tablasCALCULO DE EFICIENCIA PARA RETROEXCAVADORA 62HP 1.0
YD3CALCULO DE EFICIENCIA DE RETROEXCAVADORA PARA TN (TERRENO
NORMAL)PROF.(M)CONDICION, TRABAJO YADMINISTRACIONK1FACTOR DE
CARGADE CUCHARAK2FACTOR DEBIDOA PROF.K3EFICIENCIAE=K1xK2xK31.20 -
1.500.90.90.950.771.51 - 2.000.90.90.940.762.01 -
2.500.90.90.920.752.51 - 3.000.90.90.90.733.01 -
4.000.90.90.880.71CALCULO DE EFICIENCIA DE RETROEXCAVADORA PARA TS
(TERRENO SATURADO)PROF.(M)CONDICION, TRABAJO
YADMINISTRACIONK1FACTOR DE CARGADE CUCHARAK2FACTOR DEBIDOA
PROF.K3EFICIENCIAE=K1xK2xK31.20 - 1.500.850.90.930.711.51 -
2.000.850.90.920.702.01 - 2.500.850.90.900.692.51 -
3.000.850.90.880.673.01 - 4.000.850.90.860.66CALCULO DE EFICIENCIA
PARA RETROEXCAVADORA S/ORUGA 222HP 2.0 YD3CALCULO DE EFICIENCIA DE
RETROEXCAVADORA PARA TN (TERRENO NORMAL)PROF.(M)CONDICION, TRABAJO
YADMINISTRACIONK1FACTOR DE CARGADE CUCHARAK2FACTOR DEBIDOA
PROF.K3EFICIENCIAE=K1xK2xK31.20 - 1.500.980.970.980.931.51 -
2.000.980.970.980.932.01 - 2.500.980.970.970.922.51 -
3.000.980.970.970.923.01 - 4.000.980.970.960.914.01 -
5.000.980.970.950.905.01 - 6.000.980.970.940.896.01 -
7.000.980.970.930.88CALCULO DE EFICIENCIA DE RETROEXCAVADORA PARA
TS (TERRENO SATURADO)PROF.(M)CONDICION, TRABAJO
YADMINISTRACIONK1FACTOR DE CARGADE CUCHARAK2FACTOR DEBIDOA
PROF.K3EFICIENCIAE=K1xK2xK31.20 - 1.500.950.970.980.901.51 -
2.000.950.970.970.892.01 - 2.500.950.970.950.882.51 -
3.000.950.970.950.873.01 - 4.000.950.970.930.864.01 -
5.000.950.970.910.845.01 - 6.000.950.970.890.826.01 -
7.000.950.970.870.80
rend retroCALCULO DEL RENDIMIENTO DE RETROEXCAVADORA EN
EXCAVACION DE ZANJASRETROEXCAVADORA DE 62 HP 1.0 YD3CUADRO RESUMEN
DEL RENDIMIENTO DE RETROEXCAVADORA DE 62 HP 1.0 YD3FORMULA:PROF.
ZANJATIPO DE TERRENOR1 =V2 x N x E x 60 x 8(m3/da)TNTSR2 =V2 x N x
E x f x 60 x 8(m3/da)(m)(m3/da)(m3/da)1.20 - 1.50199156Donde :1.51
- 2.00195153R1 :Rend. Retroexcavadora en avance continuo
(M3/da)2.01 - 2.50192149R2 :Rend. Retroexcavadora incl. movimiento
en la excavacin (M3/da)2.51 - 3.00189146C :Capacidad de la cuchara
de retroexcavadora (M3)3.01 - 4.00182143V1 :Volumen de material
suelto promedio (M3)V1 = C + %/100F :Factor de esponjamiento (F)F =
1 + %/100V2 :Volumen de material en zanja (M3)V2 = V1/FCUADRO
RESUMEN DEL RENDIMIENTO DE RETROEXCAVADORA DE 222 HP 2.0 YD3N
:Nmero de ciclos/minutoE :Eficiencia de retroexcavadora segn tipo
de terreno, factor de cargade cuchara, profundidad, condicin de
trabajo, etc.PROF. ZANJATIPO DE TERRENOf :Factor de traslado de
retroexcavadora conforme avanza la
excavacinTNTS(m)(m3/da)(m3/da)1.20 - 1.506075281.51 -
2.006075242.01 - 2.50598519CALCULOS:2.51 - 3.005985103.01 -
4.00593506Tipo de terrenoTNTS4.01 - 5.00584497Capacidad de la
cuchara de retroexcavadora de 62 HP 1.0 yd3CM30.760.765.01 -
6.00579483% esponjamiento del material a excavar6.01 -
7.00574470Terreno normal%30Terreno saturado%35Volumen de material
suelto promedioV1m30.991.03CUADRO RESUMEN DEL RENDIMIENTO DE
RETROEXCAVADORA DE 62 HP 1.0 YD3Factor de
esponjamientoFF1.251.30Volumen medido en zanjasV2m30.790.79PROF.
EXCAV.BUZONTIPO DE TERRENON de ciclos/minNN0.970.87TNTSTiempo de
bajada y llenado de cucharas3542(m)(m3/da)(m3/da)Tiempo de subida y
giro 90 para descargars15151.20 - 1.50284236Tiempo de descarga de
cuchara y giro 90s12121.51 - 2.00279232s62692.01 -
2.50274226Eficiencia de la retroexcavadora H=1.50m0.770.712.51 -
3.00270221Rendimiento del equipo en aperturas de
zanjasR1m3/min0.590.493.01 - 4.00260217R1m3/hora35.429.4* No se
considera el factor de correccin de la retroexcav. conforme
avanzaR1m3/da283.20235.20Factor de correccin de la retroexcav.
Conforme avanzaf0.700.66CUADRO RESUMEN DEL RENDIMIENTO DE
RETROEXCAVADORA DE 222 HP 2.0 YD3Rendimiento real del
retroexcavador en aperturas de
zanjasR2m3/min0.4130.3234R2m3/hora24.7819.404R2m3/da199156PROF.
EXCAV.BUZONTIPO DE TERRENOTNTS(m)(m3/da)(m3/da)1.20 -
1.506195621.51 - 2.006195572.01 - 2.506105522.51 - 3.006105433.01 -
4.006055384.01 - 5.005965295.01 - 6.005915146.01 - 7.00586500* No
se considera el factor de correccin de la retroexcav. conforme
avanzaCALCULO DEL RENDIMIENTO DE RETROEXCAVADORA EN EXCAVACION DE
ZANJASRETROEXCAVADORA DE 222 HP 2.0 YD3FORMULA:R1 =V2 x N x E x 60
x 8(m3/da)R2 =V2 x N x E x f x 60 x 8(m3/da)Donde :R1 :Rend.
Retroexcavadora en avance continuo (M3/da)R2 :Rend. Retroexcavadora
incl. movimiento en la excavacin (M3/da)C :Capacidad de la cuchara
de retroexcavadora (M3)V1 :Volumen de material suelto promedio
(M3)V1 = C + %/100F :Factor de esponjamiento (F)F = 1 + %/100V2
:Volumen de material en zanja (M3)V2 = V1/FN :Nmero de
ciclos/minutoE :Eficiencia de retroexcavadora segn tipo de terreno,
factor de cargade cuchara, profundidad, condicin de trabajo, etc.f
:Factor de traslado de retroexcavadora conforme avanza la
excavacinCALCULOS:Tipo de terrenoTNTSCapacidad de la cuchara de
retroexcavadora de 222 HP 2.0 yd3CM31.531.53% esponjamiento del
material a excavarTerreno normal%30Terreno saturado%35Volumen de
material suelto promedioV1m31.992.07Factor de
esponjamientoFF1.251.30Volumen medido en zanjasV2m31.591.59N de
ciclos/minNN0.870.82Tiempo de bajada y llenado de
cucharas3640Tiempo de subida y giro 90 para descargars1818Tiempo de
descarga de cuchara y giro 90s1515s6973Eficiencia de la
retroexcavadora H=1.50m0.880.8Rendimiento del equipo en aperturas
de zanjasR1m3/min1.221.04R1m3/hora73.262.4R1m3/da585.60499.20Factor
de correccin de la retroexcav. Conforme avanzaf0.980.94Rendimiento
real del retroexcavador en aperturas de
zanjasR2m3/min1.19560.9776R2m3/hora71.73658.656R2m3/da574470
camaCALCULOS DE VOLUMEN DE CAMA DE APOYO PARA AGUA POTABLECAMA
DE APOYO EN TERRENO NORMALANCHO DE ZANJAALTURA DEVOLUMEN DE CAMA
DERENDIM. (1 PEON)DNB = D + 2ACAMA DEAPOYO / ML (arena gruesa)R = 6
m3/dia(M)APOYO(M3)COLOCACION /
ML630.050.550.100.071584750.0630.560.100.073282900.0750.580.100.0748801100.10.600.100.0780771600.150.650.100.0845712000.20.700.100.0910662500.250.750.100.0975623150.30.800.100.104058CAMA
DE APOYO EN TERRENO SATURADOANCHO DE ZANJAALTURA DEVOLUMEN DE CAMA
DERENDIM. (1 PEON)DNB = D + 2ACAMA DEAPOYO / ML (grava selecc.)R =
6 m3/dia(M)APOYO(M3)COLOCACION /
ML630.050.550.100.068887750.0630.560.100.070485900.0750.580.100.0719831100.10.600.100.0750801600.150.650.100.0813742000.20.700.100.0875692500.250.750.100.0938643150.30.800.100.100060FUENTE:
Elaboracin propia* Se est considerando un espaciamiento mnimo de
A=0.25m de la pared de la zanja.* Se est considerando 30% de
esponjamiento para la arena gruesa y 25% para la grava
seleccionadaCALCULOS DE VOLUMEN DE CAMA DE APOYO PARA
ALCANTARILLADOCAMA DE APOYO EN TERRENO NORMALANCHO DE ZANJAALTURA
DEVOLUMEN DE CAMA DERENDIM. (1 PEON)DNB = D + 2ACAMA DEAPOYO / ML
(arena gruesa)R = 6 m3/dia(M)APOYO(M3)COLOCACION /
ML1100.10.600.100.0780771600.150.650.100.0845712000.20.700.100.0910662500.250.750.100.0975623150.30.800.100.104058CAMA
DE APOYO C/TABLESTACADO EN TERRENO NORMALANCHO DE ZANJAALTURA
DEVOLUMEN DE CAMA DERENDIM. (1 PEON)DNB = D + 2A + 2ECAMA DEAPOYO /
ML (arena gruesa)R = 6 m3/dia(M)APOYO(M3)COLOCACION /
ML1100.10.900.100.1170511600.150.950.100.1235492000.21.000.100.1300462500.251.050.100.1365443150.31.100.100.143042CAMA
DE APOYO C/TABLESTACADO EN TERRENO SATURADOANCHO DE ZANJAALTURA
DEVOLUMEN DE CAMA DERENDIM. (1 PEON)DNB = D + 2A + 2ECAMA DEAPOYO /
ML (grava selecc.)R = 6 m3/dia(M)APOYO(M3)COLOCACION /
ML1100.10.900.150.1688361600.150.950.150.1781342000.21.000.150.1875322500.251.050.150.1969303150.31.100.150.2063293550.351.150.150.2156284000.41.200.150.225027FUENTE:
Elaboracin propia* Se est considerando un espaciamiento mnimo de
A=0.25m de la pared de la zanja.* Se est considerando para el
tablaestacado un ancho de E=0.15m (4" el puntal y 2" la tabla) a
cada lado.* Se est considerando 30% de esponjamiento para la arena
gruesa y 25% para la grava seleccionada
rellenoCALCULO DEL RENDIMIENTO DE RELLENO DE ZANJA EN AGUA
POTABLE EN TN y TS (ML/DIA)DNANCHO DEANCHO DEALTURA
DEVOLUMENPROFUNDIDADVOLUMEN DEVOLUMENULTIMA CAPAVOLUMENRENDIM. (1
PEON)RENDIM.ZANJA (fondo)ZANJA (superior)CAMA DECAMA DEPROM. DE
ZANJAEXCAVACION DEOCUPADODENETO RELLENOR = 6
m3/dia(3pen+1oficial)B1 = D + 2AB2 = D + 2A +2ZAPOYOAPOYO(M)ZANJA
S/ENTIBADOPOR TUBERIAAFIRMADO(M3/ML)COLOCACION /
ML(M)(M)(M)(M)(M)H=1.00+DN+h
cama(M3/ML)(M3/ML)(M3/ML)630.050.550.930.10.061.150.850.0020.2800.50811.8136.00750.0630.560.950.10.061.160.880.0030.2900.52711.3935.00900.0750.580.970.10.061.180.910.0040.2900.55610.7933.001100.10.601.000.10.061.200.960.0080.3000.59210.1431.001600.150.651.070.10.071.251.080.0180.3200.6728.9327.002000.20.701.130.10.071.301.190.0310.3400.7498.0125.002500.250.751.200.10.081.351.320.0490.3600.8317.2222.00CONSIDERACIONES:*
Se considera el talud (Z) del terreno 1:6 ; Z:H , siendo H, la
profundidad total.* Se considera terreno normal (TN) en agua
potable, al tipo de terreno existente predominante en la zona:
grava suelta-arenosa.* Se est considerando un espaciamiento mnimo
de A=0.25m de la pared de la zanja.* Se est considerando como
relleno, material propio seleccionado y el rendimiento de la
cuadrilla incluye zarandeo
APCALCULO DEL RENDIMIENTO DE EXCAVACION DE ZANJA EN AGUA POTABLE
EN TERRENO NORMAL - TN (ML/DIA)199156ANCHO DEANCHO DEALTURA
DEPROFUNDIDADVOLUMEN DEREND.DNZANJA (fondo)ZANJA (superior)CAMA
DEPROM. DE ZANJAEXCAVACION DERETROEXCAV.B1 = D + 2AB2 = D + 2A
+2ZAPOYO(M)ZANJA S/ENTIBADO(ML/DIA)(M)(M)(M)H=1.00+DN+h
cama(M3/ML)630.050.550.930.11.150.852340.6324314289.4626.838750.0630.560.950.11.160.882260.6523500900.0750.580.970.11.180.912190.6822540465.727516.6768255.00281100.10.601.000.11.200.962070.722131807.91301.688390.50641600.150.651.070.11.251.081840.811896923.85608.2781682.48342000.20.701.130.11.301.191670.911682083.31895.803568.74092500.250.751.200.11.351.321511.01151288.3291.18387.354936703.08811010.926445878.8613213.1116832665.74832CALCULO
DEL RENDIMIENTO DE EXCAVACION DE ZANJA EN AGUA POTABLE EN TERRENO
SATURADO - TS (ML/DIA)ANCHO DEANCHO DEALTURA DEPROFUNDIDADVOLUMEN
DEREND.DNZANJAZANJA (superior)CAMA DEPROM. DE ZANJAEXCAVACION
DERETROEXCAV.B = D + 2AB2 = D + 2A +2ZAPOYO(M)ZANJA
S/ENTIBADO(ML/DIA)(M)(M)(M)H=1.00+DN+h
cama(M3/ML)630.050.550.930.11.150.85184197750.0630.560.950.11.160.88177191900.0750.580.970.11.180.911711821100.10.601.000.11.200.961631721600.150.651.070.11.251.081441532000.20.701.130.11.301.191311362500.250.751.200.11.351.32118123FUENTE:
Elaboracin propiaCONSIDERACIONES:* Se est considerando un equipo
Cargador-retroexcavador de 62 HP y 1 yd3.* El rendimiento del
equipo considerado, en zanja, en terreno normal (TN) es 199 m3/da
hasta H=1.50m.* El rendimiento del equipo considerado, en zanja, en
terreno saturado (TS) es 156 m3/da hasta H=1.50m.* Se considera el
talud (Z) del terreno 1:6 ; Z:H , siendo H, la profundidad total.*
Se considera terreno normal (TN) en agua potable, al tipo de
terreno existente predominante en lazona: grava suelta-arenosa.
T.N.CALCULOS PARA RENDIMIENTOS EN TERRENO NORMALANCHOTALUD:
1:5VOLUMEN DE EXCAV. M3/MLREND. RETRO S/LL ML/DIAREND. RETRO S/0
ML/DIADNZANJAANCHO
FONDOH=1.5H=2.0H=2.5H=3.00H=4.00H=5.00H=6.00H=7.00H=8.00H=1.5H=2.0H=2.5H=3.00H=4.00H=5.00H=6.00H=7.00FONDOC/ENTIB.
(>3m)0.30.40.50.60.20.40.60.811.502.002.503.004.005.006.007.008.001991951921891825845795742000.711.502.203.003.904.205.807.8010.2013.001338964484310174562500.751.051.582.303.134.054.406.058.1010.5513.40126856147419771543150.81.11.652.403.254.204.606.308.4010.9013.8012181594540936953ANCHO
DE REPOSICION DE
PAVIMENTO2001.301.501.701.901.401.802.202.603.002501.351.551.751.951.451.852.252.653.053151.401.601.802.001.501.902.302.703.10
T.SCALCULOS PARA RENDIMIENTOS EN TERRENO SATURADOANCHOTALUD:
1:3VOLUMEN DE EXCAV. M3/MLREND. RETRO S/LL ML/DIAREND. RETRO S/0
ML/DIADNZANJAANCHO
FONDOH=1.5H=2.0H=2.5H=3.00H=4.00H=5.00H=6.00H=7.00H=8.00H=1.5H=2.0H=2.5H=3.00H=4.00H=5.00H=6.00H=7.00FONDOC/ENTIB.0.170.330.670.330.670.331.331.502.002.503.004.005.006.007.008.001561531491461434974834702000.711.502.002.593.335.348.9312.1417.0120.52104775844275640282500.751.051.582.102.713.485.549.1812.4417.3620.9299735542265439273150.81.11.652.202.843.635.749.4312.7417.6621.3295705240255338273550.851.151.732.302.963.785.949.6813.0417.9621.7290675039245137264000.91.21.802.403.093.936.149.9313.3418.2622.128764483723503626ANCHO
DE REPOSICION DE
PAVIMENTO2001.001.001.341.662.342.863.545.207.202501.051.051.391.712.392.913.595.257.253151.101.101.441.762.442.963.645.307.303551.151.151.491.812.493.013.695.357.354001.201.201.541.862.543.063.745.407.40concreto
sim2696.561252.091252.13335.43139.1161.320002966.2161377.2991803.0672590.3568339.404477.50720007553.850213192.612763651739.267604221218.233072718323.86951226547.81530986674.49312590296.3213750254asfalto5771.632661.921427.83623.56325.97442.63110.21006348.7932928.1122056.07521097.4656795.36681310.1848401.16440014937.161828739.627795061942.503342234719.602867259613.7648318177.34721639025.32475185488.77131022312.6856802207adoquin2428.171602.8371.13297.82118.200002670.9871763.08534.4272524.1632288.40800005781.065410793.050185121846.202331494130.49749272869.24444134479.06689621614.9888382166conexionesconcreto3997.641569.7774533893728.8926082172954.2171701271312.4279533571179.6189983434252.7058165660001726.7551987282801.78186903891374.072724983549.8731979085438.2703559579748.00921703530005638.7625636517pav.
Flex9213.893916.21119982581806.18662614211268.2764623014676.9644362548490.6167786742808.1788755125247.4556212892004307.83231980841986.80528875631826.3181057141191.45740780851197.10493996522392.209471517900.73846149260013802.4659950619adoquin3983.71840.56227973131214.9286178288368.2708098476361.1979445588198.740348033400002024.61850770451336.4214796117530.3099661806635.7083824235484.926449201600005011.9847851218
ELIM1CALCULOS PARA RENDIMIENTOS EN TERRENO NORMALANCHOTALUD:
1:5VOLUMEN DE EXCAV. M3/MLREND. RETRO S/LL ML/DIAREND. RETRO S/0
ML/DIADNZANJAANCHO
FONDOH=1.5H=2.0H=2.5H=3.00H=4.00H=5.00H=6.00H=7.00H=8.00H=1.5H=2.0H=2.5H=3.00H=4.00H=5.00H=6.00H=7.00FONDOC/ENTIB.
(>3m)0.30.40.50.60.20.40.60.811.502.002.503.004.005.006.007.008.001991951921891825845795742000.711.502.203.003.904.205.807.8010.2013.001338964484310174562500.751.051.582.303.134.054.406.058.1010.5513.40126856147419771543150.81.11.652.403.254.204.606.308.4010.9013.8012181594540936953ANCHO
DE REPOSICION DE
PAVIMENTO2001.301.501.701.901.401.802.202.603.002501.351.551.751.951.451.852.252.653.053151.401.601.802.001.501.902.302.703.10
ELIMINCALCULOS PARA RENDIMIENTOS EN TERRENO SATURADOANCHOTALUD:
1:3VOLUMEN DE EXCAV. M3/MLREND. RETRO S/LL ML/DIAREND. RETRO S/0
ML/DIADNZANJAANCHO
FONDOH=1.5H=2.0H=2.5H=3.00H=4.00H=5.00H=6.00H=7.00H=8.00H=1.5H=2.0H=2.5H=3.00H=4.00H=5.00H=6.00H=7.00FONDOC/ENTIB.0.170.330.670.330.670.331.331.502.002.503.004.005.006.007.008.001561531491461434974834702000.711.502.002.593.335.348.9312.1417.0120.52104775844275640282500.751.051.582.102.713.485.549.1812.4417.3620.9299735542265439273150.81.11.652.202.843.635.749.4312.7417.6621.3295705240255338273550.851.151.732.302.963.785.949.6813.0417.9621.7290675039245137264000.91.21.802.403.093.936.149.9313.3418.2622.128764483723503626ANCHO
DE REPOSICION DE
PAVIMENTO2001.001.001.341.662.342.863.545.207.202501.051.051.391.712.392.913.595.257.253151.101.101.441.762.442.963.645.307.303551.151.151.491.812.493.013.695.357.354001.201.201.541.862.543.063.745.407.40
aguavol/mVOL TOTAL EXCAVVOL
NETOELIMINTNASFCONCADOQVOLUMENESPARCIALESreposicionASFALTOreposicionCONCRETOreposicionADOQUIN630.930.190.850.510.000000000.880.530.00000016949.5900.970.190.910.5620872.2140465.7228478200.74974.54443.57688.487954.684825.274310.211010.200.960.59971.931807.9257.3808.2761.90361.58808.2761.901601.070.211.080.674137.666923.83879.52265.1547.3212.414542423.66585.61227.272001.130.231.190.751350.402083.3834.21249.100479.161411.48002501.20.241.320.83207.23288.3288.300069.1900027539.435156910052.4112598.026172.784537.47%
de reposicin que no traslapa con la red de
alcantarillado70%8818.6144320.9463176.229CONEXIONES1600.73.510.210705.35857.15986.57493.714099.974190.55%
de reposicin que no traslapa con la red de
alcantarillado80%5994.9683279.9763352.4414813.5827600.9226528.669
Hoja1 (2)METRADO TOTAL DE COLECTORES POR TIPO DE SUPERFICIE DE
RODADURASuperficie de Rodadura (m)PFCA1.00Tubera de 200mm hasta
1.5m199.09199.090.000.00001.00Tubera de 200mm hasta
2.0m189.48189.48112.00112.00001.34Tubera de 200mm hasta
2.5m389.38521.7715.7621.12001.66Tubera de 200mm hasta
3.0m77.35128.400.000.00002.34Tubera de 200mm hasta
4.0m125.54293.760.000.00002.86Tubera de 200mm hasta
5.0m0.000.000.000.00003.54Tubera de 200mm hasta
6.0m00.000.000.00005.2Tubera de 200mm hasta
7.0m00.0000.00001.05Tubera de 250mm hasta
2.0m00.0074.7278.46001.39Tubera de 250mm hasta
2.5m00.00309.67430.44001.1Tubera de 300mm hasta
1.5m00.0000.0030.6133.6711.1Tubera de 300mm hasta
2.0m112.64123.90114.12125.5347.3552.0851.44Tubera de 300mm hasta
2.5m00.0057.3782.6144.0563.4321.76Tubera de 300mm hasta
3.0m60.06105.7100.00106.46187.36962.44Tubera de 300mm hasta
4.0m00.0000.0086.56211.20642.96Tubera de 300mm hasta
5.0m00.0000.00003.64Tubera de 300mm hasta 6.0m00.0000.00005.3Tubera
de 300mm hasta 7.0m00.0000.00001.49Tubera de 350mm hasta
2.5m00.0055.7583.07002.49Tubera de 350mm hasta
4.0m00.0039.698.60003.01Tubera de 350mm hasta
5.0m00.0057.92174.34003.06Tubera de 400mm hasta
5.0m00.00100.53307.6200Total1153.54937.44315.03METRADO TOTAL DE
REDES SECUNDARIAS POR TIPO DE SUPERFICIE DE RODADURASuperficie de
Rodadura (m)PFCA1.00Tubera de 200mm hasta
1.5m5912.375912.372835.762835.762501.562501.561.00Tubera de 200mm
hasta 2.0m2426.142426.141091.011091.011617.851617.851.34Tubera de
200mm hasta 2.5m1036.261388.59737.41988.13341.63457.78421.66Tubera
de 200mm hasta 3.0m506.16840.23191.98318.69202.56336.24962.34Tubera
de 200mm hasta 4.0m185.46433.9826.9763.1137.0486.67362.86Tubera de
200mm hasta 5.0m459.731314.8300.00003.54Tubera de 200mm hasta
6.0m115.91410.3200.00005.2Tubera de 200mm hasta
7.0m00.0000.0000Total10642.034883.134700.6414288.566810.495547.88141.669564.5415877.13643967.066585.31964114.36829.73830165.7013395.8112377.6194
Hoja241344656171055321100413477.69216312724658.738958842372213.5688780304100116790549939929703.51039575973934375.26.4602894193403450235110.223980.240465.71807.96923.82083.3288.351569