CalARP/RMP/PSM Common Deficiencies Presented by: Stephanie Smith, PE Risk Management Professionals, Inc. (949) 282-0123 (877) 532-0806 www.RMPCorp.com
34

CalARP/RMP/PSM Common Deficiencies Common Deficiencies Presented by: ... –Seismic Assessment (California) Common Program ... guidance –Hazards Analysis ...

May 13, 2018

Download

Documents

vodien
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: CalARP/RMP/PSM Common Deficiencies Common Deficiencies Presented by: ... –Seismic Assessment (California) Common Program ... guidance –Hazards Analysis ...

CalARP/RMP/PSM Common Deficiencies

Presented by:Stephanie Smith, PE

Risk Management Professionals, Inc.(949) 282-0123 ● (877) 532-0806

www.RMPCorp.com

Page 2: CalARP/RMP/PSM Common Deficiencies Common Deficiencies Presented by: ... –Seismic Assessment (California) Common Program ... guidance –Hazards Analysis ...

Stephanie M. Smith, PERisk Management Professionals

• Environmental Engineering– B.S. - California Polytechnic State University, San Luis

Obispo– M.S. - University of Southern California

• 10 years engineering experience• Environmental Remediation• Dispersion Modeling• CalARP / RMP / PSM Program Development and

Auditing– Ammonia Refrigeration– Agriculture– Cogeneration

• Webinar / Presentation Speaker on PSM/RMP Topics

• LA Chapter RETA Board Member (2 years)

Page 3: CalARP/RMP/PSM Common Deficiencies Common Deficiencies Presented by: ... –Seismic Assessment (California) Common Program ... guidance –Hazards Analysis ...

Key Topics

• Program 3 Elements and Overlap• Periodic Requirements• Common Program Deficiencies• References

Page 4: CalARP/RMP/PSM Common Deficiencies Common Deficiencies Presented by: ... –Seismic Assessment (California) Common Program ... guidance –Hazards Analysis ...

PSM Elements

PSM

EPPSI

PHA

OP

TRN

CON

PSSRMI

HWP

MOC

II

EP&R

CA

• Employee Participation• Process Safety Information• Process Hazard Analysis• Operating Procedures• Training• Contractors• Pre-Startup Safety Review• Mechanical Integrity• Hot Work Permit• Management of Change• Incident Investigation• Emergency Planning &

Response• Compliance Audits (CA-

IIPP)

Page 5: CalARP/RMP/PSM Common Deficiencies Common Deficiencies Presented by: ... –Seismic Assessment (California) Common Program ... guidance –Hazards Analysis ...

Prevention Program OverlapSection US EPA RMP

(40 CFR)OSHA

(29 CFR)CalARP

(19 CCR)Cal/OSHA PSM

(8 CCR)Process Safety

Information68.65 1910.119 (d) 2760.1 5189 (d)

Process Hazard Analysis 68.67 1910.119 (e) 2760.2 5189 (e)

Operating Procedures 68.69 1910.119 (f) 2760.3 5189 (f)

Training 68.71 1910.119 (g) 2760.4 5189 (g)

Mechanical Integrity 68.73 1910.119 (j) 2760.5 5189 (j)

Management of Change 68.75 1910.119 (l) 2760.6 5189 (l)

Pre-Startup Safety Review

68.77 1910.119 (i) 2760.7 5189 (i)

Compliance Audit 68.79 1910.119 (o) 2760.8

Incident Investigation 68.81 1910.119 (m) 2760.9 5189 (m)

Employee Participation 68.83 1910.119 (c) 2760.10 5189 (p)

Hot Work Permit 68.85 1910.119 (k) 2760.11 5189 (k)

Contractors 68.87 1910.119 (h) 2760.12 5189 (h)

Emergency Planning & Response

68.95 1910.119 (n) Article 7 5189 (n)

Trade Secrets 1910.119 (p)

Page 6: CalARP/RMP/PSM Common Deficiencies Common Deficiencies Presented by: ... –Seismic Assessment (California) Common Program ... guidance –Hazards Analysis ...

Periodic Requirements• Ongoing, as Changes to Process Occur• Annual Review/Update

– Operating Procedures– Emergency Plan (EAP or ERP)

• Triennial (Every Three Years)– Refresher Training– Compliance Audit

• Every 5-Years– CalARP/RMP Submittal– Hazard Assessment/Off-site Consequence

Analysis– Process Hazard Analysis– Seismic Assessment (California)

Page 7: CalARP/RMP/PSM Common Deficiencies Common Deficiencies Presented by: ... –Seismic Assessment (California) Common Program ... guidance –Hazards Analysis ...

Common Program Deficiencies

• Deficiencies include those:– observed by industry, consultants, and

regulators, – from US EPA Enforcement Alert,

February 2015, – from Revised CalARP Regulations

effective January 1, 2015, and– from US EPA Region 9 presentation at

the 2016 Refrigerating Engineers and Technicians Association (RETA) Safety Day for Los Angeles and Inland Empire.

Page 8: CalARP/RMP/PSM Common Deficiencies Common Deficiencies Presented by: ... –Seismic Assessment (California) Common Program ... guidance –Hazards Analysis ...

CalARP/RMP Submittal• Submittal not completed and submitted to the

agency in a timely manner• Management System not in-place

– Must be documented in the submittal– Includes organization chart and responsibilities– Must be up-to-date

• Changes in ownership or updated contact information– Administrative changes that must be updated as

they occur– Does not reset the 5-year anniversary date

• New accident history information• New emergency contact information

Page 9: CalARP/RMP/PSM Common Deficiencies Common Deficiencies Presented by: ... –Seismic Assessment (California) Common Program ... guidance –Hazards Analysis ...

Hazard Assessment• Description of alternative release scenario is not

available– Should be considered “more likely to occur” than

worst-case– Should consult industry and best-practice for

guidance– Hazards Analysis findings

• Worst-case and alternative release scenarios do not meet requirements in Sections 2750.3 and 2750.4

• Revalidation– Failure to update population count based on most

recent census– Failure to update list of sensitive receptors and

maps, where required (i.e., LEPC Region I)

Page 10: CalARP/RMP/PSM Common Deficiencies Common Deficiencies Presented by: ... –Seismic Assessment (California) Common Program ... guidance –Hazards Analysis ...

Process Safety Information• Piping and Instrumentation Diagrams

(P&IDs)– Missing– Do not reflect changes to process or system

• Lack of documentation for:– Relief system design– Compliance with RAGAGEP– Electrical area classifications and

distribution system– Chemical reactivity hazards– Codes and standards used during design

• Information not kept up-to-date

Page 11: CalARP/RMP/PSM Common Deficiencies Common Deficiencies Presented by: ... –Seismic Assessment (California) Common Program ... guidance –Hazards Analysis ...

What is RAGAGEP?• Center for Chemical Process Safety (CCPS)

definition:“Recognized And Generally Accepted Good Engineering Practices” (RAGAGEP) - are the basis for engineering, operation, or maintenance activities and are themselves based on established codes, standards, published technical reports or recommended practices (RP) or similar documents. RAGAGEP detail generally approved ways to perform specific engineering, inspection or mechanical integrity activities, such as fabricating a vessel, inspecting a storage tank, or servicing a relief valve.”

• Sources of RAGAGEP– Published and widely accepted codes– Published consensus documents– Published non-consensus documents

Page 12: CalARP/RMP/PSM Common Deficiencies Common Deficiencies Presented by: ... –Seismic Assessment (California) Common Program ... guidance –Hazards Analysis ...

Process Hazard Analysis• PHA not conducted by a knowledgeable person

– Knowledge of the system– Knowledge of set points/design– Knowledge in PHA methodology

• Identifying hazards properly– Include understanding of gap between new industry

codes and codes to which facility was built– Develop a plan to address safety deficiencies

(upgrades?)– Emergency shutoff location– Missing key controls due to old industry standards– Pressure-relief devices located where ammonia

could be sprayed on people/personnel

Page 13: CalARP/RMP/PSM Common Deficiencies Common Deficiencies Presented by: ... –Seismic Assessment (California) Common Program ... guidance –Hazards Analysis ...

Process Hazard Analysis (cont.)

• Recommendations not closed in a timely manner:– Agreed-upon timeline with AA– Within 2.5 years of the PHA– During the next turnaround

• Lacking documentation for closed recommendations– Must keep for the life of the process– Must include completion dates

• Five-year update not completed by anniversary

• Human factors or facility siting not addressed

Page 14: CalARP/RMP/PSM Common Deficiencies Common Deficiencies Presented by: ... –Seismic Assessment (California) Common Program ... guidance –Hazards Analysis ...

Process Hazard Analysis (cont.)

• Revalidations performed more than once consecutively

• Facility siting not based on current design codes/standards

• Industry accepted approach not used, or not used correctly

• Inconsistent consideration of scenarios and risk ranking

Page 15: CalARP/RMP/PSM Common Deficiencies Common Deficiencies Presented by: ... –Seismic Assessment (California) Common Program ... guidance –Hazards Analysis ...

Operating Procedures

• Procedure outdated or annual certification not performed

• Written procedures not synchronized with operator actions

• Each phase of operation (i.e., temporary) not covered with an assigned SOP

• Emergency shutdown procedure job assignments not clear

Page 16: CalARP/RMP/PSM Common Deficiencies Common Deficiencies Presented by: ... –Seismic Assessment (California) Common Program ... guidance –Hazards Analysis ...

Operating Procedures (cont.)

• Acceptable alarm set point range not documented

• Procedures not in the language of the user

• Operating limits and/or consequences of deviation not included

• Safe work practices not followed

Page 17: CalARP/RMP/PSM Common Deficiencies Common Deficiencies Presented by: ... –Seismic Assessment (California) Common Program ... guidance –Hazards Analysis ...

Training

• Documentation of training not on-file• Refresher training not performed

– Every 3 years– As needed

• Training does not cover maintenance procedures

• Records do not verify operators understanding of procedures

• Training not in the language of the operator/user

Page 18: CalARP/RMP/PSM Common Deficiencies Common Deficiencies Presented by: ... –Seismic Assessment (California) Common Program ... guidance –Hazards Analysis ...

Mechanical Integrity• Written procedures not available, not

complete, or not implemented• Inspection/maintenance not performed or not

documented– Frequency not consistent with industry

standards– Pipe corrosion issues and piping

support/security not addressed– Schedule and procedure for defrosting (ice

build-up) non-existent• Annual and/or 5-year inspections not

performed• Not documenting preventative maintenance

schedule with contractor

Page 19: CalARP/RMP/PSM Common Deficiencies Common Deficiencies Presented by: ... –Seismic Assessment (California) Common Program ... guidance –Hazards Analysis ...

Mechanical Integrity (cont.)• Equipment deficiencies not corrected in a

safe or timely manner• Quality assurance plan not in-place• Sufficient information not available for

piping and equipment to understand hazards and develop maintenance program

• Facility does not have adequate ventilation

• Lack of ventilation/relief system design basis

• Inadequate component labeling

Page 20: CalARP/RMP/PSM Common Deficiencies Common Deficiencies Presented by: ... –Seismic Assessment (California) Common Program ... guidance –Hazards Analysis ...

Management of Change• Procedure not used• Prevention Program documentation not

updated to reflect changes– PSI, P&IDs, SOPs, Training, etc.

• Personnel not adequately notified of the change

• The need for modifications to existing operating and/or maintenance procedures or whether new procedures are needed is not assessed

• MOC procedure not completed prior to startup

Page 21: CalARP/RMP/PSM Common Deficiencies Common Deficiencies Presented by: ... –Seismic Assessment (California) Common Program ... guidance –Hazards Analysis ...

Pre-Startup Safety Review

• Procedure not documented• Documentation not kept on file or not

completed following implementation• Documentation not completed or

signed prior to start-up• PSSR not documented and conducted

independently of the MOC

Page 22: CalARP/RMP/PSM Common Deficiencies Common Deficiencies Presented by: ... –Seismic Assessment (California) Common Program ... guidance –Hazards Analysis ...

Compliance Audit• Recommendations not corrected/completed

– Agreed-upon timeline with AA– Due 1.5 years from audit– During next planned turnaround

• Compliance audit not completed by anniversary date

• No documentation included regarding audit scope, methods used, or findings

• Program implementation not verified with facility personnel

• Completion dates of recommendations not included in documentation

• Not keeping most recent two (2) audits on-file

Page 23: CalARP/RMP/PSM Common Deficiencies Common Deficiencies Presented by: ... –Seismic Assessment (California) Common Program ... guidance –Hazards Analysis ...

Incident Investigation

• No follow-through on recommendations– Agreement on timeline with AA– Due 1.5 years following investigation or due

2 years after the date of incident, whichever is earlier

– During next planned turnaround• Findings not shared with affected

personnel• Investigation not initiated within 48 hours

of the incident

Page 24: CalARP/RMP/PSM Common Deficiencies Common Deficiencies Presented by: ... –Seismic Assessment (California) Common Program ... guidance –Hazards Analysis ...

Incident Investigation (cont.)

• Required information not documented during investigation or in report

• No investigation or documentation of near-misses

• Completion dates not documented for recommendations/deficiencies

• Incident not reported to appropriate authorities within 6 months

Page 25: CalARP/RMP/PSM Common Deficiencies Common Deficiencies Presented by: ... –Seismic Assessment (California) Common Program ... guidance –Hazards Analysis ...

Employee Participation

• Written plan not documented and/or shared with facility personnel

• Personnel involved with covered process operations not aware of location of CalARP/RMP/PSM documentation and procedures

• Personnel not involved with program development

• Documentation not in or not communicated in the language of the operator/user

Page 26: CalARP/RMP/PSM Common Deficiencies Common Deficiencies Presented by: ... –Seismic Assessment (California) Common Program ... guidance –Hazards Analysis ...

Hot Work Permit

• Personnel not trained or knowledgeable on the procedure(s)

• Records are not documented or not kept on-file

• Hot work area is not field-verified by a supervisor

Page 27: CalARP/RMP/PSM Common Deficiencies Common Deficiencies Presented by: ... –Seismic Assessment (California) Common Program ... guidance –Hazards Analysis ...

Contractors

• No documentation regarding contractors training or procedures for conducting work/maintenance on the covered process

• Lack of contractor/visitor safety training

• Lack of periodic evaluation/audit of contractor(s)

Page 28: CalARP/RMP/PSM Common Deficiencies Common Deficiencies Presented by: ... –Seismic Assessment (California) Common Program ... guidance –Hazards Analysis ...

Emergency Planning & Response

• Emergency Response Plan vs. Emergency Action Plan– Not knowing the difference– Not having the correct plan in-place– Not meeting emergency response

requirements by other agencies• Contact information not up-to-date

– Point of contact must be updated within 6 months of change.

• Annual review not completed/documented• Training not performed/documented

Page 29: CalARP/RMP/PSM Common Deficiencies Common Deficiencies Presented by: ... –Seismic Assessment (California) Common Program ... guidance –Hazards Analysis ...

Emergency Planning & Response (cont.)

• Coordination with local agency/agencies not documented

• No written response procedures– Informing and interfacing with public and

local responders– Documentation of proper first-aid and

emergency medical treatment– Procedures related to chemical release– Checking/inspecting emergency

equipment– ICS training for relevant employees

Page 30: CalARP/RMP/PSM Common Deficiencies Common Deficiencies Presented by: ... –Seismic Assessment (California) Common Program ... guidance –Hazards Analysis ...

RecommendationFollow-up

• Assign an individual to follow-up on recommendation completion

• Assign anticipated date of completion to every recommendation– Follow regulatory requirements– Verify AA or UPA agrees with timeline

• Document actions taken to address recommendation, label “closed” when addressed, and record the date of completion

• Applies to all recommendations from PHA, II, CA, Seismic Assessment (California only) and other regulatory audits.

Page 31: CalARP/RMP/PSM Common Deficiencies Common Deficiencies Presented by: ... –Seismic Assessment (California) Common Program ... guidance –Hazards Analysis ...

Program Cycle

Requirements/Improvements

ProgramManagement

Documentation

Training

Feedback

Page 32: CalARP/RMP/PSM Common Deficiencies Common Deficiencies Presented by: ... –Seismic Assessment (California) Common Program ... guidance –Hazards Analysis ...

Most Common, Program-Wide Deficiencies

RECOMMENDATION FOLLOW-UP

DOCUMENTATION

If these are missing, there’s a deficiency!

Page 33: CalARP/RMP/PSM Common Deficiencies Common Deficiencies Presented by: ... –Seismic Assessment (California) Common Program ... guidance –Hazards Analysis ...

References• Risk Management Professionals’ Regulatory

Update Webpage (http://www.rmpcorp.com/sms_regulatory_updates/)

• US EPA Enforcement Alert, February 2015 (http://www.rmpcorp.com/u-s-epa-enforcement-alert-ammonia-refrigeration-facilities/)

• Revised CalARP Regulations Effective January 1, 2015 (http://www.caloes.ca.gov/HazardousMaterials/Pages/Cal-ARP-Regulation-Amendments-2015.aspx)

• US EPA Region 9 2016 SoCal RETA Safety Day Presentation (https://www.reta-socal.com/attendees.html)

Page 34: CalARP/RMP/PSM Common Deficiencies Common Deficiencies Presented by: ... –Seismic Assessment (California) Common Program ... guidance –Hazards Analysis ...

Questions?

Stephanie Smith, [email protected]