Top Banner
Butte Silver Bow Transportation Development Plan Update Lisa Ballard, P.E. Barb Beck Kimberly Brown 1
17

Butte Silver Bow Transportation Development Plan Update Lisa Ballard, P.E. Barb Beck Kimberly Brown 1.

Jan 02, 2016

Download

Documents

Muriel Snow
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Butte Silver Bow Transportation Development Plan Update Lisa Ballard, P.E. Barb Beck Kimberly Brown 1.

Butte Silver Bow Transportation Development Plan Update

Lisa Ballard, P.E.Barb BeckKimberly Brown

1

Page 2: Butte Silver Bow Transportation Development Plan Update Lisa Ballard, P.E. Barb Beck Kimberly Brown 1.

Project Goal/Purpose

• Assessment of existing services and guidance over five years• Project advisory

committee • Census data• Focus groups and

interviews• Rider and community

surveys• Drivers and BSBT

management• Ridership and budget data 2

Page 3: Butte Silver Bow Transportation Development Plan Update Lisa Ballard, P.E. Barb Beck Kimberly Brown 1.

Public Transportation is vital to Butte-Silver Bow…

• Access to jobs, school, medical facilities, shopping, and recreation

• Part of a multi-modal network that can enhance livability

3

Page 4: Butte Silver Bow Transportation Development Plan Update Lisa Ballard, P.E. Barb Beck Kimberly Brown 1.

… and the community supports transit

4

Page 5: Butte Silver Bow Transportation Development Plan Update Lisa Ballard, P.E. Barb Beck Kimberly Brown 1.

BSBT compares well to other Montana systems

5

Ridership (FY10)

Mileage (FY10)

Population (2009 city

limits)

Rides per Capita

Rides per Mile

Bozeman 238,800 393,165 39,282 6.1 0.6Helena 149,521 364,155 29,939 5.0 0.4Butte (total)

123,817 201,145 32,949* 3.8 0.6

Fixed Route

110,356 (89%)

157,085 (78%)

Big Sky Local

60,690 90,675 1,148 52.9 0.7

Kalispell 58,271 181,274 19,927 2.9 0.3

Page 6: Butte Silver Bow Transportation Development Plan Update Lisa Ballard, P.E. Barb Beck Kimberly Brown 1.

Issues identified

• Improve on-time performance• Later service and more weekend service desired• Respect and understand needs of people with disabilities• Energize system with improved marketing and

coordination• Options constrained by budget

6

Page 7: Butte Silver Bow Transportation Development Plan Update Lisa Ballard, P.E. Barb Beck Kimberly Brown 1.

Five Year Goals

• Increase ridership and community support for BSBT• Maximize coordination to benefit riders• Practice sound financial management

7

Page 8: Butte Silver Bow Transportation Development Plan Update Lisa Ballard, P.E. Barb Beck Kimberly Brown 1.

Short Term Objectives

• Designated stops with signs, schedules• Adjust schedules to improve on-time performance• Adjust routes to better serve traveling public needs• Hire a mobility manager to focus on rider needs and

coordination• Consider creating an Urban Transportation District

8

Page 9: Butte Silver Bow Transportation Development Plan Update Lisa Ballard, P.E. Barb Beck Kimberly Brown 1.

9

MT

375

2

Cobban St

N

Ma

i n S

t

Ro

we R

d

S M

ain

St

Grand Ave S

Mo

nta

na

St

Co

nti n

en

tal D

r

Dewey Blvd

Hil

l A

ve

W I ron St

Ore

go

n A

ve

E 2Nd S t

C e n t ennial Ave

S E

xc

els i

or

Av

e

W Gran ite St

E Park St

Te

xa

s A

ve

W Daly St

Ca sey S t E

Front St

N

Em

me

tt A

ve

Ir ene St

Le

xin

gto

n S

t

Ha

r ri s

on

Av

e

Har rison A

ve

Co

nti

ne

nt a

l D

r

Transfer Station

0 1 20.5 Miles

Legend

Harrison- Montana Tech Route

Walkerville- Harrison Route

Oregon- Racetrack Route

Service Route

Page 10: Butte Silver Bow Transportation Development Plan Update Lisa Ballard, P.E. Barb Beck Kimberly Brown 1.

10

Walkerville/ Racetrack

31%

Montana St/ Oregon Ave

17%

Montana Tech/ Harrison

42%

Service Route10%

Ridership by Route (CY 2010)

Page 11: Butte Silver Bow Transportation Development Plan Update Lisa Ballard, P.E. Barb Beck Kimberly Brown 1.

Annual Ridership

1119971998

19992000

20012002

20032004

20052006

20072008

20092010

0

20,000

40,000

60,000

80,000

100,000

120,000

140,000

Annual Ridership

Page 12: Butte Silver Bow Transportation Development Plan Update Lisa Ballard, P.E. Barb Beck Kimberly Brown 1.

12

1997

1998

1999

2000

2001

2002

2003

2004

2005

2006

2007

2008

2009

2010

0

10,000

20,000

30,000

40,000

50,000

60,000

70,000Ridership by Category Over Time

ElderlyDisabledStudentCommuterD&L

Annu

al R

ides

Page 13: Butte Silver Bow Transportation Development Plan Update Lisa Ballard, P.E. Barb Beck Kimberly Brown 1.

Proposed Routing Changes

• Goal – adjust service to demand within budget• Consider suggestions as starting point• Needs to be timed and refined in winter conditions after

completion of Harrison Avenue construction

13

Page 14: Butte Silver Bow Transportation Development Plan Update Lisa Ballard, P.E. Barb Beck Kimberly Brown 1.

Summary and Implementation

• 16 objectives under three goals• Short term (1-year) objectives

14

Page 15: Butte Silver Bow Transportation Development Plan Update Lisa Ballard, P.E. Barb Beck Kimberly Brown 1.

Five Year Goals

• Increase ridership and community support for BSBT• Maximize coordination to benefit riders• Practice sound financial management

15

Page 16: Butte Silver Bow Transportation Development Plan Update Lisa Ballard, P.E. Barb Beck Kimberly Brown 1.

Final Document

• Draft plan posted at:• http://co.silverbow.mt.us/transit/• http://www.currenttransportation.com/projects/

• Comments received by September 2 will be addressed in final document (targeted to September 9)

• Thank you, Gary!

16

Page 17: Butte Silver Bow Transportation Development Plan Update Lisa Ballard, P.E. Barb Beck Kimberly Brown 1.

17

Lisa Ballard, P.E.Bozeman, MT406-581-4601

[email protected]