CamCube Interim Review 2 ASEN 4028 – March 15, 2004 Sam Baker Tom Freestone Brian Madge Brian Roberts Steve Pfau Jen Uchida
17

CamCube Interim Review 2 ASEN 4028 – March 15, 2004 Sam Baker Tom Freestone Brian Madge Brian Roberts Steve Pfau Jen Uchida.

Dec 21, 2015

Download

Documents

Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: CamCube Interim Review 2 ASEN 4028 – March 15, 2004 Sam Baker Tom Freestone Brian Madge Brian Roberts Steve Pfau Jen Uchida.

CamCube Interim Review 2

ASEN 4028 – March 15, 2004Sam Baker

Tom FreestoneBrian MadgeBrian Roberts

Steve PfauJen Uchida

Page 2: CamCube Interim Review 2 ASEN 4028 – March 15, 2004 Sam Baker Tom Freestone Brian Madge Brian Roberts Steve Pfau Jen Uchida.

Overview

• Project Summary• Resolved Issues• Design Summary• Current Issues to

be Resolved• Schedule Progress• Budget Progress

Page 3: CamCube Interim Review 2 ASEN 4028 – March 15, 2004 Sam Baker Tom Freestone Brian Madge Brian Roberts Steve Pfau Jen Uchida.

Project Summary• Multi-year goal

– Design a pico-satellite around the CubeSat program guidelines. The satellite will be launched from the shuttle and orient itself in order to take pictures of the heat tiles with an onboard camera.

• Current year goal– Develop an attitude control system that

will orient the satellite and keep the on board camera steady for pictures.

Page 4: CamCube Interim Review 2 ASEN 4028 – March 15, 2004 Sam Baker Tom Freestone Brian Madge Brian Roberts Steve Pfau Jen Uchida.

Project Summary

• Reaction Wheel– Testing in a single axis– Possibility of testing in two axes

• Dual Disk testing apparatus– Applied torque from the reaction wheel

• 3-axis Gimbal– 2-axes will be locked for the single axis test– Measuring stability, slew rate, response to

applied forces

Page 5: CamCube Interim Review 2 ASEN 4028 – March 15, 2004 Sam Baker Tom Freestone Brian Madge Brian Roberts Steve Pfau Jen Uchida.

Resolved Issues

• Machining Time– Most parts

complete– 1 part left to

fabricate• Battery mounting

bracket

Page 6: CamCube Interim Review 2 ASEN 4028 – March 15, 2004 Sam Baker Tom Freestone Brian Madge Brian Roberts Steve Pfau Jen Uchida.

Design Summary – Cube

Page 7: CamCube Interim Review 2 ASEN 4028 – March 15, 2004 Sam Baker Tom Freestone Brian Madge Brian Roberts Steve Pfau Jen Uchida.

Design Summary – Cube

Page 8: CamCube Interim Review 2 ASEN 4028 – March 15, 2004 Sam Baker Tom Freestone Brian Madge Brian Roberts Steve Pfau Jen Uchida.

Design Summary – Dual Disk

Page 9: CamCube Interim Review 2 ASEN 4028 – March 15, 2004 Sam Baker Tom Freestone Brian Madge Brian Roberts Steve Pfau Jen Uchida.

Current Issues

• Load cell– Miscalculation of force from desired

torque numbers– Ordered new load cell (came in this

morning)– Each test only takes about 8 seconds

• Increase output voltage to the motion controller by 1mV every millisecond

Page 10: CamCube Interim Review 2 ASEN 4028 – March 15, 2004 Sam Baker Tom Freestone Brian Madge Brian Roberts Steve Pfau Jen Uchida.

Dual Disk Results

Page 11: CamCube Interim Review 2 ASEN 4028 – March 15, 2004 Sam Baker Tom Freestone Brian Madge Brian Roberts Steve Pfau Jen Uchida.

Dual Disk Results

• Wrong load cell• Noise

– ~5mV output– ~15 mV noise– Wobble in reaction wheel– Torque from wire

Page 12: CamCube Interim Review 2 ASEN 4028 – March 15, 2004 Sam Baker Tom Freestone Brian Madge Brian Roberts Steve Pfau Jen Uchida.

Current Issues• Wobble analysis

– Nutation angle, – Shaft displacement

from center of RW– Non-uniform mass

• Nutation– Number of

precessions per revolution

– Negative => retrograde

Page 13: CamCube Interim Review 2 ASEN 4028 – March 15, 2004 Sam Baker Tom Freestone Brian Madge Brian Roberts Steve Pfau Jen Uchida.
Page 14: CamCube Interim Review 2 ASEN 4028 – March 15, 2004 Sam Baker Tom Freestone Brian Madge Brian Roberts Steve Pfau Jen Uchida.
Page 15: CamCube Interim Review 2 ASEN 4028 – March 15, 2004 Sam Baker Tom Freestone Brian Madge Brian Roberts Steve Pfau Jen Uchida.

Budget Progress – Estimated Budget

System Est Price Price

Att Control $800.00 $667.79Att Determ $300.00 $294.00Electronics $50.00 $36.40

Misc $100.00 $14.97Structures $150.00 $124.91

Testing $2,000.00 $590.07Est Cost Actual Difference

$3,400.00 $1,728.14 $1,671.86

Page 16: CamCube Interim Review 2 ASEN 4028 – March 15, 2004 Sam Baker Tom Freestone Brian Madge Brian Roberts Steve Pfau Jen Uchida.

Budget Progress – Actual BudgetSystem Member Item Company Ordered Received Price

Att Control Tom 1.5-3 V DC Motor Radio Shack 11/12/03 11/12/03 $1.99 $4,000.00 CUStructures Sam 5052 H32 Aluminum 11/18/03 11/19/03 $9.04 $4,200.00 UROP

Testing Tom 3-Axis Gimbal Small Pts Cat 11/25/03 12/3/03 $27.95Att Determ Madge Rate Gyros/Eval Boards Analog Devices 11/30/03 12/3/03 $0.00Att Determ Madge Rate Gyros/Eval Boards Future Active Cat 12/1/03 $294.00

Final Report Jen Binding Report Kinko's 12/15/03 12/15/03 $14.97Att Control Madge A/D converter Future Active Cat 1/12/04 1/18/04 $93.00Att Control Steve Motors/Motion Controller Micro Mo Elect 1/16/04 1/20/04 $212.10 Structures Sam Bearing/Al Stock/Brass McMaster 1/22/04 1/28/04 $36.93Electronics Madge Static Mat Newark 1/28/04 2/26/04 $36.40Structures Sam Chucking Reamer McMaster 1/28/04 1/29/04 $10.96Att Control Steve Motors (5) Micro Mo Elect 2/22/04 2/25/04 $360.70Structures Sam Brass Online Metals 2/23/04 2/25/04 $24.83

Testing Roberts Load Cell Omega 2/23/04 2/25/04 $114.09Testing Roberts Batteries/Charger Eagle Pitcher 2/25/04

Structures Steve Screws/Aluminum Rod McGuckins 3/1/04 3/1/04 $21.14Structures Sam Chucking Reamer McMaster 3/3/04 3/4/04 $22.01

Testing Roberts Laser McGuckins 3/9/04 3/9/04 $12.13Testing Tom Camera Mike's Camera 3/10/04 3/10/04 $435.90

Spent $1,728.14 $6,471.86 Remain

Available Funds

Page 17: CamCube Interim Review 2 ASEN 4028 – March 15, 2004 Sam Baker Tom Freestone Brian Madge Brian Roberts Steve Pfau Jen Uchida.