Top Banner
12 th April 2006 Workshop on test facilities 1 Cable and Strand test facility L. Oberli, A. Verweij Outline : •Test facilities installed in 103 and 163 •Cryogenic equipments to characterize the superconductors in 163 •Test program for coming years
7

Cable and Strand test facility

Jan 22, 2016

Download

Documents

dewey

Cable and Strand test facility. L. Oberli, A. Verweij. Outline : Test facilities installed in 103 and 163 Cryogenic equipments to characterize the superconductors in 163 Test program for coming years. Map of the Buildings 103 and 163. Control room. Cold Box 130 l/h. 163. - PowerPoint PPT Presentation
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Cable and Strand test facility

12thApril 2006 Workshop on test facilities 1

Cable and Strand test facility

L. Oberli, A. Verweij

Outline :

•Test facilities installed in 103 and 163

•Cryogenic equipments to characterize the superconductors in 163

•Test program for coming years

Page 2: Cable and Strand test facility

12thApril 2006 Workshop on test facilities 2

Transpooling zone for cable

Furnace

Strand sample preparation area

Map of the Buildings 103 and 163

Preparation area for cable

FRESCA

103

163

Control room

Cold Box

130 l/h

Cryogenic Equipment in 163 :

• 7 small Cryostats for strand tests

• FRESCA facility for Ic cable test

• 1 cold box

• 6000 l dewar for Fresca operation

Page 3: Cable and Strand test facility

12thApril 2006 Workshop on test facilities 3

Building 103

“Chemical” room : Cu/Sc and

metallography preparation

Strand and cable samples characterization

Page 4: Cable and Strand test facility

12thApril 2006 Workshop on test facilities 4

Trans-spooling zone for cable

Furnace

Strand sample preparation area

Building 163

Preparation area for cable

FRESCA

103

163

Control room

Cold Box

130 l/h

Cryogenic Equipment in 163 :

• 7 small cryostats for strand tests

• FRESCA facility for Ic cable test

• 1 cold box

• 6000 l dewar for FRESCA operation

LHe consumption : FRESCA ~ 70 %

small crysotats ~ 30%

M Rc RRR

Page 5: Cable and Strand test facility

12thApril 2006 Workshop on test facilities 5

163 : Trans-spooling equipment and preparation area for strand samples

Page 6: Cable and Strand test facility

12thApril 2006 Workshop on test facilities 6

163 : Cryogenic test facility for strand and cable samples

7 small cryostats for strand samples tests :

• 2 cryostats for Ic on NbTi strand : 1 kA, B = 11 T at 4.2 K, 13 T at 1.9 K

Sample holders for 10 samples

• 1 cryostat for Ic test on Nb3Sn strand : 4 kA, B = 12.5 T at 4.2 K

Sample holder for 2 kA and a single sample

• 1 cryostat for thermal transfer measurements on insulated cable :

1.8 K < T < 2.1 K

• 1 cryostat for Rc test on cable samples : 4.2 K

• 1 cryostat for RRR test on NbTi and Nb3Sn strands

• 1 cryostat for Magnetisation test on NbTi strands (to be upgraded to measure Nb3Sn strands and

electromagnetic instabilities)

Page 7: Cable and Strand test facility

12thApril 2006 Workshop on test facilities 7

163 : Test program for coming years

Characterization of Nb3Sn strand by Ic and RRR measurements for NED and CERN programs

Ic measurements on LHC strands and on strands with very small filament diameter ( ~ 1 m)

Evaluation of the transfer of heat from the coil of the LHC dipole magnet to He II

Rc test to qualify different types of coating for AC cables, tests on core cables and on LHC cables

Magnetization measurements on LHC strands, Nb3Sn strands, strands for Neuro-spin project, strands for AC applications