Cable Enterprise A1 Cable Laying Barge, DPS-2 DP2 upgrade conversion project Delivered in 2015 - Production of Classification and Design Documentation - Extention of the barge for 10 meters - Total 1400 tons of steel installed - New Bulbous Bow fabricated, assembled and mounted - New Aft Engine Room Section to accomodate two diesel engine driven Voith Schneider propellers - New Forward Engine Room Section with two diesel electric generating sets, powering two Wartsila azimuth thrusters, and two tunnel thrusters - Two new decks on the accommodation block - Fully equipped Bridge Controll Room and additional accomodation facilities - Total 155 tons of pipeline installed - Total 145 km of electrical cables installed - Latest generation of propulsion equipment and automation systems installed, integrated, commissioned and completed including DP proving trials - Installation of sophisticated cable lay equipment - Production and installation of Pick Up Arm - Installation of sophisticated NOx reducing system, compliant with IMO Tier 3 standard - Installation of Urea Solution Production Plant developed for this vessel Upgrading a „dumb“ cable lay barge with dynamically positioning capabilities (DP-2 Class) Conversion Works: