H E N R Y J C A R T E R S P E C I A LT Y H O S P I TA L
RENOVATION
ADDRESS: 1867 MADISON AVE, NYC
PROJECT SIZE: 276,000 SQ. FT
CLIENT: NYC EDC + NYC HHC
ARCHITECT: ARRAY ARCHITECTS
CM: GILBANE + McKISSACK JV
NEW CONSTRUCTION
ADDRESS: 1752 PARK AVE, NYC
PROJECT SIZE: 133,850 SQ. FT
CLIENT: NYC EDC + NYC HHC
ARCHITECT: ARRAY ARCHITECTS
ASSOC ARCH: GEDDIS ARCHITECTS
CM: GILBANE + McKISSACK JV
LTA C H S N F
LTA C H + S N F = H H C T O TA L $ 1 5 3 , 1 9 1 , 0 0 0 + $ 1 3 1 , 3 0 1 , 0 0 0 = $ 2 8 4 , 4 9 2 , 0 0 0
Long Term Acute Care Hospital 276,000 SF renovation, housing 201 beds. Seven floors plus cellar, penthouses (3), and shared loading. Two elevator cores: 3 service cars, 3 passenger cars.
Skilled Nursing Facility new construction, 133,850 gross SF. Six floors plus cellar, connector to LTACH, penthouse and shared loading. Two elevator cores: 2 service cars, 2 passenger cars.
area of detail!
project location map!
Goldwater (Roosevelt Island)!
Skilled Nursing Facility (SNF) 1879 Madison Ave!
Institute for Family Health (FH) 1824 Madison Ave!
Long Term Acute Care Hospital (LTACH) 1879 Madison Ave!
project overview! site location!
Long Term Acute Care Hospital (LTACH)!
• Renovation of former North General Hospital,! 1879 Madison Avenue, New York, NY!!• 276,385 SF Inpatient Acute Care Hospital!!• 201 Beds relocated from existing facility on! Roosevelt Island!!
Skilled Nursing Facility (SNF)!
• New Construction!!• 164 Beds!!• 130,000 SF!
• Connection to Renovated LTACH!!
LTA C H
S N F
RELOCATED from Roosevelt Island
IMAGE SOURCE: GILBANE CO IMAGE SOURCE: ARRAY ARCHITECTS
3
LTA C H - 2 0 1 B E D S
2 32 Beds!
3 32 Beds!4 32 Beds!5 34 Beds!6 34 Beds!
2 Diagnostic/Clinical!
3 35 Beds (Ventilator & Weaning)!
4 40 Beds (Ventilator)!
5 36 Beds (Ventilator)!6 40 Beds (Medical)!7 50 Beds (Medical)!
1 Lobby/ Community! Connector 1 Lobby/ Community!
Cellar! Cellar!Connector!
Skilled Nursing Facility!164 BEDS!
Long Term Acute Care Hospital! (Former North General Hospital)!
! 201 BEDS!
!
project overview! site location!
IMAGE SOURCE: ARRAY ARCHITECTS
(Ventilator)
S N F - 1 6 4 B E D S
ON-SITE CO-LOCATION
The Gilbane and McKissick JV and Array and Geddis architecture team had full-time team members on site during the entire construction. This enabled instantaneous and continuous communication, supervision, and problem solving.
IMAGE SOURCE: ARRAY ARCHITECTS
5
Typical Bedroom Types Goldwater North Skilled Nursing Facility
Typical Semi-‐Private
23
Typical Private
Typical Bariatric Private Typical Isola8on
SNF First Floor Floor Plans
22
Oxygen Tanks
Trash Area Truck Dock
Community Meeting
Hall
Administration
Concourse
SNF Lobby
Art/ Culinary
Music/ Movement Chapel
Library/ Computer
Pre- Function
Gen. Store
Salon
Smoking
Family Visiting
FIRST FLOOR
P AT I E N T R O O M T Y P E S
S K I L L E D N U R S I N G F A C I L I T Y - S N F
TYPICAL SEMI-PRIVATEIMAGE SOURCE: ARRAY ARCHITECTS
Typical Bedroom Types Goldwater North Skilled Nursing Facility
Typical Semi-‐Private
23
Typical Private
Typical Bariatric Private Typical Isola8on
SNF Typical Floor
Floor Plans
25
Pant
ry
Din
ing
Li
ving
Rec
rea
tion
Ce
ntra
l St
aff
Porc
h
Ce
ntra
l Ba
thin
g
Sta
ff W
ork
roo
m
IDF
Typical Bedroom Types Goldwater North Skilled Nursing Facility
Typical Semi-‐Private
23
Typical Private
Typical Bariatric Private Typical Isola8on
Typical Bedroom Types Goldwater North Skilled Nursing Facility
Typical Semi-‐Private
23
Typical Private
Typical Bariatric Private Typical Isola8on
TYPICAL FLOOR
TYPICAL PRIVATE TYPICAL BARIATRIC TYPICAL ISOLATION 7
S N F E X C AVAT I O N
9
S N F F O U N D AT I O N
11
1 2
3 4
S N F F O U N D AT I O N
ABOVE: ride-on concrete power trowelLEFT: rebar connection between sections of concrete being placed in phases.
15
S N F F O R M W O R K
SNF was designed as a cast-in-place concrete structure with a curtainwall and pre-cast panel envelope. Building a cast-in-place structure requires formwork to create the shape of the foundation, floor slabs, columns and beams. Moving up from the foundation, each floor is placed on top of the previous one. After the formwork is set up, rebar is layed throughout as required in the structural drawings. Then, wet concrete is pumped from the mixing truck into the form. When the concrete reaches the necessary strength, the formwork is removed and shoring is put in place. The formwork is reassembled to create the floor above.
RIGHT: view from northwest corner of Park Ave and 122nd StreetABOVE: worker directs the concrete hose into the wall space
17
S N F F O R M W O R KHorizontal: Floor Slabs
Vertical: Shear Walls
19
1 2
5 6
Placing second half of concrete foundation slab
First Floor form work Placing rebar in slab and beams
Concrete drying
7 8
3 4
S N F S U P E R S T R U C T U R E
Foundation complete Building scaffolding for First Floor
Placing First Floor slab with quick-setting cement Loading new slab for next floor scaffolding
23
24
ABOVE: parapet connection points
ABOVE: bearing and lateral precast panel connectionLEFT: panels lifted into place by crane
BEARING
LATERAL
S N F E X T E R I O R E N V E L O P E
Precast panels arriving by tuck Inspecting the panels
Before installation
Precast mock-up Lateral and bearing connection points for panels
During installation
O C T O B E R ‘ 1 3 B L I Z Z A R D
29
Partial envelope enclosure achieved prior to Hurricane Sandy and subsequent blizzard
View from 122nd Street & Park Avenue
Steps to installing the curtain wall
S N F C U R TA I N WA L L
BELOW: shoring in place while the concrete reaches its max strength
BELOW: subcontractor using plans to lay out the interior walls
S N F I N T E R I O R L AY O U T
LEFT: coring through slab
BELOW: waste plumbing and top track; interior partitions and HVAC ducts.
GRAB BAR MOCK-UP PLUMBING WALL CHASE
Copper water pipes
Toilet carrier for wall mounted toilet
Cast iron waste pipes
Gypsum board and blocking
Insulated copper pipe
Temporary enclosure & door
Metal studs
Bottom track
Blocking
B E H I N D T H E WA L L
PLUMBING WALL CHASE HVAC INSTALLATION
Open shaft
Ducts with LEED protective covering
Sprinkler mains
IMAGE SOURCE: EILEEN LEE, ARRAY ARCHITECTS
36
Oxygen Tank, located between LTACH and SNF
Front Entry Canopy of SNF during construction
The connecting Concourse, joining LTACH and SNF at the First Floor
S N F E X T E R I O R
Oxygen Tank, located between LTACH and SNF
Front Entry Canopy of SNF during construction
SNF PATIENT DINING AREA BEFORE & AFTER
SNF LIVINGROOM
S N F I N T E R I O R
IMAGE SOURCE: ARRAY ARCHITECTS
SNF PATIENT CORRIDOR BEFORE & AFTER
41
SNF LOBBY
IMAGE SOURCE: ARRAY ARCHITECTS
43
SNF CHAPEL
IMAGE SOURCE: ARRAY ARCHITECTS
45
L O N G T E R M A C C U T E C A R E H O S P I TA L - LTA C H
UP
UP
UP
KEYPLAN
GENERAL NOTES1 2 3 4 5 6 7 9
A
B
C
D
E
F
G
H
I
J
8
0.5
EXISTING LTACH
EXISTING LTACH
#5#4
#2 #3#1
STAIR #11A
STAIR #21B
STORAGE1132
STAFFLOUNGE
1134
ASSOCIATEDIR. OFFICE
1136
CLINIC &ESCORT DIR.
OFFICE1138
SPEECHWORK ROOM
1140
NURSEOFFICE1122
WORK ROOM1118
PATIENTTOILET1108
ENT EXAM1151
DECONTAMINATION1120
CLEANSUPPLY
1126
CHIEF DIR.OFFICE1130
STAFF TOILET1128
ELEC1209
PERSONNELLOCKERS
1220G
TOILET1220F
PERSONNELLOCKERS
1220E
STORAGE1220D
TOILET1220H
SUPERVISORWORK ROOM
1220C
STORAGE1220B
INTERVIEW1220A
SECURITY /POLICE ROLL
CALL1220
VESTIBULE1020
CLERICALOFFICE1220Q
LOCKERS1220R
OFFICE1220P
EXITPASSAGEWAY
1018
STORAGE1218
TOILET1220M
STORAGE1211B
MALE PUB.TOILETS
1216
TELE1301
ELEC1303
OFFICE1220N
WHEELCHAIRSTORAGE
1305
WHEEL CHAIRWORKSHOP
1306
STORAGE1304
INTERVIEW1309
TOILET1321E
TOILET1321F
TOILET1321B
STAFFLOUNGE1321D
PROSTHETIC& ORTHOTICS
1321V
STORAGE1321W
STORAGE1321R
STORAGE1321Q
FABRICATION1321P
OFFICE1321K
DIR. OFFICE1321L
STORAGE1321N
STORAGE1321M
HOUSEKEEPING1321S
SOILEDHOLDING
1321T
CLEANSUPPLY1321U
SERVICEELEVATOR
LOBBY1015
#6
STAIR 31C
HSKPG1107
SHOWER1321G
VESTIBULE1025
AMBULETTEDROP OFF
1026
ABLUTIONAREA A1103C
PHYSICALTHERAPY
1404
TRAININGTOILET/BATH
1321H
LAUNDRYALCOVE1321J
TEMPLE1101
PUBLICELEVATOR
LOBBY1003
STORAGE1321CLOCKERS
1220S
THERAPISTWORK ROOM
1321A
MOSQUE1103
RECEPTION /WAITING
1321
CAMERAMONITORING
1220J
SUPERV.CAPTAIN
1220L
DENTAL &CLINICSWAITING
1106
GYN EXAM1114
CORRIDOR1002
I.D.F. ROOM1312
CHEMICALSTORAGE
1314
CLINIC &DENTAL
RECEPTION /SCHEDULING
1104
ALCOVE1401
SPEECH1144
PATIENTTOILET1110
CAFE / GIFTSHOP1211
RESIDENT'SLOUNGE
1207
CORRIDOR1001
EGRESSCORRIDOR
1023
PASSAGE1017
PASSAGE1022
PASSAGE1019
BOTTLEDGAS STOR.
1310
STORAGE1105
OCCUPATIONALTHERAPY
1405
RECEPTION1307
COORDINATINGMANAGER
1307B
DIRECTOROFFICE1307A
PASSAGE1021
TOILET1307E
STAFFOFFICE1307D
ALCOVE1406
FEMALE PUB.TOILETS
1210
CAFEWORKROOM
1211A
TELEVISIONPRODUCTION
1208C
MECHANICAL1307C
CORRIDOR1024
WORSHIPOFFICE1322
VESTIBULE1101A
SUBWAITING1409
EYE EXAM1149
MUSTERING1116
CHARTING1124
BROADCASTONAIR1208A
PRODUCTION1208
PATIENT RELATIONS
NURSING ADMIN.CLERICAL /RECEPTION
1200
ADMISSIONS
SECURITY PT/ OT
CLINICSDENTAL
VESTIBULE1008
CORRIDOR1014
SPEECH /AUDIOLOGY
UP
OFFICE1208B
ART DISPLAYALCOVE
1402
PANOREX1112A
DENTALOFFICE1115C
PASSAGE1010
PASSAGE1007
SURGERYEXAM1147
EXAM1145
SOILEDUTILITY
1129
STAFF TOILET1131
SPEECH &AUDIOLOGY
WAITING1102
SPEECHAUDIOLOGY &
REHABTECHS1102A
AUDIOLOGYWORK1142
STORAGE1103A
STAFFSHOWER
1316
STAFFSHOWER
1318
SPEECH1143
COATCLOSET
1137
PASSAGE1012
SITTINGALCOVE
1400
CONSULT1320
ABLUTIONAREA B1103B
WASHING1115A
TOILET1212
TOILET1214
N2O TANKSTORAGE
1112C
CLOSET1112B
ASSISTANTDIRECTOR
1201A100 SF
ASSISTANTDIRECTOR
1201CCLERICAL
1201EDIRECTOR
1201F
PASSAGE1201
SIGNIN1407
CONFERENCE1202
CORRIDOR1004
EXITPASSAGEWAY
1006
PASSAGE1011
PANTRY1204
TOILET1206
INFECTIONCONTROL
1205D
ADN OFFICE1203B
ADN OFFICE1203A
ADN OFFICE1203G
PASSAGE1203
CLERICAL1203F
ADN OFFICE1203D
OFFICE1205C
WORK ROOM1203C
OFFICE1205B RECEPTION /
WAITING1205
DIRECTOR1205A
STERILIZATION1115D
DENTALWORK AREA
1408
PASSAGE1115
LAB1115B
DECONTAM.1112D
DENTALOPERATORIES
1112
STORAGE1201D
COATCLOSET1201B
22'2
1/4"
28'10 5/8"
18'1
0 7/8"
655 SF
600 SF
27'7 1/4"
A215C2
SECURITYEQUIPMENT
1220K
A215A2
PASSAGE1009
CLOSET1203E
AUDIOLOGYBOOTH1142A
VESTIBULE1030
AREA
AAR
EA C
AREA
BAR
EA D
AREA AAREA B
AREA CAREA D
N
LTACH SNF
1. FOR LIFE SAFETY PLANS SEE SHEET LS111
2. PROPOSED PROJECT DOES NOT MEET THE REQUIREMENTS OF ZR2580.PROJECT IS NOT A NEW DEVELOPMENT OR HAVE AN INCREASE IN FLOOR AREA.REFER TO JOB No: 121181522 FOR BICYCLE STORAGE.
3. FOR FIRST FLOOR ENLARGED ARCHITECTURAL PLANS SEE SHEETS A211, A212, A213, A214 & A215.
4. FOR FIRST FLOOR ENLARGED EQUIPMENT PLANS SEE SHEETS A216, A217, A218 & A2119.
5. FOR ENLARGED TOILET ROOM PLANS SEE SHEETS A441 THROUGH A451.
PRSI-037-L 10/31/12
102 Madison AvenueNew York, NY 10016
Philip Habib & Associates Engineers and Planners
C E LLP
MECHANICAL * ELECTRICAL * PLUMBING * FIRE PROTECTION
Excellence in Design Since 1957
ONSULTING NGINEERS,KALLEN & LEMELSON
520 Eighth Avenue, 17th FloorNew York, NY 10018 Tel: 2126439898Fax: 2126432332 / 2126431449www.klengineers.com
Yhealthcare facilities solutionshealthcare facilities solutionshealthcare facilities solutionshealthcare facilities solutions
New York, NY 10010New York, NY 10010New York, NY 10010New York, NY 1001060 Madison Avenue, Suite 100160 Madison Avenue, Suite 100160 Madison Avenue, Suite 100160 Madison Avenue, Suite 1001
www.arrayhfs.comwww.arrayhfs.comwww.arrayhfs.comwww.arrayhfs.comf: 646.742.3001f: 646.742.3001f: 646.742.3001f: 646.742.3001t: 212.689.3110t: 212.689.3110t: 212.689.3110t: 212.689.3110
RRA A
Architect of Record:Architect of Record:Architect of Record:Architect of Record:
A r c h i t e c t s P. C.A r c h i t e c t s P. C.A r c h i t e c t s P. C.A r c h i t e c t s P. C.
This document is a copyright protected instrument of service, property of ARRAY andlicensed for use in the titled project only. Reproduction or use of this documentwithout written permission of ARRAY is illegal and will be prosecuted under the law.
ARRAY HFSARRAY HFSARRAY HFSARRAY HFSCOPYRIGHT - 2012COPYRIGHT - 2012COPYRIGHT - 2012COPYRIGHT - 2012C
DATE:DATE:DATE:DATE:SEAL:SEAL:SEAL:SEAL:
IMPLEMENTING AGENT:IMPLEMENTING AGENT:IMPLEMENTING AGENT:IMPLEMENTING AGENT:
PROJECT:PROJECT:PROJECT:PROJECT:
PROJECT No.PROJECT No.PROJECT No.PROJECT No.
CON/REF No.CON/REF No.CON/REF No.CON/REF No.
DRAWN:DRAWN:DRAWN:DRAWN:
CHK:CHK:CHK:CHK:
SHEET TITLE:SHEET TITLE:SHEET TITLE:SHEET TITLE:
F
1
HOSPITAL:HOSPITAL:HOSPITAL:HOSPITAL:
E
D
C
B
A
2 3 4 5 6 7 8
ADDRESS:ADDRESS:ADDRESS:ADDRESS:
ofofofofDWGDWGDWGDWG
CONTRACT # 47840002CONTRACT # 47840002CONTRACT # 47840002CONTRACT # 47840002
516 NORTH BLAKELY ST. SCRANTON, PA 18512516 NORTH BLAKELY ST. SCRANTON, PA 18512516 NORTH BLAKELY ST. SCRANTON, PA 18512516 NORTH BLAKELY ST. SCRANTON, PA 18512PHONE: 570.496.7020 FAX: 570.496.7021PHONE: 570.496.7020 FAX: 570.496.7021PHONE: 570.496.7020 FAX: 570.496.7021PHONE: 570.496.7020 FAX: 570.496.7021
L L
110 WILLIAMS ST. NEW YORK, NY. 10038110 WILLIAMS ST. NEW YORK, NY. 10038110 WILLIAMS ST. NEW YORK, NY. 10038110 WILLIAMS ST. NEW YORK, NY. 10038
346 BROADWAY, 12 WEST NEW YORK, NY. 10013346 BROADWAY, 12 WEST NEW YORK, NY. 10013346 BROADWAY, 12 WEST NEW YORK, NY. 10013346 BROADWAY, 12 WEST NEW YORK, NY. 10013
OWNER:OWNER:OWNER:OWNER:
10/2
8/20
12 1
0:45
:11
AMAs
indi
cate
dC:
\Use
rs\f
papa
\Des
ktop
\Rev
it P
roje
cts
2012
\351
6-LT
ACH
_Cen
tral
_201
2_fp
apa.
rvt
1879 Madison AvenueNew York, NY
A-111
FAP/JS
JTG
3516
00000
FIRST FLOORARCHITECTURALCOMPOSITE PLAN
FAP/
JS
LTACH Renovations
.00
Goldwater North
10/14/11
1/8" = 1'0"A1 FIRST FLOOR ARCHITECTURAL COMPOSITE PLAN
N0 4' 8' 16'
REVISIONS/ISSUESREVISIONS/ISSUESREVISIONS/ISSUESREVISIONS/ISSUESNO.NO.NO.NO. DESCRIPTIONDESCRIPTIONDESCRIPTIONDESCRIPTION DATEDATEDATEDATE
1 Package 10
Interior
Bid
Set
Upper Floors
5,6,
& 7
PRSI-012-L
06-01-12
2 Package 11
Interior
Bid
Set
Floors Cellar
through
4th
06-01-12
3 Package 10
& Package
11
PRSI-018-L06-15-12
4 PRSI-022-L 07-25-125 PRSI-037-L 10-31-12
UP
UP
UP
KEYPLAN
GENERAL NOTES2 3 4 5 6 7 9 10
A
B
C
D
E
F
G
H
I
J
8
STAIR #14A
HSKPG/CLEANSUPPLY
4160
SEMIPRIVATE4162
SEMIPRIVATE4164
#6#5#4
#1 #2 #3
SEMIPRIVATE4239
PRIVATE4130
SEMIPRIVATE4132
PRIVATE4136
PRIVATE4138
PRIVATE4140
SEMIPRIVATE4142
EXISTINGISOLATION
4150
TOILET4136A
TOILET4138A
TOILET4140A
PRIVATE4128
TOILET4128A
TOILET4130A
DAY LOUNGE4146
TOILET4148A
PRIVATE4158
TOILET4158A
PRIVATE4156
TOILET4156A
PRIVATE4154
TOILET4154A
PRIVATE4152
TOILET4152A
STAIR #24B
TOILET4106
TELE4103
TELE4125
ELEC4123
ELEC4105
SOILEDUTILITY
4151
MEDICATION4145
CLOSET4131
PRIVATE4237
PRIVATE4235
SEMIPRIVATE4231
PRIVATE4229
PRIVATE4225
PRIVATE4223
BARIATRIC4221
ISOLATION4219
PRIVATE4217
PRIVATE4215
PRIVATE4205
EQUIPMENTALCOVE
4407TREATMENT4122STRETCHER
WHEELCHAIRALCOVE
4403
DIETARYCARTS
HOLDING4124
ONCALL4126
TOILET4126A
SOILEDUTILITY
4224
CLEANUTILITY
4220
CONSULT4114
I.D.F. ROOM4116
MULTIPURPOSE/ FAMILY
4110
PUBLICTOILET4108 HSKPG
4112
STAFFSTATION
4404
NOURISHMENT4218
SOILEDUTILITY4216
EQUIPMENTALCOVE
4405
STRETCHERSHOWER
4163
STAFFLOCKERS
4107
CLEANUTILITY /
LINEN4100
PHYSICIANWORK ROOM /
LOUNGE4211
STAFF BREAKROOM4209
STRETCHERSHOWER
4127
SOILEDUTILITY
4143
TOILET4150A
NOURISHMENT4101
PRIVATE4144
PRIVATE4148
TOILET4144A
EQUIPMENTSTORAGE
4165
PUBLICELEVATOR
LOBBY4001
SERVICEELEVATOR
LOBBY4003
PRIVATE4203
STAFFSTATION
4401
ELECTRICALCLOSET
4213
TOILET4205A
TOILET4207A
TOILET4203A
TOILET4201A
PRIVATE4207
STAFFSTATION
4406
STAFFSTATION
4402
TOILET4239A
TOILET4237A
TOILET4235A
PRIVATE4233
TOILET4231A
TOILET4215A
TOILET4233A
TOILET4229A
TOILET4227A
BARIATRIC4227
TOILET4225A
TOILET4223A
TOILET4221A
TOILET4217A
TOILET4219A
STAFFSTATION
4408
SOILED HOLD4121
STAFF TOILET4119
STRETCHERSHOWER
4129
TOILET4209A
EQUIPMENTSTORAGE
4120
SEMIPRIVATE4201
STAFFSTATION
4400
TOILET4142A
TOILET4162A
TOILET4164A
BOTTLEDGAS STOR.
4109
ONCALL4211A
TOILET4211B
TOILET4132A
HSKPG4134
STAIR #34C
EQUIPMENTSTORAGE
4200
OFFICE4202
ELECTRICALCLOSET
4118
MEDICATION4222
OFFICE4226
CORRIDOR4002
CORRIDOR4010
CORRIDOR4005
CORRIDOR4006
CORRIDOR4004
CORRRDOR4008
20 BED VENT UNIT 20 BED VENT UNIT
AREA
AAR
EA C
AREA
BAR
EA D
AREA AAREA B
AREA CAREA D
N
LTACH SNF
1. FOR LIFE SAFETY PLANS SEE SHEET LS141
2. FOR FOURTH FLOOR ENLARGED ARCHITECTURAL PLANS SEE SHEETS A241,A242, A243 & A244.
3. FOR FOURTH FLOOR ENLARGED EQUIPMENT PLANS SEE SHEETS A245, A246,A247 & A248.
4. FOR ENLARGED TOILET ROOM PLANS SEE SHEETS A441 THROUGH A451.
PRSI-037-L 10/31/12
102 Madison AvenueNew York, NY 10016
Philip Habib & Associates Engineers and Planners
C E LLP
MECHANICAL * ELECTRICAL * PLUMBING * FIRE PROTECTION
Excellence in Design Since 1957
ONSULTING NGINEERS,KALLEN & LEMELSON
520 Eighth Avenue, 17th FloorNew York, NY 10018 Tel: 2126439898Fax: 2126432332 / 2126431449www.klengineers.com
Yhealthcare facilities solutionshealthcare facilities solutionshealthcare facilities solutionshealthcare facilities solutions
New York, NY 10010New York, NY 10010New York, NY 10010New York, NY 1001060 Madison Avenue, Suite 100160 Madison Avenue, Suite 100160 Madison Avenue, Suite 100160 Madison Avenue, Suite 1001
www.arrayhfs.comwww.arrayhfs.comwww.arrayhfs.comwww.arrayhfs.comf: 646.742.3001f: 646.742.3001f: 646.742.3001f: 646.742.3001t: 212.689.3110t: 212.689.3110t: 212.689.3110t: 212.689.3110
RRA A
Architect of Record:Architect of Record:Architect of Record:Architect of Record:
A r c h i t e c t s P. C.A r c h i t e c t s P. C.A r c h i t e c t s P. C.A r c h i t e c t s P. C.
This document is a copyright protected instrument of service, property of ARRAY andlicensed for use in the titled project only. Reproduction or use of this documentwithout written permission of ARRAY is illegal and will be prosecuted under the law.
ARRAY HFSARRAY HFSARRAY HFSARRAY HFSCOPYRIGHT - 2012COPYRIGHT - 2012COPYRIGHT - 2012COPYRIGHT - 2012C
DATE:DATE:DATE:DATE:SEAL:SEAL:SEAL:SEAL:
IMPLEMENTING AGENT:IMPLEMENTING AGENT:IMPLEMENTING AGENT:IMPLEMENTING AGENT:
PROJECT:PROJECT:PROJECT:PROJECT:
PROJECT No.PROJECT No.PROJECT No.PROJECT No.
CON/REF No.CON/REF No.CON/REF No.CON/REF No.
DRAWN:DRAWN:DRAWN:DRAWN:
CHK:CHK:CHK:CHK:
SHEET TITLE:SHEET TITLE:SHEET TITLE:SHEET TITLE:
F
1
HOSPITAL:HOSPITAL:HOSPITAL:HOSPITAL:
E
D
C
B
A
2 3 4 5 6 7 8
ADDRESS:ADDRESS:ADDRESS:ADDRESS:
ofofofofDWGDWGDWGDWG
CONTRACT # 47840002CONTRACT # 47840002CONTRACT # 47840002CONTRACT # 47840002
516 NORTH BLAKELY ST. SCRANTON, PA 18512516 NORTH BLAKELY ST. SCRANTON, PA 18512516 NORTH BLAKELY ST. SCRANTON, PA 18512516 NORTH BLAKELY ST. SCRANTON, PA 18512PHONE: 570.496.7020 FAX: 570.496.7021PHONE: 570.496.7020 FAX: 570.496.7021PHONE: 570.496.7020 FAX: 570.496.7021PHONE: 570.496.7020 FAX: 570.496.7021
L L
110 WILLIAMS ST. NEW YORK, NY. 10038110 WILLIAMS ST. NEW YORK, NY. 10038110 WILLIAMS ST. NEW YORK, NY. 10038110 WILLIAMS ST. NEW YORK, NY. 10038
346 BROADWAY, 12 WEST NEW YORK, NY. 10013346 BROADWAY, 12 WEST NEW YORK, NY. 10013346 BROADWAY, 12 WEST NEW YORK, NY. 10013346 BROADWAY, 12 WEST NEW YORK, NY. 10013
OWNER:OWNER:OWNER:OWNER:10
/28/
2012
11:
11:2
6 AM
As in
dica
ted
C:\U
sers
\fpa
pa\D
eskt
op\R
evit
Pro
ject
s 20
12\3
516-
LTAC
H_C
entr
al_2
012_
fpap
a.rv
t
1879 Madison AvenueNew York, NY
A-141
FAP
JTG
3516
00000
FOURTH FLOORARCHITECTURALCOMPOSITE PLAN
FAP
LTACH Renovations
.00
Goldwater North
10/14/11
1/8" = 1'0"A1 FOURTH FLOOR ARCHITECTURAL COMPOSITE PLAN
N0 4' 8' 16'
REVISIONS/ISSUESREVISIONS/ISSUESREVISIONS/ISSUESREVISIONS/ISSUESNO.NO.NO.NO. DESCRIPTIONDESCRIPTIONDESCRIPTIONDESCRIPTION DATEDATEDATEDATE
1 Package 10
Interior
Bid
Set
Upper Floors
5,6,
& 7
PRSI-012-L
06-01-12
2 Package 11
Interior
Bid
Set
Floors Cellar
through
4th
06-01-12
3 Package 10
& Package
11
PRSI-018-L06-15-12
4 PRSI-022-L 07-25-125 PRSI-037-L 10-31-12
FOURTH FLOOR
UP
UP
UP
KEYPLAN
GENERAL NOTES1 2 3 4 5 6 7 9
A
B
C
D
E
F
G
H
I
J
8
0.5
EXISTING LTACH
EXISTING LTACH
#5#4
#2 #3#1
STAIR #11A
STAIR #21B
STORAGE1132
STAFFLOUNGE
1134
ASSOCIATEDIR. OFFICE
1136
CLINIC &ESCORT DIR.
OFFICE1138
SPEECHWORK ROOM
1140
NURSEOFFICE1122
WORK ROOM1118
PATIENTTOILET1108
ENT EXAM1151
DECONTAMINATION1120
CLEANSUPPLY
1126
CHIEF DIR.OFFICE1130
STAFF TOILET1128
ELEC1209
PERSONNELLOCKERS
1220G
TOILET1220F
PERSONNELLOCKERS
1220E
STORAGE1220D
TOILET1220H
SUPERVISORWORK ROOM
1220C
STORAGE1220B
INTERVIEW1220A
SECURITY /POLICE ROLL
CALL1220
VESTIBULE1020
CLERICALOFFICE1220Q
LOCKERS1220R
OFFICE1220P
EXITPASSAGEWAY
1018
STORAGE1218
TOILET1220M
STORAGE1211B
MALE PUB.TOILETS
1216
TELE1301
ELEC1303
OFFICE1220N
WHEELCHAIRSTORAGE
1305
WHEEL CHAIRWORKSHOP
1306
STORAGE1304
INTERVIEW1309
TOILET1321E
TOILET1321F
TOILET1321B
STAFFLOUNGE1321D
PROSTHETIC& ORTHOTICS
1321V
STORAGE1321W
STORAGE1321R
STORAGE1321Q
FABRICATION1321P
OFFICE1321K
DIR. OFFICE1321L
STORAGE1321N
STORAGE1321M
HOUSEKEEPING1321S
SOILEDHOLDING
1321T
CLEANSUPPLY1321U
SERVICEELEVATOR
LOBBY1015
#6
STAIR 31C
HSKPG1107
SHOWER1321G
VESTIBULE1025
AMBULETTEDROP OFF
1026
ABLUTIONAREA A1103C
PHYSICALTHERAPY
1404
TRAININGTOILET/BATH
1321H
LAUNDRYALCOVE1321J
TEMPLE1101
PUBLICELEVATOR
LOBBY1003
STORAGE1321CLOCKERS
1220S
THERAPISTWORK ROOM
1321A
MOSQUE1103
RECEPTION /WAITING
1321
CAMERAMONITORING
1220J
SUPERV.CAPTAIN
1220L
DENTAL &CLINICSWAITING
1106
GYN EXAM1114
CORRIDOR1002
I.D.F. ROOM1312
CHEMICALSTORAGE
1314
CLINIC &DENTAL
RECEPTION /SCHEDULING
1104
ALCOVE1401
SPEECH1144
PATIENTTOILET1110
CAFE / GIFTSHOP1211
RESIDENT'SLOUNGE
1207
CORRIDOR1001
EGRESSCORRIDOR
1023
PASSAGE1017
PASSAGE1022
PASSAGE1019
BOTTLEDGAS STOR.
1310
STORAGE1105
OCCUPATIONALTHERAPY
1405
RECEPTION1307
COORDINATINGMANAGER
1307B
DIRECTOROFFICE1307A
PASSAGE1021
TOILET1307E
STAFFOFFICE1307D
ALCOVE1406
FEMALE PUB.TOILETS
1210
CAFEWORKROOM
1211A
TELEVISIONPRODUCTION
1208C
MECHANICAL1307C
CORRIDOR1024
WORSHIPOFFICE1322
VESTIBULE1101A
SUBWAITING1409
EYE EXAM1149
MUSTERING1116
CHARTING1124
BROADCASTONAIR1208A
PRODUCTION1208
PATIENT RELATIONS
NURSING ADMIN.CLERICAL /RECEPTION
1200
ADMISSIONS
SECURITY PT/ OT
CLINICSDENTAL
VESTIBULE1008
CORRIDOR1014
SPEECH /AUDIOLOGY
UP
OFFICE1208B
ART DISPLAYALCOVE
1402
PANOREX1112A
DENTALOFFICE1115C
PASSAGE1010
PASSAGE1007
SURGERYEXAM1147
EXAM1145
SOILEDUTILITY
1129
STAFF TOILET1131
SPEECH &AUDIOLOGY
WAITING1102
SPEECHAUDIOLOGY &
REHABTECHS1102A
AUDIOLOGYWORK1142
STORAGE1103A
STAFFSHOWER
1316
STAFFSHOWER
1318
SPEECH1143
COATCLOSET
1137
PASSAGE1012
SITTINGALCOVE
1400
CONSULT1320
ABLUTIONAREA B1103B
WASHING1115A
TOILET1212
TOILET1214
N2O TANKSTORAGE
1112C
CLOSET1112B
ASSISTANTDIRECTOR
1201A100 SF
ASSISTANTDIRECTOR
1201CCLERICAL
1201EDIRECTOR
1201F
PASSAGE1201
SIGNIN1407
CONFERENCE1202
CORRIDOR1004
EXITPASSAGEWAY
1006
PASSAGE1011
PANTRY1204
TOILET1206
INFECTIONCONTROL
1205D
ADN OFFICE1203B
ADN OFFICE1203A
ADN OFFICE1203G
PASSAGE1203
CLERICAL1203F
ADN OFFICE1203D
OFFICE1205C
WORK ROOM1203C
OFFICE1205B RECEPTION /
WAITING1205
DIRECTOR1205A
STERILIZATION1115D
DENTALWORK AREA
1408
PASSAGE1115
LAB1115B
DECONTAM.1112D
DENTALOPERATORIES
1112
STORAGE1201D
COATCLOSET1201B
22'2
1/4"
28'10 5/8"
18'1
0 7/8"
655 SF
600 SF
27'7 1/4"
A215C2
SECURITYEQUIPMENT
1220K
A215A2
PASSAGE1009
CLOSET1203E
AUDIOLOGYBOOTH1142A
VESTIBULE1030
AREA
AAR
EA C
AREA
BAR
EA D
AREA AAREA B
AREA CAREA D
N
LTACH SNF
1. FOR LIFE SAFETY PLANS SEE SHEET LS111
2. PROPOSED PROJECT DOES NOT MEET THE REQUIREMENTS OF ZR2580.PROJECT IS NOT A NEW DEVELOPMENT OR HAVE AN INCREASE IN FLOOR AREA.REFER TO JOB No: 121181522 FOR BICYCLE STORAGE.
3. FOR FIRST FLOOR ENLARGED ARCHITECTURAL PLANS SEE SHEETS A211, A212, A213, A214 & A215.
4. FOR FIRST FLOOR ENLARGED EQUIPMENT PLANS SEE SHEETS A216, A217, A218 & A2119.
5. FOR ENLARGED TOILET ROOM PLANS SEE SHEETS A441 THROUGH A451.
PRSI-037-L 10/31/12
102 Madison AvenueNew York, NY 10016
Philip Habib & Associates Engineers and Planners
C E LLP
MECHANICAL * ELECTRICAL * PLUMBING * FIRE PROTECTION
Excellence in Design Since 1957
ONSULTING NGINEERS,KALLEN & LEMELSON
520 Eighth Avenue, 17th FloorNew York, NY 10018 Tel: 2126439898Fax: 2126432332 / 2126431449www.klengineers.com
Yhealthcare facilities solutionshealthcare facilities solutionshealthcare facilities solutionshealthcare facilities solutions
New York, NY 10010New York, NY 10010New York, NY 10010New York, NY 1001060 Madison Avenue, Suite 100160 Madison Avenue, Suite 100160 Madison Avenue, Suite 100160 Madison Avenue, Suite 1001
www.arrayhfs.comwww.arrayhfs.comwww.arrayhfs.comwww.arrayhfs.comf: 646.742.3001f: 646.742.3001f: 646.742.3001f: 646.742.3001t: 212.689.3110t: 212.689.3110t: 212.689.3110t: 212.689.3110
RRA A
Architect of Record:Architect of Record:Architect of Record:Architect of Record:
A r c h i t e c t s P. C.A r c h i t e c t s P. C.A r c h i t e c t s P. C.A r c h i t e c t s P. C.
This document is a copyright protected instrument of service, property of ARRAY andlicensed for use in the titled project only. Reproduction or use of this documentwithout written permission of ARRAY is illegal and will be prosecuted under the law.
ARRAY HFSARRAY HFSARRAY HFSARRAY HFSCOPYRIGHT - 2012COPYRIGHT - 2012COPYRIGHT - 2012COPYRIGHT - 2012C
DATE:DATE:DATE:DATE:SEAL:SEAL:SEAL:SEAL:
IMPLEMENTING AGENT:IMPLEMENTING AGENT:IMPLEMENTING AGENT:IMPLEMENTING AGENT:
PROJECT:PROJECT:PROJECT:PROJECT:
PROJECT No.PROJECT No.PROJECT No.PROJECT No.
CON/REF No.CON/REF No.CON/REF No.CON/REF No.
DRAWN:DRAWN:DRAWN:DRAWN:
CHK:CHK:CHK:CHK:
SHEET TITLE:SHEET TITLE:SHEET TITLE:SHEET TITLE:
F
1
HOSPITAL:HOSPITAL:HOSPITAL:HOSPITAL:
E
D
C
B
A
2 3 4 5 6 7 8
ADDRESS:ADDRESS:ADDRESS:ADDRESS:
ofofofofDWGDWGDWGDWG
CONTRACT # 47840002CONTRACT # 47840002CONTRACT # 47840002CONTRACT # 47840002
516 NORTH BLAKELY ST. SCRANTON, PA 18512516 NORTH BLAKELY ST. SCRANTON, PA 18512516 NORTH BLAKELY ST. SCRANTON, PA 18512516 NORTH BLAKELY ST. SCRANTON, PA 18512PHONE: 570.496.7020 FAX: 570.496.7021PHONE: 570.496.7020 FAX: 570.496.7021PHONE: 570.496.7020 FAX: 570.496.7021PHONE: 570.496.7020 FAX: 570.496.7021
L L
110 WILLIAMS ST. NEW YORK, NY. 10038110 WILLIAMS ST. NEW YORK, NY. 10038110 WILLIAMS ST. NEW YORK, NY. 10038110 WILLIAMS ST. NEW YORK, NY. 10038
346 BROADWAY, 12 WEST NEW YORK, NY. 10013346 BROADWAY, 12 WEST NEW YORK, NY. 10013346 BROADWAY, 12 WEST NEW YORK, NY. 10013346 BROADWAY, 12 WEST NEW YORK, NY. 10013
OWNER:OWNER:OWNER:OWNER:
10/2
8/20
12 1
0:45
:11
AMAs
indi
cate
dC:
\Use
rs\f
papa
\Des
ktop
\Rev
it P
roje
cts
2012
\351
6-LT
ACH
_Cen
tral
_201
2_fp
apa.
rvt
1879 Madison AvenueNew York, NY
A-111
FAP/JS
JTG
3516
00000
FIRST FLOORARCHITECTURALCOMPOSITE PLAN
FAP/
JS
LTACH Renovations
.00
Goldwater North
10/14/11
1/8" = 1'0"A1 FIRST FLOOR ARCHITECTURAL COMPOSITE PLAN
N0 4' 8' 16'
REVISIONS/ISSUESREVISIONS/ISSUESREVISIONS/ISSUESREVISIONS/ISSUESNO.NO.NO.NO. DESCRIPTIONDESCRIPTIONDESCRIPTIONDESCRIPTION DATEDATEDATEDATE
1 Package 10
Interior
Bid
Set
Upper Floors
5,6,
& 7
PRSI-012-L
06-01-12
2 Package 11
Interior
Bid
Set
Floors Cellar
through
4th
06-01-12
3 Package 10
& Package
11
PRSI-018-L06-15-12
4 PRSI-022-L 07-25-125 PRSI-037-L 10-31-12
UP
UP
UP
KEYPLAN
GENERAL NOTES
2 3 4 5 6 7 9
B
C
D
E
F
G
H
I
8
#6#5#4
#1 #2 #3
TOILET7132A
TOILET7134A
SEMIPRIVATE7132
TOILET7136A
TOILET7138A
SEMIPRIVATE7136
SEMIPRIVATE7138
TOILET7140A
ISOLATION7140
DINING/LOUNGE/
MULTIPURPOSE7142
TOILET7146A
TOILET7144A
SEMIPRIVATE7144
ISOLATION7146
TOILET7154A
TOILET7152A
TOILET7150A
TOILET7148A
SEMIPRIVATE7148
SEMIPRIVATE7150
SEMIPRIVATE7152
SEMIPRIVATE7154
STAIR #17A
STAIR #27B
SEMIPRIVATE7164
TOILET7164A
TOILET7168A
SEMIPRIVATE7166
SEMIPRIVATE7168
SEMIPRIVATE7170
TOILET7170A
TOILET7166A
HSKPG7130
TOILET7128A
TOILET7126A
TOILET7122A
TOILET7120A
TOILET7124A
PRIVATE7128
SEMIPRIVATE7126
SEMIPRIVATE7122
SEMIPRIVATE7120
STAFFSTATION
7401
NOURISHMENT7101
TELE7103
ELEC7105
STAFFSTATION
7400
CLEANUTILITY /SUPPLY
7100
STAIR #37C
TOILET7113
TELE7143
ELEC7145
MEDICATION7141
STAFFLOUNGE
7204
MEDICATION7212
TREATMENTROOM7222
NURSEMANAGER
OFFICE7214
I.D.F. ROOM7114
TOILET7223A
TOILET7221A
CLEANUTILITY
7225
TOILET7219A
TOILET7217A
SEMIPRIVATE7223
SEMIPRIVATE7221
ISOLATION7219
PRIVATE7217
TOILET7206
TOILET7203A TOILET
7205A
TOILET7207A
TOILET7201A
PUBLICTOILET7110
SEMIPRIVATE7201
SEMIPRIVATE7203
ISOLATION7205
PRIVATE7207
PRIVATE7209
TOILET7209A
TOILET7215A
DINING/LOUNGE/
MULTIPURPOSE7213
SEMIPRIVATE7124
SEMIPRIVATE7134
HSKPG7200
PRIVATE7215
STRETCHERSHOWER
7165
STAFFLOCKERS
7107
EQUIPMENTROOM7111
STAFF TOILET7117
DIETARYCARTS
HOLDING7118
STRETCHERSHOWER
7125
SOILED HOLD7147
TOILET7162A
STORAGE7116
PUBLICELEVATOR
LOBBY7001
SERVICEELEVATOR
LOBBY7003
BOTTLEDGAS STOR.
7109SOILEDUTILITY
7149
SOILEDUTILITY
7139
PRIVATE7162
HSKPG/CLEANSTORAGE
7160
STAFFSTATION
7402
STRETCHERALCOVE
7403
STAFFSTATION
7404
NOURISHMENT7211
EQUIPMENTALCOVE
7405
CORRIDOR7002
CORRIDOR7008
CORRIDOR7004
CORRIDOR7006
CORRIDOR7007
CORRIDOR7005
SOILEDUTILITY
7202
TOILET7142A
38 BED MED/SURG UNIT
14 BED MED/SURG UNIT
AREA
AAR
EA C
AREA
BAR
EA D
AREA AAREA B
AREA CAREA D
N
LTACH SNF
PRSI-037-L 10/31/12
1. FOR LIFE SAFETY PLANS SEE SHEET LS171
2. FOR SEVENTH FLOOR ENLARGED ARCHITECTURAL PLANS SEE SHEETS A271,A272, A273 & A274.
3. FOR SEVENTH FLOOR ENLARGED EQUIPMENT PLANS SEE SHEETS A275, A276,A277 & A278.
4. FOR ENLARGED TOILET ROOM PLANS SEE SHEETS A441 THROUGH A451.
102 Madison AvenueNew York, NY 10016
Philip Habib & Associates Engineers and Planners
C E LLP
MECHANICAL * ELECTRICAL * PLUMBING * FIRE PROTECTION
Excellence in Design Since 1957
ONSULTING NGINEERS,KALLEN & LEMELSON
520 Eighth Avenue, 17th FloorNew York, NY 10018 Tel: 2126439898Fax: 2126432332 / 2126431449www.klengineers.com
Yhealthcare facilities solutionshealthcare facilities solutionshealthcare facilities solutionshealthcare facilities solutions
New York, NY 10010New York, NY 10010New York, NY 10010New York, NY 1001060 Madison Avenue, Suite 100160 Madison Avenue, Suite 100160 Madison Avenue, Suite 100160 Madison Avenue, Suite 1001
www.arrayhfs.comwww.arrayhfs.comwww.arrayhfs.comwww.arrayhfs.comf: 646.742.3001f: 646.742.3001f: 646.742.3001f: 646.742.3001t: 212.689.3110t: 212.689.3110t: 212.689.3110t: 212.689.3110
RRA A
Architect of Record:Architect of Record:Architect of Record:Architect of Record:
A r c h i t e c t s P. C.A r c h i t e c t s P. C.A r c h i t e c t s P. C.A r c h i t e c t s P. C.
This document is a copyright protected instrument of service, property of ARRAY andlicensed for use in the titled project only. Reproduction or use of this documentwithout written permission of ARRAY is illegal and will be prosecuted under the law.
ARRAY HFSARRAY HFSARRAY HFSARRAY HFSCOPYRIGHT - 2012COPYRIGHT - 2012COPYRIGHT - 2012COPYRIGHT - 2012C
DATE:DATE:DATE:DATE:SEAL:SEAL:SEAL:SEAL:
IMPLEMENTING AGENT:IMPLEMENTING AGENT:IMPLEMENTING AGENT:IMPLEMENTING AGENT:
PROJECT:PROJECT:PROJECT:PROJECT:
PROJECT No.PROJECT No.PROJECT No.PROJECT No.
CON/REF No.CON/REF No.CON/REF No.CON/REF No.
DRAWN:DRAWN:DRAWN:DRAWN:
CHK:CHK:CHK:CHK:
SHEET TITLE:SHEET TITLE:SHEET TITLE:SHEET TITLE:
F
1
HOSPITAL:HOSPITAL:HOSPITAL:HOSPITAL:
E
D
C
B
A
2 3 4 5 6 7 8
ADDRESS:ADDRESS:ADDRESS:ADDRESS:
ofofofofDWGDWGDWGDWG
CONTRACT # 47840002CONTRACT # 47840002CONTRACT # 47840002CONTRACT # 47840002
516 NORTH BLAKELY ST. SCRANTON, PA 18512516 NORTH BLAKELY ST. SCRANTON, PA 18512516 NORTH BLAKELY ST. SCRANTON, PA 18512516 NORTH BLAKELY ST. SCRANTON, PA 18512PHONE: 570.496.7020 FAX: 570.496.7021PHONE: 570.496.7020 FAX: 570.496.7021PHONE: 570.496.7020 FAX: 570.496.7021PHONE: 570.496.7020 FAX: 570.496.7021
L L
110 WILLIAMS ST. NEW YORK, NY. 10038110 WILLIAMS ST. NEW YORK, NY. 10038110 WILLIAMS ST. NEW YORK, NY. 10038110 WILLIAMS ST. NEW YORK, NY. 10038
346 BROADWAY, 12 WEST NEW YORK, NY. 10013346 BROADWAY, 12 WEST NEW YORK, NY. 10013346 BROADWAY, 12 WEST NEW YORK, NY. 10013346 BROADWAY, 12 WEST NEW YORK, NY. 10013
OWNER:OWNER:OWNER:OWNER:
10/2
8/20
12 1
1:11
:52
AMAs
indi
cate
dC:
\Use
rs\f
papa
\Des
ktop
\Rev
it P
roje
cts
2012
\351
6-LT
ACH
_Cen
tral
_201
2_fp
apa.
rvt
1879 Madison AvenueNew York, NY
A-171
FAP
JTG
3516
00000
SEVENTH FLOORARCHITECTURALCOMPOSITE PLAN
FAP
LTACH Renovations
.00
Goldwater North
10/14/11
1/8" = 1'0"A1 SEVENTH FLOOR ARCHITECTURAL COMPOSITE PLAN
N0 4' 8' 16'
REVISIONS/ISSUESREVISIONS/ISSUESREVISIONS/ISSUESREVISIONS/ISSUESNO.NO.NO.NO. DESCRIPTIONDESCRIPTIONDESCRIPTIONDESCRIPTION DATEDATEDATEDATE
1 Package 10
Interior
Bid
Set
Upper Floors
5,
6 & 7
04-02-12
2 Package 10
Interior
Bid
Set
Upper Floors
5,6,
& 7
PRSI-012-L
06-01-12
3 Package 10
& Package
11
PRSI-018-L06-15-12
4 PRSI-022-L 07-25-125 PRSI-037-L 10-31-12
SEVENTH FLOORFIRST FLOOR
47
LTA C H D E M O L I T I O N
NORTH GENERAL HOSPITAL
North General Hospital was abandoned in 1994. Sitting vacant for over a decade, it was allowed to decompose in place. It had previously served the East Harlem community as an in-patient hospital and emergency room .
The LTACH design required preserving many of the interior walls, particularly in partient room areas, in order to grandfather in the building and comply with code requirements. Necessary remediation and upgrades were done in place, sometimes down to the stud. New insullation, electrical conduit and plumbing were installed in the walls.
49
LTA C H D E M O L I T I O N
Ceiling, floor, drywall and studs demolished
Rusted studs cut out and patched with new studs in patient room shower; new bottom track and metal studs installed
Removed drywall, installed new insullation and door frame
51
LTACH during demolition
LTA C H I N T E R I O R
LTA C H A S S T O R A G E
Drywall and metal studs Door frames
HVAC ducts Acoustic ceiling tiles
Uninstalled toilets and sinks
55
OPPOSITE PAGE: Lab casework installation
THIS PAGE: Casework installation
57
H E A D W A L L I N S TA L L AT I O N
SNF in-wall headwall: electrical conduit, copper medical gas piping SNF wall insulation, medical gas faceplate
SNF wall insulation, medical gas faceplate LTACH prefabricated headwall installed
59
LTA C H P U N C H L I S T
Painting and drywall damage Discoloration of floor
Hooks in wrong location
Gilbane used BIM 360 on iPads to document, photograph, and track punch-list items during the final stages of construction. After general completion, architect and CM teams walked the floors of LTACH and SNF, and completed a check list of issues that needed to be addressed. Blue painters tape was used to mark locations of issues to make it clear for the workers who come back to fix the situation.
Discoloration of floor Door frame Mismatched casework
Hooks in wrong location Mismatched toilet partitions Door swing conflict
61
LTACH NURSES STATION
LTACH ELEVATOR LOBBY 63
LTACH facade remediation
LTA C H E X T E R I O R
LTA C H G A R D E N
H A R L E M R O O F T O P V I E W
All images are by me unless cited otherwise
NY TIMES BUILDING
METRO RAIL NORTH
EMPIRE STATE BUILDING
CHRYSLER BUILDING