Prof. Dr. techn. G. Scheffknecht Institute of Combustion and Power Plant Technology M. Hornberger , H. Dieter, G. Scheffknecht The 6 th High Temperature Solid Looping Cycles Network Meeting, September 1 st , 2015, Milan Calcium Looping Post Combustion CO 2 Capture: A promising technology for emission free cement production
14
Embed
Calcium Looping Post Combustion CO2 Capture: A · PDF filereci. Flue Gas CO 2-lean Flue Gas O 2 + reci. Flue Gas O 2 + reci. Flue Gas O 2 + reci. Flue Gas Flue Gas O 2. Operational
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Prof. Dr. techn. G. Scheffknecht
Institute of Combustion and Power Plant Technology
M. Hornberger, H. Dieter, G. Scheffknecht
The 6th High Temperature Solid Looping Cycles Network Meeting,
September 1st, 2015, Milan
Calcium Looping Post Combustion CO2 Capture:
A promising technology for emission free
cement production
2
Expertise in Lime based Fluidized Bed Processes
Fluidized Bed Processes
Calcium Looping (CaL)
Chemical Looping (CLC)
Oxy-fuel CFB
Sorption enhanced reforming (SER)
Oxy-fuel SER
Fuels
Biomass
Waste
Lignite / Coal
Measurement techniques
Sorbent Characterization (TGA)
Online gas analysis:
CO2, CO, O2, H2, CH4, SOx, NOx
Non-condensable HC: GC
Tar: wet chemical & online (FID)
H2S, HCl, NH3: wet chemical
200 kWth DFB Pilot
Facility20 kWth electrically heated
DFB System
5 kWth electrically heated
FB batch System
Calcium Looping – Post Combustion CCS
Flue
Gas
Air
Coal
ASU
O2
N2
CO2-lean
Flue Gas
CO2-rich Flue Gas
CO2 to Storage
CaCO3
CaO
Calciner
T = 900 °CCaCO3 + Heat CO2 + CaO
CO2
Conditioning
Make-up Limestone
Purge
Carbonator
T = 650 °CCO2 + CaO CaCO3 + Heat
CoalAir
Power Plant
G 1
Steam Generator
CaL Steam Generator
G 2
retrofitting to existing facilities
low CO2 separation cost
low efficiency penalty3
Calcium Looping – Post Combustion CCS
4
General conditions
Looping Ratio: 2 - 10
Make-up Ratio: < 0,1 - 0,4
Temperature
TCalciner: 850 - 1000 °C
TCarbonator: 600 - 700 °C
Flue gas
CO2: ~ 15 %
F
B C
aro
bn
ato
r
F
B C
alc
ine
r
CO2 lean
Flue Gas
Flue Gas
CO2 rich Gas
CaCO3
Fuel
O2
Steam Cycle
PurgeAsh
Air
Fuel
Steam Cycle
Calcium Looping – Pilot Plant (200 kWth)
Operation Conditions
Flue Gas Load: 170 - 230 kWth
Sorbent Looping Ratio: 3 - 13 molCaO/molCO2
Total Solid Inventory: 70 - 120 kg CaO/CaCO3
5
CaO
CaCO3
CO2-rich Gas
reci.
Flue Gas
CO2-lean
Flue Gas
O2 + reci.
Flue Gas
O2 + reci.
Flue Gas
O2 + reci.
Flue Gas
Flue
Gas
O2
Operational Results – Carbonator
6
500
600
700
800
900
1000
Tem
pe
ratu
re [
°C]
T Regenerator
T Carbonator
60
70
80
90
100
CO
2 C
aptu
re [
%]
ECO2
0
5
10
15
20
8:05 9:05 10:05 11:05 12:05 13:05
CO
2C
on
c. [
vol-
%]
yCO2, in
yCO2,out
Over 90% capture efficiency achieved over a wide range of operating conditions