0 33 30 27 28 10 50 54 31 132 Works 136.2m Works Works 20 48 30 to 34 95 Works 132.0m Works Works 101 133.2m 13 109 12a Warehouse 8 10 93 Wks 66 94 93 5 89 139.6m Works 140.5m ESS 70 139.3m 121 to 137 Shelter Warehouse 95 72 to 74 16 14 89 95 111 12 137.8m 66 119 Works 137.5m Nursery 15 83 to 87 90 69 11 37 to 42 10 65 91 137.2m 200 92 17 33 96 to 101 102 104 103 106 105 50 18 14 to 64 1 to 12 102 to 107 100 19 to 38 1 to 14 81 12 9 11 1 3 6 18 41 33a El Sub Sta 91 36 Works 12 15 96c 41 44 92 to 93 43 42 28 to 29 5 96d 35 35a 34 35g 97 39 1 14 1 El Sub Sta 87 0 33 30 27 28 10 50 54 31 132 Works 136.2m Works Works 20 48 30 to 34 95 Works 132.0m Works Works 101 133.2m 13 109 12a Warehouse 8 10 93 Wks 66 94 93 5 89 139.6m Works 140.5m ESS 70 139.3m 121 to 137 Shelter Warehouse 95 72 to 74 16 14 89 95 111 12 137.8m 66 119 Works 137.5m Nursery 15 83 to 87 90 69 11 37 to 42 10 65 91 137.2m 200 92 17 33 96 to 101 102 104 103 106 105 50 18 14 to 64 1 to 12 102 to 107 100 19 to 38 1 to 14 81 12 9 11 1 3 6 18 41 33a El Sub Sta 91 36 Works 12 15 96c 41 44 92 to 93 43 42 28 to 29 5 96d 35 35a 34 35g 97 39 1 14 1 El Sub Sta 87 CAMDEN STREET ALBION STREET POPE STREET MORETON STREET SCHOOL KEEP CLEAR ONE WAY NORTHEAST BOUND ON ALBION STREET BETWEEN CAMDEN STREET AND POPE STREET ONE WAY SOUTHWEST BOUND ON ALBION STREET BETWEEN CARVER STREET AND POPE STREET 2.00 5.89 1.50 2.00 3.83 2.00 TC-01-01 TC-01-02 TC-01-03 TC-01-04 TC-01-05 TC-01-06 TC-01-13 TC-01-12 TC-01-09 TC-01-10 & 11 TC-01-07 & 08 TC-01-17 TC-01-16 TC-01-15 TC-01-14 50m 1 : 500 30 5 10 20 0 40 This drawing includes map data licensed from Ordnance Survey with the permission of the controller of Her Majesty's Stationery Office. ã Crown copyright licence number 100019543 (2020) KEY EXISTING ROAD MARKINGS PROPOSED WHITE ROAD MARKINGS PROPOSED KERB TRAFFIC CONE BARRIERS TEMPORARY TRAFFIC SIGN A-FRAME LOCATION PLAN NOTES 1. ALL DIMENSIONS IN METRES UNLESS OTHERWISE STATED. 2. NOTES PLACED DIRECTLY ON THE LAYOUT DRAWING SUPERSEDE THOSE DETAILED IN KEYS. 3. ALL DIAGRAMS ARE TO THE TRAFFIC SIGNS REGULATIONS AND GENERAL DIRECTIONS 2016 (TSRGD). 4. ALL DESIGNS ARE BASED ON ORDNANCE SURVEY MAPPING. 5. WHERE NO CHANGE IS SHOWN, EXISTING RESTRICTIONS APPLY. 6. WHERE CYCLES ARE PERMITTED THROUGH ROAD CLOSURES, A MINIMUM OF 1.5m GAP SHOULD BE PROVIDED BETWEEN THE KERB AND TEMPORARY BARRIER. FOR INFORMATION 100 BROAD STREET BIRMINGHAM B15 1AE Telephone +44 (0)121 456 1616 Email: [email protected]www.pellfrischmann.com P04 104130-PF-100-C1-DR-TR-001 Sheet 1 Concept Design Tranche 1 Birmingham Traffic Cells Transport Plan Emergency Birmingham
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
1
1
0
3
3
3
0
2
7
2
8
1
0
5
0
5
4
3
1
1
3
2
W
o
r
k
s
1
3
6
.2
m
W
o
r
k
s
W
o
r
k
s
2
0
4
8
3
0
t
o
3
4
9
5
W
o
r
k
s
1
3
2
.0
m
W
o
r
k
s
W
o
r
k
s
1
0
1
1
3
3
.2
m
1
3
1
0
9
1
2
a
W
a
r
e
h
o
u
s
e
8
1
0
9
3
W
k
s
6
6
9
4
9
3
5
8
9
1
3
9
.6
m
W
o
r
k
s
1
4
0
.5
m
E
S
S
7
0
1
3
9
.3
m
1
2
1
t
o
1
3
7
S
h
e
lte
r
W
a
r
e
h
o
u
s
e
9
5
7
2
t
o
7
4
1
6
1
4
8
9
9
5
1
1
1
1
2
1
3
7
.8
m
6
6
1
1
9
W
o
r
k
s
1
3
7
.5
m
N
u
r
s
e
r
y
1
5
8
3
t
o
8
7
9
0
6
9
1
1
3
7
t
o
4
2
10
6
5
9
1
1
3
7
.2
m
2
0
0
9
2
1
7
3
3
9
6
t
o
1
0
1
1
0
2
1
0
4
1
0
3
1
0
6
1
0
5
5
0
1
8
1
4
to
6
4
1
to
1
2
1
0
2
t
o
1
0
7
1
0
0
1
9
t
o
3
8
1
t
o
1
4
8
1
1
2
9
1
1
1
3
6
1
8
4
1
3
3
a
E
l S
u
b
S
ta
9
1
3
6
W
o
r
k
s
1
2
1
5
9
6
c
4
1
4
4
9
2
t
o
9
3
4
3
4
2
2
8
t
o
2
9
5
9
6
d
3
5
3
5
a
3
4
3
5
g
9
7
3
9
1
1
4
1
E
l
S
u
b
S
ta
8
7
1
1
0
3
3
3
0
2
7
2
8
1
0
5
0
5
4
3
1
1
3
2
W
o
r
k
s
1
3
6
.2
m
W
o
r
k
s
W
o
r
k
s
2
0
4
8
3
0
t
o
3
4
9
5
W
o
r
k
s
1
3
2
.0
m
W
o
r
k
s
W
o
r
k
s
1
0
1
1
3
3
.2
m
1
3
1
0
9
1
2
a
W
a
r
e
h
o
u
s
e
8
1
0
9
3
W
k
s
6
6
9
4
9
3
5
8
9
1
3
9
.6
m
W
o
r
k
s
1
4
0
.5
m
E
S
S
7
0
1
3
9
.3
m
1
2
1
t
o
1
3
7
S
h
e
lte
r
W
a
r
e
h
o
u
s
e
9
5
7
2
t
o
7
4
1
6
1
4
8
9
9
5
1
1
1
1
2
1
3
7
.8
m
6
6
1
1
9
W
o
r
k
s
1
3
7
.5
m
N
u
r
s
e
r
y
1
5
8
3
t
o
8
7
9
0
6
9
1
1
3
7
t
o
4
2
10
6
5
9
1
1
3
7
.2
m
2
0
0
9
2
1
7
3
3
9
6
t
o
1
0
1
1
0
2
1
0
4
1
0
3
1
0
6
1
0
5
5
0
1
8
1
4
to
6
4
1
to
1
2
1
0
2
t
o
1
0
7
1
0
0
1
9
t
o
3
8
1
t
o
1
4
8
1
1
2
9
1
1
1
3
6
1
8
4
1
3
3
a
E
l S
u
b
S
ta
9
1
3
6
W
o
r
k
s
1
2
1
5
9
6
c
4
1
4
4
9
2
t
o
9
3
4
3
4
2
2
8
t
o
2
9
5
9
6
d
3
5
3
5
a
3
4
3
5
g
9
7
3
9
1
1
4
1
E
l
S
u
b
S
ta
8
7
C
A
M
D
E
N
S
T
R
E
E
T
A
L
B
I
O
N
S
T
R
E
E
T
P
O
P
E
S
T
R
E
E
T
M
O
R
E
T
O
N
S
T
R
E
E
T
S
C
H
O
O
L
K
E
E
P
C
L
E
A
R
ONE WAY NORTHEAST BOUND ON
ALBION STREET BETWEEN CAMDEN
STREET AND POPE STREET
ONE WAY SOUTHWEST BOUND ON
ALBION STREET BETWEEN CARVER
STREET AND POPE STREET
2
.0
0
5
.8
9
1
.5
0
2
.0
0
3
.8
3
2
.0
0
TC-01-01
TC-01-02
TC-01-03
TC-01-04
TC-01-05
TC-01-06
TC-01-13
TC-01-12
TC-01-09
TC-01-10 & 11
TC-01-07 & 08
TC-01-17
TC-01-16
TC-01-15
TC-01-14
50m
1 : 500
305 10 200 40
This drawing includes map data licensed from Ordnance Survey with the permission
of the controller of Her Majesty's Stationery Office.
ã Crown copyright licence number 100019543 (2020)
KEY
EXISTING ROAD MARKINGS
PROPOSED WHITE ROAD MARKINGS
PROPOSED KERB
TRAFFIC CONE
BARRIERS
TEMPORARY TRAFFIC SIGN A-FRAME
LOCATION PLAN
NOTES
1. ALL DIMENSIONS IN METRES UNLESS OTHERWISE STATED.
2. NOTES PLACED DIRECTLY ON THE LAYOUT DRAWING
SUPERSEDE THOSE DETAILED IN KEYS.
3. ALL DIAGRAMS ARE TO THE TRAFFIC SIGNS REGULATIONS
AND GENERAL DIRECTIONS 2016 (TSRGD).
4. ALL DESIGNS ARE BASED ON ORDNANCE SURVEY MAPPING.
5. WHERE NO CHANGE IS SHOWN, EXISTING RESTRICTIONS
APPLY.
6. WHERE CYCLES ARE PERMITTED THROUGH ROAD
CLOSURES, A MINIMUM OF 1.5m GAP SHOULD BE PROVIDED