Top Banner
California Passenger Rail Summit April 29, 2015 LOSSAN Pacific Surfliner Rail Service Update
11

California Passenger Rail Summit April 29, 2015 LOSSAN Pacific Surfliner Rail Service Update.

Dec 21, 2015

Download

Documents

Marshall Byrd
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: California Passenger Rail Summit April 29, 2015 LOSSAN Pacific Surfliner Rail Service Update.

California Passenger Rail Summit

April 29, 2015

LOSSANPacific Surfliner Rail Service Update

Page 2: California Passenger Rail Summit April 29, 2015 LOSSAN Pacific Surfliner Rail Service Update.

Current Service in the Corridor• 2nd busiest intercity passenger rail corridor in U.S.

• 150+ daily passenger trains• Amtrak• Metrolink• COASTER

• 41 stations served

• Annual ridership: 7.2 million

2.7 million (Pacific Surfliner); 4.5 million (Metrolink/COASTER)

• Seven right-of-way owners

Page 3: California Passenger Rail Summit April 29, 2015 LOSSAN Pacific Surfliner Rail Service Update.

LOSSAN Rail Corridor

Page 4: California Passenger Rail Summit April 29, 2015 LOSSAN Pacific Surfliner Rail Service Update.

• Added complexity

• Freight railroads (55%)

• County commissions/local transportation agencies (45%)

• 80 percent single track north of L.A.

• Approx. 50 percent single track in San Diego County; top speeds of 90 mph

Right-of-Way Ownership

Page 5: California Passenger Rail Summit April 29, 2015 LOSSAN Pacific Surfliner Rail Service Update.

Current Coordination Activities

• Coordinated schedule changes• Work window coordination• Rail 2 Rail program• Coordinated rail planning study

Page 6: California Passenger Rail Summit April 29, 2015 LOSSAN Pacific Surfliner Rail Service Update.

Joint Timetable

• All passenger trains schedules in one place• Highlights connection opportunities

Page 7: California Passenger Rail Summit April 29, 2015 LOSSAN Pacific Surfliner Rail Service Update.

Room for Improvement

• One corridor, three operators, multiple ticket types• No uniform technology (TAP/Compass card,

mobile, paper, barcode)

Page 8: California Passenger Rail Summit April 29, 2015 LOSSAN Pacific Surfliner Rail Service Update.

Transit Transfer Program

• Cap-and-trade application – one-year demo• Seamless transfer from Pacific Surfliner to

12 local transit operators at 27 stations• On-board sale of discounted Metro TAP pass

Page 9: California Passenger Rail Summit April 29, 2015 LOSSAN Pacific Surfliner Rail Service Update.

Statewide Perspective

• Three existing state-funded corridors

• 1 in 5 Amtrak passengers use California services

• Annual ridership 5.5 million+

• Three emerging corridors

• Need to ensure connectivity

Page 10: California Passenger Rail Summit April 29, 2015 LOSSAN Pacific Surfliner Rail Service Update.

Next Steps

• Complete negotiations of interagency transfer agreement with State of California Close coordination with San Joaquin corridor Expected approval in June 2015, transfer

beginning in summer 2015• Submit final business plan with key initiatives• Finalize staffing and transition plans • Work on statewide initiatives (equipment

purchase, integrated schedules and ticketing)• Continue to work with member agencies and

partners on regional/statewide coordination

Page 11: California Passenger Rail Summit April 29, 2015 LOSSAN Pacific Surfliner Rail Service Update.

Questions?

David GolonskiLOSSAN Rail Corridor Agency

[email protected]