INDUSTRIAL ENERGY CONSERVATION SOLUTIONS BY Aadil Naveed 2013(Fall)-MBA E-004 TO DR. ASIF NAWAZ
Jan 19, 2015
INDUSTRIAL ENERGY CONSERVATION SOLUTIONS
BYAadil Naveed 2013(Fall)-MBA E-004
TODR. ASIF NAWAZ
PROJECT PROFILE
PROJECT PROFILEProduct /Services Energy Solutions (Personal Services)
Potential customers Energy Consuming Industries
Deliverables Energy Conservation Potentials
Strategic Partners ABB, WEG, SIEMENS etc.
Contingencies Not frequent
Business Type Small Business (Sole proprietorship)
Planning Requirement Daily basis
Competitive Strategy Cost effectiveness and Quality
Business Emergence Corridor Principle
Field Experience 3 Years in IMEIP US-AID
Team Span 3 to 5 Members
PROJECT SCOPE
PROJECT SCOPE
Industrial Energy Conservation is the need of the hour
With increasing energy prices and shortfall we need to conserve and generate more
The deliverable include the identification of areas where energy savings are possible
Replacements of old, less efficient motors and other instruments would be suggested
Saving potentials would be calculated and discussed with the customers
HOW THE IDEA EMERGED ?
Idea GerminationI was doing Energy auditing since last two years
during which the idea emergedI often thought that there is an empty market niche
which can be exploited Preparation
I started gathering information which would be required to start a new business
I gathered knowledge from where ever possible and help was taken from seniors
HOW THE IDEA EMERGED ?
IncubationDuring the last few months I saw an increasing
potential for this sort of business Illumination
I prepared the feasibilities of the idea and the finances associated with it and it came out to be a good business venture
VerificationNow I am planning to execute the business plan
which would verify its validity
WHAT CREATES THE MARKET NICHE ?
WHAT CREATES THE MARKET NICHE ?
Energy Crisis in the countryIncreasing Environmental ProblemsDeclining Fossil FuelsIncreasing Energy PricesEnergy Efficient MotorsEnergy Policies EstablishmentVFD Technology Emergence
WHAT CREATES THE MARKET NICHE ?
ISO 50001 implementationUS-AID Energy initiativeNew Process DesignsEvolution in Lighting TechnologyIncreasing use of Renewable EnergyGlobal Warming
Energy Crisis in the country
The energy demand is increasing in the country with every passing day
Due to the lack of planning by the previous governments Pakistan is facing a serious energy crisis
Currently Pakistan is facing a shortfall of 4,000 to 5,000 MW
So the need of the hour is that apart from increasing the energy generation we must also focus on conserving it
The energy prices in the countries have increased by 100% since 2000
ARRIVAL OF NEW TECHNOLOGY
Energy Efficient MotorsNew energy efficient motors (IE1, IE2, IE3 and IE4) are in the markets with IE4 having the highest efficiency of almost 96%
Evolution in Lighting TechnologyThe new LVD lights consume 50% less energy and provide 37 % more luminosity compared to a normal light in operation
EFFICIENCY GRAPH
LVD vs. Older Technology
ARRIVAL OF NEW TECHNOLOGY
VFD Technology EmergenceEmploying a VFD and reducing the RPM of a motor can easily result into about 20% energy saving
Previously dampers have been employed which does not reduce the energy consumption but in fact dampens the energy delivered10 reduction in RPM means 22% reduction in energy consumption and 20% reduction in RPM means 44% reduction
US-AID INITIATIVE
US-AID was providing 50% subsidy on the purchase of new motors and VFDs in their IMEIP project
Old inefficient motors were replaced by New high efficiency motors and new VFDs were installed to increase the energy savings
The 3rd phase and the biggest of this project is due within a year or so
Almost 70 industries all over the Pakistan benefitted from this project and 90% of them were highly satisfied with the energy savings
MARKET ANALYSIS
5 C
CustomersEnergy Consuming Industries
CompanyIECoS Pvt. Ltd.
CompetitorsFew Individuals
CollaborationABB and WEG Pakistan
ContextEnergy Conservation is the need of the hour with the
increasing energy prices and shortfall.
4 P
Product/ServicesEnergy Services
PromotionWebsite, Pamphlets and Brochure
PlaceIndustries all over the Pakistan
PricingIndustries would be charged Rs. 20 per KW
STRENGTHS ANALYSIS During the last 2 to 3 years I have been auditing the
industries which are ready for investment in the energy sector
These are my ready potential customers and I have all the contact details available with me
I have the N.P.O. auditor certificate which will be helping me in training the junior engineers and in gaining the contracts
The vendor companies (ABB, WEG, SIEMENS etc) are my natural alliances and will be doing the marketing for me
The technologies are calling for the change and it is easy to convince the clients regarding the saving potentials
MARKETING ANALYSIS As the 3rd phase of US-AID IMEIP project is due within six
months and the industries are interested in seeking the potential replacement
We would be providing them with saving potentials before the start of the 3rd phase so they can place their orders accordingly
There are almost 58 potential customers which are in contact with me and are willing to invest in energy sector
Industries which missed the chance of getting registered in the previous two phases are lurking for the 3rd phase and would be easy to convince
MARKETING
An attractive website would be made and emails regarding services would be forwarded to the industries
Energy Conservation Pamphlets would be made and mailed
Motors, VFDs and Lighting vendors would be contacted for support
Engineers in their spare time would be visiting the industries and giving presentations to high officials
SWOT Analysis
SWOT Analysis
STRENGTHSVendor’s Interest3rd IMEIP US-AID PhaseNegligible Competition3 years of field experience
WEAKNESSESNo data for help availableLow competition, Low MotivationLack of Awareness
SWOT Analysis
OpportunitiesSolar Panels for IndustriesWaste Heat ExchangersMachine Spare parts Services
ThreatsGIZ, NEC starts similar servicesCustomers low motivationNo energy left to conserve
GROWTH STAGES
GROWTH STAGES
PRE-START UP GROWTHThe instruments required would be purchase from
Makkays Pvt. Ltd.The Engineers would be hired (1-3 years experienced)
and trained for EAMarketing would be done by the website and
Pamphlets START –UP GROWTH
During the initial phase maximum audits would be done and reports would be then compiled
Energy audit results would be verified with the customers
GROWTH STAGES
EARLY GROWTH Rapid response is expected so new teams can be
hired on contract and project basis Competitors may arrive, cost effectiveness would
be the weapon to use LATER GROWTH
Industrial instrument installation services Erection support would be provided to industries Solar system installation is also a possibility
POTENTIAL CUSTOMERS
POTENTIAL CUSTOMERSSr. No. Facility Name Address Disco District
1Sapphire Finishing Mills Limited
Sapphire Finishing Mills Ltd. 3.5 Km, Raiwind Manga Road, Raiwind
LESCO Kasur
2Crescent Steel And Allied Products Ltd.
A/25 S.I.T.E Nooriabad. District Jam Shoro Sindh, Pakistan
HESCO Jamshoro
3 Al Noor Sugar Mills
Shah Pur Jaharian Taulaka, Doulat Pur District Benazirabad Sindh Pakistan Sukhar
SEPCO Benazirabad
4Thatta Cement Company Limited
Makli Ghulam Ullah Road District Thatta, Sindh
HESCO Thatta
5 Pak-Arab FertilizerDisposal Workshop Pak Arab Fartilizer Kwl Road Khad Factory
MEPCO Multan
6 Nestle Pakistan LimitedNestle Pakistan Limited, Sheikhupura Road, Sheikhupura.
LESCO Sheikhupura
7Dalda Foods Private Limited
F 33 Site Hub River Road Karachi
KESC Karachi
8 Unilever Pakistan Limited.
Unilever Pakistan Limited,Tea Factory,Chak # 88-A 10 R,Khanewal MEPCO Khanewal
9 Thal Limited (Jute Division)
Dg Khan Road Muzafargarh MEPCO Muzaffargarh
10 Hazara Phosphate Fertilizer Pvt.Ltd
Hazara Phosphate (Pvt) Ltd Hattar Road, Haripur. PESCO Haripur
11 Ici Soda Ash KhewraIci Soda Ash Plant Khewra IESCO Jhelum
12 Maple Leaf Cement Factory Ltd.
Maple Leaf Cement Factory Ltd. Iskandarabad, Mianwali.
FESCO Mianwali
13 Anjum Textile Mills (Private) Limited
42 Km Sheikhupura Road Faisalabad FESCO Faisalabad
14 Bilal Fibres Mills38-Km Sheikhupura Road Faisalabad FESCO Faisalabad
15 Al-Abbas Cement Industries Limited
Nooriabad Industrial Area, Kalo Koher District Jamshoroo Sindh
HESCO Jamshoro
ENRGY AUDITING TEAM
ENERGY AUDITING TEAM
Team Lead
Environmental Analyst
Electrical Engineer
Mechanical Engineer
Chemical Engineer
WBS OF PROJECT
Every team member is expected to work individuallyAll the data collection would be done with the help
of the industrial representativeData collected would be shared with the customer
before analysisThe final analysis and report compilation would be
done by the Team LeadFinal audit results would then be submitted to the
esteemed customer in hard form
ENRGY AUDITING TEAM
Electrical EngineerMotor SizingMotor DrivesLightningHVAC
Mechanical Engineer Machinery Maintenance Compressors Thermography
ENRGY AUDITING TEAM
Chemical Engineer Carbon Emission Waste Heat Supply &Waste Water
Environmental Engineer Health and balance of Environment Energy Management Standards Carbon Footprints
FINANCIAL DETAILS
FINANCIAL DETAILS
Industrial Equipment
Energy Analyzer
Thermal Analyzer
Tachometer Vibrometer
Funds Allocated = Rs. 1000, 000/-
FINANCIAL DETAILS
Office Equipment
Furniture& AC etc. Laptops Stationary &
AdvertisingPrinter and
Scanner
Funds Allocated = Rs. 1200, 000/-
OFFICE RENT AND EXPENSESAn amount of Rs. 500, 000/- would be submitted
as advance for the rent placeMonthly Rent = Rs. 80, 000/-Office Expenses = Rs. 70, 000/- per month
(Photocopies + Print + Office Boy Pay + Tea etc.)Advertisement = Rs. 20, 000/- per month
Total Office Expenses = Rs. 170, 000/-
FINANCIAL DETAILS
FINANCIAL DETAILS
TEAM SALARIES
I myself would be working as the team lead and engineer who would be experienced up to 2 years would be hired and trained for their respective roles
Team Lead Rs. 100, 000/-Electrical Engineer Rs. 50, 000/-Mechanical Engineer Rs. 50, 000/-Chemical Engineer Rs. 50, 000/-Total Salaries Rs. 250, 000/-
FINANCIAL DETAILS TRAVELLING EXPENSES
Car would be taken on rent form the Lahore Rental Company (Mobile: 0321 90 999 09) from Johar Town branch Lahore The rates were taken from the company for the calculation purpose and they
are detailed below
Vehicle Charges Rs. 3, 600 per day + Distance dependent cost Car Rent (4 days per visit) Rs. 3, 600*4 = Rs. 14, 400/-
(For one visit) Distance dependent cost Rs. 17 per KM Total Visits per month 5 Average kilometers travelled 1000 KM
(Per Visit) Per month distance expenses 1000*5*17 = Rs. 85, 000/- Total Travelling Expenses 85, 000 + (14, 400*5) = Rs. 157, 000/-
(Per Month)
FINANCIAL DETAILS AUDIT FEE AND PROFIT
The audit fee would be charged at per watt basis. In other words we would be charging the audit fee according to the watts audited in the industry. Calculation would be done as:
Average sanction load (From 58 industries record) = 8580 KW Total monthly expenses = Rs. 577, 000/- At ~48.7 % profit income should be = Rs. 858, 000 Total KW audited per month (5 audits per month) = 8580*5 = 42900 KW So charges for the audit comes out to be Rs. 20 per KW This will ensure a profit of almost 48.7 % on the expenses which gives us a
profit of 858, 000- 577, 000 = Rs. 281, 000 per month given that the team perform 5 audits per month irrespective of the type of the industry.
INCOME STATEMENT
Initial Investment = Rs. 2700, 000/-Monthly Expenses = Rs. 577, 000/-Charges = Rs. 20 per KWTotal Monthly Earning = Rs. 858, 000/-Profit = 858, 000- 577, 000 = Rs. 281, 000/-Profit on Investment ~ 48.7 %Payback Period = 2700, 000/ 281, 000
= 9.6 months
EPILOGUE
EPILOGUEWith the reducing fossil fuels this business
plan is the need of the hourReduced energy usage will reduce the bills
and environmental pollution as wellEnergy Efficiency Program can be expanded to
other disciplines like building audits, home energy audits
This conserved energy can be used some where else
1 unit saved= 2 units produced
REFRENCEShttp://sharifinternational.net/energy-efficient-lamps/lvd-
lamps-comparison/http://www.aps-solutionsforbusiness.com/
ProjectCenter/Portals/54/MotorsFactSheet_WEB090908.pdf
http://www.plantservices.com/articles/2010/06vfdssaveenergy/?start=1
http://www.iso.org/iso/home/standards/management-standards/iso50001.htm
http://www.copper.org/environment/sustainable-energy/electric-motors/education/motor_text.html
THANK YOU FOR LISTENING