Prince Frederick Fire Station September 17, 2019 Page 1 of 1 BULLETIN #1 Prince Frederick Fire Station– Drawing Revisions to 100% CD Set 9/17/2019 This bulletin is hereby made a part of the Contract Documents on which the General Contract is based, and is issued to modify, explain or correct the original drawings and/or specifications. The General Contractor shall properly apprise all sub-contractors of the contents of this Bulletin. All revisions are listed below. Action Water meter at south west corner of building to be revised from 3” to 4”. Transition from a 4” line to 3” line is to be made prior to entry into building. Attachments Detail W1.26 - Standard Calvert County meter vault for 4” service Sheet 3 of 18 – Civil Proposed Site Plan Affected Documents: Sheet Description 3 of 18 Revised meter size and WHC line size at south side of building (tagged Delta 1) (Delta 2 tag revision at northeast corner of building addressed in Bulletin 2.) END OF BULLETIN NUMBER 1.
3
Embed
BULLETIN #1 - S E Davis Construction€¦ · 116.50 cb-fl 114.89 sd cmp18 117.67 cb-fl pc 118.40 cb-fl ex. guy wire ex. utility pole street sign #300037 114.88 sd rcp24 116.73 116.72
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Prince Frederick Fire Station September 17, 2019
Page 1 of 1
BULLETIN #1 Prince Frederick Fire Station– Drawing Revisions to 100% CD Set 9/17/2019 This bulletin is hereby made a part of the Contract Documents on which the General Contract is based, and is issued to modify, explain or correct the original drawings and/or specifications. The General Contractor shall properly apprise all sub-contractors of the contents of this Bulletin. All revisions are listed below. Action Water meter at south west corner of building to be revised from 3” to 4”. Transition from a 4” line to 3” line is to be made prior to entry into building. Attachments Detail W1.26 - Standard Calvert County meter vault for 4” service Sheet 3 of 18 – Civil Proposed Site Plan Affected Documents: Sheet Description 3 of 18 Revised meter size and WHC line size at south side of building (tagged Delta 1) (Delta 2 tag revision at northeast corner of building addressed in Bulletin 2.)
END OF BULLETIN NUMBER 1.
116
DUMPSTER
PAD
PIPE IN STREAM
PRINCE FREDERICK VILLAS, PHASE TWOLIBER B.J.S. 1/50
PLAT TWOSOUTHGATE
LIBER KPS 2/270
PLAT OF CORRECTIONLOTS 1, 2, & 3
COMMERCIAL SUBDIVISIONDUKE STREET COMMONS
LIBER A.B.E. 3/108 OLD FIELD INN COMMONSCOMMMERCIAL CONDOMINIUM
TYPE S CURB ALONG OLDFIELD LANE AND TIE INTOEXISTING CURB
SHA CURB TO MEET EX.PAVEMENT GRADE
PROP. LP
PROP. 8" x 6" T.S. & V.TO EX. WATERLINE
10' WIDE WEIRELEV. 112.00'
5.5' WIDE WEIRELEV. = 113.50
118
10610
811011
2
4.00'
G G G G G G G G G G 2
1
1 3" WHC
4" X 3"REDUCER
4" WHC
NAD 83
3
PRO
POSE
D S
ITE
PLAN
1" = 30'
PARKING SPACE SUMMARYBAY AREA AND MEETING ROOMS
CATEGORY D = 1 SPACE / 200 SQ. FT. ..................... 9,997 SQ. FT. = 50 SPACESREMAINING APPLICABLE AREAS
CATEGORY B = 1 SPACE / 300 SQ. FT. ..................... 8,215 SQ. FT. = 28 SPACESTWO PARKING SPACES PER BAY ................................................. 5 BAYS = 10 SPACES
IMPERVIOUS AREA SUMMARYEXISTING IMPERVIOUS ...................................................... 61,961 SQ. FT. OR 40.77%PROPOSED IMPERVIOUS .................................................. 70,979 SQ. FT. OR 46.70%
DECEMBER, 2018
17-5965
BWHPRINCE FREDERICK VFD
OF 18
AL
NA
FOR
Warning: This document is an instrument of professionalservice prepared by Bay Engineering Inc. Alteration of thisdocument by any party other than Bay Engineering Inc. is aviolation of law that will be prosecuted to its fullest extent.