RESUMENCLIENTE:HOSPITAL GENERAL EL PLANOBRA:CONSTRUCCION DE
EDIFICIO PARA SALA DE CAPACITACIONUBICACIN:CHINAMECA,
VER.ALCANCE:OBRA CIVIL Y ACABADOSFECHA:Tuesday, July 08,
2014ATENCIN:ING. JUAN C. MARQUEZ M.COTIZACIN
SOLUTECSLT-GRUMA-021-2012COTIZACIONCodigoDescripcinUnidadCantidadP.U.TOTAL1.00TRAZO
Y NIVELACION TOPOGRAFICA EN RED DE DESCARGA ESTABLECIENDO EJES DE
REFERENCIA PARA CONSTRUCCION.M22.00EXCAVACION EN MATERIAL TIPO "B"
CON MAQUINARIA 0.00 A 4.00 MTS. DE PROFUNDIDAD, INCLUYE: MANO DE
OBRA, MAQUINARIA, HERRAMIENTA Y EQUIPO, Y TODO LO NECESARIO PARA SU
CORRECTA EJECUCION.M33.00AFINE DE FONDO DE LA EXCAVACION CON
HERRAMIENTA MENOR, INCLUYE. HERRAMIENTA Y EQUIPO, MANO DE OBRA Y
TODO LO NECESARIO PARA SU CORRECTA EJECUCION.M24.00SUMINISTRO,
COLOCACION Y TENDIDO DE CAMA DE ARENA DE 10 CM DE ESPESOR PARA
RECIBIR TUBERIA, INCLUYE. MANO DE OBRA, HERRAMIENTA Y EQUIPO Y TODO
LO NECESARIO PARA SU CORRECTA EJECUCION.M25.00SUMINISTRO , TENDIDO
Y COLOCACION DE TUBERIA DE P.V.C. SANITARIO DE 8" @ (20 CMS.),
SERIE 25, INCLUYE ACCESORIOS , MANO DE OBRA, HERRAMIENTA , EQUIPO Y
TODO LO NECESARIO PARA SU CORRECTA INSTALACION Y BUEN
FUNCIONAMIENTO.ML6.00PRUEBA HIDROSANITARIA PARA TUBERIA DE P.V.C.
EN LA RED DE DESCARGA DE LA PLANTA DE TRATAMIENTO, INCLUYE.
MATERIAL, HERRAMIENTA, EQUIPO Y TODO LO NECESARIO PARA SU CORRECTA
EJECUCION.PBA7.00RELLENO Y COMPACTADO CON MATERIAL PRODUCTO DE LA
EXCAVACION, EN CAPAS DE 20 CMS DE ESPESOR,COMPACTACION MANUAL:
INCLUYE MANO DE OBRA, HERRAMIENTA Y EQUIPO Y TODO LO NECESARIO PARA
SU CORRECTA EJECUCION.M38.00CONSTRUCCION DE POZOS DE VISITA CON
TABIQUE TIPO CUA CON PLANTILLA DE 15 CM. ESP. CONCRETO F`c=150
KG/CM2, ACABADO Y PULIDO INTERIOR, INCLUYE TAPA, BROCAL, ESCALERA
MARINA CON VARILLA 3/4" Y MEDIA CAA, DE 1.00 MTS. DE PROFUNDIDAD,
INCLUYE MATERIAL, MANO DE OBRA, HERRAMIENTA, EQUIPO Y TODO LO
NECESARIO PARA SU CORRECTA EJECUCION.PZA9.00CONSTRUCCION DE POZOS
DE VISITA CON TABIQUE TIPO CUA CON PLANTILLA DE 15 CM. ESP.
CONCRETO F`c=150 KG/CM2, ACABADO Y PULIDO INTERIOR, INCLUYE TAPA,
BROCAL, ESCALERA MARINA CON VARILLA 3/4" Y MEDIA CAA, DE 1.50 MTS.
DE PROFUNDIDAD, INCLUYE MATERIAL, MANO DE OBRA, HERRAMIENTA, EQUIPO
Y TODO LO NECESARIO PARA SU CORRECTA EJECUCION.PZA10.00CONSTRUCCION
DE POZOS DE VISITA CON TABIQUE TIPO CUA CON PLANTILLA DE 15 CM.
ESP. CONCRETO F`c=150 KG/CM2, ACABADO Y PULIDO INTERIOR, INCLUYE
TAPA, BROCAL, ESCALERA MARINA CON VARILLA 3/4" Y MEDIA CAA, DE 2.00
MTS. DE PROFUNDIDAD, INCLUYE MATERIAL, MANO DE OBRA, HERRAMIENTA,
EQUIPO Y TODO LO NECESARIO PARA SU CORRECTA EJECUCION.PZA12.00CARGA
Y ACAREO DE MATERIAL SOBRANTE PRODUCTO DE LA EXCAVACION FUERA DEL
SITIO DE LA OBRA, DONDE LO INDIQUE LA SUPERVISION.M313.00LIMPIEZA
GENERAL DE LA OBRA.M2TOTAL OBRAS PRELIMINARESIMPRTEIVATOTALTOTAL
CON LETRA:(* UN MILLON QUINIENTOS VEINTISEIS MIL NOVECIENTOS
OCHENTA Y NUEVE PESOS 46/100 M.N. *)OBSERVACIONES:1.- Los trabajos
incluyen mano de obra especializada, supervisin y certificacin de
trabajos, acarreos, limpieza final, equipos de seguridad de los
trabajadores, ropa de trabajo acreditada y herramientas necesarios
para su correcta ejecucin2.- Tiempo aproximado de ejecucion: 90
dias naturales, considerando que las condiciones climatologicas
sean favorables y no exista alguna otra restriccion de fuerza
mayor.3.- Vigencia de la cotizacin: 30 das.4.- Las medidas son
aproximadas, para efectos de facturacin se cobrara lo realmente
ejecutado en obraCONDICIONES DE PAGO1.- Se requiere de un 30% de
anticipo2.- Pagos parciales por avance estimado medido en obra de
manera semanal3.- Se ha considerado la expedicion de fianzas por
anticipo, cumplimiento y vicios ocultos para la ejecucion de este
contrato.ATENTAMENTEING. LUIS OSWALDO ROBLEDO BERMDEZAdministracion
y CostosSOLUCIONES TECNICAS DE CONSTRUCCION S.A. DE C.V.Av. Sarabia
No. 73Col. Insurgentes NorteMinatitln, Ver.Tel. Fax. 01922 22 1 98
79Email: [email protected]: luis.robledo-solutec
GENERADORESCLIENTE:HOSPITAL GENERAL DE LAS CHOAPAS,
VERACRUZOBRA:"CONSTRUCCION DE DESCARGA DE AGUAS RESIDUALES DE LA
PLANTA DE TRATAMIENTO DEL HOSPITAL GENERAL EL PLAN, DE LAS CHOAPAS,
VER"UBICACIN:LAS CHOAPAS, VERACRUZSLT-GRUMA -2012NUMEROS
GENERADORES DE
PRESUPUESTOVOLUMENESCODIGODESCRIPCIONEJEOBJETOUNIDADCANTIDADP.U.TOTALSLT-DEM-001TRAZO
Y NIVELACION TOPOGRAFICA EN RED DE DESCARGA ESTABLECIENDO EJES DE
REFERENCIA PARA
CONSTRUCCION.M2396.40EJEOBJETOXYZPZASTOTAL396.401.00396.40total:396.40SLT-DEM-002EXCAVACION
EN MATERIAL TIPO "B" CON MAQUINARIA 0.00 A 4.00 MTS. DE
PROFUNDIDAD, INCLUYE: MANO DE OBRA, MAQUINARIA, HERRAMIENTA Y
EQUIPO, Y TODO LO NECESARIO PARA SU CORRECTA EJECUCION.M30.0XH
PROMZPZASTOTALPTA A REG 0130.000.610.8014.04REG 01 A REG
0230.000.380.808.51REG 02 A REG 0323.900.381.008.32REG 03 A REG
0430.000.000.800.00REG 04 A REG 0530.000.000.800.00REG 05 A REG
0630.000.000.800.00REG 06 A REG 0730.000.000.800.00REG 07 A REG
0830.000.000.800.00REG 08 A REG 0930.000.000.800.00REG 09 A REG
1030.000.000.800.00REG 10 A REG 1124.400.000.800.00REG 11 A REG
1221.070.000.800.00REG 12 A REG 1324.530.000.700.00REG 13 A
DESCARGA32.500.000.700.00REGISTRO 12.000.762.003.04REGISTRO
22.000.502.002.00EL H PROMEDIO SE OBTUVO ASI: (C. N - C.PROY.) DEL
PRIMER PUNTO + (C. N - C.PROY.)REGISTRO 32.000.762.003.04DEL PUNTO
2. LA SUMA SE DIVIDIO ENTRE 2REGISTRO 42.000.002.000.00REGISTRO
52.000.002.000.00REGISTRO 62.000.002.000.00REGISTRO
72.000.002.000.00REGISTRO 82.000.002.000.00REGISTRO
92.000.002.000.00REGISTRO 102.000.002.000.00REGISTRO
112.000.002.000.00REGISTRO 122.000.002.000.00REGISTRO
133.000.003.000.00total:0.0SLT-DEM-003AFINE DE FONDO DE LA
EXCAVACION CON HERRAMIENTA MENOR, INCLUYE. HERRAMIENTA Y EQUIPO,
MANO DE OBRA Y TODO LO NECESARIO PARA SU CORRECTA
EJECUCION.ML317.12PLANTAS, CORTES, FACHADAS,
PERSPECTIVAS,OPERACIONESXYZPZASTOTAL396.400.80317.120.0total:317.12VOLUMENESCODIGODESCRIPCIONEJEOBJETOUNIDADCANTIDADP.U.TOTALSLT-DEM-004SUMINISTRO,
COLOCACION Y TENDIDO DE CAMA DE ARENA DE 10 CM DE ESPESOR PARA
RECIBIR TUBERIA, INCLUYE. MANO DE OBRA, HERRAMIENTA Y EQUIPO Y TODO
LO NECESARIO PARA SU CORRECTA EJECUCION.M2317.12PLANTAS, CORTES,
FACHADAS,
PERSPECTIVAS,EJEOBJETOXYZPZASTOTAL396.400.80317.120.0total:317.12SLT-DEM-005PRUEBA
HIDROSANITARIA PARA TUBERIA DE P.V.C. EN LA RED DE DESCARGA DE LA
PLANTA DE TRATAMIENTO, INCLUYE. MATERIAL, HERRAMIENTA, EQUIPO Y
TODO LO NECESARIO PARA SU CORRECTA EJECUCION.PBA1.00PLANTAS,
CORTES, FACHADAS,
PERSPECTIVAS,OPERACIONESXYZPZASTOTAL1.00total:1.00SLT-DEM-006RELLENO
Y COMPACTADO CON MATERIAL PRODUCTO DE LA EXCAVACION, EN CAPAS DE 20
CMS DE ESPESOR,COMPACTACION MANUAL: INCLUYE MANO DE OBRA,
HERRAMIENTA Y EQUIPO Y TODO LO NECESARIO PARA SU CORRECTA
EJECUCION.M30.0PLANTAS, CORTES, FACHADAS,
PERSPECTIVAS,OPERACIONESXAREEAZPZASTOTAL396.40.07328.94REGISTRO
10.761.050.80REGISTRO 20.501.050.53REGISTRO 30.761.050.80REGISTRO
40.001.050.00REGISTRO 50.001.050.00REGISTRO 60.001.050.00REGISTRO
70.001.050.00REGISTRO 80.001.050.00REGISTRO 90.001.050.00REGISTRO
100.001.050.00REGISTRO 110.001.050.00REGISTRO
120.001.050.00REGISTRO 130.001.050.00TOTAL DE VOLUMEN DE
REGISTROS0.00VOL DE EXCAVACION TOTAL0.0MENOS VOL DE
TUBERIA-28.94MENOS VOL DE REGISTROS0.0AREA DE BASE 1.60 M DE
DIAMETRO =2.01 M2AREA DE BASE 1.00 M DE DIAMETRO =0.785 M20.0AREA
PROMEDIO=1.05
M2total:0.0VOLUMENESCODIGODESCRIPCIONEJEOBJETOUNIDADCANTIDADP.U.TOTALSLT-DEM-007CONSTRUCCION
DE POZOS DE VISITA CON TABIQUE TIPO CUA CON PLANTILLA DE 15 CM.
ESP. CONCRETO F`c=150 KG/CM2, ACABADO Y PULIDO INTERIOR, INCLUYE
TAPA, BROCAL, ESCALERA MARINA CON VARILLA 3/4" Y MEDIA CAA, DE 1.00
MTS. DE PROFUNDIDAD, INCLUYE MATERIAL, MANO DE OBRA, HERRAMIENTA,
EQUIPO Y TODO LO NECESARIO PARA SU CORRECTA
EJECUCION.PZA2.00EJEOBJETOXYZPZASTOTAL2.002.00total:2.00SLT-DEM-008CONSTRUCCION
DE POZOS DE VISITA CON TABIQUE TIPO CUA CON PLANTILLA DE 15 CM.
ESP. CONCRETO F`c=150 KG/CM2, ACABADO Y PULIDO INTERIOR, INCLUYE
TAPA, BROCAL, ESCALERA MARINA CON VARILLA 3/4" Y MEDIA CAA, DE 1.50
MTS. DE PROFUNDIDAD, INCLUYE MATERIAL, MANO DE OBRA, HERRAMIENTA,
EQUIPO Y TODO LO NECESARIO PARA SU CORRECTA
EJECUCION.PZA8.00XYZPZASTOTAL8.008.00total:8.00SLT-DEM-009CONSTRUCCION
DE POZOS DE VISITA CON TABIQUE TIPO CUA CON PLANTILLA DE 15 CM.
ESP. CONCRETO F`c=150 KG/CM2, ACABADO Y PULIDO INTERIOR, INCLUYE
TAPA, BROCAL, ESCALERA MARINA CON VARILLA 3/4" Y MEDIA CAA, DE 2.00
MTS. DE PROFUNDIDAD, INCLUYE MATERIAL, MANO DE OBRA, HERRAMIENTA,
EQUIPO Y TODO LO NECESARIO PARA SU CORRECTA
EJECUCION.PZA3.00XYZPZASTOTAL3.003.00total:3.00VOLUMENESCODIGODESCRIPCIONEJEOBJETOUNIDADCANTIDADP.U.TOTALSLT-DEM-011CARGA
Y ACAREO DE MATERIAL SOBRANTE PRODUCTO DE LA EXCAVACION FUERA DEL
SITIO DE LA OBRA, DONDE LO INDIQUE LA SUPERVISION.M30.0PLANTAS,
CORTES, FACHADAS, PERSPECTIVAS,OPERACIONESEJEOBJETOXYZPZASTOTALVOL
TOTAL DE EXCAVACION0.0VOL. TOTAL DE RELLENO0.0VOL. SOBRANTE0.0VOL
SOBRANTE MAS 30 % DE ABUNDAMIENTO0.0total:0.0SLT-DEM-012LIMPIEZA
GENERAL DE LA OBRA.M2396.40PLANTAS, CORTES, FACHADAS,
PERSPECTIVAS,OPERACIONESXYZPZASTOTAL396.401.00396.40total:396.40
ANEXO 2 EANEXO - 2MUNICIPIO DE CHINAMECA, VER.VOLUMENES DE OBRA
DE 0-2MUNICIPIO: CHINAMECA, VER.LOCALIDAD:H0JA 1 DE 1TIPO DE OBRA:
"CONSTRUCCION DE DRENAJE SANITARIO QUE INCLUYE LA REHABILITACIN EN
LAS CALLES MARIANO ESCOBEDO Y RAFAEL MURILLO VIDAL, ENTRE IGNACIO
ZARAGOZA Y 5 DE MAYO"LONGITUD: 292.27 MLVOLUMENES DE OBRA SECCIN
ILONGITUDANCHOSUMAPROMEDIOM2ESPESOR CORTEM3 CORTERELLENOM3
RELLENON.T.N.N.
PROYESP.salida0.8099.0519.24-79.810200.801.600.8016.0099.3519.36-79.990-79.900-1278.400.000.00300.801.600.8016.0099.48400.801.600.8016.0099.6019.07-80.5300.0000.000.325.12600.801.600.8016.0099.4018.76-80.6400.0000.000.7912.6483.90.801.600.8016.0098.6418.44-80.2000.0000.000.375.92103.90.801.600.8016.0097.7018.20-79.5000.0000.000.040.64113.90.801.600.8016.0097.63123.90.801.600.8016.0097.4417.96-79.4800.0000.000.396.24143.90.801.600.8016.0096.9317.73-79.2000.0000.000.8713.92163.90.801.600.8016.0095.2617.49-77.7700.0000.001.0917.44173.90.801.600.8016.0095.26183.90.801.600.8016.0095.2017.25-77.9500.0000.000.6510.40203.90.801.600.8016.0094.3217.01-77.3100.0000.000.182.88223.90.801.600.807.4594.1416.90-77.240-77.275-575.540.000.00233.90.801.600.807.4593.53243.90.801.600.807.4592.81263.90.801.600.807.4592.04283.90.801.600.807.4591.16293.90.801.600.807.4590.63296.50.801.600.807.4590.31297.90.801.600.807.4589.86303.90.801.600.807.4590.43311.740.801.600.807.4590.37313.740.801.600.807.4590.50318.30.801.600.807.4588.83323.90.801.600.807.4588.56331.90.801.600.807.4588.20339.370.801.600.807.4586.26345.380.801.600.807.4584.70349.90.801.600.807.4584.26356.10.801.600.807.4584.22363.90.801.600.807.4584.11383.90.801.600.807.4584.06396.40.801.600.8083.51215.45-1,853.9475.20revestimiento
de 5 cm.LONGITUDANCHOSUMAPROMEDIOM2ESPESOR REVEST.M3 CORTERELLENOM3
RELLENO0+0005.8421.8221.820.0000+0204.4910.335.16103.2620.8120.860.0500.000.000.0505.160+0405.5810.075.04100.7018.5918.640.0500.000.000.0505.050+0607.5913.176.59131.7017.0017.050.0500.000.000.0506.59335.660.0016.79VOLUMENES
TOTALES DE OBRA:TOTAL REVEST =38.34M3TOTAL RELLENO =75.20M3TOTAL
CORTE =1,853.94M3AREA DE PAV. =1,416.16M2
calc hidraulico okCOLECTORNo.N BUZOND a t o s d e l t e r r e n
oLongitud del tramoD a t o s d e p l a n t i I l aCoeficiente de
Harmon MQ de A.N MEDIO (individual)Q de A.N acumuladaC a l c u l o
de a g u a s n e g r a s (l.p.s)Q de infiltracion (l.p.s)Gasto de
diseo (l.p.s)D i a m e t r oVelocidad ComercialQ' ComercialAnalisis
de gastos maximoAnalisis a gastos minimosCota inicial (m)Cota final
(m)Desnivel (m)Pend (%)Propia (m)Acumulada (m)Cota inicial (m)Cota
final (m)Desnivel (m)pend (mm)M e d i oMinMax instMax extraDiseo
(cm)Comercial (cm)Q/Q'V/V'T/T'Velocidad efectiva (m/s)Tirante
efectivo (cm)Gasto minimoGasto minimo
acumuladoQmin/Q'V/V'T/T'Velocidad efectiva (m/s)Tirante efectivo
(cm)COLECTOR
A1BZ1-BZ235.5034.001.501.14131.29131.334.8033.491.31103.818.2218.2218.229.1169.2486.550.0886.6328.79301.976139.6760.6201.0530.5712.0817.133.003.000.0200.0700.0110.140.330.001250.070.0112BZ2-BZ334.0032.501.501.21124.31255.633.4932.251.24103.818.2218.2218.229.1169.2486.550.0886.6328.79301.976139.6760.6201.0530.5712.0817.133.006.000.0400.2300.0490.451.470.00250.120.0213BZ3-BZ432.5031.600.901.1677.41333.032.2531.091.16153.818.2218.2218.229.1169.2486.550.0586.6026.68302.42171.060.5060.9800.4802.3714.403.009.000.0500.2300.0490.561.470.003750.150.0354BZ4-BZ531.6031.200.401.1734.23367.231.0930.340.75223.818.2218.2218.229.1169.2486.550.0286.5724.83252.596127.4310.6791.0570.6012.7415.031.5010.500.0800.0700.0110.180.280.0050.230.049tramo
20.0280.440.121BZ1-BZ231.2030.700.501.1444.0544.130.5030.060.44103.818.2218.2218.229.1169.2486.550.0386.5828.78301.976139.6760.6201.0490.5652.0716.953.003.000.0200.0700.0110.140.330.001250.070.0112BZ2-BZ330.7030.200.501.1941.8985.930.0629.640.42103.818.2218.2218.229.1169.2486.550.0386.5828.78301.976139.6760.6201.0490.5652.0716.953.006.000.0400.0700.0110.140.330.00250.120.0213BZ3-BZ430.2029.700.501.1742.79128.729.6429.000.64153.818.2218.2218.229.1169.2486.550.0386.5826.67302.42171.060.5060.9800.4802.3714.403.009.000.0500.0700.0110.170.330.003750.150.0354BZ4-BZ529.7029.400.301.1126.96155.729.0028.410.59223.818.2218.2218.229.1169.2486.550.0286.5724.83252.596127.4310.6791.0570.6012.7415.031.5010.500.0800.0700.0110.180.280.0050.230.0495BZ4-BZ529.4028.500.901.0784.02239.728.4126.561.85223.818.2218.2218.229.1169.2486.550.0586.6024.83252.596127.4310.6801.0570.6012.7415.031.5012.000.0900.6210.2101.615.250.0050.230.0490.040.50.14tramo
30.0280.440.121BZ1-BZ228.5028.000.501.0447.9147.927.8027.320.48103.818.2218.2218.229.1169.2486.550.0386.5828.78301.976139.6760.6201.0490.5652.0716.953.003.000.0200.0700.0110.140.330.001250.070.0112BZ2-BZ328.0027.500.501.0448.2696.227.3226.840.48103.818.2218.2218.229.1169.2486.550.0386.5828.78301.976139.6760.6201.0490.5652.0716.953.006.000.0400.0700.0110.140.330.00250.120.0213BZ3-BZ427.5027.100.401.0339.01135.226.8426.250.59153.818.2218.2218.229.1169.2486.550.0286.5726.67302.42171.060.5060.9800.4802.3714.403.009.000.0500.0700.0110.170.330.003750.150.0354BZ4-BZ527.1026.600.501.0547.64182.826.2525.21.05223.818.2218.2218.229.1169.2486.550.0386.5824.83252.596127.4310.6791.0570.6012.7415.031.5010.500.0800.0700.0110.180.280.0050.230.0490.0540.5380.158COLECTOR
B0.0550.540.16TRAMO
10.0580.550.1691BZ1-BZ235.4034.001.401.02137.14137.134.7033.331.37103.818.2218.2218.229.1169.2486.550.0886.6328.79301.976139.6760.6201.0530.5712.0817.133.003.000.0200.0700.0110.140.330.001250.070.0112BZ2-BZ334.0032.201.801.15156.91294.033.3331.761.57103.818.2218.2218.229.1169.2486.550.186.6528.79301.976139.6760.6201.0530.5712.0817.133.006.000.0400.0700.0110.140.330.00250.120.0213BZ3-BZ432.2030.301.901.09174.89468.931.7629.142.62153.818.2218.2218.229.1169.2486.550.1186.6626.68302.42171.060.5070.9800.4802.3714.403.009.000.0500.0700.0110.170.330.003750.150.0350.0650.5650.178TRAMO
20.0660.571.791BZ1-BZ230.3029.301.001.0991.9391.929.6028.680.92103.818.2218.2218.229.1169.2486.550.0686.6128.79301.976139.6760.6201.0530.5712.0817.133.003.000.0200.0700.0110.140.330.001250.070.0112BZ2-BZ329.3028.800.501.0547.46139.390028.6828.210.47103.818.2218.2218.229.1169.2486.550.0386.5828.78301.976139.6760.6201.0490.5652.0716.953.006.000.0400.0700.0110.140.330.00250.120.0213BZ3-BZ428.8028.400.401.1136.15175.528.2127.670.54153.818.2218.2218.229.1169.2486.550.0286.5726.67302.42171.060.5060.9800.4802.3714.403.009.000.0500.0700.0110.170.330.003750.150.0354BZ4-BZ528.4028.000.401.1235.86211.427.6726.880.79223.818.2218.2218.229.1169.2486.550.0286.5724.83252.596127.4310.6791.0570.6012.7415.031.5010.500.0800.0700.0110.180.280.0050.230.0495BZ4-BZ528.0027.600.401.1235.57246.9726.8826.10.78223.818.2218.2218.229.1169.2486.550.0286.5724.83252.596127.4310.6791.0570.6012.7415.031.5012.000.0900.6210.2101.615.250.0050.230.0496BZ1-BZ227.0026.600.401.1335.28282.326.3025.950.35103.818.2218.2218.229.1169.2486.550.0286.5728.78301.976139.6760.6201.0490.5652.0716.953.003.000.0200.0700.0110.140.330.001250.070.0110.0820.610.2010.0840.6120.2030.0850.6150.2050.0860.6180.2070.0880.61950.20850.090.6210.210.0920.6220.21150.0940.6280.2140.0960.630.2160.0980.6380.2180.10.640.220.110.6590.2290.120.6780.2390.130.6940.2490.140.7090.260.150.7210.2690.160.7330.2780.170.7480.2880.180.760.2940.190.7720.3010.20.7810.310.210.7980.3180.220.8080.3240.230.8180.3320.240.8250.3390.250.8350.3480.260.8430.3520.270.8490.3590.280.860.3660.290.8680.3720.30.8740.380.310.8820.3880.320.8910.3930.330.8980.40.340.9050.4060.350.910.4110.360.9150.4190.370.9210.4240.380.930.430.390.9350.4350.40.9420.4410.410.9480.4460.420.9540.4540.430.960.460.440.9650.4680.450.970.4710.460.9750.4780.470.980.480.511.0040.5080.521.0090.5120.531.0130.5190.541.0170.5220.551.0210.530.561.0280.5380.571.0310.5410.581.0380.5490.591.0410.5540.61.0460.560.611.0490.5650.621.0530.5710.631.05650.5780.641.05980.5830.651.05630.590.661.05680.5980.671.05710.6010.681.05740.6080.691.05780.6130.71.08450.6260.711.08950.6320.721.0920.6380.731.0950.6420.751.0980.650.761.1020.6560.771.1050.6620.781.1080.6690.791.11050.6760.81.11350.680.811.11550.6880.821.1180.6920.831.12150.70.841.12480.7090.851.12550.7120.861.1280.720.871.130.7250.881.1310.730.891.1320.7390.91.13380.7470.911.3480.7520.921.13510.7580.931.13680.7640.941.1370.7740.951.13850.780.961.140.7890.971.14120.7960.981.14250.8020.991.14340.8111.14480.8181.011.14590.8221.021.440.8321.031.14210.8411.041.13980.8581.051.13550.871.061.13250.8891.071.1240.911.0741.11920.925
SOLUTEC:la pendiente se proponeSOLUTEC:se inicia con la cota
inicial menos el colchon menos el diametro del tuboSOLUTEC:se
ingresan las distancias entre cada puntoSOLUTEC:cota inicial - cota
finalSOLUTEC:desnivel entre la longitud propia nos da la
pendienteSOLUTEC:PRIMERO SE INTRODUCE LA COTA INICIAL, DESPUES LA
PENDIENTE, LO DEMAS SALE EN AUTOMATICOSOLUTEC:(APORTAC=75% DOTAC X
No. D' HABITANTES)/86400SOLUTEC:V=(1/n)*r exp (2/3) * S exp
(1/2)SOLUTEC:V=(1/n)*r exp (2/3) * S exp (1/2)SOLUTEC:V=(1/n)*r exp
(2/3) * S exp (1/2)SOLUTEC:V=(1/n)*r exp (2/3) * S exp
(1/2)SOLUTEC:CHECAR SI AQU SE ACUMULA PORQ AQU YA ES LA DESCARGA Y
NO RECIBE APORTACION DE NINGUN TIPOSOLUTEC:se ingresa la cota de
T.N. del punto de llegadaSOLUTEC:se ingresa la cota de T.N. del
punto de llegadaSOLUTEC:cota inicial - cota finalSOLUTEC:desnivel
entre la longitud propia nos da la pendienteSOLUTEC:se ingresan las
distancias entre cada puntoSOLUTEC:se inicia con la cota inicial
menos el colchon menos el diametro del tuboSOLUTEC:la pendiente se
proponeSOLUTEC:(APORTAC=75% DOTAC X No. D'
HABITANTES)/86400SOLUTEC:CHECAR SI AQU SE ACUMULA PORQ AQU YA ES LA
DESCARGA Y NO RECIBE APORTACION DE NINGUN TIPOSOLUTEC:V=(1/n)*r exp
(2/3) * S exp (1/2)SOLUTEC:V=(1/n)*r exp (2/3) * S exp
(1/2)SOLUTEC:V=(1/n)*r exp (2/3) * S exp (1/2)SOLUTEC:V=(1/n)*r exp
(2/3) * S exp (1/2)SOLUTEC:V=(1/n)*r exp (2/3) * S exp
(1/2)SOLUTEC:se ingresa la cota de T.N. del punto de
llegadaSOLUTEC:cota inicial - cota finalSOLUTEC:desnivel entre la
longitud propia nos da la pendienteSOLUTEC:se ingresan las
distancias entre cada puntoSOLUTEC:se inicia con la cota inicial
menos el colchon menos el diametro del tuboSOLUTEC:la pendiente se
proponeSOLUTEC:(APORTAC=75% DOTAC X No. D'
HABITANTES)/86400SOLUTEC:CHECAR SI AQU SE ACUMULA PORQ AQU YA ES LA
DESCARGA Y NO RECIBE APORTACION DE NINGUN TIPOSOLUTEC:V=(1/n)*r exp
(2/3) * S exp (1/2)SOLUTEC:V=(1/n)*r exp (2/3) * S exp
(1/2)SOLUTEC:V=(1/n)*r exp (2/3) * S exp (1/2)SOLUTEC:V=(1/n)*r exp
(2/3) * S exp (1/2)SOLUTEC:se ingresa la cota de T.N. del punto de
llegadaSOLUTEC:cota inicial - cota finalSOLUTEC:desnivel entre la
longitud propia nos da la pendienteSOLUTEC:se ingresan las
distancias entre cada puntoSOLUTEC:se inicia con la cota inicial
menos el colchon menos el diametro del tuboSOLUTEC:la pendiente se
proponeSOLUTEC:(APORTAC=75% DOTAC X No. D'
HABITANTES)/86400SOLUTEC:CHECAR SI AQU SE ACUMULA PORQ AQU YA ES LA
DESCARGA Y NO RECIBE APORTACION DE NINGUN TIPOSOLUTEC:V=(1/n)*r exp
(2/3) * S exp (1/2)SOLUTEC:V=(1/n)*r exp (2/3) * S exp
(1/2)SOLUTEC:V=(1/n)*r exp (2/3) * S exp (1/2)SOLUTEC:se ingresa la
cota de T.N. del punto de llegadaSOLUTEC:cota inicial - cota
finalSOLUTEC:desnivel entre la longitud propia nos da la
pendienteSOLUTEC:se ingresan las distancias entre cada
puntoSOLUTEC:se inicia con la cota inicial menos el colchon menos
el diametro del tuboSOLUTEC:la pendiente se
proponeSOLUTEC:(APORTAC=75% DOTAC X No. D'
HABITANTES)/86400SOLUTEC:CHECAR SI AQU SE ACUMULA PORQ AQU YA ES LA
DESCARGA Y NO RECIBE APORTACION DE NINGUN TIPOSOLUTEC:V=(1/n)*r exp
(2/3) * S exp (1/2)SOLUTEC:V=(1/n)*r exp (2/3) * S exp
(1/2)SOLUTEC:V=(1/n)*r exp (2/3) * S exp (1/2)SOLUTEC:V=(1/n)*r exp
(2/3) * S exp (1/2)SOLUTEC:V=(1/n)*r exp (2/3) * S exp
(1/2)SOLUTEC:se ingresa la cota de T.N. del punto de
llegadaSOLUTEC:cota inicial - cota finalSOLUTEC:desnivel entre la
longitud propia nos da la pendienteSOLUTEC:se ingresan las
distancias entre cada puntoSOLUTEC:se inicia con la cota inicial
menos el colchon menos el diametro del tuboSOLUTEC:la pendiente se
proponeSOLUTEC:(APORTAC=75% DOTAC X No. D'
HABITANTES)/86400SOLUTEC:CHECAR SI AQU SE ACUMULA PORQ AQU YA ES LA
DESCARGA Y NO RECIBE APORTACION DE NINGUN TIPOSOLUTEC:V=(1/n)*r exp
(2/3) * S exp (1/2)
NO MOVER NADAno tocar estos
datos0.001250.070.011000.00250.120.0210.010.0010.003750.150.0350.020.0020.0050.230.0490.030.0040.006250.250.0590.040.0050.00750.290.0680.050.0070.008750.3050.0710.060.00750.010.320.0780.070.00850.0120.340.080.080.010.0140.350.0880.090.0120.0160.370.0940.10.01250.0180.380.0990.110.0130.020.390.1040.120.0150.0220.40.1090.130.01650.0240.410.110.140.0170.0260.4250.1120.150.01750.0280.440.120.160.030.450.1230.170.0320.460.1280.180.0340.470.130.190.0360.4850.1320.20.0380.490.1360.210.040.50.140.220.0420.5020.14150.230.0440.5030.1430.240.0450.5150.1450.250.0480.520.1490.260.050.5220.1510.270.0520.530.1550.280.0540.5380.1580.290.0550.540.160.30.0580.550.1690.310.060.5580.170.320.0620.560.1730.330.0640.5630.1760.340.0650.5650.1780.350.0660.571.790.360.0680.5780.180.370.070.5810.1840.380.0720.5830.1860.390.0740.590.1880.40.0750.5980.1910.410.0760.6020.1940.420.0780.6050.1970.430.080.6080.20.440.0820.610.2010.450.0840.6120.2030.460.0850.6150.2050.470.0860.6180.2070.480.0880.61950.20850.490.090.6210.210.50.0920.6220.21150.510.0940.6280.2140.520.0960.630.2160.530.0980.6380.2180.540.10.640.220.550.110.6590.2290.560.120.6780.2390.570.130.6940.2490.580.140.7090.260.590.150.7210.2690.60.160.7330.2780.610.170.7480.2880.620.180.760.2940.630.190.7720.3010.640.20.7810.310.650.210.7980.3180.660.220.8080.3240.670.230.8180.3320.680.240.8250.3390.690.250.8350.3480.70.260.8430.3520.710.270.8490.3590.720.280.860.3660.730.290.8680.3720.740.30.8740.380.750.310.8820.3880.760.320.8910.3930.770.330.8980.40.780.340.9050.4060.790.350.910.4110.80.360.9150.4190.810.370.9210.4240.820.380.930.430.830.390.9350.4350.840.40.9420.4410.850.410.9480.4460.860.420.9540.4540.870.430.960.460.880.440.9650.4680.890.450.970.4710.90.460.9750.4780.910.470.980.480.920.930.940.950.511.0040.5080.960.521.0090.5120.970.531.0130.5190.980.541.0170.5220.990.551.0210.5310.561.0280.5380.571.0310.5410.581.0380.5490.591.0410.5540.61.0460.560.611.0490.5650.621.0530.5710.631.05650.5780.641.05980.5830.651.05630.590.661.05680.5980.671.05710.6010.681.05740.6080.691.05780.6130.71.08450.6260.711.08950.6320.721.0920.6380.731.0950.6420.751.0980.650.761.1020.6560.771.1050.6620.781.1080.6690.791.11050.6760.81.11350.680.811.11550.6880.821.1180.6920.831.12150.70.841.12480.7090.851.12550.7120.861.1280.720.871.130.7250.881.1310.730.891.1320.7390.91.13380.7470.911.3480.7520.921.13510.7580.931.13680.7640.941.1370.7740.951.13850.780.961.140.7890.971.14120.7960.981.14250.8020.991.14340.8111.14480.8181.011.14590.8221.021.440.8321.031.14210.8411.041.13980.8581.051.13550.871.061.13250.8891.071.1240.911.0741.11920.925
comparativaANEXO - 2VOLUMENES DE OBRA DE 0-2MUNICIPIO: LAS
CHOAPAS, VER.LOCALIDAD:H0JA 1 DE 1TIPO DE OBRA: "CONSTRUCCION DE
DESCARGA DE AGUAS RESIDUALES DE LA PLANTA DE TRATAMIENTO DEL
HOSPITAL GENERAL EL PLAN, DE LAS CHOAPAS, VER"LONGITUD: 396.40
MLVOLUMENES DE OBRA SECCIN ILONGITUDPROF.
PROMEDIOLONGITUDESCAVACION x 1 mt DE ANCHORELLENOM3 RELLENON.T.N.N.
PROYDIF.
NIVELsalida99.0534.8064.2503099.4833.4965.99065.1230.001888.486099.4032.2567.15066.5730.001863.9683.998.6431.0967.55067.3523.901474.97113.997.630.000.0000.0030.000.00143.996.930.000.0000.0030.000.00173.995.260.000.0000.0030.000.00203.994.320.000.0000.0030.000.00233.993.530.000.0000.0030.000.00263.992.040.000.0000.0030.000.00293.990.630.000.0000.0030.000.00318.388.830.000.0000.0024.400.00339.3786.260.000.0000.0021.070.00363.984.110.000.0000.0024.530.00396.483.510.000.0000.0032.500.00396.400.00revestimiento
de 5 cm.VOLUMENES TOTALES DE OBRA:TOTAL REVEST =TOTAL RELLENO
=TOTAL CORTE =AREA DE PAV. =