15. Proposed Development in Bukit Jalil Sports City. 1. Sports Mall Building Sports Mall Building is located in Location 1. Agencies that will be located in Sports Mall Buildings are: 1. Administration Office of “Perbadanan Stadium Malaysia” (PSM) 2. Sports Building (MSN) 3. Sports Mall (PSM) 4. Youth Dormitories (JBSN) This building is located near LRT Bukit Jalil and National Aquatic Centre. An existing food court building will be demolished for the purpose of constructing PSM’s Admin Office. The location of PSM admin office must be strategic and important because it will be a main entrance from LRT. Thousands of people that use LRT service to Bukit Jalil Sports City will use this path. Sports Mall must show iconic features and a landmark visually and physically. Comprehensive Traffic studies must be conducted by Traffic Consultants to ensure smooth traffic flow. For Sports Mall, total parking space to be provided is 1379. In initial calculation, the 4 basement floors are required. Large carpark area is required because this building will house the following facilities: Carpark Requirements: 1. Admin Office – 81 carpark 2. Sports Building- 223 carpark 3. Sports Mall-726 carpark 4. Sports Mall Outdour Retail Area-234 carparks 5. Youth Dormitories-115 carparks.. For motorcycling parking space, 651 space is required. In carpark requirement calculation, Sports Mall requires most carparks area due to its large area and commercial usage. Page 56
26
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript

15. Proposed Development in Bukit Jalil Sports City.

1. Sports Mall Building

Sports Mall Building is located in Location 1.

Agencies that will be located in Sports Mall Buildings are:1. Administration Office of Perbadanan Stadium Malaysia (PSM)2. Sports Building (MSN)3. Sports Mall (PSM)4. Youth Dormitories (JBSN)This building is located near LRT Bukit Jalil and National Aquatic Centre. An existing food court building will be demolished for the purpose of constructing PSMs Admin Office.The location of PSM admin office must be strategic and important because it will be a main entrance from LRT. Thousands of people that use LRT service to Bukit Jalil Sports City will use this path. Sports Mall must show iconic features and a landmark visually and physically.Comprehensive Traffic studies must be conducted by Traffic Consultants to ensure smooth traffic flow. For Sports Mall, total parking space to be provided is 1379. In initial calculation, the 4 basement floors are required.Large carpark area is required because this building will house the following facilities:Carpark Requirements:1. Admin Office 81 carpark2. Sports Building- 223 carpark3. Sports Mall-726 carpark4. Sports Mall Outdour Retail Area-234 carparks5. Youth Dormitories-115 carparks..For motorcycling parking space, 651 space is required.In carpark requirement calculation, Sports Mall requires most carparks area due to its large area and commercial usage.

2. Youth ParkFor Youth Park, it must be considered that part of the area to be developed is not necessarily to be indoor. Few area such as Bicycle track, jogging, roller speed rink etc. dont need indoor space. It can be outside of the building or on the roof.Total area to be provided for Youth Park is 19,686 m2. Location 2 is for the purpose of 2 storey carpark which comprise of 145 car space and 286 motorcycle space.A 4-storey building can be fitted in the proposed site and can be divided to few separate building as mentioned in Proposed Development for Location 2.

3. Convention CentreConvention centre is a critical component in generating sports and entertainment activities in Bukit Jalil Sports City. Modern and unique design/features has to be considered.In the convention centre, the following facilities are to be located:1. Indoor hall2. Indoor showroom/exhibition centre.3. Indoor sports and entertainment facilities.4. Sports Museum5. Library6. Landscape area7. Food courtTotal area for Convention centre is 86,765 m2. Carparks space to be provided is 1,236 spaces and motorcycle spaces is 413 spaces.Summary is as below:NoFacilitiesArea (m2)Car ParkMotorcycle Space

1Indoor Hall(See Page 58 for info)

2Indoor Showroom/Exhibition Centre

3Indoor sports and entertainment

4Sports Museum

5Library

6Landscape area

7Food Court

8

Traffic studies is crucial to ensure the Convention Centre can cater for traffic flows especially during sports or entertainment event.The design of the Convention Centre must have a Moving Forward feature that unite and uniform all the facilities in the building. Crucial facilities such as Indoor Hall, Indoor Sports and Entertainment Facility and Sports Museum must have a distinct design.

(Diagrams)Convention Centre (PSM)Sports Museum LibraryFood Court

Another main criteria for a convention centre is its large area with large distance between structural supports. This building requires comprehensive structural study.This type of structure usually make use of steel truss. Developer/Contractor can study other feasible structural design.Some sports hall or international swimming pool can use glue laminated timber truss as a main structure. This will gives a beautiful finish.

4. Institute Sukan Negara (ISN) Building

Consist of1. Specialist Medical Centre2. Common use support space in Podium

The summary is as belowNoFacilityArea (m2)CarparkMotorcycle park

1Specialist Medical centre16,5612130

ISN building is located in Location 4 where the Common use support space will be located in 1-storey or 2-storey podium. Spaces for ISN will be 9 levels.Also to be provided is half basement carpark. Since the site for ISN building is on a hill, there will be a need to cut so the basement parking can be provided.

5. Majlis Sukan Negara (MSN) BuildingMSN Building consists of:1. Training Building.2. Common usage space in PodiumThe summary is as belowNoFacilityArea (m2)CarparkMotorcycle park

1Training Building (MSN)15,6667792

MSN Building is located in Location 5 where all the support/common area is placed in 1-storey podium. Space for MSN is in 4 levels.Also to be provided is 2 half basement floor for carpark. 6 training halls for the following sports will be provided:a. Taekwondob. Silatc. Wushud. Karatee. Fencingf. Boxing1 competition hall to be provided in ground floor.

16. Provision on CarparksA. carparkEventhough Bukit Jalil Sports City has 226.7 acre of space, it has high level of space and accommodation usage.Hence, theres limited space available for new development. With respect to general usage and available space, 3,084 carpark lot is required.Existing open area for carparks, motorcycle and bus cant cope with the requirement. Hence every new building or facilities has to provide space for carpark either in separate building or within the basement/upper floors.Required Motorcycle parking space is 1,448. This number is derived from DBKL guideline.Bukit Jalil Sports City is a premier development that will have modern and spacious buildings. Therefore, its important theres sufficient carpark space.Please refer to provided carpark calculation.

Page 6225. Upgrading of existing facilities in National Stadium (PSM) Phase 1The upgrading works is as follows:A. Upgrading of Bukit Jalil National StadiumB. Upgrading of Bukit Jalil Putra StadiumC. Upgrading of Bukit Jalil Hockey StadiumD. Upgrading of Bukit Jalil Aquatic CentreE. Upgrading of common facilities.

A. Upgrading of National Stadium Bukit Jalil

1. Upgrade of Corporate Room in National Stadiuma. Project Requirement for SEA games Provide more comfortable facilities that gives satisfaction to audience. Upgrade of corporate room. Upgrade of wall and floor structure and interior design Corporate room add audience capacity in National Stadium and will be an interest for organiser to turn it into VIP room because of its strategic location.b. Project briefTechnical Infoi. Total area: 941.6 m2ii. Corporate room area: 10.7m x 8miii. Total capacity: 110 paxiv. Equipment requirement: Furniture, toilet, ID etc.v. Usage: Space for VIP

c. Implementation Duration: 6 month Expected start: jan 2016 Expected end: Jun 2016

2. Upgrade of Water Reticulation System in National Stadium

a. Project Requirement for SEA games Existing piping system frequently has leakage and waste of water occur. Works comprise of pipe and pump replacement and ceiling replacement and building repair affected by existing water leakage.b. Project briefTechnical InfoReplace to new piping systemi. Total area: 63,631 ft2ii. Usage: daily- for office staffs and during event (90,000 visitors)iii. Qty: approx. 900m for whole building system.iv. Size: a. Domestic PipePropose to use GI pipe size 2,4 and 8 and complied to Syabas and JKR specifications.b. BOMBA PipePropose to use GI pipe size 4 and complied to BOMBA specifications.c. Implementation Duration: 6 month Expected start: Jun 2016 Expected end: December 2016

3. Upgrade of Corporate Room in National Stadium

a. Project need for SEA gamesi. Demolish, discard and design of new Interior Design for 8 unit of corporate room for SEA games.ii. Painting of room interior and exterior

b. Project brief Area: 40 ft x 40 ft Capacity: 30 pax. Length: - International specification: - Usage: To be use as rest room for Countrys Contingent leader. Also as VIP room during event.

c. Implementation Duration: 6 months Start: Jun 2016 End: December 2016

4. Upgrading of changing rooms in National Stadium

a. Project need for SEA gamesI. Upgrading of existing changing rooms which consist of demolition of existing structure to suit the requirement of the games.II. Replace of indoor equipment such as massage table, dopping test equipment and painting according to suitable colours.III. Renovation of exisiting changing room for soccer that can also be used for track games.IV. Painting of exterior and interior of the changing rooms.b. Project brief Area: 40 ft x 40 ft Capacity: 120 pax Length: - International spec : - Usage: athlete changing room and doping test.c. Implementation Duration: 8 months Start: Mac 2016 End: October 2016

5. Upgrade of Landscape

a. SEA Games requirementi. Upgrading of landscape quality in National Stadium parking space in preparation for 2017 SEA games.b. Project BriefTech infoi. Parking A area: 31,507 m2ii. Parking B area: 32,706 m2iii. Parking C area: 25,307 m2

Affected componenti. Softscape Shade tree Shrubs Grass?ii. Hardscape Benches Pond Park lighting Landscape deco Planter boxC. Implementation Duration: 10 month Start: January 2016 End: November 2016

6. Upgrading of PA System

a. SEA games requirementI. Dismantle existing equipment and installation of new systemII. Wiring works for power supply complete with BD in amplifier room.III. Data wiring from control room to amplifier.IV. Construct new room for amplifier in level 4 comes with 2 unit of air-conV. Ensure amplifier location must be centralised in Level 5 and with 4 predetermined zones.b. Project briefArea:Size:Length:Specifications:Usage: Ensure PA system can be used during event, emergency and normal announcement.

c. Implementation:Duration : 8 monthStart: Jun 2016End: February 2017.

7. Upgrading of 2 unit scoreboards

a. SEA games requirement.i. Dismantling existing equipment and installation of new equipment.ii. Power supply wiring works complete with BD in scoreboard.iii. Data cabling from control room to scoreboardiv. Scoreboard can show video/text.v. Software for soccer and athletics.b. Project briefSize: 18.5x15.5m and 16x8,96mLength: -National spec: -Usage: for live event

c. ImplementationDuration: 8 monthStart: Jun 2016End: Feb 2017

8. Re-Epdm of track surface and track line marking complete with IAAF certification.

a. Project Brief

i. Total area 10 lanes 100m track 9 lane 400m track 4 lanes 60m Warm-up track D-Area (green area) Long Jump and 3 point Jump ii. EPDM thickness 13 mmiii. Type IAAF certified red synthetic surface IAAF certified blue synthetic surfaceiv. IAAF Class 1 Certified.v. Lifecycle : 5 yearsvi. Line marking 10 lanes 100m track 9 lane 400m track 4 lanes 60m Warm-up track D-Area (green area) Long Jump and 3 point Jump High jump Pole vault Discus throw Shot put Hammer throw Hurdles 110m hurdles

b. Project requirementFor the purpose of preparation of 2017 SEA Games.

Implementation Duration: 6 months Start: Jun 2016 End: December 2016 Tender: May 2016

9. Upgrading of toilets in National Stadium

a. Project requirement for SEA games.

To provide better facilities for the public as the existing toilet is worn down.

b. Project briefTechnical info

i. Underground toilet 6 unit of toilet 108 cubicle. 1 unit toilet size: 14m x 8m Total toilet area: 672 m2ii. Female underground toilet 6 unit of toilet 252 cubicle. 1 unit toilet size: 14m x 8m Total toilet area: 672 m2iii. Male VIP underground toilet 4 unit of toilet total 24 cubicle. 1 unit toilet size: 10m x 6m Total toilet area: 240 m2iv. Female VIP underground toilet 4 unit of toilet total 24 cubicle. 1 unit toilet size: 10m x 6m Total toilet area: 240 m2

v. Male Level 4 toilet 8 unit of toilet total 16 cubicle. 1 unit toilet size: 6m x 2m Total toilet area: 96 m2vi. Female Level 4 toilet 8 unit of toilet total 32 cubicle. 1 unit toilet size: 6m x 2m Total toilet area: 96 m2

Approx. total toilet area in National Stadium is 2016 m2c. Implementation

Duration: 8 monthsStart: January 2016End: September 2016

10. Upgrading of Timing System in National Stadium

11. Upgrading of athletics equipment in National StadiumPage 1035. Upgrading of scoreboards at 4 sides of putra stadium

6. Upgrading of stadium putra toilet

Page 109

(Please see scanned copy for translation of Page 104-107)

A. Retractable Seating

Retractable seats are seating system that are retractable when are not used.

Its a frequently used system that requires extra seating space but limited in available space for permanent seat.

This system is space efficient and only used when extra seats required.

Its a popular solution all over the world because seating area can be increased to extra thousands.

Typically type of retractable seat are:

a. Tip-up mechanism for individual seat which has fabric finish.b. Bench shell. Without back support.Chosen seat must not be a bucket shell type which is the type that are not foldable.

Proposed Retractable seat must consider the following aspects:i. Structural system and frame for retractable seat must not clashing with 100m track.ii. Retractable seat system must not pose damage to the track.iii. Retractable seat system has to be automatic.iv. Retractable seat must consider existing seat location. It shall not obstruct the view of audience at the back. Developer/Contractor has to study to determine the angle, height of the retractable system.v. Track and field to be modified to satisfy the need of new retractable seat system. vi. 15,000 retractable seat to be provided. This is addition to additional seat.vii. Numbers of existing seat must not be reduced.

Page 137