CALENDAR OF ACTIVITY AS OF APRIL 2015 Sunday Monday Tuesday Wednesday Thursday Friday Saturday 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20. HO 21. HO/SPV 22. LBT/SAUG 23. MWV 24. MPV/ELG3 25. HO Orientation Weekly TOE Meeting 26 27. HO/SPV 28. HO/STV 29. HO/2C 30. PKSV 1 2 KENNETH S. RAYMUNDO FERNANDO D. VALDEZ JR. Technical Operations Engineer Director Process Integration and QM, FOPM Process Integration and QM, FOPM Orientation and Site Inspection Validation of EE Roooms @ LBT4 & Audio System @ SAUG1 BTO Activity: perimenter fence & landscape BTO Activity for Podium Parking @ MPV, Site and Telco Room Inspection @ ELG3 delivery of materials, observation report for SPV Observation report for STV Meeting, Initial Inspection Validation Of Basement 1&2 Parking Area
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Validation of 3F hallways 150NB, Validation of intercom STV
Validation of FDAS, Basement 1 and Hallways
Validation of Cluster A, B & D Aux room @ PTV1, Validation of Cluster A & B Hallways and Lift Lobbies @ PSV
BTO of A/C Equipment
BTO of Passenger Elevator 2 & 3, Machine Room
21. N150/MWV
24. UPTP/HO
Revalidation of 3F & 5F Hallways and Lift Lobbies @ N150, Coordination for Admin Layout for MWV
Validation of A/C Equipment and Passenger Elevator 2 & 3
BTO of EE room, Water meter room and janitor room @ UPTP, Otis Elevator Seminar
Hauling of Doors and Troffer Lights
Hauling of Office Documents from Paseo to 1800
Cleaning of Proposed Storage
Technical Operations Engineer Director
Process Integration and QM, FOPM Process Integration and QM, FOPM
CALENDAR OF ACTIVITY FOR THE MONTH OF AUGUST 2015Sunday Monday Tuesday Wednesday Thursday
2 3. PASEO 4. PASEO 5. PASEO
9 10 11. HO 12. SPV 13. HO/1800
Sick Leave Reports
16 17. HO/2CC 18. HO/2CC 19. HO/ICITE
23 24. HO/2CC 25. HO/2CC 26. HO 27. HO
30 31
Holiday
6. HO/2CC/ PASEO
Site Supervision, cleaning of Paseo Penthouse Office
Site Supervision, Inventory of items, pull out of items to be use for OSG penthouse
Site Supervision, Pull out of items from Paseo to 1800
Validation of Function room @ 2CC, assemble of office @ OSG Penthouse for parking
BTO of Genset System and EE Room, Dahlia
Cleaning and Hauling of item from ICITE to 1800 and from Paseo to 1800
20. 150NB/ PTV2
DTR, Revalidation of AC Equipment
DTR, Reports, Fire Detection and Alarm System; 7th-15th Floor, Videophone; 7th-15th Floor
Site Supervision w/ Jolly
BTO of Transfer pump (reschedule) for 150NB, Coordination for Admin Layout for PTV2
Site Inspection w/ 2CC P.E.
Fire Detection and Alarm System; 7th-15th Floor, Videophone; 7th-15th Floor (reschedule)
KENNETH S. RAYMUNDO FERNANDO D. VALDEZ JR.Technical Operations Engineer Director
Process Integration and QM, FOPM Process Integration and QM, FOPM
CALENDAR OF ACTIVITY FOR THE MONTH OF AUGUST 2015Friday Saturday
1. PASEO
7. 1800 8. PASEO
Fixing of Storage
14. 2CC 15. 150NB
Revalidation of AC Equipment
21 22
Holiday ABSENT
28. 2CC 29. HO
Securing of permits, Hauling of Documents from Paseo to 1800
Hauling of office documents and other items
BTO of Transfer pump for wing A, Coordination for BTO Monitoring
Generator Set, Fuel Storage Tank, Fuel Pumps and Pipes, ELVSAd and MCB1, Genset Room, Water Distribution System @ 1:30 PM, Transfer Pumps and Controllers, Booster Pumps and Controllers, Cistern Tank, Overhead Tank, Transfer Pump Room, Sump Pumps and Controllers
FERNANDO D. VALDEZ JR. Director
Process Integration and QM, FOPM
CALENDAR OF ACTIVITY FOR THE MONTH OF SEPTEMBER 2015Sunday Monday Tuesday Wednesday Thursday
1. PTV1/PTV2 2. HO 3. 2CC
DTR, Reports
6 7. HO 8. 150NB 9. HO 10. 2CC
BTO of Fire Exit No. 3 BTO of Podium 1
13 14. HO/SPV 15. 150NB 16. UPTP1
20 21. PTV2 22. 150NB 23. SPV 24. UPTP1
27 28. HO 29. 150NB 30. HO
PIM Meeting
KENNETH S. RAYMUNDO FERNANDO D. VALDEZ JR.Technical Operations Engineer Director
Process Integration and QM, FOPM Process Integration and QM, FOPM
BTO of CCTV System @ PTV1, Coordination for Admin Layout @ PTV2
Coordination Meeting
17. 2CC/PTV1
Validation of Genset
Toilet and Kitchen Exhaust Fans incl Controllers, Building Signage, Jockey Pumps, Fire Pumps and Controllers, Fire Pump Room and Fire Tank, Validation of Fire exit 3
BTO of EE Rooms and Redundant Rooms, MT/FT & Lift lobby (Rescheduled)
Validation of Podium 1, Revalidation of CCTV & Aux Room
Inspection on Deffective pump on cluster C, (to get service report for the said pump) 8:30AM - 5:30PM
Validation of Hallways and lift lobbies @ PTV2 9:30 - 11:30AM, Validation of KEF and TEF incl Controllers, JP, FP and Controllers, FP Room and Fire Tank, Revalidation of FE 3 @ 150 NB 1:30 - 5:00PM
BTO of EE Rooms (dahlia) 9:30AM - 11:30AM, revalidation of Genset 1:30PM - 5:00PM
Validation of EE Rooms and Redundant Rooms (10F, 11F, 12F, 14F) 9:30AM - 11:30AM, MT/FT & Lift lobby (6F, 7F, 8F, 9F) 1:30PM - 5:00PM
BTO of Sump pump and Sewage pump @ Wing A 9:30-11:30 AM, Validation of Fire Protection system, KEF & TEF 1:30 - 5:00 PM
CALENDAR OF ACTIVITY FOR THE MONTH OF SEPTEMBER 2015Friday Saturday
4. 2CC/PTV1 5.HO
11. UPTP/PTV1 12. HO
18. PKSV/PTV2 19. HO
25 26. HO
Holiday PIM Meeting
FERNANDO D. VALDEZ JR. Director
Process Integration and QM, FOPM
Validation of Generator system @ 2CC, Validation of CCTV System @ PTV1
PIM Monthly Meeting
EE Rooms, EE Rooms Redundant (10F, 11F, 12F & 14F), MT/FT, Lift Lobbies (6F, 7F, 8F & 9F) @ UPTP, Revalidation of CCTV System, Revalidation of AUX Room CL A, B & D @ PTV1
Validation of Basement 2 Parking 9:30AM - 11:30AM @ PKSV, Validation of Machine room, PE1 & PE2 and BTO of hallways and lift lobby 1:30PM - 5:00PM @ PTV2
CALENDAR OF ACTIVITY FOR THE MONTH OF OCTOBER 2015Sunday Monday Tuesday Wednesday Thursday Friday Saturday
KENNETH S. RAYMUNDO FERNANDO D. VALDEZ JR.Technical Operations Engineer Director
Inspection of SOR together with CMT and 2CC PE, Assist PE about site concerns on CMT
BTO Filing and monitoring 8:30AM - 12:30PM
BTO transmittal 8:30AM - 12:00PM @ HO, Coordination with PE and PA for the SPV Coordination meeting 1:00PM - 5:30PM
Validation of Sump pump and Sewage pump @ Wing A 9:30-11:30 AM, Revalidation of, KEF & TEF 1:30 - 5:00 PM
BTO transmittal, Assist PE about site concerns on CMT
BTO of Air Conditioning System, 6/F - 14/F, 9:00 AM - 11:30 AM @ UPTP1, BTO of PE 2, Fans and Blowers, 1:00 PM - 5:00 PM @ VLR
BTO of Roofdeck and FE 3, 9:30 AM - 11:30 PM, PE 1&2, Machine Room and Elevator Pit @ Cluster B, 2:00 PM - 5:00 PM
BTO of Roofdeck for Wing A & B, 9:30 AM - 12:00 NN
BTO transmittal, Monitoring of 2CEN
BTO of Parking Area, 9:30 AM - 11:30 AM, Mechanical System @ Parking
Megaworld QC Orientation on repairs, Monitoring of 2CEN
BTO of Transfer Pumps; Tower D, Overhead Water Tank; Tower D, Fire Protection System – High Zone; Tower D, Turbo Fans – Basement 1, Machine Room; Tower B, Male/Female Toilet; Tower C/D, 9:30AM - 5:00 PM
BTO of Videophone for VEN D, 9:30 AM - 11:30 AM, Videophone for VEN C, 1:30 PM - 5:00 PM
PIM Meeting, Coordination Meeting @ 2CC
BTO of Basement Parking and Lift Lobby - Wing A, Service Corridor for Fire Exit 1, Transfer Fans and Controllers, 9:30AM - 5:00PM
BTO of Podium Parking 3 & 4; Tower 5 & 6, 9:30AM - 11:30AM, Validation of Genset, 1:30PM - 5:00PM
Validation of Parking Area and Mechanical System @ Parking, 9:30AM - 11:30AM, BTO of Fire exit, 2:00PM - 5:00PM
Validation of PE 2, Fans and Blowers, Transfer Pumps; Overhead Water Tank; Fire Protection System; Turbo Fans; MT/FT; 9:30AM - 5:00 PM
Coordination meeting
BTO of Combined EE/Aux Room- 7F to 15th Floor, Seismic Accelerograph System
Validation of Genset and Fire Exit, 9:30AM - 11:30AM, Validation of Podium Parking 3 & 4; Tower 5 & 6, 1:30PM - 5:00PM
Validation of Fire exit, podium 1, Coordination meeting
Validation of Basement Parking and Lift Lobby - Wing A, Service Corridor for Fire Exit 1, Transfer Fans and Controllers, roofdeck, KEF, TEF, 9:30AM - 5:00PM
Assist PA on CMT Concerns
Process Integration and QM, FOPM Process Integration and QM, FOPM
CALENDAR OF ACTIVITY FOR THE MONTH OF NOVEMBER 2015Sunday Monday Tuesday Wednesday Thursday Friday Saturday
1 2 3 4. HO/PTV2 5. 150NB/PTV2 6. HO/2CC 7. ICITE
Rest Day LEAVE ABSENT Family Fun Day
8 9. HO 10. 150NB/PTV2 11. VLR 12. 2CC/PTV2 13. PKSV 14. HO
Rest Day PIM Meeting PIM Monthly Meeting
15 16. HO 18 19 20. PTV2 21. HO
Rest Day DTR, Reports HOLIDAY HOLIDAY PIM Meeting
22 23. HO 24. SPV 25. HO 26. 8FTR/VLR 27. VLR/HO 28. 150NB
Rest Day BTO Activity report PIM Meeting
29 30
Rest Day HOLIDAY
KENNETH S. RAYMUNDO FERNANDO D. VALDEZ JR.Site Operations Engineer Director
DTR and Reports @ HO, Validation of hallways and lift lobbies and Fire exit 2 @ PTV2, 2:00PM - 5:00PM
BTO of Diesel Generator Set, MDP/ATS/ GCB, Genset Room @ 150NB, 9:30AM – 11:30AM, BTO of Diesel Generator Set, MDP,ATS & GCB, Genset Room, Exhaust Fan and Sump Pumps @ PTV2, 2:00PM - 5:30PM (BTO of Genset System cancelled due to non attendance of technician/facilitator, reschedule on tuesday, 11/10/15)
BTO of Hallways and Lift Lobbies – 8F to 12F, 10:00AM – 11:30AM, Jockey Pumps and Controller – High Zone and Low Zone, Fire Tank and Fire Pump Room, 2:00PM - 5:00PM
Validation of Genset Room, BTO of GenSet, MDP/ATS/GCB @ 150NB, 9:30AM - 11:30PM, Validation of Genset Room, Sump Pump and Exhaust Fan, BTO of GenSet, MDP, ATS & GCB @ PTV2, 1:30PM - 5:00PM
BTO of VENA – FDAS – PH and B1, VENB – FDAS – 26F to 30F, VP System – 22nd to 26F, VENC/D – FDAS – 9F to 15F, EE/Aux Room – 9F to 15F, 9:30AM - 5:00PM
Validation of Combined EE/Aux Room- 7F to 15th Floor, Seismic Accelerograph System 9:30AM - 11:30AM @ 2CC, BTO of Basement Parking CL A, Outdoor Fitness Station, Playground and Jogging Path 1:30PM - 5:00PM @ PTV2
BTO of Fire Protection and Piping Works – Basement 2,
17. VLR/150NB/PTV2Validation of Fans and Blowers, Water Distribution; Fire Pro System; Turbo Fans; 9:30AM - 11:30AM @ VLR, Validation of GenSet, MDP/ATS/GCB @ 150NB and PTV2, 1:30PM - 5:00PM
Validation of Fitness Station, Jogging Path, playground, Genset room, Exhaust fan for genset, 9:30AM - 11:30AM, BTO of Hallways and Lift Lobbies 10F & 7F CL A 1:30PM - 5:00PM
Validation of EE rooms and Genset, Follow up of construction update, assist PA on CMT Concerns @ 8:30AM - 5:30PM
8FTR @ 9:00 AM - HelipadVENB @ 10:30 AM - Auxiliary/EE Rooms - 22nd to 26th FloorVENC @ 1:30 PM - Videophone System - 9th to 15th Floor
VEND @ 9:30 AM - 11:30 AM, BTO of Videophone System - 9th to 15th Floor, PIM Meeting with JRS @ HO
Validation of TEF & KEF, Basement Parking and Roofdeck @ 9:00AM - 12:00 NN
Process Integration and QM, FOPM Process Integration and QM, FOPM
CALENDAR OF ACTIVITY FOR THE MONTH OF DECEMBER 2015Sunday Monday Tuesday
1. PTV2/150NB
6 7. HO/2CC 8. HO/2CC
Monitoring of Property
13 14. 2CC 15. PTV1/PTV2
20 21. MHH 22. PTV1/PTV2
27 28 29
LEAVE LEAVE
KENNETH S. RAYMUNDOTechnical Operations Engineer
Process Integration and QM, FOPM
Validation of Genset & Genset Room, Exhaust fan, Playground, Basement 1 and CL A hallways @ PTV2, 9:00AM - 11:30AM, Validation of Genset & Genset Room @150NB, 1:30PM - 5:00PM
BTO of Fire Pumps and Controllers; Low Zone and High Zone, 1:30PM
Validation of Fire Pumps and Controllers; Low Zone and High Zone, 1:30PM
PTV1 @ 9:30 AM, BTO of TF at B1 & B2 ParkingPTV2 @ 10:30 AM, BTO of WDS – CL A, Transfer Pump, Booster Pump and Controller, Bladder Tank and Elevated Water Tank, @ 1:30 PM, BTO of FE 1 – CL A, FE 2 – CL B, Hallways and Lift Lobbies – CL A; 8F to 9F
BTO of CATV, CCTV and Intercom @ 9:30AM - 5:00PM
PTV1 @ 9:30 AM, Validation of TF at B1 & B2 ParkingPTV2 @ 10:30 AM, Validation of WDS – CL A, Validation of Transfer Pump, Booster Pump and Controller, Bladder Tank and Elevated Water Tank, @ 1:30 PM, FE 1 – CL A, FE 2 – CL B, Hallways and Lift Lobbies – CL A; 8F to 9F
CALENDAR OF ACTIVITY FOR THE MONTH OF DECEMBER 2015Wednesday Thursday Friday
2. HO 3. HO/2CC 4. 150NB/PTV2
Reports, DTR Monitoring of property
9. SPV 10. MEGATENT 11. 2CC
HO Performer Preparation
16. SPV/331 AJI 17. PTV2 18. 2CC
23. PTV2 24 25
HOLIDAY HOLIDAY
30 31
HOLIDAY HOLIDAY
FERNANDO D. VALDEZ JR. Director
Process Integration and QM, FOPM
150NB @ 9:30 AM BTO of Machine Deck, PTV2 @ 2:00 PM BTO of Hallways and Lift Lobbies – 5F to 2F, Cluster B
Validation of EE Rooms, Fire Exit, Machine Room, BTO of Podium parking 3 & 4, 8:30 AM - 5:30 PM
9:30 AM, BTO of Supply and Exhaust Fans, Transfer Fans and Controllers – B3,4 & 5, BTO of Basement Parking – B3, 4 & 5 @ 1:30 PM
9:30 AM, BTO of Hallways and Lift Lobbies – GF to 20F, Validation of Podium Parking 3 & 4, 331AJI @ 2:00 PM, BTO of Passenger Elevator No. 1 & 2
Validation of Hallways and Lift Lobbies – CL A; 8F to 9F, 10F & 7F, Basement 1 CL A Parking
9:30 AM, Validation of Supply and Exhaust Fans, Transfer Fans and Controllers – B3,4 & 5, Validation of Basement Parking – B3, 4 & 5 @ 1:30 PM
Meralco Power Up, Site Inspection Report
CALENDAR OF ACTIVITY FOR THE MONTH OF DECEMBER 2015Saturday
5. HO
12. HO
19. HO
26
LEAVE
CALENDAR OF ACTIVITY FOR THE MONTH OF JANUARY 2015Sunday Monday Tuesday
3 4 5
10 11 12
17 18 19
24/31 25 26
KENNETH S. RAYMUNDOTechnical Operations Engineer
Process Integration and QM, FOPM
CALENDAR OF ACTIVITY FOR THE MONTH OF JANUARY 2015Wednesday Thursday Friday
1
HOLIDAY
6 7 8
13 14 15
20 21 22
27 28 29
FERNANDO D. VALDEZ JR. Director
Process Integration and QM, FOPM
CALENDAR OF ACTIVITY FOR THE MONTH OF JANUARY 2015Saturday