-01

    Page 44 of 110 Rev. 07

  • 8/17/2019 Cameron - Installation Procedures

    45/110

    SD-018239-01

    Page 45 of 110 Rev. 01

    Running of wear bushing

    1.0 Check that 'O' rings on wear bushing are in good condition. Replace as necessary.Lightly grease 'O' rings.

    2.0 Make up combination tool with pins down onto an NC50 handling joint, avoidtonging on seal area.

    3.0 Insert the combination tool into the wear bushing and rotate tool approx 90° righthand to fully latch into the wear bushing.

    Note: Ensure the tiedown screws in the riser adaptor are fully retracted (4.25" from O/D) and gland nuts are re-made tight before continuing with the next stage.

    4.0 Lower wear bushing through BOP stack and riser into the compact housing andland off on 45 ° shoulder.

    Note: Compare stick up above rotary table with that calculated to ensure at correct depth.

    5.0 Lock wear bushing in place by engaging the two tiedown screws into the recess ofthe wear bushing. To do this, the glands must be first loosened by turning lefthand with a 2-1/4" wrench approx. 2 turns. The tiedown screws can then berotated right hand with a 3/4" wrench until they come into contact with bushingwall (approx 6 turns). Back off the tiedown screws 45º (1/8th turn) and re-tightenthe glands to 250 ft.lbf.

    6.0 Rotate running tool left hand approx. 90º to disengage from ‘Breech’ connectionand retrieve tool.

    Note: To ease rotation, some or all of the hang-off weight should be taken up by the elevators.

    7.0 Drill out for 10.3/4" casing.

  • 8/17/2019 Cameron - Installation Procedures

    46/110

    SD-018239-01

    Page 46 of 110 Rev. 01

    Retrieval of wear bushing

    8.0 Make up combination tool onto an NC50 handling joint.

    9.0 Lower combination tool into compact housing and land on wear bushing. Slowlyrotate tool right hand to locate ‘Breech’ connection until it drops 2.50".

    Note: Compare stick up above rotary table with that calculated to ensure at correct depth.

    10.0 Continue rotating tool right hand approx 90º until it is fully engaged.

    Note: Ensure the tiedown screws in the riser adaptor are fully retracted (4.25"

    from O/D) and the gland nuts are re-made before continuing with the next stage.

    11.0 Retrieve wear bushing and running tool. Pick up slowly to ensure bushing is free.

    Note: Overpull should not be required. Check tiedown screws if the wear bushing does not come free.

  • 8/17/2019 Cameron - Installation Procedures

    47/110

    SD-018239-01

    Page 47 of 110 Rev. 01

    Installation of 10.3/4" casing hanger

    Equipment

    One 13.5/8" nom x 10.3/4" casing hanger Part no. 2125537-04

    One 10.3/4" casing hanger running tool Part no. 2125913-01

    One Crossover adapter, 9.5/8" New Vam Part no. 2205445-01x 10.3/4" buttress

  • 8/17/2019 Cameron - Installation Procedures

    48/110

    SD-018239-01

    Page 48 of 110 Rev. 07

  • 8/17/2019 Cameron - Installation Procedures

    49/110

    SD-018239-01

    Page 49 of 110 Rev. 01

    Installation of 10.3/4" casing hanger

    1.0 Run casing to depth. If casing becomes stuck and the emergency equipment isrequired, refer to page 93.

    2.0 Make up the pre-assembled 10.3/4" casing hanger, with running tool, onto the last joint of casing. Ensure casing is hanging central.

    3.0 Run hanger through B.O.P stack and riser into compact housing and land on 45ºshoulder.

    Note 1. Care should be taken when lowering hanger through BOP and housing. Hanger should be run slowly to avoid damage to the housing

    bore.

    Note 2. In order to confirm correct landing position for the casing hanger, prior to running, paint the running tool with a 1/4" wide band at a height of 2.17" from the running thread end. On installation, the band can be viewed through the lower outlet valve on the compact housing (see page 44).

    4.0 Rig up to cement 10.3/4" casing.

    5.0 Remove running tool by right hand rotation, (approx. 6 turns) and retrieve slowly

    to ensure tool has fully disengaged.

  • 8/17/2019 Cameron - Installation Procedures

    50/110

    SD-018239-01

    Page 50 of 110 Rev. 01

    This Page

    Intentionally Left Blank

  • 8/17/2019 Cameron - Installation Procedures

    51/110

    SD-018239-01

    Page 51 of 110 Rev. 01

    Washout of compact housing lower seal areas

    Equipment

    One Wash out tool, NC50 box thread Part no. 2125914-01

  • 8/17/2019 Cameron - Installation Procedures

    52/110

    SD-018239-01

    Page 52 of 110 Rev. 07

  • 8/17/2019 Cameron - Installation Procedures

    53/110

    SD-018239-01

    Page 53 of 110 Rev. 01

    Washout of compact housing lower seal areas

    1.0 Make-up wash tool onto handling joint and connect to a clean water supply.

    2.0 Open lower outlets in the compact housing

    3.0 Lower tool through rotary and slowly begin washing at the top of BOP stack,using a flowrate of approximately 900 litres/min. Washout tool should be slowlyrotated to achieve full circumferential washing effect.

    Note: Ensure the tiedown screws in the riser adaptor are fully retracted (4.25" from O/D) and gland nuts are re-made tight before continuing with the next stage.

    4.0 Lower wash tool slowly, continuing to wash housing bore and seal areas of casinghanger.

    Note: As tool approaches fully landed position on casing hanger, the volume of water passing through the tool may have to be reduced to reduce back pressure build up.

    5.0 Continue to jet water until water flowing out of the compact housing outlets isclean.

    6.0

    Stop water jet and retrieve tool.

    Note: DO NOT jet water and clean on retrieval of tool back up the stack, as this may wash any remaining debris that could be lodged in the ram cavities/annular, back down hole.

  • 8/17/2019 Cameron - Installation Procedures

    54/110

    SD-018239-01

    Page 54 of 110 Rev. 01

    This Page

    Intentionally Left Blank

  • 8/17/2019 Cameron - Installation Procedures

    55/110

    SD-018239-01

    Page 55 of 110 Rev. 04

    Installation and testing of casing hanger seal assembly

    Equipment

    One 13.5/8" nom. seal assembly, to suit Part no. 2205123-0110.3/4" casing hanger

    One Seal assembly running tool, NC50 Part no. 2095627-01threads top and bottom

    One Installation tool for split lockdown ring Part no. 2230761-02(Service tool)

  • 8/17/2019 Cameron - Installation Procedures

    56/110

    SD-018239-01

    Page 56 of 110 Rev. 05

  • 8/17/2019 Cameron - Installation Procedures

    57/110

    SD-018239-01

    Page 57 of 110 Rev. 01

    Installation and testing of casing hanger seal assembly

    Note: Ensure the riser is drained prior to running the seal assembly.

    1.0 Inspect seal assembly for damage, paying particular attention to the 'LS' and 'NS'seals. Replace as necessary.

    2.0 Make up the running tool onto NC50 handling joint.

    Note: A minimum weight of 10,000 lbf is required to install the seal assembly.This may require the use of heavy weight drill collars hung from the

    NC50 box thread below the running tool to supplement total hangoffweight.

    3.0 Partially screw seal assembly left hand onto running tool until tool contactstapered portion of split lockdown ring. Approximately 4 turns are required tocontact split lockdown ring, note number of turns.

    4.0 Adjust bolt on the installation tool to compress the split lockdown ring.

    5.0 As ring is compressed, screw the seal assembly further onto the running tool.

    6.0 Repeat 4.0 and 5.0 until O/D of split lockdown ring is flush with or just below theO/D of the seal assembly body. Approximately 4 further turns are required tofully compress the split lockdown ring. Note number of turns.

    7.0 With the running tool fully engaged on split lockdown ring, adjust bolt on theinstallation tool and remove tool.

    Note: After removal of the installation tool, split lockdown ring must be flushwith or just below the O/D of the seal assembly. If required, replaceinstallation tool and repeat from 4.0.

    8.0 Clean seal assembly and lubricate all seals with valve grease.

    9.0 Open lower outlets in the compact housing.

    10.0 Slowly lower seal assembly through BOP stack and riser into housing.

    Note. An increase in resistance will be felt as the I/D seals engage onto the casing hanger.

    11.0 Compare stick up above rotary table with that calculated to ensure at correctdepth.

  • 8/17/2019 Cameron - Installation Procedures

    58/110

    SD-018239-01

    Page 58 of 110 Rev. 05

  • 8/17/2019 Cameron - Installation Procedures

    59/110

    SD-018239-01

    Page 59 of 110 Rev. 01

    Installation and testing of casing hanger seal assembly (continued)

    12.0 Mark angular datum on handling joint and back out running tool 4 turns righthand to allow split lockdown ring to expand into its groove in the housing.

    Note 1. Initial rotation right hand will locate the four anti-rotation springloaded pins of the seal assembly into the casing hanger. This will be

    achieved within 90°. A revised angular datum should then be marked at this point.

    Note 2. If confirmation of ring expansion is required, an overpull of 20,000lbf can be applied to the running tool at this stage.

    13.0 Ensure lower outlets are open on housing, do not retrieve running tool at thisstage.

    Pressure testing of seal assembly

    Note: The split lockdown ring must be expanded into the lockdown groove before pressure testing commences. Failure to do this can result in damage to the seal assembly.

    14.0 Remove autoclave plug and gland from test port 1 (see page 54) in housing.

    15.0 Connect pressure test pump into the test port and apply pressure while bleedingair from the opposite port. Test pressure is to be 5,000 psi max. Lock in forrequired hold period.

    16.0 After successful test, release pressure, and re-install plug and gland (see manualsection 3.7).

    17.0 Fully back out running tool by right hand rotation, approximately 4 further turns(see 3.0) and retrieve. Lift slowly to ensure that the tool has fully disengaged.

  • 8/17/2019 Cameron - Installation Procedures

    60/110

    SD-018239-01

    Page 60 of 110 Rev. 01

    Installation and testing of casing hanger seal assembly (continued)

    Retrieval of seal assembly

    Note: In the unlikely event that a successful pressure test is not obtained on the seal assembly, it may be necessary to retrieve the seal assembly andinvestigate the problem.

    1.0 If the running tool is still engaged on the seal assembly down hole, proceed to 5.0.

    2.0 Make up running tool onto NC50 handling joint. Lubricate threads and inner lipof tool.

    3.0 Slowly lower running tool through BOP and riser into the compact housinglanding out on top of the seal assembly.

    4.0 Rotate left hand to engage tool onto seal assembly thread.

    5.0 Continue rotation approximately 8 turns (see 3.0 and 6.0 on page 53) until tool isfully engaged on thread and a firm stop is encountered. The torque required willincrease as the running tool approaches 7 turns and the 8 th turn should be achievedwithin 5000 ft.lbf of make-up torque. DO NOT exceed 7,000 ft.lbf of make-uptorque as the seal assembly latch pins may be sheared. Back off from this point amaximum of 45° (1/8th of a turn) right hand.

    6.0 Retrieve seal assembly by overpull.

    Note: An overpull of 15,000 lbf should be satisfactory to retrieve the assembly, DO NOT exceed 25,000 lbf.

    7.0 To remove seal assembly from running tool, replace the installation tool andadjust bolt to fully compress the ring. Unscrew seal assembly right hand.

  • 8/17/2019 Cameron - Installation Procedures

    61/110

    SD-018239-01

    Page 61 of 110 Rev. 01

    Running and retrieval of 13.5/8" nom. BOP test tool

    Equipment

    One 13.5/8" nom. combination tool, BOP tester Part no. 2125910-01and wear bushing running tool, NC50threads top and bottom

  • 8/17/2019 Cameron - Installation Procedures

    62/110

    SD-018239-01

    Page 62 of 110 Rev. 05

  • 8/17/2019 Cameron - Installation Procedures

    63/110

    SD-018239-01

    Page 63 of 110 Rev. 05

    Running and retrieval of 13.5/8" nom. BOP test tool

    Running the combination tool at this stage does not allow testing of the compact housing upper annulus outlets. Should this be a requirement while testing the BOP, then a cup tester is to be used.

    1.0 Make up NC50 handling joint into combination tool with pins facing up (seedrawing).

    Note: Do not tong on seal areas. Use minimum make up torque as the handling joint will need to be backed out to test the blind rams. Make upwith chain tongs.

    2.0 Check 'O' rings for damage and replace as necessary.

    3.0 Lightly grease 'O' rings.

    Note: Ensure the tiedown screws in the riser adaptor are fully retracted (4.25" from O/D) and gland nuts are re-made tight before continuing with the next stage.

    4.0 Lower tool through BOP stack and riser and land on seal assembly.

    Note: Compare stick up above rotary table with that calculated to ensure at correct depth.

    Note: Do NOT apply pressure below the Test Tool.

    Note: The pressure test must be performed by applying pressure through Choke / Kill Lines. Ensure upper side pipe plug is correctly installed.

    5.0 Fill stack full of water and close pipe rams around handling joint. Open the upperoutlet valves in the compact housing to monitor any fluid passing.

    6.0 Apply test pressure to BOP through kill line for required hold period.

    Note: Maximum test pressure is 5,000 psi or equal to the maximum working pressure of the lowest rated item in the stack.

    7.0 Release pressure and retract BOP rams.

  • 8/17/2019 Cameron - Installation Procedures

    64/110

    SD-018239-01

    Page 64 of 110 Rev. 05

    Blind Ram Test

    8.0 Back out handling joint from combination tool.

    9.0 Fill stack full of water and close blind rams and open the upper outlet valves inthe compact housing.

    10.0 Apply test pressure to BOP through kill line for required hold period. Monitoropen upper outlet valve for any leakage past the test plug.

    Note: Maximum test pressure is 5,000 psi or equal to the maximum working pressure of the lowest rated item in the stack.

    11.0 Release pressure, ensure no check valve is in the kill line. Retract blind rams.

    Close the upper valves in the compact housing. Retrieve the combination tool.

  • 8/17/2019 Cameron - Installation Procedures

    65/110

    SD-018239-01

    Page 65 of 110 Rev. 01

    Running and retrieval of 13.5/8" nom. upper wear bushing

    Equipment

    One 13.5/8" nom. upper wear bushing, Part no. 2125916-018.845" min. bore

    One 13.5/8" nom. combination tool, BOP Part no. 2125910-01Tester and wear bushing running tool,NC50 threads top and bottom

  • 8/17/2019 Cameron - Installation Procedures

    66/110

    SD-018239-01

    Page 66 of 110 Rev. 05

  • 8/17/2019 Cameron - Installation Procedures

    67/110

    SD-018239-01

    Page 67 of 110 Rev. 01

    Running of wear bushing

    1.0 Check that 'O' rings on wear bushing are in good condition. Replace as necessary.Lightly grease 'O' rings.

    2.0 Make up combination tool with pins down onto an NC50 handling joint, avoidtonging on seal area.

    3.0 Insert the combination tool into the wear bushing and rotate tool approx 90° righthand to fully latch into the wear bushing.

    Note: Ensure the tiedown screws in the riser adaptor are fully retracted (4.25" from O/D) and gland nuts are re-made tight before continuing with the next stage.

    4.0 Lower wear bushing through B.O.P. stack and riser into the compact housing andland off on the seal assembly.

    Note: Compare stick up above rotary table with that calculated to ensure at correct depth.

    5.0 Lock wear bushing in place by engaging the two tiedown screws into the recess ofthe wear bushing. To do this, the glands must be first loosened by turning lefthand with a 2-1/4" wrench approx. 2 turns. The tiedown screws can then berotated right hand with a 3/4" wrench until they come into contact with bushingwall (approx 6 turns). Back off the tiedown screws 45º (1/8th turn) and re-tightenthe glands to 250 ft.lbf.

    6.0 Rotate running tool left hand approx. 90º to disengage from 'Breech' connectionand retrieve tool.

    Note: To ease rotation, some or all of the hang-off weight should be taken up by the elevators .

  • 8/17/2019 Cameron - Installation Procedures

    68/110

    SD-018239-01

    Page 68 of 110 Rev. 01

    Retrieval of wear bushing (continued)

    7.0 Make up combination tool onto an NC50 handling joint.

    8.0 Lower combination tool into compact housing and land on wear bushing. Slowlyrotate tool right hand to locate ‘Breech’ connection until it drops 2.50".

    Note: Compare stick up above rotary table with that calculated to ensure at correct depth.

    9.0 Continue rotating tool right hand approx 90º until it is fully engaged.

    Note: Ensure the tiedown screws in the riser adaptor are fully retracted (4.25"

    from O/D) and the gland nuts are re-made before continuing with the next stage.

    10.0 Retrieve wear bushing and running tool. Pick up slowly to ensure bushing is free.

    Note: Overpull should not be required. Check tiedown screws if the wear bushing does not come free.

  • 8/17/2019 Cameron - Installation Procedures

    69/110

    SD-018239-01

    Page 69 of 110 Rev. 01

    Washout of compact housing upper seal areas

    Equipment

    One Wash out tool, NC50 box thread Part no. 2125914-01

  • 8/17/2019 Cameron - Installation Procedures

    70/110

    SD-018239-01

    Page 70 of 110 Rev. 05

  • 8/17/2019 Cameron - Installation Procedures

    71/110

    SD-018239-01

    Page 71 of 110 Rev. 01

    Washout of compact housing upper seal areas

    1.0 Make-up wash tool onto handling joint and connect to a clean water supply.

    2.0 Open upper outlets in the compact housing.

    3.0 Lower tool through rotary and begin washing at the top of BOP stack, using aflowrate of approximately 900 litres/min. Washout tool should be slowly rotatedto achieve full circumferential effect.

    Note: Ensure the tiedown screws in the riser adaptor are fully retracted (4.25"

    from O/D) and gland nuts are re-made tight before continuing with the next stage.

    4.0 Lower wash out tool slowly, continuing to wash housing bore until wash out toollands on top face of seal assembly.

    Note: As tool approaches fully landed position on seal assembly, the volume ofwater passing through the tool may have to be reduced to reduce back

    pressure build up.

    5.0 Continue to jet water until water flowing out of the outlets is clean.

    6.0 Stop water jet and retrieve tool.

    Note: DO NOT jet water and clean on retrieval of tool back up the stack, as this may wash any remaining debris that could have lodged in the ram cavities/annular back down hole.

  • 8/17/2019 Cameron - Installation Procedures

    72/110

    SD-018239-01

    Page 72 of 110 Rev. 01

    This Page

    Intentionally Left Blank

  • 8/17/2019 Cameron - Installation Procedures

    73/110

    SD-018239-01

    Page 73 of 110 Rev. 04

    Installation and testing of tubing hanger

    Equipment

    One 13.5/8" nom. tubing hanger, 7" Vam Top Part no. 2205088-05

    One Tubing hanger running tool, 7.5/8" Vam Top Part no. 2180000-04-07

    One Installation tool for split lockdown ring Part no. 2230761-02(Service tool)

  • 8/17/2019 Cameron - Installation Procedures

    74/110

    SD-018239-01

    Page 74 of 110 Rev. 01

  • 8/17/2019 Cameron - Installation Procedures

    75/110

    SD-018239-01

    Page 75 of 110 Rev. 01

    Installation and testing of tubing hanger

    1.0 Inspect the running threads on both the hanger and the running tool and lubricate.Inspect tubing hanger seals for damage, replace as necessary. Apply a light coat ofvalve grease to seals.

    2.0 Check 'O' ring on the running tool is in good condition. Replace as necessary.

    Note: The tubing hanger is supplied with a protector sleeve for the 'SRL' seal preparation. This should remain in place until installation of the tree assembly

    3.0 Attach the snap ring lock to the snap ring but do not collapse it until the hanger is

    ready to be run at the rig floor. Note: In order to confirm the correct landing position for the tubing hanger,

    paint a band on the 45 ° °° ° chamfer (see drawing). On installation, the painted band can be reviewed through the upper outlet valve or flange.Once the hanger is landed off, the painted band should be central in theupper annulus outlet.

    4.0 Make up the running tool onto the handling joint (if not already made up). Tongonly on the running tool neck.

    5.0 Run the tubing string complete with control line per completion program. Makeup hanger onto the last joint of tubing.

    6.0 Cut and bevel the control line at a height of approx. 8 ft above the hanger, stripback encapsulation and check for any scarring of stripped lines. Slide the 1/4"NPT fitting over the control line (thread towards the top). Insert continuouscontrol line through the port in the tubing hanger.

    7.0 Make up the compression fittings on top and bottom of the tubing hanger.

    8.0 Pressure test the gallery around the control line through the test port on the O/D ofthe tubing hanger to a maximum of 5,000 psi.

    9.0 Collapse the snap ring using the snap ring lock mechanism.

    10.0 Lift the running tool above the tubing hanger and insert the control line throughthe hole provided in the running tool.

  • 8/17/2019 Cameron - Installation Procedures

    76/110

    SD-018239-01

    Page 76 of 110 Rev. 05

  • 8/17/2019 Cameron - Installation Procedures

    77/110

    SD-018239-01

    Page 77 of 110 Rev. 01

    Installation and testing of tubing hanger (continued)

    Note: The pins in the running tool sleeve will ensure the control lines through

    the hanger are aligned with the through hole in the sleeve.

    11.0 Re-attach the spooled control line to the control line exiting the tool with acoupling, ensuring that the coupling will fit through the hole in the running tool.

    12.0 Pick up the running tool and carefully lower it onto the tubing hanger assembly.

    13.0 Make up the running tool to the tubing hanger by rotating the tool right hand withrespect to the tubing hanger. Be sure to keep the outer sleeve of the running toolfrom rotating by sliding the pins in the outer barrel into their respective slots inthe hanger. Also be sure to properly capture the snap ring with the running tool.

    Approximately 10-1/2 turns are required, note turns. 14.0 Remove the snap ring lock and ensure that the snap ring is below flush with the

    body of the tubing hanger. If it is not then the running tool must be furtherengaged onto the hanger by additional right hand rotation.

    15.0 Pressure test control lines as required.

    16.0 Just prior to landing, drain BOP stack and ensure tubing is central in rotary table.

    17.0 Lower hanger and running tool through BOP stack and riser into the compact

    housing and land on top of seal assembly. Note: Compare stick up above rotary table with that calculated to ensure

    correct depth. Look through upper outlet valve in the compact housing and confirm painted band is in the correct position. Close valve.

    18.0 Slowly rotate the running tool left hand to disengage the snap ring from therunning tool and engage it into the compact housing. After 4 turns the snap ringshould be checked for engagement into the housing by an overpull of 20,000 lbfabove string weight.

    Note 1: If visual confirmation of the correct snap ring engagement is required, prior to overpull, remove the blanking plug and view through the viewing port provided.

    Note 2: Visual confirmation of the correct overpull test can be achieved byviewing through the upper 'A' annulus. The hanger should lift a

    maximum of 0.15" and then stop when the snap ring 'float' has been taken up.

  • 8/17/2019 Cameron - Installation Procedures

    78/110

    SD-018239-01

    Page 78 of 110 Rev. 04

    19.0 Test between the tubing hanger seals through test port 2 (see drawing) in thecompact housing to 5000 psi for required hold period.

    20.0

    After successful test, release pressure and re-install fittings (see section 3.7).

    21.0 Proceed with wireline work as necessary.

    22.0 Refer to running procedure RP-002398 for installation of two way check valve(see section 3.9) into tubing hanger through the landing string. Torque to 400ft.lbf and test to 5000 psi per completion procedure.

    23.0 Disengage running tool from tubing hanger by left hand rotation, afterapproximately 10-1/2 turns, see 13.0 and 18.0. Begin to slowly lift the runningtool out of the housing ensuring the tool has fully disengaged. After approx. 8 ft

    the control line must be monitored to ensure couplings do not hang in the runningtool.

    24.0 Release pressure in control lines and cut either just below or above the runningtool at rig floor level. Remove running tool from landing string.

  • 8/17/2019 Cameron - Installation Procedures

    79/110

    SD-018239-01

    Page 79 of 110 Rev. 01

  • 8/17/2019 Cameron - Installation Procedures

    80/110

    SD-018239-01

    Page 80 of 110 Rev. 05

    Termination of control lines

    Note: Terminate control line as follows:

    1.0 Nipple down the BOP stack from the 13-5/8" compact housing.

    2.0 Lift the riser adaptor and stack clear and remove the CF-13 gasket.

    3.0 Remove the control line blind flange where applicable.

    4.0 Wrap control line around the hanger neck and feed through the control line exitport in the compact housing.

    5.0 Clean and lightly oil gasket preps in the needle valve and control line exit flange

    on compact housing.

    6.0 Install fitting nut, ferrule and No. 14 gasket over each tubing. Cut control line tolength, use a tube cutter not a hacksaw. Ensure sufficient line is available to workwith and that excess can be pushed back into the compact housing.

    7.0 Make-up compression fitting (ferrule and nut) into control line needle valve.

    8.0 Install control line needle valve, secure with cap screws pushing excess tubingback into compact housing. Connect control line for SSSV to port in control lineas required.

    Note: To ease installation of the needle valve block, use two 1/2" UNC threaded stud bolts approx. 8" long as guides, before installing the needle valve onto the wellhead.

  • 8/17/2019 Cameron - Installation Procedures

    81/110

    SD-018239-01

    Page 81 of 110 Rev. 01

    Installation and testing of xmas tree

    Equipment

    One Xmas tree, 6.3/8" 5000 'FLS' valves Part no. 2115330-04

    One 7" 'SRL' seal Part no. 2120000-34-03

    One 'CF-13' gasket Part no. 2162890-01-01

    One 7" 'SRL' seal installation tool Part no. 2119760-34-01

  • 8/17/2019 Cameron - Installation Procedures

    82/110

    SD-018239-01

    Page 82 of 110 Rev. 01

  • 8/17/2019 Cameron - Installation Procedures

    83/110

    SD-018239-01

    Page 83 of 110 Rev. 01

    Installation and testing of xmas tree

    1.0 Remove the BOP stack from the compact housing by backing out drive screws inthe fastlock drilling adaptor left hand until they bottom out.

    2.0 Lift the BOP and riser clear and remove the 'CF-13' gasket.

    3.0 Install studs into the compact housing 50 to 100 ft.lbf. After installation of studs,confirm 7.13" maximum height (see drawing).

    Note: Do not over torque.

    4.0 Thoroughly clean seal preps in top of the compact housing and in the bottom of

    the xmas tree.

    5.0 Fit new 'CF-13' gasket into the compact housing.

    6.0 Prise out protector sleeve from seal prep in the hanger neck.

    7.0 Ensure prep for 'SRL' seal in hanger neck is clean and free from defects. Apply alight coat of oil only and install seal. Prior to installing seal, drift through the sealwith spare BPV.

    Note: The 'SRL' seal is an interference fit in the bore of the tubing hanger

    (and xmas tree) and requires a certain load to fully install it. The seal can be carefully installed in the tubing hanger using the 'SRL' sealinstallation tool. Alternatively, use a block of wood and a sharp rap with

    a hammer. The seal will be fully installed during installation of xmas tree.

    8.0 Ensure prep for 'SRL' seal in xmas tree is clean and free from defects. Check 'NS'seal is in good condition. Replace as necessary.

    10.0 Remove autoclave fittings from test port and vent port (see drawing) in the xmastree. Ensure all gates and swab cap vent port in the vertical bore of the xmas tree

    are open to prevent trapped pressure when landing tree.11.0 Lift tree and orientate to suit site requirements. Ensure tree is as near vertical as

    possible. It is recommended at this stage to fill the compact housing annulus withtest fluid. This will aid the connection pressure test.

    Note: Ensure correct lifting eyes are used to lower tree onto the compact housing.

  • 8/17/2019 Cameron - Installation Procedures

    84/110

    SD-018239-01

    Page 84 of 110 Rev. 01

  • 8/17/2019 Cameron - Installation Procedures

    85/110

    SD-018239-01

    Page 85 of 110 Rev. 04

    Note: It is recommended at this stage to fill the annulus in the top of the housing with light oil (pressure test fluid). This will assist the connection pressure test later.

    Installation and testing of xmas tree

    12.0 Slowly lower tree onto housing taking extra care as the tree slides over theprojecting hanger neck.

    13.0 Install the 24 nuts onto studs to make up Flangelock connection. Tighten in stagesin an opposite and alternate pattern to evenly make up connection. Final torque tobe within range of 750 ft.lbf min. to 970 ft.lbf max.

    Connection pressure test14.0 Apply pressure through test port 3 (see drawing) to 5,000 psi and lock in for

    required hold period.

    Note: Ensure the vent port is open to monitor any leakage past the 'NS' seal.

    15.0 After successful test, release pressure and install fittings (see section 3.7).

    'SRL' hanger neck seal test

    16.0 The 'SRL' hanger neck seal is a uni-directional metal to metal seal. It cannot betested via an external test port.

    Note: Under no circumstances apply a pressure test through the vent port.

    17.0 The test is performed by pressurising the flow bore of the tree against the two waycheck valve set in the tubing hanger. Pressure to 5,000 psi and lock in for requiredhold period. Monitor for leakage through the vent port (see drawing).

    18.0 After successful test, release pressure and install fittings (see section 3.7).

    19.0 Test each valve on xmas tree.

    20.0 Install and pressure test lubricator and retrieve the two way check valve (seesection 3.9).

  • 8/17/2019 Cameron - Installation Procedures

    86/110

    SD-018239-01

    Page 86 of 110 Rev. 01

    Removal of xmas tree and retrieval of tubing hanger

    1.0 Install two way check valve and pressure test.

    2.0 Disconnect flowline from tree and remove flangelock nuts. Lift tree as vertical aspossible.

    3.0 Clean the top of the tubing hanger in readiness for the tubing hanger running tool.

    4.0 Disconnect control line exit and remove control line needle valve from compactwellhead outlet. Plug the control line in the wellhead outlet. Cut off the controlline 1/2" above the tubing hanger fitting. Clean the top of the tubing hanger inreadiness for the tubing hanger running tool.

    5.0 Install and pressure test the BOP against the blind ram only. Function test BOP.

    Note: The BOP should have been pressure tested on the test stump so only a pressure test of the connection to the wellhead is necessary.

    6.0 Recover two way check valve.

    Note: Recover other plugs, pump fluid etc. as required by the workover programme.

    7.0

    Remove 4 off pins from the tubing hanger running tool outer sleeve. Lower thetool on the landing string down onto the tubing hanger. When landed, turn thelanding string right hand to make up the tubing hanger running tool to the tubinghanger. Approx. 8.1/2 to 9 turns are required to fully collapse the hanger snapring.

    8.0 Slowly retrieve the tubing hanger with a straight vertical lift.

  • 8/17/2019 Cameron - Installation Procedures

    87/110

    SD-018239-01

    Page 87 of 110 Rev. 07

    Installation of 20" nom. emergency lowermost housing

    Equipment

    One 20.3/4" emergency lower casing head housing Part no. 2289213-01

    One 20" nom. lower housing running tool, Part no. 2125904-0121.25"-2 TPI LH stub acme x 20" buttress

    One Crossover, 20" buttress x 18.5/8" buttress Part no. 2205444-01

  • 8/17/2019 Cameron - Installation Procedures

    88/110

    SD-018239-01

    Page 88 of 110 Rev. 07

  • 8/17/2019 Cameron - Installation Procedures

    89/110

    SD-018239-01

    Page 89 of 110 Rev. 07

    Installation of 20" nom. emergency lowermost housing

    1.0 In the event that the 18.5/8" casing becomes stuck during running and it isrequired to cement, centralise the casing and cement per completion programme.

    2.0 Cut and dress the 18.5/8" casing 7.50" +/- 0.25" (190.5±6.4mm) above theconductor (see drawing).

    3.0 Make up the emergency lowermost housing running tool to landing string.

    4.0 Prepare 20" nom. emergency lowermost housing for running by backing off 8sliplock activating screws. Ensure that the slips are in their uppermost positionand lock in by tightening the slip retaining screws hand tight only.

    5.0 Make up running tool to housing by left hand rotation 200 ft.lbf max,approximately 4.1/2 turns (note turns).

    6.0 Lower housing over the casing stub. Prior to landing on conductor pipe / plate,loosen the slip retaining screws. Confirm that outlet orientation conforms to siterequirements.

    7.0 Energise 'P' seals, see Section 3.5.

    8.0 Test between the two 'P' seals through test port in the emergency lowermost

    housing (see drawing) to 80% of casing collapse pressure.

    9.0 After successful test, release pressure and re-install fittings (see section 3.6).

    10.0 Run in the eight slip activating screws and torque up evenly in sequence to 100 to200 ft.lbf. to engage the slip segments onto the casing.

    Note: It is important to successfully test the 'P' seals prior to setting the slips. In the event that the seals fail a pressure test and require replacing, it may be necessary to remove the housing. It will be impossible to pull the housing after setting the slips.

    11.0 To ensure that the slip segments have gripped the casing, perform an overpull testto approx. 30,000 lbf.

    12.0 Remove running tool by right hand rotation approximately 4.1/2 turns (see 5.0).

    13.0 Thoroughly flush out and clean housing bore and install outlet equipment.

    14.0 Continue with operations, see page 9.

  • 8/17/2019 Cameron - Installation Procedures

    90/110

    SD-018239-01

    Page 90 of 110 Rev. 01

    This Page

    Intentionally Left Blank

  • 8/17/2019 Cameron - Installation Procedures

    91/110

    SD-018239-01

    Page 91 of 110 Rev. 07

    Installation of 13.3/8" emergency sliplock connector

    Equipment

    One 13.5/8" nom. 'SSMC' 2 stage compact, Part no. 2115330-16complete with annulus equipment

    One Compact housing running tool Part no. 2125909-01

    One Emergency sliplock connector, 13.3/8" Part no. 2055120-0568 # BTC pin x 13.3/8" slips

    Four 1.1/2" nom. outlet blanking plug Part no. 268689-01

    (Service tools)

    Three Control line outlet flush plug Part no. 2125647-01(Service tools)

    Four Installation studs (1/2" UNC x 3" long (Service tool)screwed bar) for hold down ring

  • 8/17/2019 Cameron - Installation Procedures

    92/110

    SD-018239-01

    Page 92 of 110 Rev. 07

  • 8/17/2019 Cameron - Installation Procedures

    93/110

    SD-018239-01

    Page 93 of 110 Rev. 07

    Installation of 13.3/8" emergency sliplock connector

    1.0 In the event that the 13.3/8" casing becomes stuck during running and it isrequired to cement, ensure that there are no casing collars or centralisers withinthe lowermost housing. Centralise the casing and cement per completionprogramme.

    2.0 Using a rig internal casing cutter, cut and bevel the 13.3/8" casing. To determinethe position, measure from the top of the compact hub to the bottom face of thesliplock connector. Take 21.25" from this dimension to give the correct cut-offheight (see drawing). There is a +/- 2.00" (50.8 mm) tolerance on this dimension.

    3.0 Nipple down 20.3/4" BOP stack by backing out drilling adaptor drive screws.

    4.0 Dress and chamfer top of 13.3/8" casing.

    5.0 Measure diameter of the 13.3/8" casing stub and select the appropriate 'T' seals.

    Casing diameter 'T' seal part no.

    13.308 / 13.375” [338.02 / 339.72mm] 2017924-03-0113.375 / 13.442” [339.72 / 341.43mm] 2017924-02-0113.442 / 13.509” [341.43 / 343.13mm] 2017924-01-01

    Assemble the selected seals and retainer wires into the sliplock connector.

    6.0 Check 'O'-ring on compact housing running tool is in good condition. Replace asnecessary.

    7.0 Ensure the compact housing annulus equipment is removed and four off plugspart no. 268689-01 are fitted.

    8.0 Make up compact housing running tool to landing joint.

    9.0 Make up running tool into compact housing left hand to 200 ft.lbf maximum.

    Approx. 4 turns are required (note turns).10.0 Make up 13.3/8" sliplock connector / crossover into the bottom of the compact

    housing.

    11.0 Check 'O'-rings on the compact housing are in good condition. Replace asnecessary.

  • 8/17/2019 Cameron - Installation Procedures

    94/110

    SD-018239-01

    Page 94 of 110 Rev. 07

  • 8/17/2019 Cameron - Installation Procedures

    95/110

    SD-018239-01

    Page 95 of 110 Rev. 07

    Installation of 13.3/8" emergency sliplock connector (continued)

    12.0 Loosen but do not remove the 4 off transportation socket head screws locking theslips in place. Ensure that the screws are below the O/D of the connector. Confirmthat the slips are held in the uppermost position.

    13.0 Run compact housing and sliplock connector over casing stub and into lowermosthousing. Ensure outlets conform to site requirement.

    14.0 Test between the compact seals through test port in the lowermost housing (seedrawing) to 3,000 psi for required hold period.

    15.0 After successful test, release pressure and re-install fittings (see Section 3.6).

    16.0 Retrieve running tool by rotating right hand approximately 4 turns (see 9.0) andpulling vertically. Lift slowly to ensure the tool has fully dis-engaged.

    17.0 Ensure threads on the 20" nom. lowermost housing are free of debris and greased.

    18.0 Pass the hold down ring over the compact housing and thread into the 20" nom.lower housing by turning left hand using the 1/2" installation studs (approx. 3turns).

    19.0 Install inner and outer 'O'-rings seals onto the hold down ring for debris

    protection.

    20.0 Remove blanking plugs, clean out and re-install outlet equipment as required. Forthe final A and B annuli outlet configuration and connection pressure testing seepage 106 to 109.

    21.0 Install 13.5/8" nom. drilling adaptor with BOP and riser, see page 31.

    22.0 Run 13.3/8" casing spear below casing cut-off.

    23.0 Pull required tension in the casing, slowly release to set slips.

    24.0 Pressure test sliplock connector seals by applying pressure against 13.3/8" cuptester.

  • 8/17/2019 Cameron - Installation Procedures

    96/110

    SD-018239-01

    Page 96 of 110 Rev. 01

    This Page

    Intentionally Left Blank

  • 8/17/2019 Cameron - Installation Procedures

    97/110

    SD-018239-01

    Page 97 of 110 Rev. 01

    Installation of 9.5/8" or 10.3/4" emergency slip bowl assembly

    Equipment

    One 13.5/8" nom. x 9.5/8" emergency slip bowl Part no. 2119357-01-01assembly (includes 4 off handling rods)

    OR

    One 13.5/8" nom. x 10.3/4" emergency slip bowl Part no. 2179369-01assembly (includes 4 off handling rods)

  • 8/17/2019 Cameron - Installation Procedures

    98/110

    SD-018239-01

    Page 98 of 110 Rev. 07

  • 8/17/2019 Cameron - Installation Procedures

    99/110

    SD-018239-01

    Page 99 of 110 Rev. 07

    Installation of 9.5/8" or 10.3/4" emergency slip bowl assembly

    1.0 In the event that either the 9.5/8" or 10.3/4" casing becomes stuck during runningand it is required to cement the casing as is, the mandrel casing hanger cannot beused. Ensure there are no casing collars or centralisers within the compacthousing. Centralise the casing and cement per completion programme.

    2.0 When the well is in a safe condition, nipple down 13.5/8" BOP stack by backingout drilling adaptor drive screws. Lift BOP stack at least 24" clear to gain accessto casing.

    3.0 Select the appropriate slip bowl assembly. Assemble four 1/2" handling rods, assupplied, into slip bowl assembly. Unbolt two halves of emergency slip assembly

    and wrap around casing. Bolt two halves back together.

    4.0 Loosen slip retaining screws ensuring that the screws remain below the O/D of theslip bowl.

    5.0 Lower slip bowl assembly into housing and land out on 45º shoulder. Removehandling rods.

    6.0 Pick up casing and pull required tension, 15,000 lbf. Confirm casing is central andadjust as required to allow slips to set down evenly.

    7.0

    Release tension to set slips.

    8.0 Make a rough cut on the casing, leaving the casing stub above the face of thecompact housing.

    9.0 Retrieve cut casing back to rig floor and discard.

    10.0 Position BOP stack away from the wellhead to gain further access to the casingstub and secure.

    11.0 Accurately cut the casing inside the compact housing 19.75" +/-.25" [501.7±6.35]

    from top face of the compact using the internal casing cutter. Refer to Furmaniteoperation instructions.

    12.0 Dress casing stub with a 3/16" x 30º chamfer and remove all cuttings etc. fromaround the casing stub.

    13.0 Thoroughly clean 'CF-13' gasket prep on the bottom of 13.5/8" drilling adaptorand top of the compact housing.

  • 8/17/2019 Cameron - Installation Procedures

    100/110

    SD-018239-01

    Page 100 of 110 Rev. 07

    14.0 Ensure segments of fastlock connector are fully retracted prior to make-up to thecompact housing.

    15.0 Install 'CF-13' gasket into compact housing hub and lower BOP stack with drillingriser adaptor onto connection.

    16.0 Make-up the fastlock connector by tightening each drive screw in sequence and tothe correct torque specification. The correct sequence is to tighten opposite screwsin pairs and work around the connector in a right hand or left hand direction. Asecond application of torque at the correct torque specification should be appliedin the same sequence to ensure make-up. The torque for each drive screw is 600ft.lbf.

    17.0 Washout seal areas in housing per procedure see page 47.

    18.0 See page 101 for installation of 9.5/8" or 10.3/4" emergency seal assembly asapplicable.

  • 8/17/2019 Cameron - Installation Procedures

    101/110

    SD-018239-01

    Page 101 of 110 Rev. 04

    Installation and testing of 9.5/8" or 10.3/4" emergency seal assembly

    Equipment

    One 13.5/8" nom. emergency seal assembly Part no. 2119379-01-01to suit 9.5/8" casing

    OR

    One 13.5/8" nom. emergency seal assembly Part no. 2179370-01to suit 10.3/4" casing

    One Seal assembly running tool, NC50 threads Part no. 2095627-01top and bottom

    One Installation tool for split lockdown ring Part no. 2230761-02(Service tool)

  • 8/17/2019 Cameron - Installation Procedures

    102/110

    SD-018239-01

    Page 102 of 110 Rev. 07

  • 8/17/2019 Cameron - Installation Procedures

    103/110

    SD-018239-01

    Page 103 of 110 Rev. 01

    Installation and testing of 9.5/8" or 10.3/4" emergency seal assembly

    1.0 Prepare seal assembly. Inspect for damage, paying particular attention to the 'LS'and 'T' seals. Replace as necessary. Ensure spring loaded anti-rotational pinsdepress and retract.

    2.0 Make up the running tool onto NC50 handling joint.

    Note: A minimum weight of 10,000 lbf is required to install the seal assembly.This may require the use of heavy weight drill collars hung from the

    NC50 box thread below the running tool to supplement total hangoffweight.

    3.0 Partially screw seal assembly left hand onto running tool until tool contactstapered portion of split lockdown ring. Approximately 4 turns are required tocontact split lockdown ring. Note number of turns.

    4.0 Adjust bolt on the installation tool to compress the split lockdown ring.

    5.0 As ring is compressed, screw the seal assembly further onto the running tool.

    6.0 Repeat 4.0 and 5.0 until O/D of split lockdown ring is flush with or just below theO.D. of the seal assembly body. Approximately 4 further turns are required tofully compress the split lockdown ring. Note number of turns.

    7.0 With the running tool fully engaged on split lockdown ring, adjust bolt on theinstallation tool and remove tool.

    Note: After removal of the installation tool, split lockdown ring must be flushwith or just below the O/D of the seal assembly. If required, replaceinstallation tool and repeat from 4.0.

    8.0 Clean seal assembly and lubricate all seals with valve grease.

    9.0 Open lower outlets in the compact housing.

    10.0 Slowly lower seal assembly through BOP stack and riser into housing.

    Note: An increase in resistance will be felt as the I/D seals engage onto the casing.

    11.0 Compare stick up above rotary table with that calculated to ensure at correctdepth. This can be verified by viewing through lower outlets.

  • 8/17/2019 Cameron - Installation Procedures

    104/110

    SD-018239-01

    Page 104 of 110 Rev. 06

    Installation and testing of 9.5/8" or 10.3/4"emergency seal assembly(continued)

    12.0 Mark angular datum on handling joint and back out running tool 4 turns righthand to allow split lockdown ring to expand into its groove in the housing.

    Note 1: Initial rotation right hand of the 9.5/8" seal assembly will locate the two anti-rotation spring loaded pins of the seal assembly into the slip bowl. This will be achieved within 180°. A revised angular datum should then be marked at this point.

    Note 2: Initial rotation right hand of the 10.3/4" seal assembly will locate the three anti-rotation spring loaded pins of the seal assembly into the slip

    bowl. This will be achieved within 120°. A revised angular datum should then be marked at this point.

    Note 3: If confirmation of ring expansion is required, an overpull of 20,000lbf can be applied to the running tool at this stage.

    13.0 Ensure lower outlets are open on housing, do not retrieve running tool at thisstage.

    Pressure testing of seal assembly

    Note: The split lockdown ring must be expanded into the lockdown groove before pressure testing commences. Failure to do this can result in damage to the seal assembly.

    14.0 Remove autoclave plug and gland from test port 1 (see page 100) in housing.

    15.0 Connect pressure test pump into the test port and apply pressure while bleedingair from the opposite port. Test pressure is to be 80% of collapse of casing. Lockin for required hold period.

    16.0 After successful test, release pressure, and re-install plug and gland (see Section3.6).

    17.0 Fully back out running tool by right hand rotation, approximately 4 further turns(see 3.0) and retrieve. Lift slowly to ensure that the tool has fully disengaged.

  • 8/17/2019 Cameron - Installation Procedures

    105/110

    SD-018239-01

    Page 105 of 110 Rev. 06

    Installation and testing of 9.5/8" or 10.3/4" emergency seal assembly(continued)

    Retrieval of seal assembly

    Note: In the unlikely event that a successful pressure test is not obtained on the seal assembly, it may be necessary to retrieve the seal assembly andinvestigate the problem.

    1.0 If the running tool is still engaged on the seal assembly down hole, proceed to 5.0.

    2.0 Make up running tool onto NC50 handling joint. Lubricate threads and inner lipof tool.

    3.0 Slowly lower running tool through BOP and riser into the compact housinglanding out on top of the seal assembly.

    4.0 Rotate left hand to engage tool onto seal assembly thread.

    5.0 Continue rotation approximately 8 turns (see 3.0 and 6.0 on page 99) until tool isfully engaged on thread and a firm stop is encountered. The torque will increaseas the tool approaches the 8 th turn, DO NOT exceed 4,500 ft.lbf of make-uptorque as the seal assembly latch pins may be sheared. Back off from this point amaximum of 45° (1/8 th of a turn) right hand.

    6.0 Retrieve seal assembly by overpull.

    Note: An overpull of 15,000 lbf should be satisfactory to retrieve the assembly, DO NOT exceed 25,000 lbf.

    7.0 To remove seal assembly from running tool, replace the installation tool andadjust bolt to fully compress the lockdown ring. Unscrew seal assembly righthand.

  • 8/17/2019 Cameron - Installation Procedures

    106/110

    SD-018239-01

    Page 106 of 110 Rev. 07

    Final A and B-annuli wellhead configuration and connection pressuretesting

    Equipment

    5 ea. 2-1/16”5000 psi manual gate valve Part no. 141521-31-34-01

    24 ea. Stud .875”-9UNC x 6.00” LG Part no. 702533-08-10-60

    48 ea. Nut HVY HEX .875-9UNC Part no. 2709000-09-10

    4 ea. RX-24 gasket Part no. 702002-02-42

    4 ea. 2-1/16” 5000 psi companion flange Part no. 142362-01-03-02

    4 ea. 2.00” LP bull plug Part no. 2221884-13-01

    1 ea. Valve removal plug 1-1/2" Part no. 2222164-02-01

    6 ea. 1/2" NPT needle valve Part no. 007482-40

    2 ea. 1/2" NPT HEX nipple Part no. 062224-04-06

    2 ea. 1/2” NPT screw end Tee Part no. 062229-04-06

    2 ea. Pressure gauge 5000 psi Part no. 007484-40

    4 ea. 1/2" NPT HEX HD pipe plug Part no. 005930-03-10

    Install wellhead outlet valves as per JV Gas wellhead configuration drawingfollowing the next steps:

    Note: Prior to commencing the wellhead configuration, check the wellhead annuli for (trapped) pressure. All annuli should be depressurized.

    A-annulus active side:

    1.0 Leave the 2 ea. annulus valves on the wellhead, these valves were previouslyinstalled by drilling.

    2.0 Remove the 2.00”-5K Weco flange and replace by 2-1/16”-5K companion flange.

    3.0 Make up the companion flange connection with new ring gasket, fit the bull plug,and wellhead monitoring manifold with pressure gauge.

    A-annulus non active side:

    4.0 Remove the 2.00”-5K Weco flange and remove the outer annulus valve previouslyinstalled by drilling. Leave the inner annulus valve in place.

  • 8/17/2019 Cameron - Installation Procedures

    107/110

    SD-018239-01

    Page 107 of 110 Rev. 07

    5.0 Make up the companion flange connection with new ring gasket, fit the bull plug,and needle valve.

    6.0 Open the valve and leave in the open position

    B-annulus non active side:7.0 Remove both the 2 ea. annual valves previously installed by drilling and leave the

    wellhead outlet open.

    B-annulus active side:

    8.0 Leave 2 ea. annulus valves on the wellhead, these valves were previously installedby drilling.

    9.0 Remove the 2.00”-5K Weco flange and replace by 2-1/16”-5K companion flange.

    10.0 Make up the companion flange connection with new ring gasket, fit the bull plug,and wellhead monitoring manifold with pressure gauge.

    Pressure testing the B-annulus end connections active side

    11.0 Connect hand pump test hose and fitting to the bleed needle valve of the wellheadmonitoring manifold. Ensure the needle valves of the wellhead monitoringmanifold are in the open position.

    12.0 Close the outer annulus valve (back off hand wheel 1/4 turn) and start pumping.

    13.0 Pump to the required test pressure as specified by the Customer and bleedoff the pressure.

    14.0 Repeat this step a couple of times to bleed trapped air from the valve bore.

    15.0 Apply the final pressure as per Customers requirement and holding period.

    16.0 After successful pressure testing bleed off the test pressure to zero and open theouter annulus valve. Leave the outer annulus valve open.

    17.0 Disconnect the test pump.

    Pressure testing the A-annulus end connections active side

    18.0 Connect hand pump test hose and fitting to the bleed needle valve of the wellheadmonitoring manifold. Ensure the needle valves of the wellhead monitoringmanifold are in the open position.

    19.0 Close the outer annulus valve (back off hand wheel 1/4 turn) and start pumping.

  • 8/17/2019 Cameron - Installation Procedures

    108/110

    SD-018239-01

    Page 108 of 110 Rev. 07

    20.0 Pump to the required test pressure as specified by the Customer and bleedoff the pressure.

    21.0 Repeat this step a couple of times to bleed trapped air from the valve bore.

    22.0 Apply the final pressure as per Customers requirement and holding period.

    23.0 After successful pressure testing bleed off the test pressure to zero and open theouter annulus valve. Leave the outer annulus valve open.

    24.0 Disconnect the test pump.

    Pressure testing the A-annulus end connections non active side

    25.0 Connect hand pump test hose and fitting to the needle valve on bull plug of thecompanion flange. Ensure the needle valve is in the open position.

    26.0 Close the annulus valve (back off hand wheel 1/4 turn) and start pumping.

    27.0 Pump to the required test pressure as specified by the Customer and bleedoff the pressure.

    28.0 Repeat this step a couple of times to bleed trapped air from the valve bore.

    29.0 Apply the final pressure as per Customers requirement and holding period.

    30.0 After successful pressure testing bleed off the test pressure to zero and openthe outer annulus valve. Leave the outer annulus valve open.

    31.0 Disconnect the test pump.

    Pressure testing the B-annulus end connections non active side

    32.0 Check and clean the VR threads and ring groove of the exposed B-annulus outlet.

    33.0 Install the VR plug refer to RP-001558 (Section 3 Maintenance and ServiceInstructions)

    34.0 Apply TS-73 (P/n - 687950-38-31-26) or TF-15 (P/n - 687950-39-31-26) threadsealants on the VR plug threads. Carefully screw the VR plug in by hand.

    35.0 Use the appropriate torque wrench and socket to apply the required torque for themake-up and break-out of VR plugs. Final make-up torque to be in the range of110 ft.lbf min. to 140 ft.lbf max.

    36.0 Fit the 2-1/16”-5K companion flange with new ring gasket, bull plug and needlevalve.

  • 8/17/2019 Cameron - Installation Procedures

    109/110

    SD-018239-01

    Page 109 of 110 Rev. 07

    37.0 Connect hand pump test hose and fitting to the needle valve on bull plug of thecompanion flange. Ensure the needle valve is in the open position.

    38.0 Pump to the required test pressure as specified by the Customer and bleedoff the pressure.

    39.0 Repeat this step a couple of times to bleed trapped air from the valve bore.

    40.0 Apply the final pressure as per Customers requirement and holding period.

    41.0 After successful pressure testing bleed off the test pressure to zero.

    42.0 Disconnect the test pump.

    43.0 Close all the wellhead A and B-annuli valves.

    44.0 Close all the needle valves and install the 1/2" NPT blind plugs.