Introduction To By Grant Tod FCIOB (Founder) www.bstructured.co.uk #minrisk2maxmargin
Introduction To
By Grant Tod FCIOB(Founder)
www.bstructured.co.uk #minrisk2maxmargin
Brief History:
Grant Tod:• Graduated in 1999 from University of Paisley (now University of West of Scotland) with a BSc
(Hons) in Construction Management• Achieved MCIOB status (Member of the Chartered Institute of Building) in 2002 and FCIOB
status 2017• Over the last 20 years worked for a mixture of specialist subcontractors & main contractors
QS Advisor Limited/Bstructured:• Bstructured is a brand name of QS Advisor Limited• QS Advisor was formed in 2012• Focusing on providing a proactive & flexible Quantity Surveying Solution for Small to
Medium Sized Contractors, Sub-Contractors & Specialists• QS Advisor Limited is a Chartered Building Consultancy (CBC), which is regulated by the
Chartered Insitute of Building (CIOB)
2www.bstructured.co.uk #minrisk2maxmargin
3
CONTACT DETAILS:
GRANT TOD; FOUNDER OF BSTRUCTURED (PART OF QS ADVISOR LIMITED)
E-MAIL: [email protected]
LINKEDIN: www.linkedin/in/granttod
WEBSITE: www.bstructured.co.uk
www.bstructured.co.uk #minrisk2maxmargin
Value Proposition Statement:
Our strategy platform is for small to medium sized contractors, subcontractors & specialists.
This project tool collaborates the commercial and contract management tools from inception to completion of your project obligations.
Our product is a must to enhance margin expectations by mitigating risk from the start and through the currency of your project.
It provides an easy to use and concise step by step format.
4www.bstructured.co.uk #minrisk2maxmargin
What is Bstructured:• Lets start off with a definition for structured:
“having definite and highly organised structure”• What does this mean for you:
• Have a method from getting from A to B, but in a more logical/less risky approach• A is the commencement of your involvement with the project• B is the completion of all your requirements/obligations of the project (i.e. where you
can close the book!)• It consists of several key tools/methods used during the currency of a project. It is split into 3 key
Phases:• Pre Contract Phase• Construction Phase• Post Contract Phase
5www.bstructured.co.uk #minrisk2maxmargin
• It brings together the key members of the construction team by:• Making the whole team accountable• The need for teamwork• Collaboration between the team• There is no them or us anymore within the team
• This collaboration/teamwork will not only assist with mitigating risk, but also:• Eliminate high % of non-recoverables• Minimise programme implications• Make supply chain more accountable• Maintain margin/margin betterment
6www.bstructured.co.uk #minrisk2maxmargin
AIM:
ABOVE ALL IT IS TOOLS TO MINIMISING RISK BY MAXIMISE MARGIN!!
7www.bstructured.co.uk #minrisk2maxmargin
Pre-Contract Phase Construction Phase
Post-Contract Phase
The Bstructured
MethodOr (as we
like to call it):“The
SynergyStrategy”
8www.bstructured.co.uk #minrisk2maxmargin
This is where:• The three main Phases are working together (i.e. in synergy).• Each division has merits that if not completed successfully will not allow the other two divisions to
have a successful transition• If all divisions are working together you have a solid structure that will last
9www.bstructured.co.uk #minrisk2maxmargin
IF ALL DIVISIONS ARE NOT WORKING TOGETHER THIS IS WHAT HAPPENS:
10www.bstructured.co.uk #minrisk2maxmargin
Pre-Construction
Phase Construction Phase
Post-Contract Phase
11www.bstructured.co.uk #minrisk2maxmargin
NOT AGOOD DESIGN
ADESIGN
THATIS
FLAWEDWITH:
• Inconsistencies• No collaboration• Resulting in
RISK RISK RISK!!!
12www.bstructured.co.uk #minrisk2maxmargin
This process uses and adopts the use of a group of professionals to collaborate, engage, coach & mentor your business into a structure that can:
“Minimise Risk To Maximise Margin”
Project Management
Commercial Management
Business Accounting
Planning
13www.bstructured.co.uk #minrisk2maxmargin
SO LETS LOOK AT EACH DIVISION IN TURN
14www.bstructured.co.uk #minrisk2maxmargin
Pre-Construction Phase
15www.bstructured.co.uk #minrisk2maxmargin
Tender Review &
Submission
Project Award
& Contract
Tender Enquiry
Cost Control
Internal Handover
Planning
Supply chain
management
Cashflow Control
16www.bstructured.co.uk #minrisk2maxmargin
Construction Phase
17www.bstructured.co.uk #minrisk2maxmargin
Change Manage
ment
External Meetings
Payments Cost Control
Internal Meetings
Planning
Supply chain
management
18www.bstructured.co.uk #minrisk2maxmargin
Completion
Post-Contract Phase
19www.bstructured.co.uk #minrisk2maxmargin
Change Manage
mentExternal
MeetingsPaymen
tsCost
Control
Internal MeetingsPlanning
Supply chain
management
20www.bstructured.co.uk #minrisk2maxmargin
PRE CONTRACT PHASE : BREAKDOWN OF EACH SUB PHASE
21www.bstructured.co.uk #minrisk2maxmargin
Pre-Contract Phase
Tender Enquiry
Tender Review &
Submission
• Tender Enquiry Letter
• Tender Build Up sheet
• Tender Qualification Sheet
22www.bstructured.co.uk #minrisk2maxmargin
Cost Control
• CVR/Cost Report
• Prelim Sheet
Internal Handover
Planning
• Estimators Handover Minute
• Prelim Sheet
• Cashflow Projection/Forecast
23www.bstructured.co.uk #minrisk2maxmargin
Project Award & Contract
• Contract Checklist
• Sample Responses if issues
• Sample response if no issues
CONSTRUCTION PHASE : BREAKDOWN OF EACH SUB PHASE
24www.bstructured.co.uk #minrisk2maxmargin
www.bstructured.co.uk #minrisk2maxmargin 25
Planning
• Procurement Schedule
• Daily Site Diary• Request for
Further Information (RFI’s)
Change Management
• Change Control Register
• Variation procedures
• Architects/client’s instructions
• Instruction Schedule
• Confirmation of Verbal Instruction (CVI’s)
• Instructions to Supply chain
• Delay Notice (EOT)
• Early Warning Notice (EWN)
26www.bstructured.co.uk #minrisk2maxmargin
Valuation &
Cost Control
• Forecast Final Account (FFA)
• CVR Template
• Valuation/AFP Template
• Financial Position per Contract
• Default notice to client
• Invoice Template
• Cash Position Schedule
27www.bstructured.co.uk #minrisk2maxmargin
External Meetings
Internal Meetings
• Contract Review meeting & minutes
• Cash Position Schedule
• Commercial/H&S/Contract position
• Ongoing lessons learned
• Progress report
28www.bstructured.co.uk #minrisk2maxmargin
Supply chain management • Letting Analysis
• Main Sub-order content
• Letter of Intent
29www.bstructured.co.uk #minrisk2maxmargin
www.bstructured.co.uk #minrisk2maxmargin 30
Payments to Subcontractors
• Subcontractor Payments
• Payment Notices• Payless Notices• Subcontractor
Val Cert Breakdown
• Subcontractor Performance on site
• Subcontractor damage on site
• Subcontractor defective work/material notice
POST CONTRACT PHASE : BREAKDOWN OF EACH SUB PHASE
31www.bstructured.co.uk #minrisk2maxmargin
www.bstructured.co.uk #minrisk2maxmargin 32
Post Contract Activities
• Subcontractor Final Account Statement
• Internal Post Contract Meeting
• Chasing Retention Monies
Conclusion:
• Each systematic step goes from commencement to completion• These steps together bring the tools necessary for
teamworking/collaboration• It mitigates the blame culture as it makes everyone accountable
33www.bstructured.co.uk #minrisk2maxmargin
34
The end result; Minimising Risk by Maximum Margin!!
www.bstructured.co.uk #minrisk2maxmargin
35
CONTACT DETAILS: