RESUMENSAN PEDRO DE CARABAYLLOPRIMERA ALTERNATIVACUADRO RESUMEN
DE RESERVORIOSRESERVORIOSCODIGO SEDAPALVolumen (M3)COTA FONDO
(msnm)Impulsa al reservorioQb (lps)H.D.T. (m)EQUIPO DE
BOMBEORP-01R-654300274.00RP-0260164.5103 BOMBAS TIPO CENTRIFUGA DE
120 HP
&L&"Times New Roman,Cursiva"&9INFORME
FINAL&R&"Times New Roman,Cursiva"&9Perfil Reforzado:
Ampliacin y Mejoramiento de los Sistemas de Agua Potable y
Alcantarillado del Esquema San Pedro del Distrito de
Carabayllo&L&"Times New Roman,Cursiva"&9Consorcio
CRV
MEJICOALTERNATIVA N1LINEA DE IMPULSIONPP-01 A REP-011DATOS
GENERALESTRAMO: PP-01 - REP-0130.641.1CAUDAL DE
BOMBEOQ10.55l/sFORMULAS1.2HORAS DE BOMBEO18HorasPOTENCIA BOMBAPOT.
BOMBA = g HDT x Qb /76 e1.3MATERIALHDPEPOTENCIA INSTALADAPOT. INST.
= 1.1 POT. BOMBA1.4COEF. HAZENC140COSTO DE TUBERIACT =
1.45*D1.54*L1.5DIFERENCIA C.T.H169.00mCOSTO DE EQUIPAMIENTOCEq =
6730*POTinst.0.551.6LONGITUDL13007.00mCOSTO ENERG. FUNC.CE = POT.
INST.* 0.746*Hb*365*CKw-h9601.7PENDIENTES122.95m/KmCOSTO DE
OPERACINCO =CE * ( (1+i) n - 1) /(
i*(1+i)n)1.8DIAMETROD128.4mmCOSTO DE MANTENIMIENTOCM = 20 %
CO1.9VELOCIDADV10.87m/s2.0ALTURA DE SUCC. (ND)Hs57m2.1PRESION DE
LLEGADAPs3.50m2.2VELOCIDAD SUCC.Vs0.48m/s2.3DIAMETRO
SUCC.Ds38.1mm3257REP-012.4LONG. SUCC.Ls57m.2.5MATERIALHD2.6ALT.
EST. TOTAL + NDDHR1-A126.00m15.30857142862.7PESO
ESPECIFICOg1000.00Kg/m3DN 282.8EFICIENCIA BOMBAe75%2.9COSTO DE
Kw-Hr0.158$ / Kw-hr3.0TASA DE COSTO OPORT.i9%3.1PERIODO DE
DISEOn20aos13.33.2NIVEL DINAMICO
DISEONDD0m1.5PP-01espesor6.73.3ALT. DE INGRESO TUB.
REP-01Hi23.00m3188Criterio de Seleccin: Velocidad recomendable lnea
de impulsin: 0.9 < V < 1.2 m/s2RESULTADOS TCNICOSTRAMO: PP-01
- REP-01NDIAMETRO NOMINALDIAMETRO INTERNOVELOCIDADPENDIENTEPERD.
LONG. + COL + ECPERD. ACCES.PERD. TOTALALT. ESTAT.ALT. DINAMPOT.
BOMBAPOT. INST.(mm)(mm)(m/s)S (m/Km)hf (m)hk (m)ht (m)H (m)HDT
(m)(HP)(HP)128.4251.1571.03212.231.35213.58129.00346.083.343.84248.3400.457.4022.040.2122.25129.00154.751.491.71360.3490.292.637.810.097.90129.00140.401.351.55488.9730.130.541.590.021.61129.00134.111.291.485114.3940.080.270.810.010.82129.00133.321.291.484"1RESULTADOS
ECONOMICOSTRAMO: PP-01 - REP-01NDIAMETRO NOMINALDIAMETRO
INTERNOCOSTO TUBERIACOSTO EQUIP.COSTO ENERGIA FUNC.COSTO
OPERAC.COSTO MANTEN.COSTO
TOTAL(mm)(mm)($)($)($)($)($)($)128254181.6914107.802981.8427219.865443.9753935.16248408613.029050.061330.2212142.972428.5933564.863604912114.718572.011205.2311002.002200.4035094.354897322038.828360.331151.6710513.072102.6144166.5051149432452.678360.331151.6710513.072102.6154580.35#
de equipos simultaneos01UNDQb por equipo0.55lpsHP por
equipo3.84HPPotencia elegida5.00HPBOMBA TIPO SUMERGIBLESOLUCION:01
BOMBA TIPO SUMERGIBLE DE 5 HPDiametro bajo a 200 mm3 equipos de 30
hp2 equipos de 60 hp e igual caudal3 bombas tipo turbina de 60 HP
bombeo 24 horas123003514"1230040164518
&R&"Times New Roman,Cursiva"&9LOCALIDAD: EL
PORVENIR&L&"Times New Roman,Cursiva"&9Consorcio
SANEAMIENTO NORTE
Balsa Flotante - PTAPALTERNATIVA 2MARS-2000LINEA DE
IMPULSIONBalsa Flotante A PTAPDIMENSIONES DE ESPESORORES DE FIERRO
FUNDIDO, REVESTIMIENTO Y DIAMETRO INTERNOTRAMO R1-A1DATOS
GENERALES1. ESPESOR NOMINAL DE HIERRO FUNDIDO (ISO-2531)TRAMO:
Balsa Flotante - PTAP30.641.1CAUDAL DE BOMBEOQ160.00l/sFORMULASe
fierro fundido = K ( 0.5 + 0.001 DN )1.2HORAS DE
BOMBEO24HorasPOTENCIA BOMBAPOT. BOMBA = g HDT x Qb /76
e1.3MATERIALHDPOTENCIA INSTALADAPOT. INST. = 1.1 POT. BOMBADonde
:1.4COEF. HAZENC130COSTO DE TUBERIACT = 1.45*D1.54*Le fierro
fundido=espesor nominal de la pared en mm1.5DIFERENCIA
C.T.H1120.87mCOSTO DE EQUIPAMIENTOCEq = 6730*POTinst.0.55DN=dimetro
nominal3001.6LONGITUDL14287mCOSTO ENERG. FUNC.CE = POT. INST.*
0.746*Hb*365*CKw-h960K=Clase de espesor, tomada en la serie de
nmeros enteros : 8, 9, 10, 11,12...91.7PENDIENTES128.19m/KmCOSTO DE
OPERACINCO =CE * ( (1+i) n - 1) /(
i*(1+i)n)1.8DIAMETROD1318.4mmCOSTO DE MANTENIMIENTOCM = 20 %
CO1.9VELOCIDADV10.75m/se mnimo=6.00mm2.0ALTURA DE SUCC.
(ND)Hs10m2.1PRESION DE LLEGADAPs3.50m2. ESPESOR DE CEMENTO DE LOS
TUBOS (ISO-4179)2.2VELOCIDAD SUCC.Vs0.62m/s2.3DIAMETRO
SUCC.Ds350mm369PTAPConclusin:DNVALOR NOMINAL(mm)TOLERANCIA
(mm)2.4LONG. SUCC.Ls15m02# de equipos +1
Reserva603.5-1.52.5MATERIALHD30.00Qb por equipo803.5-1.52.6ALT.
EST. TOTAL + NDDHR1-A130.87m164.51HDT15.30857142861003.5-1.52.7PESO
ESPECIFICOg1000.00Kg/m3DN 300120.45HP por
equipo1253.5-1.52.8EFICIENCIA BOMBAe62%1503.5-1.52.9COSTO DE
Kw-Hr0.045$ / Kw-hr2003.5-1.53.0TASA DE COSTO
OPORT.i10%2503.5-1.53.1PERIODO DE DISEOn20aos3003.5-1.53.2NIVEL
DINAMICO DISEONDD0mBalsa Flotante4.713505.0-2.03.3ALT. DE INGRESO
TUB. PTAPHi22.50m1.214005.0-2.02484505.0-2.0Criterio de Seleccin:
Velocidad recomendable lnea de impulsin: 0.9 < V < 1.2
m/s5005.0-2.06005.0-2.02RESULTADOS TCNICOSTRAMO: Balsa Flotante -
PTAP7006.0-2.58006.0-2.5NDIAMETRO NOMINALDIAMETRO
INTERNOVELOCIDADPENDIENTEPERD. LONG. + COL + ECPERD. ACCES.PERD.
TOTALALT. ESTAT.ALT. DINAMPOT. BOMBAPOT.
INST.9006.0-2.5(mm)(mm)(m/s)S (m/Km)hf (m)hk (m)ht (m)H (m)HDT
(m)(HP)(HP)4286.089510006.0-2.514004000.480.682.670.242.91133.37139.78177.99204.693511006.0-2.523503500.621.285.090.395.48133.37142.35181.26208.4512006.0-2.533003000.852.6810.770.7411.51133.37148.38188.94217.2814009.0-3.042502501.226.4526.121.5227.64133.37164.51209.48240.9015009.0-3.052002001.9118.9177.353.7281.07133.37217.94277.51319.1416009.0-3.0318009.0-3.0RESULTADOS
ECONOMICOSTRAMO: Balsa Flotante - PTAP20009.0-3.0NDIAMETRO
NOMINALDIAMETRO INTERNOCOSTO TUBERIACOSTO EQUIP.COSTO ENERGIA
FUNC.COSTO OPERAC.COSTO MANTEN.COSTO
TOTAL(mm)(mm)($)($)($)($)($)($)3.
TOTALES1400400433760.45125636.6860193.40512460.35102492.071234542.952350350353136.29126900.9861299.26521875.16104375.031167586.72NDIAMETRO
NOMINAL (mm)FIERRO FUNDIDOREVESTIMIENTOESPESOR TOTAL (mm)DIAMETRO
INTERNO
(mm)3300300278512.25129830.5963896.52543987.09108797.421125023.87e
fierro fundido(mm)e mnimo ff (mm)e
cemento(mm)4250250210331.91137412.8370842.82603124.86120624.971142337.3914008.106.005.0013.10373.805200200149163.91160399.1793849.49798993.61159798.721362204.9023507.656.005.0012.65324.7033007.206.003.5010.70278.6042506.756.003.5010.25229.50#
de equipos simultaneos02UND52006.306.003.509.80180.40Qb por
equipo30.00lpsHP por equipo108.64HPPotencia elegida120.00HPBOMBAS
TIPO CENTRIFUGASOLUCION:03 BOMBAS TIPO CENTRIFUGA DE 120 HPDiametro
bajo a 200 mm3 equipos de 30 hp2 equipos de 60 hp e igual caudal3
bombas tipo turbina de 60 HP bombeo 24
horas123003514"1230040164518
&R&"Times New Roman,Cursiva"&9Perfil del Proyecto:
Ampliacin y Mejoramiento de los Sistemas de Agua Potabley
Alcantarillado para el Esquema Musa 4ta. Y 5ta Etapa distrito La
Molina Lima&L&"Times New Roman,Cursiva"&9Consorcio RV y
Asociados
Balsa Flotante - PTAP (ALTE 3ALTERNATIVO 3MARS-2000LINEA DE
IMPULSIONBalsa Flotante A PTAPDIMENSIONES DE ESPESORORES DE FIERRO
FUNDIDO, REVESTIMIENTO Y DIAMETRO INTERNOTRAMO R1-A1DATOS
GENERALES1. ESPESOR NOMINAL DE HIERRO FUNDIDO (ISO-2531)TRAMO:
Balsa Flotante - PTAP30.641.1CAUDAL DE BOMBEOQ160.00l/sFORMULASe
fierro fundido = K ( 0.5 + 0.001 DN )1.2HORAS DE
BOMBEO24HorasPOTENCIA BOMBAPOT. BOMBA = g HDT x Qb /76
e1.3MATERIALHDPOTENCIA INSTALADAPOT. INST. = 1.1 POT. BOMBADonde
:1.4COEF. HAZENC130COSTO DE TUBERIACT = 1.45*D1.54*Le fierro
fundido=espesor nominal de la pared en mm1.5DIFERENCIA
C.T.H12.97mCOSTO DE EQUIPAMIENTOCEq = 6730*POTinst.0.55DN=dimetro
nominal3001.6LONGITUDL150.5mCOSTO ENERG. FUNC.CE = POT. INST.*
0.746*Hb*365*CKw-h960K=Clase de espesor, tomada en la serie de
nmeros enteros : 8, 9, 10, 11,12...91.7PENDIENTES158.81m/KmCOSTO DE
OPERACINCO =CE * ( (1+i) n - 1) /(
i*(1+i)n)1.8DIAMETROD1318.4mmCOSTO DE MANTENIMIENTOCM = 20 %
CO1.9VELOCIDADV10.75m/se mnimo=6.00mm2.0ALTURA DE SUCC.
(ND)Hs10m2.1PRESION DE LLEGADAPs3.50m2. ESPESOR DE CEMENTO DE LOS
TUBOS (ISO-4179)2.2VELOCIDAD SUCC.Vs0.62m/s2.3DIAMETRO
SUCC.Ds350mm251PTAPConclusin:DNVALOR NOMINAL(mm)TOLERANCIA
(mm)2.4LONG. SUCC.Ls15m01# de equipos +1
Reserva603.5-1.52.5MATERIALHD60.00Qb por equipo803.5-1.52.6ALT.
EST. TOTAL + NDDHR1-A12.97m20.90HDT15.30857142861003.5-1.52.7PESO
ESPECIFICOg1000.00Kg/m3DN 30030.60HP por
equipo1253.5-1.52.8EFICIENCIA BOMBAe62%1503.5-1.52.9COSTO DE
Kw-Hr0.045$ / Kw-hr2003.5-1.53.0TASA DE COSTO
OPORT.i10%2503.5-1.53.1PERIODO DE DISEOn20aos3003.5-1.53.2NIVEL
DINAMICO DISEONDD0mBalsa Flotante4.713505.0-2.03.3ALT. DE INGRESO
TUB. PTAPHi22.50m1.214005.0-2.02484505.0-2.0Criterio de Seleccin:
Velocidad recomendable lnea de impulsin: 0.9 < V < 1.2
m/s5005.0-2.06005.0-2.02RESULTADOS TCNICOSTRAMO: Balsa Flotante -
PTAP7006.0-2.58006.0-2.5NDIAMETRO NOMINALDIAMETRO
INTERNOVELOCIDADPENDIENTEPERD. LONG. + COL + ECPERD. ACCES.PERD.
TOTALALT. ESTAT.ALT. DINAMPOT. BOMBAPOT.
INST.9006.0-2.5(mm)(mm)(m/s)S (m/Km)hf (m)hk (m)ht (m)H (m)HDT
(m)(HP)(HP)10006.0-2.514004000.485.940.060.240.3015.4719.2724.5428.223511006.0-2.523503500.629.700.100.390.4915.4719.4624.7828.5012006.0-2.533003000.8518.420.190.740.9315.4719.9025.3429.1414009.0-3.042502501.2238.220.411.521.9315.4720.9026.6130.6015009.0-3.052002001.9195.841.123.724.8415.4723.8130.3234.8716009.0-3.0318009.0-3.0RESULTADOS
ECONOMICOSTRAMO: Balsa Flotante - PTAP20009.0-3.0NDIAMETRO
NOMINALDIAMETRO INTERNOCOSTO TUBERIACOSTO EQUIP.COSTO ENERGIA
FUNC.COSTO OPERAC.COSTO MANTEN.COSTO
TOTAL(mm)(mm)($)($)($)($)($)($)3.
TOTALES14004005109.6142250.318299.0470654.4114130.88140444.2523503504159.8742477.078380.2071345.3714269.07140631.58NDIAMETRO
NOMINAL (mm)FIERRO FUNDIDOREVESTIMIENTOESPESOR TOTAL (mm)DIAMETRO
INTERNO (mm)33003003280.8243002.388569.5972957.7514591.55142402.09e
fierro fundido(mm)e mnimo ff (mm)e
cemento(mm)42502502477.6744174.698999.0876614.2415322.85147588.5314008.106.005.0013.10373.8052002001757.1247462.4310253.7487295.8717459.17164228.3323507.656.005.0012.65324.7033007.206.003.5010.70278.6042506.756.003.5010.25229.50#
de equipos simultaneos01UND52006.306.003.509.80180.40Qb por
equipo60.00lpsHP por equipo29.14HPPotencia elegida30.00HPBOMBAS
TIPO CENTRIFUGASOLUCION:02 BOMBAS TIPO CENTRIFUGA DE 30 HPDiametro
bajo a 200 mm3 equipos de 30 hp2 equipos de 60 hp e igual caudal3
bombas tipo turbina de 60 HP bombeo 24
horas123003514"1230040164518
&R&"Times New Roman,Cursiva"&9Perfil del Proyecto:
Ampliacin y Mejoramiento de los Sistemas de Agua Potabley
Alcantarillado para el Esquema Musa 4ta. Y 5ta Etapa distrito La
Molina Lima&L&"Times New Roman,Cursiva"&9Consorcio RV y
Asociados
PTAP- RAE-05(ALTER 3ALTERNATIVO 3MARS-2000LINEA DE IMPULSIONPTAP
A RAE-05DIMENSIONES DE ESPESORORES DE FIERRO FUNDIDO, REVESTIMIENTO
Y DIAMETRO INTERNOTRAMO R1-A1DATOS GENERALES1. ESPESOR NOMINAL DE
HIERRO FUNDIDO (ISO-2531)TRAMO: PTAP - RAE-0530.641.1CAUDAL DE
BOMBEOQ181.82l/sFORMULASe fierro fundido = K ( 0.5 + 0.001 DN
)1.2HORAS DE BOMBEO18HorasPOTENCIA BOMBAPOT. BOMBA = g HDT x Qb /76
e1.3MATERIALHDPOTENCIA INSTALADAPOT. INST. = 1.1 POT. BOMBADonde
:1.4COEF. HAZENC130COSTO DE TUBERIACT = 1.45*D1.54*Le fierro
fundido=espesor nominal de la pared en mm1.5DIFERENCIA
C.T.H170.50mCOSTO DE EQUIPAMIENTOCEq = 6730*POTinst.0.55DN=dimetro
nominal3501.6LONGITUDL1700mCOSTO ENERG. FUNC.CE = POT. INST.*
0.746*Hb*365*CKw-h960K=Clase de espesor, tomada en la serie de
nmeros enteros : 8, 9, 10, 11,12...91.7PENDIENTES1100.71m/KmCOSTO
DE OPERACINCO =CE * ( (1+i) n - 1) /(
i*(1+i)n)1.8DIAMETROD1346.1mmCOSTO DE MANTENIMIENTOCM = 20 %
CO1.9VELOCIDADV10.87m/se mnimo=6.00mm2.0ALTURA DE SUCC.
(ND)Hs0m2.1PRESION DE LLEGADAPs3.50m2. ESPESOR DE CEMENTO DE LOS
TUBOS (ISO-4179)2.2VELOCIDAD SUCC.Vs0.85m/s2.3DIAMETRO
SUCC.Ds350mm320RAE-05Conclusin:DNVALOR NOMINAL(mm)TOLERANCIA
(mm)2.4LONG. SUCC.Ls8m01# de equipos +1
Reserva603.5-1.52.5MATERIALHD81.82Qb por equipo803.5-1.52.6ALT.
EST. TOTAL + NDDHR1-A70.50m84.56HDT15.30857142861003.5-1.52.7PESO
ESPECIFICOg1000.00Kg/m3DN 300126.13HP por
equipo1253.5-1.52.8EFICIENCIA BOMBAe83%1503.5-1.52.9COSTO DE
Kw-Hr0.045$ / Kw-hr2003.5-1.53.0TASA DE COSTO
OPORT.i10%2503.5-1.53.1PERIODO DE DISEOn20aos3003.5-1.53.2NIVEL
DINAMICO DISEONDD0mPTAP4.713505.0-2.03.3ALT. DE INGRESO TUB.
RAE-05Hi26.00m1.214005.0-2.02503554505.0-2.0Criterio de Seleccin:
Velocidad recomendable lnea de impulsin: 0.9 < V < 1.2
m/s5005.0-2.06005.0-2.02RESULTADOS TCNICOSTRAMO: PTAP -
RAE-057006.0-2.58006.0-2.5NDIAMETRO NOMINALDIAMETRO
INTERNOVELOCIDADPENDIENTEPERD. LONG. + COL + ECPERD. ACCES.PERD.
TOTALALT. ESTAT.ALT. DINAMPOT. BOMBAPOT.
INST.9006.0-2.5(mm)(mm)(m/s)S (m/Km)hf (m)hk (m)ht (m)H (m)HDT
(m)(HP)(HP)10006.0-2.514504500.511.040.460.270.7376.5080.73104.72120.433511006.0-2.524004000.651.760.800.431.2376.5081.23105.36121.1612006.0-2.533503500.853.231.520.742.2676.5082.26106.70122.7114009.0-3.043003001.166.513.191.374.5676.5084.56109.68126.1315009.0-3.052502501.6715.077.702.8510.5576.5090.55117.45135.0716009.0-3.0418009.0-3.0RESULTADOS
ECONOMICOSTRAMO: PTAP - RAE-0520009.0-3.0NDIAMETRO NOMINALDIAMETRO
INTERNOCOSTO TUBERIACOSTO EQUIP.COSTO ENERGIA FUNC.COSTO
OPERAC.COSTO MANTEN.COSTO TOTAL(mm)(mm)($)($)($)($)($)($)3.
TOTALES145045084912.0693845.8726560.99226128.6845225.74476673.34240040070826.2994160.8926723.31227510.6045502.12464723.21NDIAMETRO
NOMINAL (mm)FIERRO FUNDIDOREVESTIMIENTOESPESOR TOTAL (mm)DIAMETRO
INTERNO
(mm)335035057661.6394817.6827063.19230404.1946080.84456027.53e
fierro fundido(mm)e mnimo ff (mm)e
cemento(mm)430030045476.6996265.1227819.03236839.0847367.82453767.7414508.556.005.0013.55422.90525025034343.9199958.1129789.80253617.3650723.47468432.6524008.106.005.0013.10373.8033507.656.005.0012.65324.7043007.206.003.5010.70278.60#
de equipos simultaneos01UND52506.756.003.5010.25229.50Qb por
equipo81.82lpsHP por equipo126.13HPPotencia elegida130.00HPBOMBAS
TIPO TURBINASOLUCION:02 BOMBAS TIPO TURBINA DE 130 HPDiametro bajo
a 200 mm3 equipos de 30 hp2 equipos de 60 hp e igual caudal3 bombas
tipo turbina de 60 HP bombeo 24 horas123003514"1230040164518
&R&"Times New Roman,Cursiva"&9Perfil del Proyecto:
Ampliacin y Mejoramiento de los Sistemas de Agua Potabley
Alcantarillado para el Esquema Musa 4ta. Y 5ta Etapa distrito La
Molina Lima&L&"Times New Roman,Cursiva"&9Consorcio RV y
Asociados
RAE-05- REP-01(ALTER 3ALTERNATIVO 2MARS-2000LINEA DE
IMPULSIONRAE-05 A REP-01DIMENSIONES DE ESPESORORES DE FIERRO
FUNDIDO, REVESTIMIENTO Y DIAMETRO INTERNOTRAMO R1-A1DATOS
GENERALES1. ESPESOR NOMINAL DE HIERRO FUNDIDO (ISO-2531)TRAMO:
RAE-05 - REP-0130.641.1CAUDAL DE BOMBEOQ142.40l/sFORMULASe fierro
fundido = K ( 0.5 + 0.001 DN )1.2HORAS DE BOMBEO18HorasPOTENCIA
BOMBAPOT. BOMBA = g HDT x Qb /76 e1.3MATERIALHDPOTENCIA
INSTALADAPOT. INST. = 1.1 POT. BOMBADonde :1.4COEF. HAZENC130COSTO
DE TUBERIACT = 1.45*D1.54*Le fierro fundido=espesor nominal de la
pared en mm1.5DIFERENCIA C.T.H126.86mCOSTO DE EQUIPAMIENTOCEq =
6730*POTinst.0.55DN=dimetro nominal2501.6LONGITUDL11574mCOSTO
ENERG. FUNC.CE = POT. INST.* 0.746*Hb*365*CKw-h960K=Clase de
espesor, tomada en la serie de nmeros enteros : 8, 9, 10,
11,12...91.7PENDIENTES117.07m/KmCOSTO DE OPERACINCO =CE * ( (1+i) n
- 1) /( i*(1+i)n)1.8DIAMETROD1249.1mmCOSTO DE MANTENIMIENTOCM = 20
% CO1.9VELOCIDADV10.87m/se mnimo=6.00mm2.0ALTURA DE SUCC.
(ND)Hs0m2.1PRESION DE LLEGADAPs3.50m2. ESPESOR DE CEMENTO DE LOS
TUBOS (ISO-4179)2.2VELOCIDAD SUCC.Vs2.40m/s2.3DIAMETRO
SUCC.Ds150mm347.362REP-01Conclusin:DNVALOR NOMINAL(mm)TOLERANCIA
(mm)2.4LONG. SUCC.Ls8m01# de equipos +1
Reserva603.5-1.52.5MATERIALHD42.40Qb por equipo803.5-1.52.6ALT.
EST. TOTAL + NDDHR1-A26.86m42.49HDT15.30857142861003.5-1.52.7PESO
ESPECIFICOg1000.00Kg/m3DN 25033.25HP por
equipo1253.5-1.52.8EFICIENCIA BOMBAe82%1503.5-1.52.9COSTO DE
Kw-Hr0.045$ / Kw-hr2003.5-1.53.0TASA DE COSTO
OPORT.i10%2503.5-1.53.1PERIODO DE DISEOn20aos3003.5-1.53.2NIVEL
DINAMICO DISEONDD0mRAE-054.713505.0-2.03.3ALT. DE INGRESO TUB.
REP-01Hi26.00m1.214005.0-2.03203554505.0-2.0Criterio de Seleccin:
Velocidad recomendable lnea de impulsin: 0.9 < V < 1.2
m/s5005.0-2.06005.0-2.02RESULTADOS TCNICOSTRAMO: RAE-05 -
REP-017006.0-2.58006.0-2.5NDIAMETRO NOMINALDIAMETRO
INTERNOVELOCIDADPENDIENTEPERD. LONG. + COL + ECPERD. ACCES.PERD.
TOTALALT. ESTAT.ALT. DINAMPOT. BOMBAPOT.
INST.9006.0-2.5(mm)(mm)(m/s)S (m/Km)hf (m)hk (m)ht (m)H (m)HDT
(m)(HP)(HP)10006.0-2.513503500.440.951.300.21.5032.8637.8625.7629.623511006.0-2.523003000.601.762.400.372.7732.8639.1326.6230.6112006.0-2.532502500.863.895.380.756.1332.8642.4928.9133.2514009.0-3.042002001.3510.9015.301.8617.1632.8653.5236.4141.8715009.0-3.051501502.4042.5361.075.8866.9532.86103.3170.2880.8216009.0-3.0318009.0-3.0RESULTADOS
ECONOMICOSTRAMO: RAE-05 - REP-0120009.0-3.0NDIAMETRO
NOMINALDIAMETRO INTERNOCOSTO TUBERIACOSTO EQUIP.COSTO ENERGIA
FUNC.COSTO OPERAC.COSTO MANTEN.COSTO
TOTAL(mm)(mm)($)($)($)($)($)($)3.
TOTALES1350350129656.2943392.946533.7255625.2411125.05246333.242300300102257.5944183.826751.8557482.3111496.46222172.03NDIAMETRO
NOMINAL (mm)FIERRO FUNDIDOREVESTIMIENTOESPESOR TOTAL (mm)DIAMETRO
INTERNO
(mm)325025077224.7346235.487332.6862427.2412485.45205705.58e fierro
fundido(mm)e mnimo ff (mm)e
cemento(mm)420020054766.5052489.249234.9678622.4215724.48210837.6013507.656.005.0012.65324.70515015035164.9075362.6817825.69151760.1530352.03310465.4523007.206.003.5010.70278.6032506.756.003.5010.25229.5042006.306.003.509.80180.40#
de equipos simultaneos01UND51505.856.003.509.50131.00Qb por
equipo42.40lpsHP por equipo33.25HPPotencia elegida40.00HPBOMBAS
TIPO TURBINASOLUCION:02 BOMBAS TIPO TURBINA DE 40 HPDiametro bajo a
200 mm3 equipos de 30 hp2 equipos de 60 hp e igual caudal3 bombas
tipo turbina de 60 HP bombeo 24 horas123003514"1230040164518
&R&"Times New Roman,Cursiva"&9Perfil del Proyecto:
Ampliacin y Mejoramiento de los Sistemas de Agua Potabley
Alcantarillado para el Esquema Musa 4ta. Y 5ta Etapa distrito La
Molina Lima&L&"Times New Roman,Cursiva"&9Consorcio RV y
Asociados
Hoja1
Balsa Flotante - PTAP (Ant 1)ALTERNATIVO 2MARS-2000LINEA DE
IMPULSIONBalsa Flotante A PTAPDIMENSIONES DE ESPESORORES DE FIERRO
FUNDIDO, REVESTIMIENTO Y DIAMETRO INTERNOTRAMO R1-A1DATOS
GENERALES1. ESPESOR NOMINAL DE HIERRO FUNDIDO (ISO-2531)TRAMO:
Balsa Flotante - PTAP30.641.1CAUDAL DE BOMBEOQ160.00l/sFORMULASe
fierro fundido = K ( 0.5 + 0.001 DN )1.2HORAS DE
BOMBEO24HorasPOTENCIA BOMBAPOT. BOMBA = g HDT x Qb /76
e1.3MATERIALHDPOTENCIA INSTALADAPOT. INST. = 1.1 POT. BOMBADonde
:1.4COEF. HAZENC130COSTO DE TUBERIACT = 1.45*D1.54*Le fierro
fundido=espesor nominal de la pared en mm1.5DIFERENCIA
C.T.H147.97mCOSTO DE EQUIPAMIENTOCEq = 6730*POTinst.0.55DN=dimetro
nominal3001.6LONGITUDL1950.5mCOSTO ENERG. FUNC.CE = POT. INST.*
0.746*Hb*365*CKw-h960K=Clase de espesor, tomada en la serie de
nmeros enteros : 8, 9, 10, 11,12...91.7PENDIENTES150.47m/KmCOSTO DE
OPERACINCO =CE * ( (1+i) n - 1) /(
i*(1+i)n)1.8DIAMETROD1318.4mmCOSTO DE MANTENIMIENTOCM = 20 %
CO1.9VELOCIDADV10.75m/se mnimo=6.00mm2.0ALTURA DE SUCC.
(ND)Hs10m2.1PRESION DE LLEGADAPs3.50m2. ESPESOR DE CEMENTO DE LOS
TUBOS (ISO-4179)2.2VELOCIDAD SUCC.Vs0.62m/s2.3DIAMETRO
SUCC.Ds350mm296PTAPConclusin:DNVALOR NOMINAL(mm)TOLERANCIA
(mm)2.4LONG. SUCC.Ls15m02# de equipos +1
Reserva603.5-1.52.5MATERIALHD30.00Qb por equipo803.5-1.52.6ALT.
EST. TOTAL + NDDHR1-A57.97m71.36HDT15.30857142861003.5-1.52.7PESO
ESPECIFICOg1000.00Kg/m3DN 30053.99HP por
equipo1253.5-1.52.8EFICIENCIA BOMBAe60%1503.5-1.52.9COSTO DE
Kw-Hr0.045$ / Kw-hr2003.5-1.53.0TASA DE COSTO
OPORT.i10%2503.5-1.53.1PERIODO DE DISEOn20aos3003.5-1.53.2NIVEL
DINAMICO DISEONDD0mBalsa Flotante4.713505.0-2.03.3ALT. DE INGRESO
TUB. PTAPHi22.50m1.214005.0-2.02484505.0-2.0Criterio de Seleccin:
Velocidad recomendable lnea de impulsin: 0.9 < V < 1.2
m/s5005.0-2.06005.0-2.02RESULTADOS TCNICOSTRAMO: Balsa Flotante -
PTAP7006.0-2.58006.0-2.5NDIAMETRO NOMINALDIAMETRO
INTERNOVELOCIDADPENDIENTEPERD. LONG. + COL + ECPERD. ACCES.PERD.
TOTALALT. ESTAT.ALT. DINAMPOT. BOMBAPOT.
INST.9006.0-2.5(mm)(mm)(m/s)S (m/Km)hf (m)hk (m)ht (m)H (m)HDT
(m)(HP)(HP)10006.0-2.514004000.480.890.610.240.8560.4764.8285.2998.083511006.0-2.523503500.621.631.160.391.5560.4765.5286.2199.1412006.0-2.533003000.853.342.430.743.1760.4767.1488.34101.5914009.0-3.042502501.227.775.871.527.3960.4771.3693.89107.9715009.0-3.052002001.9122.1317.313.7221.0360.4785.00111.84128.6216009.0-3.0318009.0-3.0RESULTADOS
ECONOMICOSTRAMO: Balsa Flotante - PTAP20009.0-3.0NDIAMETRO
NOMINALDIAMETRO INTERNOCOSTO TUBERIACOSTO EQUIP.COSTO ENERGIA
FUNC.COSTO OPERAC.COSTO MANTEN.COSTO
TOTAL(mm)(mm)($)($)($)($)($)($)3.
TOTALES140040096171.9983828.7228843.73245562.9349112.59503519.96235035078296.2584324.8529154.86248211.7649642.35489630.07NDIAMETRO
NOMINAL (mm)FIERRO FUNDIDOREVESTIMIENTOESPESOR TOTAL (mm)DIAMETRO
INTERNO
(mm)330030061750.8585464.4429875.19254344.3350868.87482303.68e
fierro fundido(mm)e mnimo ff (mm)e
cemento(mm)425025046634.1288377.0531752.11270323.6154064.72491151.6114008.106.005.0013.10373.80520020033072.1597303.2437822.52322004.4364400.89554603.2323507.656.005.0012.65324.7033007.206.003.5010.70278.6042506.756.003.5010.25229.50#
de equipos simultaneos02UND52006.306.003.509.80180.40Qb por
equipo30.00lpsHP por equipo50.80HPPotencia elegida60.00HPBOMBAS
TIPO CENTRIFUGASOLUCION:03 BOMBAS TIPO CENTRIFUGA DE 60 HPDiametro
bajo a 200 mm3 equipos de 30 hp2 equipos de 60 hp e igual caudal3
bombas tipo turbina de 60 HP bombeo 24
horas123003514"1230040164518
&R&"Times New Roman,Cursiva"&9Perfil del Proyecto:
Ampliacin y Mejoramiento de los Sistemas de Agua Potabley
Alcantarillado para el Esquema Musa 4ta. Y 5ta Etapa distrito La
Molina Lima&L&"Times New Roman,Cursiva"&9Consorcio RV y
Asociados
PTAP- RAE-05(Ant 1)ALTERNATIVO 2MARS-2000LINEA DE IMPULSIONPTAP
A RAE-05DIMENSIONES DE ESPESORORES DE FIERRO FUNDIDO, REVESTIMIENTO
Y DIAMETRO INTERNOTRAMO R1-A1DATOS GENERALES1. ESPESOR NOMINAL DE
HIERRO FUNDIDO (ISO-2531)TRAMO: PTAP - RAE-0530.641.1CAUDAL DE
BOMBEOQ170.58l/sFORMULASe fierro fundido = K ( 0.5 + 0.001 DN
)1.2HORAS DE BOMBEO18HorasPOTENCIA BOMBAPOT. BOMBA = g HDT x Qb /76
e1.3MATERIALHDPOTENCIA INSTALADAPOT. INST. = 1.1 POT. BOMBADonde
:1.4COEF. HAZENC130COSTO DE TUBERIACT = 1.45*D1.54*Le fierro
fundido=espesor nominal de la pared en mm1.5DIFERENCIA
C.T.H124.80mCOSTO DE EQUIPAMIENTOCEq = 6730*POTinst.0.55DN=dimetro
nominal3001.6LONGITUDL11590.5mCOSTO ENERG. FUNC.CE = POT. INST.*
0.746*Hb*365*CKw-h960K=Clase de espesor, tomada en la serie de
nmeros enteros : 8, 9, 10, 11,12...91.7PENDIENTES115.59m/KmCOSTO DE
OPERACINCO =CE * ( (1+i) n - 1) /(
i*(1+i)n)1.8DIAMETROD1321.4mmCOSTO DE MANTENIMIENTOCM = 20 %
CO1.9VELOCIDADV10.87m/se mnimo=6.00mm2.0ALTURA DE SUCC.
(ND)Hs0m2.1PRESION DE LLEGADAPs3.50m2. ESPESOR DE CEMENTO DE LOS
TUBOS (ISO-4179)2.2VELOCIDAD SUCC.Vs0.73m/s2.3DIAMETRO
SUCC.Ds350mm321RAE-05Conclusin:DNVALOR NOMINAL(mm)TOLERANCIA
(mm)2.4LONG. SUCC.Ls8m02# de equipos +1
Reserva603.5-1.52.5MATERIALHD35.29Qb por equipo803.5-1.52.6ALT.
EST. TOTAL + NDDHR1-A24.80m49.58HDT15.30857142861003.5-1.52.7PESO
ESPECIFICOg1000.00Kg/m3DN 25032.29HP por
equipo1253.5-1.52.8EFICIENCIA BOMBAe82%1503.5-1.52.9COSTO DE
Kw-Hr0.045$ / Kw-hr2003.5-1.53.0TASA DE COSTO
OPORT.i10%2503.5-1.53.1PERIODO DE DISEOn20aos3003.5-1.53.2NIVEL
DINAMICO DISEONDD0mPTAP4.713505.0-2.03.3ALT. DE INGRESO TUB.
RAE-05Hi26.00m1.214005.0-2.02963554505.0-2.0Criterio de Seleccin:
Velocidad recomendable lnea de impulsin: 0.9 < V < 1.2
m/s5005.0-2.06005.0-2.02RESULTADOS TCNICOSTRAMO: PTAP -
RAE-057006.0-2.58006.0-2.5NDIAMETRO NOMINALDIAMETRO
INTERNOVELOCIDADPENDIENTEPERD. LONG. + COL + ECPERD. ACCES.PERD.
TOTALALT. ESTAT.ALT. DINAMPOT. BOMBAPOT.
INST.9006.0-2.5(mm)(mm)(m/s)S (m/Km)hf (m)hk (m)ht (m)H (m)HDT
(m)(HP)(HP)10006.0-2.514004000.561.051.350.321.6730.8035.9740.7446.853511006.0-2.523503500.731.962.570.543.1130.8037.4142.3748.7312006.0-2.533003001.004.055.421.026.4430.8040.7446.1453.0614009.0-3.042502501.449.6113.162.1215.2830.8049.5856.1564.5715009.0-3.052002002.2527.7238.925.1744.0930.8078.3988.78102.1016009.0-3.0418009.0-3.0RESULTADOS
ECONOMICOSTRAMO: PTAP - RAE-0520009.0-3.0NDIAMETRO NOMINALDIAMETRO
INTERNOCOSTO TUBERIACOSTO EQUIP.COSTO ENERGIA FUNC.COSTO
OPERAC.COSTO MANTEN.COSTO TOTAL(mm)(mm)($)($)($)($)($)($)3.
TOTALES1400400160927.4555835.5010333.2287972.5317594.51332663.212350350131015.4657053.3310746.6591492.2918298.46308606.19NDIAMETRO
NOMINAL (mm)FIERRO FUNDIDOREVESTIMIENTOESPESOR TOTAL (mm)DIAMETRO
INTERNO
(mm)3300300103329.5459791.7911702.8699633.0419926.61294383.84e
fierro fundido(mm)e mnimo ff (mm)e
cemento(mm)425025078034.2766610.2814241.78121248.3024249.66304384.2914008.106.005.0013.10373.80520020055340.6185698.3022517.99191708.3438341.67393606.9123507.656.005.0012.65324.7033007.206.003.5010.70278.6042506.756.003.5010.25229.50#
de equipos simultaneos02UND52006.306.003.509.80180.40Qb por
equipo35.29lpsHP por equipo32.29HPPotencia elegida75.00HPBOMBAS
TIPO TURBINASOLUCION:03 BOMBAS TIPO TURBINA DE 75 HPDiametro bajo a
200 mm3 equipos de 30 hp2 equipos de 60 hp e igual caudal3 bombas
tipo turbina de 60 HP bombeo 24 horas123003514"1230040164518
&R&"Times New Roman,Cursiva"&9Perfil del Proyecto:
Ampliacin y Mejoramiento de los Sistemas de Agua Potabley
Alcantarillado para el Esquema Musa 4ta. Y 5ta Etapa distrito La
Molina Lima&L&"Times New Roman,Cursiva"&9Consorcio RV y
Asociados
RAE-05- RAP-01(Ant 1) (3)ALTERNATIVO 2MARS-2000LINEA DE
IMPULSIONRAE-05 A RAP-01DIMENSIONES DE ESPESORORES DE FIERRO
FUNDIDO, REVESTIMIENTO Y DIAMETRO INTERNOTRAMO R1-A1DATOS
GENERALES1. ESPESOR NOMINAL DE HIERRO FUNDIDO (ISO-2531)TRAMO:
RAE-05 - RAP-0130.641.1CAUDAL DE BOMBEOQ142.40l/sFORMULASe fierro
fundido = K ( 0.5 + 0.001 DN )1.2HORAS DE BOMBEO18HorasPOTENCIA
BOMBAPOT. BOMBA = g HDT x Qb /76 e1.3MATERIALHDPOTENCIA
INSTALADAPOT. INST. = 1.1 POT. BOMBADonde :1.4COEF. HAZENC130COSTO
DE TUBERIACT = 1.45*D1.54*Le fierro fundido=espesor nominal de la
pared en mm1.5DIFERENCIA C.T.H135.70mCOSTO DE EQUIPAMIENTOCEq =
6730*POTinst.0.55DN=dimetro nominal2501.6LONGITUDL13265.8mCOSTO
ENERG. FUNC.CE = POT. INST.* 0.746*Hb*365*CKw-h960K=Clase de
espesor, tomada en la serie de nmeros enteros : 8, 9, 10,
11,12...91.7PENDIENTES110.93m/KmCOSTO DE OPERACINCO =CE * ( (1+i) n
- 1) /( i*(1+i)n)1.8DIAMETROD1249.1mmCOSTO DE MANTENIMIENTOCM = 20
% CO1.9VELOCIDADV10.87m/se mnimo=6.00mm2.0ALTURA DE SUCC.
(ND)Hs0m2.1PRESION DE LLEGADAPs3.50m2. ESPESOR DE CEMENTO DE LOS
TUBOS (ISO-4179)2.2VELOCIDAD SUCC.Vs2.40m/s2.3DIAMETRO
SUCC.Ds150mm356RAP-01Conclusin:DNVALOR NOMINAL(mm)TOLERANCIA
(mm)2.4LONG. SUCC.Ls8m02# de equipos +1
Reserva603.5-1.52.5MATERIALHD21.20Qb por equipo803.5-1.52.6ALT.
EST. TOTAL + NDDHR1-A35.70m56.73HDT15.30857142861003.5-1.52.7PESO
ESPECIFICOg1000.00Kg/m3DN 25022.19HP por
equipo1253.5-1.52.8EFICIENCIA BOMBAe82%1503.5-1.52.9COSTO DE
Kw-Hr0.045$ / Kw-hr2003.5-1.53.0TASA DE COSTO
OPORT.i10%2503.5-1.53.1PERIODO DE DISEOn20aos3003.5-1.53.2NIVEL
DINAMICO DISEONDD0mRAE-054.713505.0-2.03.3ALT. DE INGRESO TUB.
RAP-01Hi26.00m1.214005.0-2.03203554505.0-2.0Criterio de Seleccin:
Velocidad recomendable lnea de impulsin: 0.9 < V < 1.2
m/s5005.0-2.06005.0-2.02RESULTADOS TCNICOSTRAMO: RAE-05 -
RAP-017006.0-2.58006.0-2.5NDIAMETRO NOMINALDIAMETRO
INTERNOVELOCIDADPENDIENTEPERD. LONG. + COL + ECPERD. ACCES.PERD.
TOTALALT. ESTAT.ALT. DINAMPOT. BOMBAPOT.
INST.9006.0-2.5(mm)(mm)(m/s)S (m/Km)hf (m)hk (m)ht (m)H (m)HDT
(m)(HP)(HP)10006.0-2.513503500.440.782.350.22.5541.7047.7532.4837.353511006.0-2.523003000.601.534.620.374.9941.7050.1934.1439.2612006.0-2.532502500.863.5310.780.7511.5341.7056.7338.5944.3814009.0-3.042002001.3510.1631.311.8633.1741.7078.3753.3261.3215009.0-3.051501502.4040.40126.075.88131.9541.70177.15120.52138.6016009.0-3.0318009.0-3.0RESULTADOS
ECONOMICOSTRAMO: RAE-05 - RAP-0120009.0-3.0NDIAMETRO
NOMINALDIAMETRO INTERNOCOSTO TUBERIACOSTO EQUIP.COSTO ENERGIA
FUNC.COSTO OPERAC.COSTO MANTEN.COSTO
TOTAL(mm)(mm)($)($)($)($)($)($)3.
TOTALES1350350269016.2149293.288238.1770136.1914027.24410711.092300300212168.2550663.348659.2173720.7414744.15359955.69NDIAMETRO
NOMINAL (mm)FIERRO FUNDIDOREVESTIMIENTOESPESOR TOTAL (mm)DIAMETRO
INTERNO
(mm)3250250160229.0654195.109787.9083329.9116665.98324207.95e
fierro fundido(mm)e mnimo ff (mm)e
cemento(mm)4200200113631.7964742.3513523.99115137.3523027.47330062.9513507.656.005.0012.65324.70515015072961.58101386.7930568.47260246.6252049.32517212.7823007.206.003.5010.70278.6032506.756.003.5010.25229.5042006.306.003.509.80180.40#
de equipos simultaneos02UND51505.856.003.509.50131.00Qb por
equipo21.20lpsHP por equipo22.19HPPotencia elegida50.00HPBOMBAS
TIPO TURBINASOLUCION:03 BOMBAS TIPO TURBINA DE 50 HPDiametro bajo a
200 mm3 equipos de 30 hp2 equipos de 60 hp e igual caudal3 bombas
tipo turbina de 60 HP bombeo 24 horas123003514"1230040164518
&R&"Times New Roman,Cursiva"&9Perfil del Proyecto:
Ampliacin y Mejoramiento de los Sistemas de Agua Potabley
Alcantarillado para el Esquema Musa 4ta. Y 5ta Etapa distrito La
Molina Lima&L&"Times New Roman,Cursiva"&9Consorcio RV y
Asociados
PTAP-01 - RAE-02Cuadro N 1MARS-2000LINEA DE IMPULSIONPTAP-01 A
RAE-02DIMENSIONES DE ESPESORORES DE FIERRO FUNDIDO, REVESTIMIENTO Y
DIAMETRO INTERNOTRAMO R1-A1DATOS GENERALES1. ESPESOR NOMINAL DE
HIERRO FUNDIDO (ISO-2531)TRAMO: PTAP-01 - RAE-0230.641.1CAUDAL DE
BOMBEOQ111.32l/sFORMULASe fierro fundido = K ( 0.5 + 0.001 DN
)1.2HORAS DE BOMBEO18HorasPOTENCIA BOMBAPOT. BOMBA = g HDT x Qb /76
e1.3MATERIALHDPOTENCIA INSTALADAPOT. INST. = 1.1 POT. BOMBADonde
:1.4COEF. HAZENC130COSTO DE TUBERIACT = 1.45*D1.54*Le fierro
fundido=espesor nominal de la pared en mm1.5DIFERENCIA
C.T.H112.00mCOSTO DE EQUIPAMIENTOCEq = 6730*POTinst.0.55DN=dimetro
nominal1501.6LONGITUDL11780.5mCOSTO ENERG. FUNC.CE = POT. INST.*
0.746*Hb*365*CKw-h960K=Clase de espesor, tomada en la serie de
nmeros enteros : 8, 9, 10, 11,12...91.7PENDIENTES16.74m/KmCOSTO DE
OPERACINCO =CE * ( (1+i) n - 1) /(
i*(1+i)n)1.8DIAMETROD1128.7mmCOSTO DE MANTENIMIENTOCM = 20 %
CO1.9VELOCIDADV10.87m/se mnimo=6.00mm2.0ALTURA DE SUCC.
(ND)Hs0m2.1PRESION DE LLEGADAPs3.50m2. ESPESOR DE CEMENTO DE LOS
TUBOS (ISO-4179)2.2VELOCIDAD SUCC.Vs0.36m/sRAE-022.3DIAMETRO
SUCC.Ds200mm367Conclusin:DNVALOR NOMINAL(mm)TOLERANCIA (mm)2.4LONG.
SUCC.Ls8m01# de equipos +1 Reserva603.5-1.52.5MATERIALHD11.32Qb por
equipo803.5-1.52.6ALT. EST. TOTAL +
NDDHR1-A12.00m28.40HDT15.30857142861003.5-1.52.7PESO
ESPECIFICOg1000.00Kg/m3DN 1506.23HP por
equipo1253.5-1.52.8EFICIENCIA BOMBAe78%1503.5-1.52.9COSTO DE
Kw-Hr0.045$ / Kw-hr2003.5-1.53.0TASA DE COSTO
OPORT.i10%2503.5-1.53.1PERIODO DE DISEOn20aos3003.5-1.53.2NIVEL
DINAMICO DISEONDD0mPTAP-013505.0-2.03.3ALT. DE INGRESO TUB.
RAE-02Hi26.50m4005.0-2.03554505.0-2.0Criterio de Seleccin:
Velocidad recomendable lnea de impulsin: 0.9 < V < 1.2
m/s5005.0-2.06005.0-2.02RESULTADOS TCNICOSTRAMO: PTAP-01 -
RAE-027006.0-2.58006.0-2.5NDIAMETRO NOMINALDIAMETRO
INTERNOVELOCIDADPENDIENTEPERD. LONG. + COL + ECPERD. ACCES.PERD.
TOTALALT. ESTAT.ALT. DINAMPOT. BOMBAPOT.
INST.9006.0-2.5(mm)(mm)(m/s)S (m/Km)hf (m)hk (m)ht (m)H (m)HDT
(m)(HP)(HP)10006.0-2.512502500.230.310.500.050.5518.5022.554.314.9611006.0-2.522002000.360.901.480.131.6118.5023.614.515.1912006.0-2.531501500.643.595.980.426.4018.5028.405.426.2314009.0-3.041001001.4425.3142.952.1245.0718.5067.0712.8114.7315009.0-3.0580802.2574.36127.235.17132.4018.50154.4029.4833.9016009.0-3.0318009.0-3.0RESULTADOS
ECONOMICOSTRAMO: PTAP-01 - RAE-0220009.0-3.0NDIAMETRO
NOMINALDIAMETRO INTERNOCOSTO TUBERIACOSTO EQUIP.COSTO ENERGIA
FUNC.COSTO OPERAC.COSTO MANTEN.COSTO
TOTAL(mm)(mm)($)($)($)($)($)($)3.
TOTALES125025087356.1916231.601093.189306.861861.37115849.20220020061951.5616641.631143.919738.751947.7591423.60NDIAMETRO
NOMINAL (mm)FIERRO FUNDIDOREVESTIMIENTOESPESOR TOTAL (mm)DIAMETRO
INTERNO (mm)315015039778.3318411.891374.7211703.772340.7573609.46e
fierro fundido(mm)e mnimo ff (mm)e
cemento(mm)410010021304.2429549.553249.1027661.425532.2887296.5912506.756.003.5010.25229.505808015108.6146734.657477.2563658.0412731.61145710.1622006.306.003.509.80180.4031505.856.003.509.50131.0041005.406.003.509.5081.00#
de equipos simultaneos01UND5805.226.003.509.5061.00Qb por
equipo11.32lpsHP por equipo6.23HPPotencia elegida15.00HPBOMBAS TIPO
TURBINASOLUCION:02 BOMBAS TIPO TURBINA DE 15 HP
&R&"Times New Roman,Cursiva"&9Perfil del Proyecto:
Ampliacin y Mejoramiento de los Sistemas de Agua Potabley
Alcantarillado para el Esquema Musa 4ta. Y 5ta Etapa distrito La
Molina Lima&L&"Times New Roman,Cursiva"&9Consorcio RV y
Asociados
RAP-01 - RAE-02 (ALTER 2)Cuadro N 1MARS-2000LINEA DE
IMPULSIONRAP-01 A RAE-02DIMENSIONES DE ESPESORORES DE FIERRO
FUNDIDO, REVESTIMIENTO Y DIAMETRO INTERNOTRAMO R1-A1DATOS
GENERALES1. ESPESOR NOMINAL DE HIERRO FUNDIDO (ISO-2531)TRAMO:
RAP-01 - RAE-0230.641.1CAUDAL DE BOMBEOQ111.32l/sFORMULASe fierro
fundido = K ( 0.5 + 0.001 DN )1.2HORAS DE BOMBEO18HorasPOTENCIA
BOMBAPOT. BOMBA = g HDT x Qb /76 e1.3MATERIALHDPOTENCIA
INSTALADAPOT. INST. = 1.1 POT. BOMBADonde :1.4COEF. HAZENC130COSTO
DE TUBERIACT = 1.45*D1.54*Le fierro fundido=espesor nominal de la
pared en mm1.5DIFERENCIA C.T.H117.00mCOSTO DE EQUIPAMIENTOCEq =
6730*POTinst.0.55DN=dimetro nominal1501.6LONGITUDL11780.5mCOSTO
ENERG. FUNC.CE = POT. INST.* 0.746*Hb*365*CKw-h960K=Clase de
espesor, tomada en la serie de nmeros enteros : 8, 9, 10,
11,12...91.7PENDIENTES19.55m/KmCOSTO DE OPERACINCO =CE * ( (1+i) n
- 1) /( i*(1+i)n)1.8DIAMETROD1128.7mmCOSTO DE MANTENIMIENTOCM = 20
% CO1.9VELOCIDADV10.87m/se mnimo=6.00mm2.0ALTURA DE SUCC.
(ND)Hs0m2.1PRESION DE LLEGADAPs3.50m2. ESPESOR DE CEMENTO DE LOS
TUBOS (ISO-4179)2.2VELOCIDAD SUCC.Vs0.36m/sRAE-022.3DIAMETRO
SUCC.Ds200mm367Conclusin:DNVALOR NOMINAL(mm)TOLERANCIA (mm)2.4LONG.
SUCC.Ls8m01# de equipos +1 Reserva603.5-1.52.5MATERIALHD11.32Qb por
equipo803.5-1.52.6ALT. EST. TOTAL +
NDDHR1-A17.00m33.40HDT15.30857142861003.5-1.52.7PESO
ESPECIFICOg1000.00Kg/m3DN 1507.34HP por
equipo1253.5-1.52.8EFICIENCIA BOMBAe78%1503.5-1.52.9COSTO DE
Kw-Hr0.045$ / Kw-hr2003.5-1.53.0TASA DE COSTO
OPORT.i10%2503.5-1.53.1PERIODO DE DISEOn20aos3003.5-1.53.2NIVEL
DINAMICO DISEONDD0mRAP-013505.0-2.03.3ALT. DE INGRESO TUB.
RAE-02Hi26.50m4005.0-2.03504505.0-2.0Criterio de Seleccin:
Velocidad recomendable lnea de impulsin: 0.9 < V < 1.2
m/s5005.0-2.06005.0-2.02RESULTADOS TCNICOSTRAMO: RAP-01 -
RAE-027006.0-2.58006.0-2.5NDIAMETRO NOMINALDIAMETRO
INTERNOVELOCIDADPENDIENTEPERD. LONG. + COL + ECPERD. ACCES.PERD.
TOTALALT. ESTAT.ALT. DINAMPOT. BOMBAPOT.
INST.9006.0-2.5(mm)(mm)(m/s)S (m/Km)hf (m)hk (m)ht (m)H (m)HDT
(m)(HP)(HP)10006.0-2.512502500.230.310.500.050.5523.5027.555.266.0511006.0-2.522002000.360.901.480.131.6123.5028.615.466.2812006.0-2.531501500.643.595.980.426.4023.5033.406.387.3414009.0-3.041001001.4425.3142.952.1245.0723.5072.0713.7615.8215009.0-3.0580802.2574.36127.235.17132.4023.50159.4030.4435.0116009.0-3.0318009.0-3.0RESULTADOS
ECONOMICOSTRAMO: RAP-01 - RAE-0220009.0-3.0NDIAMETRO
NOMINALDIAMETRO INTERNOCOSTO TUBERIACOSTO EQUIP.COSTO ENERGIA
FUNC.COSTO OPERAC.COSTO MANTEN.COSTO
TOTAL(mm)(mm)($)($)($)($)($)($)3.
TOTALES125025087356.1918110.941334.1411358.292271.66120431.22220020061951.5618486.511384.8611790.092358.0295971.04NDIAMETRO
NOMINAL (mm)FIERRO FUNDIDOREVESTIMIENTOESPESOR TOTAL (mm)DIAMETRO
INTERNO (mm)315015039778.3320139.571618.2113776.732755.3578068.19e
fierro fundido(mm)e mnimo ff (mm)e
cemento(mm)410010021304.2430735.413490.0629712.855942.5791185.1312506.756.003.5010.25229.505808015108.6147565.657720.7465731.0113146.20149272.2122006.306.003.509.80180.4031505.856.003.509.50131.0041005.406.003.509.5081.00#
de equipos simultaneos01UND5805.226.003.509.5061.00Qb por
equipo11.32lpsHP por equipo7.34HPPotencia elegida15.00HPBOMBAS TIPO
TURBINASOLUCION:02 BOMBAS TIPO TURBINA DE 15 HP
&R&"Times New Roman,Cursiva"&9Perfil del Proyecto:
Ampliacin y Mejoramiento de los Sistemas de Agua Potabley
Alcantarillado para el Esquema Musa 4ta. Y 5ta Etapa distrito La
Molina Lima&L&"Times New Roman,Cursiva"&9Consorcio RV y
Asociados
Hoja2
RP-06 - RP-05Cuadro N 1MARS-2000ANALISIS DE TECNICO Y COSTOS DE
LA ALTERNATIVA SELECCIONADARP-06 A RP-05DIMENSIONES DE ESPESORORES
DE FIERRO FUNDIDO, REVESTIMIENTO Y DIAMETRO INTERNOPRIMERA
ALTERNATIVATRAMO R1-A1DATOS GENERALES1. ESPESOR NOMINAL DE HIERRO
FUNDIDO (ISO-2531)TRAMO: RP-06 - RP-0530.641.1CAUDAL DE
BOMBEOQ163.06l/sFORMULASe fierro fundido = K ( 0.5 + 0.001 DN
)1.2HORAS DE BOMBEO18HorasPOTENCIA BOMBAPOT. BOMBA = g HDT x Qb /76
e1.3MATERIALHDPOTENCIA INSTALADAPOT. INST. = 1.1 POT. BOMBADonde
:1.4COEF. HAZENC130COSTO DE TUBERIACT = 1.45*D1.54*Le fierro
fundido=espesor nominal de la pared en mm1.5DIFERENCIA
C.T.H190.00mCOSTO DE EQUIPAMIENTOCEq = 6730*POTinst.0.55DN=dimetro
nominal3001.6LONGITUDL11825mCOSTO ENERG. FUNC.CE = POT. INST.*
0.746*Hb*365*CKw-h960K=Clase de espesor, tomada en la serie de
nmeros enteros : 8, 9, 10, 11,12...91.7PENDIENTES149.32m/KmCOSTO DE
OPERACINCO =CE * ( (1+i) n - 1) /(
i*(1+i)n)1.8DIAMETROD1303.8mmCOSTO DE MANTENIMIENTOCM = 20 %
CO1.9VELOCIDADV10.87m/se mnimo=6.00mm2.0ALTURA DE SUCC.
(ND)Hs0m2.1PRESION DE LLEGADAPs3.00m2. ESPESOR DE CEMENTO DE LOS
TUBOS (ISO-4179)2.2VELOCIDAD SUCC.Vs0.89m/s2.3DIAMETRO
SUCC.Ds300mm430RP-05Conclusin:DNVALOR NOMINAL(mm)TOLERANCIA
(mm)2.4LONG. SUCC.Ls5m2# de equipos +1
Reserva603.5-1.52.5MATERIALHD31.53Qb por equipo803.5-1.52.6ALT.
EST. TOTAL + NDDHR1-A90.00m107.11HDT15.30857142861003.5-1.52.7PESO
ESPECIFICOg1000.00Kg/m3DN 30065.18HP por
equipo1253.5-1.52.8EFICIENCIA BOMBAe75%1503.5-1.52.9COSTO DE
Kw-Hr0.045$ / Kw-hr2003.5-1.53.0TASA DE COSTO
OPORT.i12%2503.5-1.53.1PERIODO DE DISEOn17aos3003.5-1.53.2NIVEL
DINAMICO DISEONDD0mRP-063505.0-2.03.3ALT. DE INGRESO TUB.
RP-05Hi25.80m4005.0-2.03404505.0-2.0Criterio de Seleccin: Velocidad
recomendable lnea de impulsin: 0.9 < V < 1.2
m/s5005.0-2.06005.0-2.02RESULTADOS TCNICOSTRAMO: RP-06 -
RP-057006.0-2.58006.0-2.5NDIAMETRO NOMINALDIAMETRO
INTERNOVELOCIDADPENDIENTEPERD. LONG. + COL + ECPERD. ACCES.PERD.
TOTALALT. ESTAT.ALT. DINAMPOT. BOMBAPOT.
INST.9006.0-2.5(mm)(mm)(m/s)S (m/Km)hf (m)hk (m)ht (m)H (m)HDT
(m)(HP)(HP)10006.0-2.514003740.571.131.740.332.0795.80100.87111.59122.7511006.0-2.523503250.762.213.440.594.0395.80102.83113.76125.1412006.0-2.533002791.034.557.231.088.3195.80107.11118.50130.3514009.0-3.042502301.5211.4618.552.3620.9195.80119.71132.44145.6815009.0-3.052001802.4736.1959.816.2366.0495.80164.84182.37200.6116009.0-3.0318009.0-3.0RESULTADOS
ECONOMICOSTRAMO: RP-06 - RP-0520009.0-3.0NDIAMETRO NOMINALDIAMETRO
INTERNOCOSTO TUBERIACOSTO EQUIP.COSTO ENERGIA FUNC.COSTO
OPERAC.COSTO MANTEN.COSTO TOTAL(mm)(mm)($)($)($)($)($)($)3.
TOTALES1400374166360.9894836.3727072.89192748.9738549.79519569.002350325133927.4795846.2927599.36196497.2539299.45493169.82NDIAMETRO
NOMINAL (mm)FIERRO FUNDIDOREVESTIMIENTOESPESOR TOTAL (mm)DIAMETRO
INTERNO
(mm)3300300118564.2398022.5828749.33204684.6140936.92490957.67e
fierro fundido(mm)e mnimo ff (mm)e
cemento(mm)425023078486.02104205.7332131.32228763.1345752.63489338.8314008.106.005.0013.10373.80520018054174.04124252.5844244.86315007.0563001.41600679.9423507.656.005.0012.65324.7033007.206.003.5010.70278.6042506.756.003.5010.25229.50#
de equipos simultaneos02UND52006.306.003.509.80180.40Qb por
equipo31.53lpsHP por equipo65.18HPPotencia elegida75.00HPBOMBAS
TIPO TURBINASOLUCION:03 BOMBAS TIPO TURBINA DE 75 HP
&L&"Times New Roman,Cursiva"&9INFORME
FINAL&R&"Times New Roman,Cursiva"&9Perfil Recargado
Ampliacin y Mejoramiento del Sistema de Agua Potable
yAlcantarillado del Esquema Cieneguilla&L&"Times New
Roman,Cursiva"&9Consorcio CRV
Pozos_RP-06MARS-2000MARS-2000MARS-2000MARS-2000MARS-2000MARS-2000MARS-2000MARS-2000MARS-2000ANALISIS
DE COSTOS DE LA ALTERNATIVA SELECCIONADAPP-11, PP-10, PP-9, PP-8 y
PP-7 A RP-06 - CIENEGUILLADIMENSIONES DE ESPESORORES DE FIERRO
FUNDIDO, REVESTIMIENTO Y DIAMETRO INTERNODIMENSIONES DE ESPESORORES
DE FIERRO FUNDIDO, REVESTIMIENTO Y DIAMETRO INTERNODIMENSIONES DE
ESPESORORES DE FIERRO FUNDIDO, REVESTIMIENTO Y DIAMETRO
INTERNODIMENSIONES DE ESPESORORES DE FIERRO FUNDIDO, REVESTIMIENTO
Y DIAMETRO INTERNODIMENSIONES DE ESPESORORES DE FIERRO FUNDIDO,
REVESTIMIENTO Y DIAMETRO INTERNODIMENSIONES DE ESPESORORES DE
FIERRO FUNDIDO, REVESTIMIENTO Y DIAMETRO INTERNODIMENSIONES DE
ESPESORORES DE FIERRO FUNDIDO, REVESTIMIENTO Y DIAMETRO
INTERNODIMENSIONES DE ESPESORORES DE FIERRO FUNDIDO, REVESTIMIENTO
Y DIAMETRO INTERNODIMENSIONES DE ESPESORORES DE FIERRO FUNDIDO,
REVESTIMIENTO Y DIAMETRO INTERNOPRIMERA ALTERNATIVATRAMO P1-ATRAMO
P2-ATRAMO P3-BTRAMO P4-CTRAMO P5-DTRAMO A-BTRAMO B-CTRAMO C-DTRAMO
D-R11DATOS GENERALES1. ESPESOR NOMINAL DE HIERRO FUNDIDO
(ISO-2531)1. ESPESOR NOMINAL DE HIERRO FUNDIDO (ISO-2531)1. ESPESOR
NOMINAL DE HIERRO FUNDIDO (ISO-2531)1. ESPESOR NOMINAL DE HIERRO
FUNDIDO (ISO-2531)1. ESPESOR NOMINAL DE HIERRO FUNDIDO (ISO-2531)1.
ESPESOR NOMINAL DE HIERRO FUNDIDO (ISO-2531)1. ESPESOR NOMINAL DE
HIERRO FUNDIDO (ISO-2531)1. ESPESOR NOMINAL DE HIERRO FUNDIDO
(ISO-2531)1. ESPESOR NOMINAL DE HIERRO FUNDIDO (ISO-2531)TRAMO
PP-11 - ATRAMO PP-10 - ATRAMO PP-9 - B1.1CAUDAL DE
BOMBEOQ126.79l/sCAUDAL DE BOMBEOQ226.79l/sCAUDAL DE
BOMBEOQ326.79l/se fierro fundido = K ( 0.5 + 0.001 DN )e fierro
fundido = K ( 0.5 + 0.001 DN )e fierro fundido = K ( 0.5 + 0.001 DN
)e fierro fundido = K ( 0.5 + 0.001 DN )e fierro fundido = K ( 0.5
+ 0.001 DN )e fierro fundido = K ( 0.5 + 0.001 DN )e fierro fundido
= K ( 0.5 + 0.001 DN )e fierro fundido = K ( 0.5 + 0.001 DN )e
fierro fundido = K ( 0.5 + 0.001 DN )1.2HORAS DE BOMBEO18HorasHORAS
DE BOMBEO18HorasHORAS DE
BOMBEO18Horas1.3MATERIALHDMATERIALHDMATERIALHDDonde :Donde :Donde
:Donde :Donde :Donde :Donde :Donde :Donde :1.4COEF. HAZENC130COEF.
HAZENC130COEF. HAZENC130e fierro fundido=espesor nominal de la
pared en mme fierro fundido=espesor nominal de la pared en mme
fierro fundido=espesor nominal de la pared en mme fierro
fundido=espesor nominal de la pared en mme fierro fundido=espesor
nominal de la pared en mme fierro fundido=espesor nominal de la
pared en mme fierro fundido=espesor nominal de la pared en mme
fierro fundido=espesor nominal de la pared en mme fierro
fundido=espesor nominal de la pared en mm1.5DIFERENCIA
C.T.H12.95mDIFERENCIA C.T.H2-3.24mDIFERENCIA C.T.H3-1.58mDN=dimetro
nominal200DN=dimetro nominal200DN=dimetro nominal200DN=dimetro
nominal200DN=dimetro nominal150DN=dimetro nominal300DN=dimetro
nominal350DN=dimetro nominal400DN=dimetro
nominal4001.6LONGITUDL1338mLONGITUDL226mLONGITUDL316mK=Clase de
espesor, tomada en la serie de nmeros enteros : 8, 9, 10,
11,12...9K=Clase de espesor, tomada en la serie de nmeros enteros :
8, 9, 10, 11,12...9K=Clase de espesor, tomada en la serie de nmeros
enteros : 8, 9, 10, 11,12...9K=Clase de espesor, tomada en la serie
de nmeros enteros : 8, 9, 10, 11,12...9K=Clase de espesor, tomada
en la serie de nmeros enteros : 8, 9, 10, 11,12...9K=Clase de
espesor, tomada en la serie de nmeros enteros : 8, 9, 10,
11,12...9K=Clase de espesor, tomada en la serie de nmeros enteros :
8, 9, 10, 11,12...9K=Clase de espesor, tomada en la serie de nmeros
enteros : 8, 9, 10, 11,12...9K=Clase de espesor, tomada en la serie
de nmeros enteros : 8, 9, 10,
11,12...91.7PENDIENTES18.74m/KmPENDIENTES2-124.65m/KmPENDIENTES3-98.5m/Km1.8DIAMETROD1198.0mmDIAMETROD2198.0mmDIAMETROD3198.0mm1.9VELOCIDADV10.87m/sVELOCIDADV20.87m/sVELOCIDADV30.87m/se
mnimo=6.00mme mnimo=6.00mme mnimo=6.00mme mnimo=6.00mme
mnimo=6.00mme mnimo=6.00mme mnimo=6.00mme mnimo=6.00mme
mnimo=6.00mm2.0ALTURA DE SUCC. (ND)Hs23.54mALTURA DE SUCC.
(ND)Hs24.08mALTURA DE SUCC. (ND)Hs23.53m2.1PRESION DE
LLEGADAPs3.50mPRESION DE LLEGADAPs3.50mPRESION DE LLEGADAPs3.50m2.
ESPESOR DE CEMENTO DE LOS TUBOS (ISO-4179)2. ESPESOR DE CEMENTO DE
LOS TUBOS (ISO-4179)2. ESPESOR DE CEMENTO DE LOS TUBOS (ISO-4179)2.
ESPESOR DE CEMENTO DE LOS TUBOS (ISO-4179)2. ESPESOR DE CEMENTO DE
LOS TUBOS (ISO-4179)2. ESPESOR DE CEMENTO DE LOS TUBOS (ISO-4179)2.
ESPESOR DE CEMENTO DE LOS TUBOS (ISO-4179)2. ESPESOR DE CEMENTO DE
LOS TUBOS (ISO-4179)2. ESPESOR DE CEMENTO DE LOS TUBOS
(ISO-4179)2.2VELOCIDAD SUCC.Vs0.85m/sVELOCIDAD
SUCC.Vs0.85m/sVELOCIDAD SUCC.Vs0.85m/s2.3DIAMETRO
SUCC.Ds200mmDIAMETRO SUCC.Ds200mmDIAMETRO SUCC.Ds200mmDNVALOR
NOMINAL(mm)TOLERANCIA (mm)DNVALOR NOMINAL(mm)TOLERANCIA (mm)DNVALOR
NOMINAL(mm)TOLERANCIA (mm)DNVALOR NOMINAL(mm)TOLERANCIA (mm)DNVALOR
NOMINAL(mm)TOLERANCIA (mm)DNVALOR NOMINAL(mm)TOLERANCIA (mm)DNVALOR
NOMINAL(mm)TOLERANCIA (mm)DNVALOR NOMINAL(mm)TOLERANCIA (mm)DNVALOR
NOMINAL(mm)TOLERANCIA (mm)2.4LONG. SUCC.Ls28.54mLONG.
SUCC.Ls29.08mLONG.
SUCC.Ls28.53m603.5-1.5603.5-1.5603.5-1.5603.5-1.5603.5-1.5603.5-1.5603.5-1.5603.5-1.5603.5-1.52.5MATERIALHDMATERIALHDMATERIALHD803.5-1.5803.5-1.5803.5-1.5803.5-1.5803.5-1.5803.5-1.5803.5-1.5803.5-1.5803.5-1.52.6ALT.
EST. TOTAL + NDDHR1-A36.49mALT. EST. TOTAL + NDDHR1-A30.84mALT.
EST. TOTAL +
NDDHR1-A31.95m1003.5-1.51003.5-1.51003.5-1.51003.5-1.51003.5-1.51003.5-1.51003.5-1.51003.5-1.51003.5-1.52.7PESO
ESPECIFICOg1000.00Kg/m3PESO ESPECIFICOg1000.00Kg/m3PESO
ESPECIFICOg1000.00Kg/m31253.5-1.51253.5-1.51253.5-1.51253.5-1.51253.5-1.51253.5-1.51253.5-1.51253.5-1.51253.5-1.52.8EFICIENCIA
BOMBAe75%EFICIENCIA BOMBAe75%EFICIENCIA
BOMBAe75%1503.5-1.51503.5-1.51503.5-1.51503.5-1.51503.5-1.51503.5-1.51503.5-1.51503.5-1.51503.5-1.52.9COSTO
DE Kw-Hr0.045$ / Kw-hrCOSTO DE Kw-Hr0.045$ / Kw-hrCOSTO DE
Kw-Hr0.045$ /
Kw-hr2003.5-1.52003.5-1.52003.5-1.52003.5-1.52003.5-1.52003.5-1.52003.5-1.52003.5-1.52003.5-1.53.0TASA
DE COSTO OPORT.i12%TASA DE COSTO OPORT.i12%TASA DE COSTO
OPORT.i12%2503.5-1.52503.5-1.52503.5-1.52503.5-1.52503.5-1.52503.5-1.52503.5-1.52503.5-1.52503.5-1.53.1PERIODO
DE DISEOn15aosPERIODO DE DISEOn15aosPERIODO DE
DISEOn15aos3003.5-1.53003.5-1.53003.5-1.53003.5-1.53003.5-1.53003.5-1.53003.5-1.53003.5-1.53003.5-1.53.2NIVEL
DINAM. DISEONDD10mNIVEL DINAM. DISEONDD10mNIVEL DINAM.
DISEONDD10m3505.0-2.03505.0-2.03505.0-2.03505.0-2.03505.0-2.03505.0-2.03505.0-2.03505.0-2.03505.0-2.04005.0-2.04005.0-2.04005.0-2.04005.0-2.04005.0-2.04005.0-2.04005.0-2.04005.0-2.04005.0-2.04505.0-2.04505.0-2.04505.0-2.04505.0-2.04505.0-2.04505.0-2.04505.0-2.04505.0-2.04505.0-2.0TRAMO
PP-8 - CTRAMO PP-7 - DTRAMO
A-B5005.0-2.05005.0-2.05005.0-2.05005.0-2.05005.0-2.05005.0-2.05005.0-2.05005.0-2.05005.0-2.00.1CAUDAL
DE BOMBEOQ126.79l/sCAUDAL DE BOMBEOQ116l/sCAUDAL DE
BOMBEOQ353.58l/s6005.0-2.06005.0-2.06005.0-2.06005.0-2.06005.0-2.06005.0-2.06005.0-2.06005.0-2.06005.0-2.00.2HORAS
DE BOMBEO18HorasHORAS DE BOMBEO18HorasHORAS DE
BOMBEO18Horas7006.0-2.57006.0-2.57006.0-2.57006.0-2.57006.0-2.57006.0-2.57006.0-2.57006.0-2.57006.0-2.50.3MATERIALHDMATERIALHDMATERIALHD0.4COEF.
HAZENC130COEF. HAZENC130COEF. HAZENC1300.5DIFERENCIA
C.T.H1-1.17mDIFERENCIA C.T.H1-1.11mDIFERENCIA
C.T.H38.13m0.6LONGITUDL126mLONGITUDL116mLONGITUDL3375m0.7PENDIENTES1-44.85m/KmPENDIENTES1-69.44m/KmPENDIENTES321.67m/Km0.8DIAMETROD1198.0mmDIAMETROD1153.0mmDIAMETROD3280.0mm0.9VELOCIDADV10.87m/sVELOCIDADV10.87m/sVELOCIDADV30.87m/s1.0ALTURA
DE SUCC. (ND)Hs22.02mALTURA DE SUCC. (ND)Hs17.73mALT. EST.
TOTALHA-R38.13m1.1PRESION DE LLEGADAPs3.50mPRESION DE
LLEGADAPs3.50mALT. DE INGRESO TUB. R1Hi30.00m1.2VELOCIDAD
SUCC.Vs0.85m/sVELOCIDAD SUCC.Vs0.85m/s1.3DIAMETRO
SUCC.Ds200mmDIAMETRO SUCC.Ds200mm1.4LONG. SUCC.Ls27.02mLONG.
SUCC.Ls22.73m1.5MATERIALHDMATERIALHD2422541.6ALT. EST. TOTAL +
NDDHR1-A30.85mALT. EST. TOTAL + NDDHR1-A26.62m1.7PESO
ESPECIFICOg1000.00Kg/m3PESO
ESPECIFICOg1000.00Kg/m32472561.8EFICIENCIA BOMBAe75%EFICIENCIA
BOMBAe75%1.9COSTO DE Kw-Hr0.045$ / Kw-hrCOSTO DE Kw-Hr0.045$ /
Kw-hr2392533402.0TASA DE COSTO OPORT.i12%TASA DE COSTO
OPORT.i12%2.1PERIODO DE DISEOn15aosPERIODO DE DISEOn15aos3.2NIVEL
DINAM. DISEONDD10mNIVEL DINAM. DISEONDD10m236248257TRAMO B-CTRAMO
C-DTRAMO D - RP-06CAUDAL DE BOMBEOQ380.37l/sCAUDAL DE
BOMBEOQ3107.16l/sCAUDAL DE BOMBEOQ3123.16l/sHORAS DE
BOMBEO18HorasHORAS DE BOMBEO18HorasHORAS DE
BOMBEO18HorasMATERIALHDMATERIALHDMATERIALHDCOEF. HAZENC130COEF.
HAZENC130COEF. HAZENC130DIFERENCIA C.T.H35.99mDIFERENCIA
C.T.H32.80mDIFERENCIA
C.T.H384.31mLONGITUDL3375mLONGITUDL3370mLONGITUDL34310mPENDIENTES315.98m/KmPENDIENTES37.58m/KmPENDIENTES319.56m/KmDIAMETROD3343.0mmDIAMETROD3396.0mmDIAMETROD3424.6mmVELOCIDADV30.87m/sVELOCIDADV30.87m/sVELOCIDADV30.87m/sALT.
EST. TOTALHA-R35.99mALT. EST. TOTALHA-R32.80mALT. EST.
TOTALHA-R384.31mALT. DE INGRESO TUB. R1Hi30.00mALT. DE INGRESO TUB.
R1Hi30.00mALT. DE INGRESO TUB. R1Hi36.30mCriterio de Seleccin:
Velocidad recomendable lnea de impulsin: 0.9 < V < 1.2
m/s2RESULTADOS TCNICOS :TRAMO PP-11 -
A8006.0-2.58006.0-2.58006.0-2.58006.0-2.58006.0-2.58006.0-2.58006.0-2.58006.0-2.58006.0-2.5NDIAMETRO
NOMINALDIAMETRO INTERNOVELOCIDADPENDIENTEPERD. LONG. + COL +
ECPERD. ACCES.PERD. TOTALALT. ESTAT.ALT. DINAMPOT. BOMBAPOT.
INST.9006.0-2.59006.0-2.59006.0-2.59006.0-2.59006.0-2.59006.0-2.59006.0-2.59006.0-2.59006.0-2.5(mm)(mm)(m/s)S
(m/Km)hf (m)hk (m)ht (m)H (m)HDT
(m)(HP)(HP)10006.0-2.510006.0-2.510006.0-2.510006.0-2.510006.0-2.510006.0-2.510006.0-2.510006.0-2.510006.0-2.513002790.441.780.400.20.6036.4940.5919.0820.9911006.0-2.511006.0-2.511006.0-2.511006.0-2.511006.0-2.511006.0-2.511006.0-2.511006.0-2.511006.0-2.522502300.653.760.840.431.2736.4941.2619.3921.3312006.0-2.512006.0-2.512006.0-2.512006.0-2.512006.0-2.512006.0-2.512006.0-2.512006.0-2.512006.0-2.532001801.0510.562.441.133.5736.4943.5620.4722.5214009.0-3.014009.0-3.014009.0-3.014009.0-3.014009.0-3.014009.0-3.014009.0-3.014009.0-3.014009.0-3.041501311.9944.6711.064.0415.1036.4955.0925.8928.4815009.0-3.015009.0-3.015009.0-3.015009.0-3.015009.0-3.015009.0-3.015009.0-3.015009.0-3.015009.0-3.05100815.20416.42113.1627.59140.7536.49180.7484.9593.4516009.0-3.016009.0-3.016009.0-3.016009.0-3.016009.0-3.016009.0-3.016009.0-3.016009.0-3.016009.0-3.0318009.0-3.018009.0-3.018009.0-3.018009.0-3.018009.0-3.018009.0-3.018009.0-3.018009.0-3.018009.0-3.0RESULTADOS
ECONOMICOS :TRAMO PP-11 -
A20009.0-3.020009.0-3.020009.0-3.020009.0-3.020009.0-3.020009.0-3.020009.0-3.020009.0-3.020009.0-3.0NDIAMETRO
NOMINALDIAMETRO INTERNOCOSTO TUBERIACOSTO EQUIP.COSTO ENERGIA
FUNC.COSTO OPERAC.COSTO MANTEN.COSTO
TOTALFORMULAS(mm)(mm)($)($)($)($)($)($)POTENCIA BOMBAPOT. BOMBA = g
HDT x Qb /76 e3. TOTALES3. TOTALES3. TOTALES3. TOTALES3. TOTALES3.
TOTALES3. TOTALES3. TOTALES3.
TOTALES130027919593.4935900.394629.0131527.566305.5197955.96POTENCIA
INSTALADAPOT. INST. = 1.1 POT.
BOMBA225023014536.0436220.034704.2232039.806407.9693908.05COSTO DE
TUBERIACT = 1.45*D1.54*LNDIAMETRO NOMINAL (mm)FIERRO
FUNDIDOREVESTIMIENTOESPESOR TOTAL (mm)DIAMETRO INTERNO
(mm)NDIAMETRO NOMINAL (mm)FIERRO FUNDIDOREVESTIMIENTOESPESOR TOTAL
(mm)DIAMETRO INTERNO (mm)NDIAMETRO NOMINAL (mm)FIERRO
FUNDIDOREVESTIMIENTOESPESOR TOTAL (mm)DIAMETRO INTERNO
(mm)NDIAMETRO NOMINAL (mm)FIERRO FUNDIDOREVESTIMIENTOESPESOR TOTAL
(mm)DIAMETRO INTERNO (mm)NDIAMETRO NOMINAL (mm)FIERRO
FUNDIDOREVESTIMIENTOESPESOR TOTAL (mm)DIAMETRO INTERNO
(mm)NDIAMETRO NOMINAL (mm)FIERRO FUNDIDOREVESTIMIENTOESPESOR TOTAL
(mm)DIAMETRO INTERNO (mm)NDIAMETRO NOMINAL (mm)FIERRO
FUNDIDOREVESTIMIENTOESPESOR TOTAL (mm)DIAMETRO INTERNO
(mm)NDIAMETRO NOMINAL (mm)FIERRO FUNDIDOREVESTIMIENTOESPESOR TOTAL
(mm)DIAMETRO INTERNO (mm)NDIAMETRO NOMINAL (mm)FIERRO
FUNDIDOREVESTIMIENTOESPESOR TOTAL (mm)DIAMETRO INTERNO
(mm)320020011760.5337316.074966.2333824.326764.8694632.01COSTO DE
EQUIPAMIENTOCEq = 6730*POTinst.0.55e fierro fundido(mm)e mnimo ff
(mm)e cemento(mm)e fierro fundido(mm)e mnimo ff (mm)e cemento(mm)e
fierro fundido(mm)e mnimo ff (mm)e cemento(mm)e fierro fundido(mm)e
mnimo ff (mm)e cemento(mm)e fierro fundido(mm)e mnimo ff (mm)e
cemento(mm)e fierro fundido(mm)e mnimo ff (mm)e cemento(mm)e fierro
fundido(mm)e mnimo ff (mm)e cemento(mm)e fierro fundido(mm)e mnimo
ff (mm)e cemento(mm)e fierro fundido(mm)e mnimo ff (mm)e
cemento(mm)41501316129.6942462.326281.1842780.278556.05106209.51COSTO
ENERG. FUNC.CE = POT. INST.*
0.746*Hb*365*CKw-h13007.206.003.5010.70278.6013007.206.003.5010.70278.6013007.206.003.5010.70278.6013007.206.003.5010.70278.6012506.756.003.5010.25229.5014008.106.005.0013.10373.8014508.556.005.0013.55422.9015009.006.005.0014.00472.0015009.006.005.0014.00472.005100812923.5381624.5720609.75140370.2128074.04273602.10COSTO
DE OPERACINCO =CE * ( (1+i) n - 1) /(
i*(1+i)n)22506.756.003.5010.25229.5022506.756.003.5010.25229.5022506.756.003.5010.25229.5022506.756.003.5010.25229.5022006.306.003.509.80180.4023507.656.005.0012.65324.7024008.106.005.0013.10373.8024508.556.005.0013.55422.9024508.556.005.0013.55422.90COSTO
DE MANTENIMIENTOCM = 20 %
CO32006.306.003.509.80180.4032006.306.003.509.80180.4032006.306.003.509.80180.4032006.306.003.509.80180.4031505.856.003.509.50131.0033007.206.003.5010.70278.6033507.656.005.0012.65324.7034008.106.005.0013.10373.8034008.106.005.0013.10373.8041505.856.003.509.50131.0041505.856.003.509.50131.0041505.856.003.509.50131.0041505.856.003.509.50131.0041005.406.003.509.5081.0042506.756.003.5010.25229.5043007.206.003.5010.70278.6043507.656.005.0012.65324.7043507.656.005.0012.65324.703RESULTADOS
TCNICOS :TRAMO PP-10 -
A51005.406.003.509.5081.0051005.406.003.509.5081.0051005.406.003.509.5081.0051005.406.003.509.5081.005805.226.003.509.5061.0052006.306.003.509.80180.4052506.756.003.5010.25229.5053007.206.003.5010.70278.6053007.206.003.5010.70278.60NDIAMETRO
NOMINALDIAMETRO INTERNOVELOCIDADPENDIENTEPERD. LONG. + COL +
ECPERD. ACCES.PERD. TOTALALT. ESTAT.ALT. DINAMPOT. BOMBAPOT.
INST.(mm)(mm)(m/s)S (m/Km)hf (m)hk (m)ht (m)H (m)HDT
(m)(HP)(HP)13002790.4413.460.150.20.3530.8434.6916.3017.9322502300.6523.850.190.430.6230.8434.9616.4318.0732001801.0556.920.351.131.4830.8435.8216.8418.5241501311.99199.621.154.045.1930.8439.5318.5820.445100815.201449.2310.0927.5937.6830.8472.0233.8537.243RESULTADOS
ECONOMICOS :TRAMO PP-10 - ANDIAMETRO NOMINALDIAMETRO INTERNOCOSTO
TUBERIACOSTO EQUIP.COSTO ENERGIA FUNC.COSTO OPERAC.COSTO
MANTEN.COSTO
TOTAL(mm)(mm)($)($)($)($)($)($)13002791507.1932921.853954.5526933.905386.7870704.2722502301118.1633066.003986.0927148.725429.7470748.713200200904.6633517.314085.5627826.205565.2471898.974150131471.5135379.874507.7030701.336140.2777200.68510081224.8949208.298212.3655933.2711186.65124765.464RESULTADOS
TCNICOS :TRAMO PP-9 - BNDIAMETRO NOMINALDIAMETRO
INTERNOVELOCIDADPENDIENTEPERD. LONG. + COL + ECPERD. ACCES.PERD.
TOTALALT. ESTAT.ALT. DINAMPOT. BOMBAPOT. INST.(mm)(mm)(m/s)S
(m/Km)hf (m)hk (m)ht (m)H (m)HDT
(m)(HP)(HP)13002790.4421.250.140.20.3431.9535.7916.8218.5022502300.6537.500.170.430.6031.9536.0516.9418.6332001801.0588.750.291.131.4231.9536.8717.3319.0641501311.99304.380.834.044.8731.9540.3218.9520.855100815.202148.756.7927.5934.3831.9569.8332.8236.103RESULTADOS
ECONOMICOS :TRAMO PP-9 - BNDIAMETRO NOMINALDIAMETRO INTERNOCOSTO
TUBERIACOSTO EQUIP.COSTO ENERGIA FUNC.COSTO OPERAC.COSTO
MANTEN.COSTO
TOTAL(mm)(mm)($)($)($)($)($)($)1300279927.5033495.414080.7127793.165558.6371855.412250230688.1033626.644109.8227991.435598.2972014.283200200556.7134050.254204.4428635.875727.1773174.444150131290.1635765.654597.4731312.756262.5578228.58510081138.3948379.047962.4754231.3010846.26121557.465RESULTADOS
TCNICOS :TRAMO PP-8 - CNDIAMETRO NOMINALDIAMETRO
INTERNOVELOCIDADPENDIENTEPERD. LONG. + COL + ECPERD. ACCES.PERD.
TOTALALT. ESTAT.ALT. DINAMPOT. BOMBAPOT. INST.(mm)(mm)(m/s)S
(m/Km)hf (m)hk (m)ht (m)H (m)HDT
(m)(HP)(HP)13002790.4413.080.140.20.3430.8534.6916.3017.9322502300.6523.460.180.430.6130.8534.9616.4318.0732001801.0556.540.341.131.4730.8535.8216.8418.5241501311.99199.231.144.045.1830.8539.5318.5820.445100815.201448.8510.0827.5937.6730.8572.0233.8537.243RESULTADOS
ECONOMICOS :TRAMO PP-8 - CNDIAMETRO NOMINALDIAMETRO INTERNOCOSTO
TUBERIACOSTO EQUIP.COSTO ENERGIA FUNC.COSTO OPERAC.COSTO
MANTEN.COSTO
TOTAL(mm)(mm)($)($)($)($)($)($)13002791507.1932921.853954.5526933.905386.7870704.2722502301118.1633066.003986.0927148.725429.7470748.713200200904.6633517.314085.5627826.205565.2471898.974150131471.5135379.874507.7030701.336140.2777200.68510081224.8949208.298212.3655933.2711186.65124765.466RESULTADOS
TCNICOS :TRAMO PP-7 - DNDIAMETRO NOMINALDIAMETRO
INTERNOVELOCIDADPENDIENTEPERD. LONG. + COL + ECPERD. ACCES.PERD.
TOTALALT. ESTAT.ALT. DINAMPOT. BOMBAPOT. INST.(mm)(mm)(m/s)S
(m/Km)hf (m)hk (m)ht (m)H (m)HDT
(m)(HP)(HP)12502300.3913.750.060.160.2226.6230.348.529.3722001800.6331.880.100.410.5126.6230.638.609.4631501311.19110.000.311.451.7626.6231.888.959.854100813.10773.752.579.8112.3826.6242.5011.9313.12580615.472512.509.6730.5340.2026.6270.3219.7421.713RESULTADOS
ECONOMICOS :TRAMO PP-7 - DNDIAMETRO NOMINALDIAMETRO INTERNOCOSTO
TUBERIACOSTO EQUIP.COSTO ENERGIA FUNC.COSTO OPERAC.COSTO
MANTEN.COSTO
TOTAL(mm)(mm)($)($)($)($)($)($)1250230688.1023042.142067.0414078.332815.6742691.282200180474.9523160.892086.4514210.532842.1142774.933150150357.4623674.662171.3614788.842957.7743950.09410081138.3927728.942894.3419712.963942.5954417.225806189.4236578.174789.1332618.126523.6280598.467RESULTADOS
TCNICOS (A-B)NDIAMETRO NOMINALDIAMETRO
INTERNOVELOCIDADPENDIENTEPERD. LONG. + ECPERD. ACCES.PERD.
TOTALALT. ESTAT.ALT. DINAMPOT. BOMBAPOT. INST.(mm)(mm)(m/s)S
(m/Km)hf (m)hk (m)ht (m)H (m)HDT
(m)(HP)(HP)14003740.491.390.270.250.528.138.658.138.94323503250.652.590.540.430.978.139.108.559.40533002790.885.121.130.791.928.1310.059.4510.39542502301.3012.292.891.724.618.1312.7411.9813.17852001802.1036.729.274.5013.778.1321.9020.5922.6494RESULTADOS
ECONOMICOS (A-B)NDIAMETRO NOMINALDIAMETRO INTERNOCOSTO TUBERIACOSTO
EQUIP.COSTO ENERGIA FUNC.COSTO OPERAC.COSTO MANTEN.COSTO
TOTAL(mm)(mm)($)($)($)($)($)($)140037434183.7622455.921972.4213433.892686.7874732.77235032527519.3423086.732074.3214127.912825.5869633.88330030024362.5124393.192292.6715615.063123.0169786.44425023016127.2627792.802906.4719795.573959.1170581.21520018011131.6537436.224995.3534022.656804.5394390.408RESULTADOS
TCNICOS (B-C)NDIAMETRO NOMINALDIAMETRO
INTERNOVELOCIDADPENDIENTEPERD. LONG. + ECPERD. ACCES.PERD.
TOTALALT. ESTAT.ALT. DINAMPOT. BOMBAPOT. INST.(mm)(mm)(m/s)S
(m/Km)hf (m)hk (m)ht (m)H (m)HDT
(m)(HP)(HP)14504230.571.730.320.330.655.996.649.3610.29624003740.732.990.580.541.125.997.1110.0311.03333503250.975.601.140.962.105.998.0911.4112.55143002791.3211.152.401.784.185.9910.1714.3415.77452502301.9426.566.123.849.965.9915.9522.4924.7393RESULTADOS
ECONOMICOS (B-C)NDIAMETRO NOMINALDIAMETRO INTERNOCOSTO TUBERIACOSTO
EQUIP.COSTO ENERGIA FUNC.COSTO OPERAC.COSTO MANTEN.COSTO
TOTAL(mm)(mm)($)($)($)($)($)($)145042341339.1324265.142270.8315466.323093.2686434.68240037434183.7625205.572433.3816573.423314.6881710.81335035030890.1627057.532768.1818853.703770.7483340.31430027921738.3330681.963479.0323695.204739.0484333.56525023016127.2639298.435456.3137162.197432.44105476.639RESULTADOS
TCNICOS (C-D)NDIAMETRO NOMINALDIAMETRO
INTERNOVELOCIDADPENDIENTEPERD. LONG. + ECPERD. ACCES.PERD.
TOTALALT. ESTAT.ALT. DINAMPOT. BOMBAPOT. INST.(mm)(mm)(m/s)S
(m/Km)hf (m)hk (m)ht (m)H (m)HDT
(m)(HP)(HP)15004720.611.890.320.380.702.803.506.587.23824504230.763.050.540.591.132.803.937.398.12934003740.985.300.980.981.962.804.768.959.84543503251.299.781.921.73.622.806.4212.0713.27753002791.7619.434.033.167.192.809.9918.7820.6583RESULTADOS
ECONOMICOS (C-D)NDIAMETRO NOMINALDIAMETRO INTERNOCOSTO TUBERIACOSTO
EQUIP.COSTO ENERGIA FUNC.COSTO OPERAC.COSTO MANTEN.COSTO
TOTAL(mm)(mm)($)($)($)($)($)($)150047248305.4919989.651596.3810872.732174.5582938.80245042340787.9521307.651792.8912211.132442.2378541.85340040037436.7523674.662171.3614788.842957.7781029.38435032527152.4227907.442928.3119944.323988.8681921.35530027921448.4935588.824556.2231031.806206.3698831.6910RESULTADOS
TCNICOS (D - RP-06)NDIAMETRO NOMINALDIAMETRO
INTERNOVELOCIDADPENDIENTEPERD. LONG. + ECPERD. ACCES.PERD.
TOTALALT. ESTAT.ALT. DINAMPOT. BOMBAPOT. INST.(mm)(mm)(m/s)S
(m/Km)hf (m)hk (m)ht (m)H (m)HDT
(m)(HP)(HP)15004720.701.164.510.55.0184.3195.62206.61227.27124504230.881.977.690.798.4884.3199.09214.10235.5134003741.123.5514.011.2815.2984.31105.90228.82251.70243503251.496.9827.812.2730.0884.31120.69260.78286.85853002792.0214.5658.604.1662.7684.31153.37331.39364.5293RESULTADOS
ECONOMICOS (D - RP-06)NDIAMETRO NOMINALDIAMETRO INTERNOCOSTO
TUBERIACOSTO EQUIP.COSTO ENERGIA FUNC.COSTO OPERAC.COSTO
MANTEN.COSTO
TOTAL(mm)(mm)($)($)($)($)($)($)1500472562693.67133080.4550125.73341399.5568279.911155579.312450423475124.45135712.6151942.88353775.9270755.181087311.043400400436087.60140767.6155514.11378099.0875619.821086088.224350325316288.99151262.7263267.94430909.3786181.871047910.895300279249845.92172570.9680398.66547584.38109516.881159916.8011RESUMEN
DE CARGA DINAMICA TOTALNDIAMETRO NOMINALDIAMETRO
INTERNOVELOCIDADALT. DINAM TOTAL P11ALT. DINAM TOTAL P10ALT. DINAM
TOTAL P9ALT. DINAM TOTAL P8ALT. DINAM TOTAL P7POT. BOMBA P11POT.
INST. P11POT. BOMBA P10POT. INST. P10POT. BOMBA P09POT. INST.
P09POT. BOMBA P4POT. INST. P4POT. BOMBA P5POT. INST.
P5(mm)(mm)(m/s)HDT (m)HDT (m)HDT (m)HDT (m)HDT
(m)(HP)(HP)(HP)(HP)(HP)(HP)(HP)(HP)(HP)(HP)15004720.70164.77157.03145.34136.20127.5077.4485.1873.8081.1868.3175.1464.0170.4121.7423.9124504230.88168.24160.50148.81139.67130.9779.0786.9875.4482.9869.9476.9365.6472.2022.2024.4234003741.12175.05167.31155.62146.48137.7882.2790.5078.6486.5073.1480.4568.8575.7423.0925.4043503251.49189.84182.10170.41161.27152.5789.2298.1485.5994.1580.0988.1075.8083.3825.0427.5453002792.02222.52214.78203.09193.95185.25104.58115.04100.95111.0595.45105.0091.16100.2829.3632.3013RESULTADOS
ECONOMICOS FINALNDIAMETRO NOMINALDIAMETRO INTERNOCOSTO TUBERIACOSTO
EQUIP.COSTO ENERGIA FUNC.COSTO OPERAC.COSTO MANTEN.COSTO TOTALPOT.
BOMBA P08POT. INST. P08POT. BOMBA P07POT. INST.
P07(mm)(mm)($)($)($)($)($)($)(HP)(HP)(HP)(HP)1500472661631.86333951.1574068.96504473.65100894.731675020.3564.0170.4121.7423.912450423574062.64338128.5575764.80516023.79103204.761607184.5465.6472.2022.2024.423400374535025.79346191.2779088.56538661.46107732.291606699.3768.8575.7423.0925.404350325415227.18363195.8086306.22587819.97117563.991570113.1675.8083.3825.0427.545300279348784.11398648.69102260.27696480.84139296.171685470.0891.16100.2829.3632.30
&L&"Times New Roman,Cursiva"&9INFORME
FINAL&R&"Times New Roman,Cursiva"&9Anteproyecto
Ampliacin y Mejoramiento del Sistema de Agua Potable
yAlcantarillado del Esquema Cieneguilla&L&"Times New
Roman,Cursiva"&9Consorcio
CRVPP-11PP-10PP-9PP-7RP-06ABDPP-8C
Pozos_RE-01MARS-2000MARS-2000MARS-2000ANALISIS DE COSTOS DE LA
ALTERNATIVAPP-3 Y PE-773 A RE-01 CIENEGUILLADIMENSIONES DE
ESPESORORES DE FIERRO FUNDIDO, REVESTIMIENTO Y DIAMETRO
INTERNODIMENSIONES DE ESPESORORES DE FIERRO FUNDIDO, REVESTIMIENTO
Y DIAMETRO INTERNODIMENSIONES DE ESPESORORES DE FIERRO FUNDIDO,
REVESTIMIENTO Y DIAMETRO INTERNOPRIMERA ALTERNATIVATRAMO R1-ATRAMO
A-R2TRAMO A-R31DATOS GENERALES1. ESPESOR NOMINAL DE HIERRO FUNDIDO
(ISO-2531)1. ESPESOR NOMINAL DE HIERRO FUNDIDO (ISO-2531)1. ESPESOR
NOMINAL DE HIERRO FUNDIDO (ISO-2531)TRAMO: PP-3 - ATRAMO: PE-773 -
ATRAMO: A - RE-011.1CAUDAL DE BOMBEOQ113.31l/sCAUDAL DE
BOMBEOQ213.31l/sCAUDAL DE BOMBEOQ326.62l/se fierro fundido = K (
0.5 + 0.001 DN )e fierro fundido = K ( 0.5 + 0.001 DN )e fierro
fundido = K ( 0.5 + 0.001 DN )1.2HORAS DE BOMBEO18HorasHORAS DE
BOMBEO18HorasHORAS DE
BOMBEO18Horas1.3MATERIALHDMATERIALHDMATERIALHDDonde :Donde :Donde
:1.4COEF. HAZENC130COEF. HAZENC130COEF. HAZENC130e fierro
fundido=espesor nominal de la pared en mme fierro fundido=espesor
nominal de la pared en mme fierro fundido=espesor nominal de la
pared en mm1.5DIFERENCIA C.T.H11.75mDIFERENCIA
C.T.H2-0.76mDIFERENCIA C.T.H363.16mDN=dimetro nominal150DN=dimetro
nominal150DN=dimetro
nominal2001.6LONGITUDL1290mLONGITUDL2220mLONGITUDL3560mK=Clase de
espesor, tomada en la serie de nmeros enteros : 8, 9, 10,
11,12...9K=Clase de espesor, tomada en la serie de nmeros enteros :
8, 9, 10, 11,12...9K=Clase de espesor, tomada en la serie de nmeros
enteros : 8, 9, 10,
11,12...91.7PENDIENTES16.03m/KmPENDIENTES2-3.46m/KmPENDIENTES3112.78m/Km1.8DIAMETROD1139.6mmDIAMETROD2139.6mmDIAMETROD3197.4mm1.9VELOCIDADV10.87m/sVELOCIDADV20.87m/sVELOCIDADV30.87m/se
mnimo=6.00mme mnimo=6.00mme mnimo=6.00mm2.0ALTURA DE SUCC.
(ND)Hs32.66mALTURA DE SUCC. (ND)Hs35.32mALT. EST.
TOTALHA-R363.16m2.1PRESION DE LLEGADAPs3.50mPRESION DE
LLEGADAPs3.50mALT. DE INGRESO TUB. R1Hi36.30m2. ESPESOR DE CEMENTO
DE LOS TUBOS (ISO-4179)2. ESPESOR DE CEMENTO DE LOS TUBOS
(ISO-4179)2. ESPESOR DE CEMENTO DE LOS TUBOS (ISO-4179)2.2VELOCIDAD
SUCC.Vs0.42m/sVELOCIDAD SUCC.Vs0.42m/s2.3DIAMETRO
SUCC.Ds200mmDIAMETRO SUCC.Ds200mmDNVALOR NOMINAL(mm)TOLERANCIA
(mm)DNVALOR NOMINAL(mm)TOLERANCIA (mm)DNVALOR NOMINAL(mm)TOLERANCIA
(mm)2.4LONG. SUCC.Ls37.66mLONG.
SUCC.Ls40.32m603.5-1.5603.5-1.5603.5-1.52.5MATERIALHDMATERIALHD429803.5-1.5803.5-1.5803.5-1.52.6ALT.
EST. TOTAL + NDDHR1-A44.41mALT. EST. TOTAL +
NDDHR1-A44.56mRE-011003.5-1.51003.5-1.51003.5-1.52.7PESO
ESPECIFICOg1000.00Kg/m3PESO
ESPECIFICOg1000.00Kg/m31253.5-1.51253.5-1.51253.5-1.52.8EFICIENCIA
BOMBAe75%EFICIENCIA BOMBAe75%DN
2001503.5-1.51503.5-1.51503.5-1.52.9COSTO DE Kw-Hr0.045$ /
Kw-hrCOSTO DE Kw-Hr0.045$ /
Kw-hr2003.5-1.52003.5-1.52003.5-1.53.0TASA DE COSTO OPORT.i12%TASA
DE COSTO OPORT.i12%3662503.5-1.52503.5-1.52503.5-1.53.1PERIODO DE
DISEOn15aosPERIODO DE DISEOn15aosADN
1503003.5-1.53003.5-1.53003.5-1.53.2NIVEL DINAM. DISEONDD10mNIVEL
DINAM. DISEONDD10m3673505.0-2.03505.0-2.03505.0-2.0DN
150PE-7734005.0-2.04005.0-2.04005.0-2.04505.0-2.04505.0-2.04505.0-2.0Criterio
de Seleccin: Velocidad recomendable lnea de impulsin: 0.9 < V
< 1.2
m/s5005.0-2.05005.0-2.05005.0-2.0364PP-36005.0-2.06005.0-2.06005.0-2.02RESULTADOS
TCNICOSTRAMO: PP-3 -
A7006.0-2.57006.0-2.57006.0-2.58006.0-2.58006.0-2.58006.0-2.5NDIAMETRO
NOMINALDIAMETRO INTERNOVELOCIDADPENDIENTEPERD. LONG. + COL +
ECPERD. ACCES.PERD. TOTALALT. ESTAT.ALT. DINAMPOT. BOMBAPOT.
INST.9006.0-2.59006.0-2.59006.0-2.5(mm)(mm)(m/s)S (m/Km)hf (m)hk
(m)ht (m)H (m)HDT
(m)(HP)(HP)10006.0-2.510006.0-2.510006.0-2.512502300.321.070.210.10.3144.4148.2211.2612.38611006.0-2.511006.0-2.511006.0-2.522001800.522.970.580.280.8644.4148.7711.3912.52912006.0-2.512006.0-2.512006.0-2.531501310.9912.482.6213.6244.4151.5312.0313.23314009.0-3.014009.0-3.014009.0-3.04100812.58115.2826.646.7933.4344.4181.3418.9920.88915009.0-3.015009.0-3.015009.0-3.0580614.55437.00105.6021.13126.7344.41174.6440.7844.85816009.0-3.016009.0-3.016009.0-3.0318009.0-3.018009.0-3.018009.0-3.0RESULTADOS
ECONOMICOSTRAMO: PP-3 - A20009.0-3.020009.0-3.020009.0-3.0NDIAMETRO
NOMINALDIAMETRO INTERNOCOSTO TUBERIACOSTO EQUIP.COSTO ENERGIA
FUNC.COSTO OPERAC.COSTO MANTEN.COSTO
TOTALFORMULAS(mm)(mm)($)($)($)($)($)($)POTENCIA BOMBAPOT. BOMBA = g
HDT x Qb /76 e3. TOTALES3. TOTALES3.
TOTALES125023012471.7526861.312731.7918605.853721.1764391.87POTENCIA
INSTALADAPOT. INST. = 1.1 POT.
BOMBA22001808608.4827031.432763.3318820.673764.1360988.04COSTO DE
TUBERIACT = 1.45*D1.54*LNDIAMETRO NOMINAL (mm)FIERRO
FUNDIDOREVESTIMIENTOESPESOR TOTAL (mm)DIAMETRO INTERNO
(mm)NDIAMETRO NOMINAL (mm)FIERRO FUNDIDOREVESTIMIENTOESPESOR TOTAL
(mm)DIAMETRO INTERNO (mm)NDIAMETRO NOMINAL (mm)FIERRO
FUNDIDOREVESTIMIENTOESPESOR TOTAL (mm)DIAMETRO INTERNO
(mm)31501506478.9227856.542918.6019878.193975.6461107.89COSTO DE
EQUIPAMIENTOCEq = 6730*POTinst.0.55e fierro fundido(mm)e mnimo ff
(mm)e cemento(mm)e fierro fundido(mm)e mnimo ff (mm)e cemento(mm)e
fierro fundido(mm)e mnimo ff (mm)e
cemento(mm)4100812508.3635807.154607.1731378.816275.7680577.25COSTO
ENERG. FUNC.CE = POT. INST.*
0.746*Hb*365*CKw-h12506.756.003.5010.25229.5012506.756.003.5010.25229.5013007.206.003.5010.70278.60580611620.8054516.389893.6567384.3113476.86146892.00COSTO
DE OPERACINCO =CE * ( (1+i) n - 1) /(
i*(1+i)n)22006.306.003.509.80180.4022006.306.003.509.80180.4022506.756.003.5010.25229.50COSTO
DE MANTENIMIENTOCM = 20 %
CO31505.856.003.509.50131.0031505.856.003.509.50131.0032006.306.003.509.80180.4041005.406.003.509.5081.0041005.406.003.509.5081.0041505.856.003.509.50131.003RESULTADOS
TCNICOSTRAMO: PE-773 -
A5805.226.003.509.5061.005805.226.003.509.5061.0051005.406.003.509.5081.00NDIAMETRO
NOMINALDIAMETRO INTERNOVELOCIDADPENDIENTEPERD. LONG. + COL +
ECPERD. ACCES.PERD. TOTALALT. ESTAT.ALT. DINAMPOT. BOMBAPOT.
INST.(mm)(mm)(m/s)S (m/Km)hf (m)hk (m)ht (m)H (m)HDT
(m)(HP)(HP)12502300.321.230.170.10.2744.5648.3311.2912.4222001800.523.320.450.280.7344.5648.7911.3912.5331501310.9913.682.0113.0144.5651.0711.9313.124100812.58123.1420.306.7927.0944.5675.1517.5519.31580614.55461.4180.3821.13101.5144.56149.5734.9338.423RESULTADOS
ECONOMICOSTRAMO: PE-773 - ANDIAMETRO NOMINALDIAMETRO INTERNOCOSTO
TUBERIACOSTO EQUIP.COSTO ENERGIA FUNC.COSTO OPERAC.COSTO
MANTEN.COSTO
TOTAL(mm)(mm)($)($)($)($)($)($)12502309461.3326900.652739.0718655.433731.0961487.5722001806530.5727031.432763.3318820.673764.1358910.1331501504915.0427728.942894.3419712.963942.5959193.874100811902.8934287.314257.8128999.375799.8775247.25580611229.5750065.708474.3857717.8511543.57129031.074RESULTADOS
TCNICOSTRAMO: A - RE-01NDIAMETRO NOMINALDIAMETRO
INTERNOVELOCIDADPENDIENTEPERD. LONG. + ECPERD. ACCES.PERD.
TOTALALT. ESTAT.ALT. DINAMPOT. BOMBAPOT. INST.(mm)(mm)(m/s)S
(m/Km)hf (m)hk (m)ht (m)H (m)HDT
(m)(HP)(HP)13002790.441.180.460.20.6663.1670.1232.7536.02522502300.642.841.170.421.5963.1671.0533.1836.49832001801.048.683.761.14.8663.1674.3234.7138.18141501311.9838.9117.79421.7963.1691.2542.6246.8825100815.17377.61184.1927.27211.4663.16280.92131.19144.3093RESULTADOS
ECONOMICOSTRAMO: A - RE-01NDIAMETRO NOMINALDIAMETRO INTERNOCOSTO
TUBERIACOSTO EQUIP.COSTO ENERGIA FUNC.COSTO OPERAC.COSTO
MANTEN.COSTO
TOTAL(mm)(mm)($)($)($)($)($)($)130027932462.5848322.267945.4954115.6610823.13153669.12225023024083.3848670.198049.8154826.1710965.23146594.78320018016623.2749892.028421.0157354.3611470.87143761.53415013110155.7055855.8210340.0570424.6814084.94160861.195100814843.72103663.6431828.06216776.6043355.32400467.345RESUMEN
DE CARGA DINAMICA TOTALNDIAMETRO NOMINALDIAMETRO
INTERNOVELOCIDADALT. DINAM TOTAL PP-3ALT. DINAM TOTAL PE-773POT.
BOMBA PP-3POT. INST. PP-3POT. BOMBA PE-773POT. INST.
PE-773(mm)(mm)(m/s)HDT (m)HDT
(m)(HP)(HP)(HP)(HP)13002790.44121.65121.1928.4131.2528.3031.1322502300.64122.58122.1228.6231.4828.5231.3732001801.04125.85125.3929.3932.3329.2832.2141501311.98142.78142.3233.3436.6733.2336.555100815.17332.45331.9977.6385.3977.5285.27RESULTADOS
ECONOMICOS FINALNDIAMETRO NOMINALDIAMETRO INTERNOCOSTO TUBERIACOSTO
EQUIP.COSTO ENERGIA FUNC.COSTO OPERAC.COSTO MANTEN.COSTO
TOTAL(mm)(mm)($)($)($)($)($)($)130027943856.5489280.6113758.4393706.8018741.36259343.74225023035477.3489652.3113862.7694417.3818883.48252293.27320018028017.2390964.7614233.9596945.5019389.10249550.54415013121549.6697509.6516150.57109999.3421999.87267209.0951008116237.68155295.1837641.00256367.7551273.55516815.16
&L&"Times New Roman,Cursiva"&9INFORME
FINAL&R&"Times New Roman,Cursiva"&9Anteproyecto
Ampliacin y Mejoramiento del Sistema de Agua Potable
yAlcantarillado del Esquema Cieneguilla&L&"Times New
Roman,Cursiva"&9Consorcio CRV
Pozos_RP-04MARS-2000MARS-2000MARS-2000MARS-2000MARS-2000ANALISIS
DE COSTOS DE LA ALTERNATIVAPP-4, PP-5 Y PP-6 A RP-04
CIENEGUILLADIMENSIONES DE ESPESORORES DE FIERRO FUNDIDO,
REVESTIMIENTO Y DIAMETRO INTERNODIMENSIONES DE ESPESORORES DE
FIERRO FUNDIDO, REVESTIMIENTO Y DIAMETRO INTERNODIMENSIONES DE
ESPESORORES DE FIERRO FUNDIDO, REVESTIMIENTO Y DIAMETRO
INTERNODIMENSIONES DE ESPESORORES DE FIERRO FUNDIDO, REVESTIMIENTO
Y DIAMETRO INTERNODIMENSIONES DE ESPESORORES DE FIERRO FUNDIDO,
REVESTIMIENTO Y DIAMETRO INTERNOPRIMERA ALTERNATIVATRAMO P1-ATRAMO
P2-ATRAMO P3-BTRAMO A-BTRAMO B-R11DATOS GENERALES1. ESPESOR NOMINAL
DE HIERRO FUNDIDO (ISO-2531)1. ESPESOR NOMINAL DE HIERRO FUNDIDO
(ISO-2531)1. ESPESOR NOMINAL DE HIERRO FUNDIDO (ISO-2531)1. ESPESOR
NOMINAL DE HIERRO FUNDIDO (ISO-2531)1. ESPESOR NOMINAL DE HIERRO
FUNDIDO (ISO-2531)TRAMO: PP-4 - ATRAMO: PP-5 - ATRAMO: PP-6 -
B1.1CAUDAL DE BOMBEOQ118.1l/sCAUDAL DE BOMBEOQ218.1l/sCAUDAL DE
BOMBEOQ318.11l/se fierro fundido = K ( 0.5 + 0.001 DN )e fierro
fundido = K ( 0.5 + 0.001 DN )e fierro fundido = K ( 0.5 + 0.001 DN
)e fierro fundido = K ( 0.5 + 0.001 DN )e fierro fundido = K ( 0.5
+ 0.001 DN )1.2HORAS DE BOMBEO18HorasHORAS DE BOMBEO18HorasHORAS DE
BOMBEO18Horas1.3MATERIALHDMATERIALHDMATERIALHDDonde :Donde :Donde
:Donde :Donde :1.4COEF. HAZENC130COEF. HAZENC130COEF. HAZENC130e
fierro fundido=espesor nominal de la pared en mme fierro
fundido=espesor nominal de la pared en mme fierro fundido=espesor
nominal de la pared en mme fierro fundido=espesor nominal de la
pared en mme fierro fundido=espesor nominal de la pared en
mm1.5DIFERENCIA C.T.H1-13.53mDIFERENCIA C.T.H20.01mDIFERENCIA
C.T.H3-2.11mDN=dimetro nominal150DN=dimetro nominal150DN=dimetro
nominal150DN=dimetro nominal250DN=dimetro
nominal3001.6LONGITUDL12015mLONGITUDL236mLONGITUDL330mK=Clase de
espesor, tomada en la serie de nmeros enteros : 8, 9, 10,
11,12...9K=Clase de espesor, tomada en la serie de nmeros enteros :
8, 9, 10, 11,12...9K=Clase de espesor, tomada en la serie de nmeros
enteros : 8, 9, 10, 11,12...9K=Clase de espesor, tomada en la serie
de nmeros enteros : 8, 9, 10, 11,12...9K=Clase de espesor, tomada
en la serie de nmeros enteros : 8, 9, 10,
11,12...91.7PENDIENTES1-6.72m/KmPENDIENTES20.19m/KmPENDIENTES3-70.23m/Km1.8DIAMETROD1162.8mmDIAMETROD2162.8mmDIAMETROD3162.8mm1.9VELOCIDADV10.87m/sVELOCIDADV20.87m/sVELOCIDADV30.87m/se
mnimo=6.00mme mnimo=6.00mme mnimo=6.00mme mnimo=6.00mme
mnimo=6.00mm2.0ALTURA DE SUCC. (ND)Hs33.05mALTURA DE SUCC.
(ND)Hs24.26mALTURA DE SUCC. (ND)Hs40.58m2.1PRESION DE
LLEGADAPs3.50mPRESION DE LLEGADAPs3.50mPRESION DE LLEGADAPs3.50m2.
ESPESOR DE CEMENTO DE LOS TUBOS (ISO-4179)2. ESPESOR DE CEMENTO DE
LOS TUBOS (ISO-4179)2. ESPESOR DE CEMENTO DE LOS TUBOS (ISO-4179)2.
ESPESOR DE CEMENTO DE LOS TUBOS (ISO-4179)2. ESPESOR DE CEMENTO DE
LOS TUBOS (ISO-4179)2.2VELOCIDAD SUCC.Vs0.58m/sVELOCIDAD
SUCC.Vs0.58m/sVELOCIDAD SUCC.Vs0.58m/s2.3DIAMETRO
SUCC.Ds200mmDIAMETRO SUCC.Ds200mmDIAMETRO SUCC.Ds200mmDNVALOR
NOMINAL(mm)TOLERANCIA (mm)DNVALOR NOMINAL(mm)TOLERANCIA (mm)DNVALOR
NOMINAL(mm)TOLERANCIA (mm)DNVALOR NOMINAL(mm)TOLERANCIA (mm)DNVALOR
NOMINAL(mm)TOLERANCIA (mm)2.4LONG. SUCC.Ls38.05mLONG.
SUCC.Ls29.26mLONG.
SUCC.Ls45.58m603.5-1.5603.5-1.5603.5-1.5603.5-1.5603.5-1.52.5MATERIALHDMATERIALHDMATERIALHD803.5-1.5803.5-1.5803.5-1.5803.5-1.5803.5-1.52.6ALT.
EST. TOTAL + NDDHR1-A29.52mALT. EST. TOTAL + NDDHR1-A34.27mALT.
EST. TOTAL +
NDDHR1-A48.47m1003.5-1.51003.5-1.51003.5-1.51003.5-1.51003.5-1.52.7PESO
ESPECIFICOg1000.00Kg/m3PESO ESPECIFICOg1000.00Kg/m3PESO
ESPECIFICOg1000.00Kg/m31253.5-1.51253.5-1.51253.5-1.51253.5-1.51253.5-1.52.8EFICIENCIA
BOMBAe75%EFICIENCIA BOMBAe75%EFICIENCIA
BOMBAe75%1503.5-1.51503.5-1.51503.5-1.51503.5-1.51503.5-1.52.9COSTO
DE Kw-Hr0.045$ / Kw-hrCOSTO DE Kw-Hr0.045$ / Kw-hrCOSTO DE
Kw-Hr0.045$ /
Kw-hr2003.5-1.52003.5-1.52003.5-1.52003.5-1.52003.5-1.53.0TASA DE
COSTO OPORT.i12%TASA DE COSTO OPORT.i12%TASA DE COSTO
OPORT.i12%2503.5-1.52503.5-1.52503.5-1.52503.5-1.52503.5-1.53.1PERIODO
DE DISEOn15aosPERIODO DE DISEOn15aosPERIODO DE
DISEOn15aos3003.5-1.53003.5-1.53003.5-1.53003.5-1.53003.5-1.53.2NIVEL
DINAM. DISEONDD10mNIVEL DINAM. DISEONDD10mNIVEL DINAM.
DISEONDD10m3505.0-2.03505.0-2.03505.0-2.03505.0-2.03505.0-2.04005.0-2.04005.0-2.04005.0-2.04005.0-2.04005.0-2.04505.0-2.04505.0-2.04505.0-2.04505.0-2.04505.0-2.0TRAMO:
A - BTRAMO: B -
RP-045005.0-2.05005.0-2.05005.0-2.05005.0-2.05005.0-2.00.1CAUDAL DE
BOMBEOQ336.2l/sCAUDAL DE
BOMBEOQ354.3l/s3006005.0-2.06005.0-2.06005.0-2.06005.0-2.06005.0-2.00.2HORAS
DE BOMBEO18HorasHORAS DE
BOMBEO18HorasPP-67006.0-2.57006.0-2.57006.0-2.57006.0-2.57006.0-2.50.3MATERIALHDMATERIALHDDN
1500.4COEF. HAZENC130COEF. HAZENC130306BRP-040.5DIFERENCIA
C.T.H3-8.11mDIFERENCIA C.T.H341.80mDN 200DN
3000.6LONGITUDL3586mLONGITUDL3450mDN
150A2983400.7PENDIENTES3-13.85m/KmPENDIENTES392.88m/KmDN
1500.8DIAMETROD3230.2mmDIAMETROD3282.0mm0.9VELOCIDADV30.87m/sVELOCIDADV30.87m/sPP-4PP-51.0ALT.
EST. TOTALHA-R3-8.11mALT. EST. TOTALHA-R341.80m3203061.1ALT. DE
INGRESO TUB. RP-04Hi30.00mALT. DE INGRESO TUB.
RP-04Hi36.30mCriterio de Seleccin: Velocidad recomendable lnea de
impulsin: 0.9 < V < 1.2 m/s2RESULTADOS TCNICOSTRAMO: PP-4 -
A8006.0-2.58006.0-2.58006.0-2.58006.0-2.58006.0-2.5NDIAMETRO
NOMINALDIAMETRO INTERNOVELOCIDADPENDIENTEPERD. LONG. + COL +
ECPERD. ACCES.PERD. TOTALALT. ESTAT.ALT. DINAMPOT. BOMBAPOT.
INST.9006.0-2.59006.0-2.59006.0-2.59006.0-2.59006.0-2.5(mm)(mm)(m/s)S
(m/Km)hf (m)hk (m)ht (m)H (m)HDT
(m)(HP)(HP)10006.0-2.510006.0-2.510006.0-2.510006.0-2.510006.0-2.512502300.441.142.100.22.3029.5235.3211.2212.3411006.0-2.511006.0-2.511006.0-2.511006.0-2.511006.0-2.522001800.713.546.630.517.1429.5240.1612.7614.0412006.0-2.512006.0-2.512006.0-2.512006.0-2.512006.0-2.531501311.3416.3931.201.8333.0329.5266.0520.9923.0914009.0-3.014009.0-3.014009.0-3.014009.0-3.014009.0-3.04100813.51166.68323.2912.57335.8629.52368.88117.20128.9215009.0-3.015009.0-3.015009.0-3.015009.0-3.015009.0-3.0580616.20657.471285.5839.221324.8029.521357.82431.41474.5516009.0-3.016009.0-3.016009.0-3.016009.0-3.016009.0-3.0318009.0-3.018009.0-3.018009.0-3.018009.0-3.018009.0-3.0RESULTADOS
ECONOMICOSTRAMO: PP-4 -
A20009.0-3.020009.0-3.020009.0-3.020009.0-3.020009.0-3.0NDIAMETRO
NOMINALDIAMETRO INTERNOCOSTO TUBERIACOSTO EQUIP.COSTO ENERGIA
FUNC.COSTO OPERAC.COSTO MANTEN.COSTO
TOTALFORMULAS(mm)(mm)($)($)($)($)($)($)POTENCIA BOMBAPOT. BOMBA = g
HDT x Qb /76 e3. TOTALES3. TOTALES3. TOTALES3. TOTALES3.
TOTALES125023086657.1626808.782722.0918539.793707.96138435.78POTENCIA
INSTALADAPOT. INST. = 1.1 POT.
BOMBA220018059814.0728773.913095.7121084.464216.89116985.04COSTO DE
TUBERIACT = 1.45*D1.54*LNDIAMETRO NOMINAL (mm)FIERRO
FUNDIDOREVESTIMIENTOESPESOR TOTAL (mm)DIAMETRO INTERNO
(mm)NDIAMETRO NOMINAL (mm)FIERRO FUNDIDOREVESTIMIENTOESPESOR TOTAL
(mm)DIAMETRO INTERNO (mm)NDIAMETRO NOMINAL (mm)FIERRO
FUNDIDOREVESTIMIENTOESPESOR TOTAL (mm)DIAMETRO INTERNO
(mm)NDIAMETRO NOMINAL (mm)FIERRO FUNDIDOREVESTIMIENTOESPESOR TOTAL
(mm)DIAMETRO INTERNO (mm)NDIAMETRO NOMINAL (mm)FIERRO
FUNDIDOREVESTIMIENTOESPESOR TOTAL (mm)DIAMETRO INTERNO
(mm)315015045017.3237834.495092.3934683.586936.72129564.50COSTO DE
EQUIPAMIENTOCEq = 6730*POTinst.0.55e fierro fundido(mm)e mnimo ff
(mm)e cemento(mm)e fierro fundido(mm)e mnimo ff (mm)e cemento(mm)e
fierro fundido(mm)e mnimo ff (mm)e cemento(mm)e fierro fundido(mm)e
mnimo ff (mm)e cemento(mm)e fierro fundido(mm)e mnimo ff (mm)e
cemento(mm)41008117428.7497429.6728433.94193659.7138731.94375684.00COSTO
ENERG. FUNC.CE = POT. INST.*
0.746*Hb*365*CKw-h12506.756.003.5010.25229.5012506.756.003.5010.25229.5012506.756.003.5010.25229.5013507.656.005.0012.65324.7014008.106.005.0013.10373.805806111261.78199512.75104664.55712856.07142571.211170866.36COSTO
DE OPERACINCO =CE * ( (1+i) n - 1) /(
i*(1+i)n)22006.306.003.509.80180.4022006.306.003.509.80180.4022006.306.003.509.80180.4023007.206.003.5010.70278.6023507.656.005.0012.65324.70COSTO
DE MANTENIMIENTOCM = 20 %
CO31505.856.003.509.50131.0031505.856.003.509.50131.0031505.856.003.509.50131.0032506.756.003.5010.25229.5033007.206.003.5010.70278.6041005.406.003.509.5081.0041005.406.003.509.5081.0041005.406.003.509.5081.0042006.306.003.509.80180.4042506.756.003.5010.25229.503RESULTADOS
TCNICOSTRAMO: PP-5 -
A5805.226.003.509.5061.005805.226.003.509.5061.005805.226.003.509.5061.0051505.856.003.509.50131.0052006.306.003.509.80180.40NDIAMETRO
NOMINALDIAMETRO INTERNOVELOCIDADPENDIENTEPERD. LONG. + COL +
ECPERD. ACCES.PERD. TOTALALT. ESTAT.ALT. DINAMPOT. BOMBAPOT.
INST.(mm)(mm)(m/s)S (m/Km)hf (m)hk (m)ht (m)H (m)HDT
(m)(HP)(HP)12502300.448.610.110.20.3134.2738.0812.1013.3122001800.7120.000.210.510.7234.2738.4912.2313.4531501311.3470.280.701.832.5334.2740.3012.8014.084100813.51528.336.4512.5719.0234.2756.7918.0419.84580616.201782.5024.9539.2264.1734.27101.9432.3935.633RESULTADOS
ECONOMICOSTRAMO: PP-5 - ANDIAMETRO NOMINALDIAMETRO INTERNOCOSTO
TUBERIACOSTO EQUIP.COSTO ENERGIA FUNC.COSTO OPERAC.COSTO
MANTEN.COSTO
TOTAL(mm)(mm)($)($)($)($)($)($)12502301548.2227945.572935.5919993.913998.7856422.0722001801068.6428110.312967.1320208.724041.7456396.543150150804.2828823.493105.4121150.534230.1158113.82410081311.3834810.574376.6929809.045961.8175269.4958061201.2048029.397858.1553520.7910704.16120313.694RESULTADOS
TCNICOSTRAMO: PP-6 - BNDIAMETRO NOMINALDIAMETRO
INTERNOVELOCIDADPENDIENTEPERD. LONG. + COL + ECPERD. ACCES.PERD.
TOTALALT. ESTAT.ALT. DINAMPOT. BOMBAPOT. INST.(mm)(mm)(m/s)S
(m/Km)hf (m)hk (m)ht (m)H (m)HDT
(m)(HP)(HP)12502300.4411.000.130.20.3348.4752.3016.6218.2822001800.7124.330.220.510.7348.4752.7016.7418.4131501311.3482.330.641.832.4748.4754.4417.3019.034100813.51603.005.5212.5718.0948.4770.0622.2624.49580616.202012.6721.1639.2260.3848.47112.3535.7039.273RESULTADOS
ECONOMICOSTRAMO: PP-6 - BNDIAMETRO NOMINALDIAMETRO INTERNOCOSTO
TUBERIACOSTO EQUIP.COSTO ENERGIA FUNC.COSTO OPERAC.COSTO
MANTEN.COSTO
TOTAL(mm)(mm)($)($)($)($)($)($)12502301290.1833275.774032.1827462.635492.5371553.292200180890.5333407.704061.3027660.965532.1971552.683150150670.2334017.814197.1628586.295717.2673188.75410081259.4939076.885400.5136782.147356.4388875.4558061167.6750669.738661.1958990.1911798.04130286.825RESULTADOS
TCNICOSTRAMO: A - BNDIAMETRO NOMINALDIAMETRO
INTERNOVELOCIDADPENDIENTEPERD. LONG. + ECPERD. ACCES.PERD.
TOTALALT. ESTAT.ALT. DINAMPOT. BOMBAPOT. INST.(mm)(mm)(m/s)S
(m/Km)hf (m)hk (m)ht (m)H (m)HDT
(m)(HP)(HP)13503250.441.020.400.20.60-8.11-7.51-4.77-5.24723002790.592.050.840.361.20-8.11-6.91-4.39-4.82932502300.885.032.160.792.95-8.11-5.16-3.28-3.60842001801.4215.386.952.069.01-8.110.900.570.62751501312.6968.7532.917.3840.29-8.1132.1820.4522.4954RESULTADOS
ECONOMICOSTRAMO: A - BNDIAMETRO NOMINALDIAMETRO INTERNOCOSTO
TUBERIACOSTO EQUIP.COSTO ENERGIA FUNC.COSTO OPERAC.COSTO
MANTEN.COSTO
TOTAL(mm)(mm)($)($)($)($)($)($)135032543003.560.00-1157.25-7881.87-1576.370.00230027933969.770.00-1065.06-7253.98-1450.800.00325025028750.760.00-795.76-5419.81-1083.960.00420018017395.065206.10138.29941.87188.3723869.69515013110627.2237296.014961.3833791.296758.2693434.166RESULTADOS
TCNICOSTRAMO: B - RP-04NDIAMETRO NOMINALDIAMETRO
INTERNOVELOCIDADPENDIENTEPERD. LONG. + ECPERD. ACCES.PERD.
TOTALALT. ESTAT.ALT. DINAMPOT. BOMBAPOT. INST.(mm)(mm)(m/s)S
(m/Km)hf (m)hk (m)ht (m)H (m)HDT
(m)(HP)(HP)14003740.501.310.330.260.5941.8048.6946.4151.05123503250.662.440.660.441.1041.8049.2046.9051.5933002790.894.871.380.812.1941.8050.2947.9352.72342502301.3111.763.541.755.2941.8053.3950.8955.97952001802.1335.5611.374.6316.0041.8064.1061.1067.213RESULTADOS
ECONOMICOSTRAMO: B - RP-04NDIAMETRO NOMINALDIAMETRO INTERNOCOSTO
TUBERIACOSTO EQUIP.COSTO ENERGIA FUNC.COSTO OPERAC.COSTO
MANTEN.COSTO
TOTAL(mm)(mm)($)($)($)($)($)($)140037441020.5258535.2411259.5576687.2715337.45202840.03235032533023.2158874.3511378.4377496.9415499.39196272.32330030029235.0259582.0111628.3279198.9115839.78195484.04425023019352.7261578.4712346.4484089.9316817.99194185.55520018013357.9868093.1914823.49100960.7820192.16217427.607RESUMEN
DE CARGA DINAMICA TOTALNDIAMETRO NOMINALDIAMETRO
INTERNOVELOCIDADALT. DINAM TOTAL PP-4ALT. DINAM TOTAL PP-5ALT.
DINAM TOTAL PP-6POT. BOMBA PP-4POT. INST. PP-4POT. BOMBA PP-5POT.
INST. PP-5POT. BOMBA PP-6POT. INST. PP-6(mm)(mm)(m/s)HDT (m)HDT
(m)HDT
(m)(HP)(HP)(HP)(HP)(HP)(HP)14003740.50115.6489.89103.1336.7440.4128.5631.4232.7736.0523503250.66116.1590.40103.6436.9040.5928.7231.5932.9336.2233002790.89117.2491.49104.7337.2540.9829.0731.9833.2736.6042502301.31120.3494.59107.8338.2342.0530.0533.0634.2637.6952001802.13131.05105.30118.5441.6445.8033.4636.8137.6641.43RESULTADOS
ECONOMICOS FINALNDIAMETRO NOMINALDIAMETRO INTERNOCOSTO TUBERIACOSTO
EQUIP.COSTO ENERGIA FUNC.COSTO OPERAC.COSTO MANTEN.COSTO
TOTAL(mm)(mm)($)($)($)($)($)($)1400374104907.41144632.3623792.80162049.5432409.91467792.02235032596910.10145023.1323909.25162842.6632568.53461253.67330027993121.91145866.8424161.57164561.1832912.24460623.74425023083239.61148238.2824877.27169435.7133887.14459678.01520018077244.87156222.7427356.75186323.1237264.62484412.10
&L&"Times New Roman,Cursiva"&9INFORME
FINAL&R&"Times New Roman,Cursiva"&9Anteproyecto
Ampliacin y Mejoramiento del Sistema de Agua Potable
yAlcantarillado del Esquema Cieneguilla&L&"Times New
Roman,Cursiva"&9Consorcio CRV
Pozos_RP-02MARS-2000MARS-2000MARS-2000ANALISIS DE COSTOS DE LA
ALTERNATIVAPP-2 Y PP-1 A RP-02 CIENEGUILLADIMENSIONES DE
ESPESORORES DE FIERRO FUNDIDO, REVESTIMIENTO Y DIAMETRO
INTERNODIMENSIONES DE ESPESORORES DE FIERRO FUNDIDO, REVESTIMIENTO
Y DIAMETRO INTERNODIMENSIONES DE ESPESORORES DE FIERRO FUNDIDO,
REVESTIMIENTO Y DIAMETRO INTERNOPRIMERA ALTERNATIVATRAMO R1-ATRAMO
A-R2TRAMO A-R31DATOS GENERALES1. ESPESOR NOMINAL DE HIERRO FUNDIDO
(ISO-2531)1. ESPESOR NOMINAL DE HIERRO FUNDIDO (ISO-2531)1. ESPESOR
NOMINAL DE HIERRO FUNDIDO (ISO-2531)TRAMO: PP-2 - ATRAMO: PP-1 -
ATRAMO: A - RP-021.1CAUDAL DE BOMBEOQ118.03l/sCAUDAL DE
BOMBEOQ218.25l/sCAUDAL DE BOMBEOQ336.28l/se fierro fundido = K (
0.5 + 0.001 DN )e fierro fundido = K ( 0.5 + 0.001 DN )e fierro
fundido = K ( 0.5 + 0.001 DN )1.2HORAS DE BOMBEO18HorasHORAS DE
BOMBEO18HorasHORAS DE
BOMBEO18Horas1.3MATERIALHDMATERIALHDMATERIALHDDonde :Donde :Donde
:1.4COEF. HAZENC130COEF. HAZENC130COEF. HAZENC130e fierro
fundido=espesor nominal de la pared en mme fierro fundido=espesor
nominal de la pared en mme fierro fundido=espesor nominal de la
pared en mm1.5DIFERENCIA C.T.H113.40mDIFERENCIA
C.T.H2-1.95mDIFERENCIA C.T.H363.14mDN=dimetro nominal150DN=dimetro
nominal150DN=dimetro
nominal2501.6LONGITUDL1705mLONGITUDL2240mLONGITUDL31800mK=Clase de
espesor, tomada en la serie de nmeros enteros : 8, 9, 10,
11,12...9K=Clase de espesor, tomada en la serie de nmeros enteros :
8, 9, 10, 11,12...9K=Clase de espesor, tomada en la serie de nmeros
enteros : 8, 9, 10,
11,12...91.7PENDIENTES119.01m/KmPENDIENTES2-8.1m/KmPENDIENTES335.08m/Km1.8DIAMETROD1162.4mmDIAMETROD2163.4mmDIAMETROD3230.4mm1.9VELOCIDADV10.87m/sVELOCIDADV20.87m/sVELOCIDADV30.87m/se
mnimo=6.00mme mnimo=6.00mme mnimo=6.00mm2.0ALTURA DE SUCC.
(ND)Hs34mALTURA DE SUCC. (ND)Hs34mALT. EST.
TOTALHA-R363.14m2.1PRESION DE LLEGADAPs3.50mPRESION DE
LLEGADAPs3.50mALT. DE INGRESO TUB. R1Hi36.30m2. ESPESOR DE CEMENTO
DE LOS TUBOS (ISO-4179)2. ESPESOR DE CEMENTO DE LOS TUBOS
(ISO-4179)2. ESPESOR DE CEMENTO DE LOS TUBOS (ISO-4179)2.2VELOCIDAD
SUCC.Vs0.57m/sVELOCIDAD SUCC.Vs0.58m/s2.3DIAMETRO
SUCC.Ds200mmDIAMETRO SUCC.Ds200mmDNVALOR NOMINAL(mm)TOLERANCIA
(mm)DNVALOR NOMINAL(mm)TOLERANCIA (mm)DNVALOR NOMINAL(mm)TOLERANCIA
(mm)2.4LONG. SUCC.Ls39mLONG.
SUCC.Ls39m603.5-1.5603.5-1.5603.5-1.52.5MATERIALHDMATERIALHD460803.5-1.5803.5-1.5803.5-1.52.6ALT.
EST. TOTAL + NDDHR1-A57.40mALT. EST. TOTAL +
NDDHR1-A42.05mRP-021003.5-1.51003.5-1.51003.5-1.52.7PESO
ESPECIFICOg1000.00Kg/m3PESO
ESPECIFICOg1000.00Kg/m31253.5-1.51253.5-1.51253.5-1.52.8EFICIENCIA
BOMBAe75%EFICIENCIA BOMBAe75%DN
2501503.5-1.51503.5-1.51503.5-1.52.9COSTO DE Kw-Hr0.045$ /
Kw-hrCOSTO DE Kw-Hr0.045$ /
Kw-hr2003.5-1.52003.5-1.52003.5-1.53.0TASA DE COSTO OPORT.i12%TASA
DE COSTO OPORT.i12%3972503.5-1.52503.5-1.52503.5-1.53.1PERIODO DE
DISEOn15aosPERIODO DE DISEOn15aosADN
1503003.5-1.53003.5-1.53003.5-1.53.2NIVEL DINAM. DISEONDD10mNIVEL
DINAM. DISEONDD10m3993505.0-2.03505.0-2.03505.0-2.0DN
150PP-14005.0-2.04005.0-2.04005.0-2.04505.0-2.04505.0-2.04505.0-2.0Criterio
de Seleccin: Velocidad recomendable lnea de impulsin: 0.9 < V
< 1.2
m/s5005.0-2.05005.0-2.05005.0-2.0383PP-26005.0-2.06005.0-2.06005.0-2.02RESULTADOS
TCNICOSTRAMO: PP-2 -
A7006.0-2.57006.0-2.57006.0-2.58006.0-2.58006.0-2.58006.0-2.5NDIAMETRO
NOMINALDIAMETRO INTERNOVELOCIDADPENDIENTEPERD. LONG. + COL +
ECPERD. ACCES.PERD. TOTALALT. ESTAT.ALT. DINAMPOT. BOMBAPOT.
INST.9006.0-2.59006.0-2.59006.0-2.5(mm)(mm)(m/s)S (m/Km)hf (m)hk
(m)ht (m)H (m)HDT
(m)(HP)(HP)10006.0-2.510006.0-2.510006.0-2.512502300.441.400.790.20.9957.4061.8919.5721.52711006.0-2.511006.0-2.511006.0-2.522001800.714.102.380.512.8957.4063.7920.1722.18712006.0-2.512006.0-2.512006.0-2.531501311.3418.1010.931.8312.7657.4073.6623.2925.61914009.0-3.014009.0-3.014009.0-3.04100813.50177.45112.6012.5125.1057.40186.0058.8264.70215009.0-3.015009.0-3.015009.0-3.0580616.17689.45447.2138.85486.0657.40546.96172.96190.25616009.0-3.016009.0-3.016009.0-3.0318009.0-3.018009.0-3.018009.0-3.0RESULTADOS
ECONOMICOSTRAMO: PP-2 - A20009.0-3.020009.0-3.020009.0-3.0NDIAMETRO
NOMINALDIAMETRO INTERNOCOSTO TUBERIACOSTO EQUIP.COSTO ENERGIA
FUNC.COSTO OPERAC.COSTO MANTEN.COSTO
TOTALFORMULAS(mm)(mm)($)($)($)($)($)($)POTENCIA BOMBAPOT. BOMBA = g
HDT x Qb /76 e3. TOTALES3. TOTALES3.
TOTALES125023030319.2636404.584747.8932337.246467.45110276.42POTENCIA
INSTALADAPOT. INST. = 1.1 POT.
BOMBA220018020927.5137014.284893.4533328.626665.72102829.58COSTO DE
TUBERIACT = 1.45*D1.54*LNDIAMETRO NOMINAL (mm)FIERRO
FUNDIDOREVESTIMIENTOESPESOR TOTAL (mm)DIAMETRO INTERNO
(mm)NDIAMETRO NOMINAL (mm)FIERRO FUNDIDOREVESTIMIENTOESPESOR TOTAL
(mm)DIAMETRO INTERNO (mm)NDIAMETRO NOMINAL (mm)FIERRO
FUNDIDOREVESTIMIENTOESPESOR TOTAL (mm)DIAMETRO INTERNO
(mm)315015015750.4840061.235650.4038484.117696.82107643.04COSTO DE
EQUIPAMIENTOCEq = 6730*POTinst.0.55e fierro fundido(mm)e mnimo ff
(mm)e cemento(mm)e fierro fundido(mm)e mnimo ff (mm)e cemento(mm)e
fierro fundido(mm)e mnimo ff (mm)e
cemento(mm)4100816097.9066683.7214270.3497193.3519438.67203683.98COSTO
ENERG. FUNC.CE = POT. INST.*
0.746*Hb*365*CKw-h12506.756.003.5010.25229.5012506.756.003.5010.25229.5013507.656.005.0012.65324.70580613940.23120684.4141961.89285796.7557159.35509542.63COSTO
DE OPERACINCO =CE * ( (1+i) n - 1) /(
i*(1+i)n)22006.306.003.509.80180.4022006.306.003.509.80180.4023007.206.003.5010.70278.60COSTO
DE MANTENIMIENTOCM = 20 %
CO31505.856.003.509.50131.0031505.856.003.509.50131.0032506.756.003.5010.25229.5041005.406.003.509.5081.0041005.406.003.509.5081.0042006.306.003.509.80180.403RESULTADOS
TCNICOSTRAMO: PP-1 -
A5805.226.003.509.5061.005805.226.003.509.5061.0051505.856.003.509.50131.00NDIAMETRO
NOMINALDIAMETRO INTERNOVELOCIDADPENDIENTEPERD. LONG. + COL +
ECPERD. ACCES.PERD. TOTALALT. ESTAT.ALT. DINAMPOT. BOMBAPOT.
INST.(mm)(mm)(m/s)S