BUJAGALI TRANSMISSION NETWORK Existing Substations New Substations For illustration purposes only. Not to scale. Existing Lines New Lines KAWANDA SUBSTATION MUTUNDWE SUBSTATION KAMPALA NORTH BUJAGALI SWITCHYARD BUJAGALI HYDRO DAM BUJAGALI- NALUBAALE LINE KAWANDA- BUJAGALI LINE KAWANDA- MUTUNDWE LINE BUJAGALI- TORORO LINE NALUBAALE 132KV 132KV TORORO NORTHERN LINE N UGANDA ELECTRICITY TRANSMISSION COMPANY LIMITED Prepared for: Project Name: Date: December, 2006 LOCATION OF THE BUJAGALI INTERCONNECTION PROJECT BUJAGALI INTERCONNECTION PROJECT SEA Figure 1.1 Prepared by: 10045-T-1 132-220KV V i c to ri a N i l e A l b e rt N ile Vic to r ia N il e Lake Kyoga UGANDA Tororo Kampala Lake Victoria Entebbe A l b e rt N ile V i c to ri a N i l e Bujagali Jinja Nalubaale & Kiira
51
Embed
BUJAGALI INTERCONNECTION Figure 1.1 PROJECT …bujagali-energy.com/docs/IPSEAREPORTS.Web Version/IP SEA...BUJAGALI TRANSMISSION NETWORK Existing Substations New Substations For illustration
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
BUJAGALI TRANSMISSION NETWORK
Existing Substations
New Substations
For illustration purposes only. Not to scale.
Existing Lines
New Lines
KAWANDASUBSTATION
MUTUNDWESUBSTATION
KAMPALA NORTH
BUJAGALI SWITCHYARD
BUJAGALI HYDRO DAM
BUJAGALI- NALUBAALE LINE
KAWANDA-BUJAGALI LINE
KAWANDA-MUTUNDWE LINE
BUJAGALI- TORORO LINE
NALUBAALE
132K
V
132KV
TORORO
NORTHERN LINE
N
UGANDA ELECTRICITYTRANSMISSION COMPANY LIMITED
Prepared for:
Project Name:Date: December, 2006
LOCATION OF THE BUJAGALI INTERCONNECTION PROJECT
BUJAGALI INTERCONNECTION PROJECT SEA
Figure 1.1
Prepared by:
10045-T-1
132-220KV
Victoria
Nile
Albe rtNi le
Victoria
Nile
LakeKyoga
U G A N D A
Tororo
Kampala
Lake Victoria
EntebbeBujagali
Albe rtNi le
Victoria
Nile
Bujagali
Jinja
Nalubaale & Kiira
DEVELOPER
SUBMISSION OF PROJECT BRIEF TOTHE AUTHORITY AND TO LEAD AGENCY
AUTHORITY AND LEAD AGENCYCONSULTATION ON PROJECT BRIEF
PROJECT BRIEF FORWARDED TOLEAD AGENCY
SCOPING
T.O.Rs
REVIEW OFT.O.Rs
EI STUDY ANDCOLLECTION OF INFORMATION
PREPARE EIS*
STAKEHOLDER CONSULTATIONSON SCOPE
AUTHORITY, LEAD AGENCY ANDSTAKEHOLDER CONSULTATIONSON T.O.Rs
PUBLIC AND STAKEHOLDER CONSULTATIONS
PUBLIC AND STAKEHOLDER CONSULTATIONS
EIS*
LEAD AGENCY AND PUBLICCOMMENT AND REVIEW
ANY FURTHER STAKEHOLDER ANDLEAD AGENCY COMMENTS
CERTIFICATE OF APPROVALOF THE EIA
RECORD OF DECISION
REVIEW AND COMMENTON EIS*
APPROVAL OF EIS*
DECISION ON PROJECT
ACTION BY DEVELOPER
GNI
NE
ER
CS
DU
TS
IE
YG
NIK
AM
NOI
SIC
ED
INPUTS/OUTPUTS
Adapted from NEMA (1997)
Prepared for:
Project Name:Date: December, 2006 10045-T-5
EIA PROCESS FLOWCHARTFOR UGANDA
BUJAGALI INTERCONNECTIONPROJECT SEA
Figure 2.1
Updated by:
Source: Adapted from NEMA (1997)* EIS synonymous with SEA Report
UGANDA ELECTRICITYTRANSMISSION COMPANY LIMITED
KIFUFOREST
RESERVE
NAMYOYAFOREST
RESERVE
NORTHERNKAMPALAFARMLAND
KAWANDA
KAWANDA
LUBIGI
LUBIGI NATETE
10
Source: Forest Department, 1999 WS Atkins 1999b.
Landscape Unit Boundary
Forest Reserve Existing Transmission Systems Proposed Transmission Systems
Northern Line
DANIDA Line
33/66kV Line
SCALE 1:75,000
0 1000 2000 M
Namyoya (aka Mwola)
Exisiting Sub Station
Kifu
Boundary of Lubigi Swamp
Ecological SurveyTransects
NORTHERNKAMPALA FARMLAND01
Proposed TransmissionSystem Route
Prepared for:
Project Name:Date: December, 2006 10045-T-6A
B IOPHYSICAL FEATURESMAP 1 OF 3
BUJAGALI INTERCONNECTIONPROJECT SEA
Figure 3.1
Updated by:
Proposed Sub Station
Mutundwe Substation
Proposed Kawanda Substation
Kampala North Substation
UGANDA ELECTRICITYTRANSMISSION COMPANY LIMITED
Typical peri-urbanlandscape near Natete.(January 2006)
Landscape typical ofKawanda area.(February 2000)
Lubigi Swamp, showing agricultural encroachment in the foreground (January 2006)
Prepared for:
Project Name:Date: December, 2006 10045-T-7A
PHOTOGRAPHS OF LANDSCAPE UNITS
Along the Proposed Transmission System Route
BUJAGALI INTERCONNECTIONPROJECT SEA
Figure 3.2A
Updated by:
UGANDA ELECTRICITYTRANSMISSION COMPANY LIMITED
Northern KampalaFarmland(February 2000)
Sezibwa Farmland(February 2000)
Mabira Fringes(February 2000)
Prepared for:
Project Name:Date: December, 2006 10045-T-7B
PHOTOGRAPHS OF LANDSCAPE UNITS
Along the Proposed Transmission System Route
BUJAGALI INTERCONNECTIONPROJECT SEA
Figure 3.2B
Updated by:
UGANDA ELECTRICITYTRANSMISSION COMPANY LIMITED
Mabira Forest. Looking eastof the existing transmission line,within the western portion of Mabira FR.Buffer zone is to the left of thetransmission line. Recreation zone isto the right of the transmission line.(January 2006)
Eastern Farmland.(February 2000)
Prepared for:
Project Name:Date: December, 2006 10045-T-7C
PHOTOGRAPHS OF LANDSCAPE UNITS
Along the Proposed Transmission System Route
BUJAGALI INTERCONNECTIONPROJECT SEA
Figure 3.2C
Updated by:
UGANDA ELECTRICITYTRANSMISSION COMPANY LIMITED
Prepared for:
Project Name:Date: December, 2006 10045-T-14
MABIRA FOREST RESERVE
BUJAGALI INTERCONNECTIONPROJECT SEA
Figure 3.3
Updated by:
UGANDA ELECTRICITYTRANSMISSION COMPANY LIMITED
Production (High Impact/Encroachment)
Production (Low Impact)
Recreation/Buffer Zone
Strict Nature Reserve
Source: National Forestry Authority (2006)
Prepared for:
Project Name:Date: December, 2006 10045-T-10A
PHOTOGRAPHS OF WAYLEAVEWITHIN MABIRA FOREST RESERVE
BUJAGALI INTERCONNECTIONPROJECT SEA
Figure 3.4A
Updated by:
Tower 138 Ssese looking west(January 2006)
Tower 154 west looking towards Tower 153(January 2006)
Tower 180 looking west(January 2006)
UGANDA ELECTRICITYTRANSMISSION COMPANY LIMITED
Prepared for:
Project Name:Date: December, 2006 10045-T-10B
PHOTOGRAPHS OF WAYLEAVEWITHIN MABIRA FOREST RESERVE
BUJAGALI INTERCONNECTIONPROJECT SEA
Figure 3.4B
Updated by:
Recently-upgraded bridge over the Waliga River between Towers 169 and 170(January 2006)
UGANDA ELECTRICITYTRANSMISSION COMPANY LIMITED
KA MP ALA C ITY
KIRASUB-COUNTY
WAKISOSUB-COUNTY
NAKAWA
NANGABO SUB-COUNTY
NABWERUSUB-COUNTY
KAWEMPE
MAKINDYE
MUKONO TOWN
NSANGISUB-COUNTY
CENTRALKAMPALA
K I F UF O R E S T
R E S E R V E
N A M Y O Y AF O R E S T
R E S E R V E
BUSEGA PARISH
NATEETE PARISH
LUBYA PARISH
KASUBI PARISH
LUGABA PARISH
MUTUNDWE PARISH
Site of CulturalSignificance
Site of CulturalSignificance
Site of CulturalSignificance
Site of CulturalSignificance
Site of CulturalSignificance
KAGUWASUB-COUNTY
N A N A N V EF O R E S T
R E S E R V E
Kawanda Sub-Station
Mutundwe Sub-Station
Kawanda-Bujagali Line
Mutundw
e-Kaw
andaLine
445,000
445,000
450,000
450,000
455,000
455,000
460,000
460,000
465,000
465,000
470,000
470,000
35,0
00
35,0
00
40,0
00
40,0
00
45,0
00
45,0
00
Project Name:
Prepared For:
Date: December, 2006 10045-T-11A Figure 3.5
SOCIO-ECONOMIC FEATURES ALONGPROPOSED TRANSMISSION SYSTEM ROUTE
(MAP 1 OF 3)
BUJAGALI INTERCONNECTIONPROJECT SEA
0 1,000 2,000 3,000 4,000 5,000
Meters
Sub-Station Location
Transmission Line Route
District Boundary
Sub-District Boundary
Protected Area
Broadleaved Tree Plantations
Tropical High Forest Well Stocked
Depleted Tropical High Forest
Woodland
Bush
Grassland
Wetland
subsistance Farmland
Commercial Farmland
Built up Areas
L and
satI
mag
e:P r
ovid
edvi
aLa
ndsa
t.org
-La
ndU
se&
Bo u
ndar
yD
ata :
Gov
ernm
ento
f Uga
nda
1:75,000
------
------
- ---- -
------
- ---- -
-La
ndUs
eC l
assif
icat io
n sAd
jac e
ntt o
Lin e
s-- -
------
- --- --
------
-- ----
----
TRANSMISSION COMPANY LIMITEDUGANDA ELECTRICITY
MU KON O DI ST RI CT
KAWOLO
NAGOJJESUB-COUNTY
KYAMPISI
MUKONOTOWN
LUGAZITOWN
MUKONOSUB-COUNTY
K I F UF O R E S T
R E S E R V E
M A B I R AF O R E S T
R E S E R V E
A M Y O Y AF O R E S TE S E R V E
Kawanda-Bujagali Line
470,000
470,000
475,000
475,000
480,000
480,000
485,000
485,000
490,000
490,000
495,000
495,000
35,0
00
35,0
0 0
40,0
00
40,0
00
45,0
00
45,0
00
50,0
00
5 0,0
0 0
Project Name:
Prepared For:
Date: December 2006 10045-T-11B Figure 3.5
SOCIO-ECONOMIC FEATURES ALONGPROPOSED TRANSMISSION SYSTEM ROUTE
(MAP 2 OF 3)
BUJAGALI INTERCONNECTIONPROJECT SEA
0 1,000 2,000 3,000 4,000 5,000
Meters
Sub-Station Location
Transmission Line Route
District Boundary
Sub-District Boundary
Protected Area
Broadleaved Tree Plantations
Tropical High Forest Well Stocked
Depleted Tropical High Forest
Woodland
Bush
Grassland
Wetland
subsistance Farmland
Commercial Farmland
Built up Areas
L and
satI
mag
e:P r
ovid
edvi
aLa
ndsa
t.org
-La
ndU
se&
Bo u
ndar
yD
ata :
Gov
ernm
ento
f Uga
nda
1:75,000
------
------
- ---- -
------
- ---- -
-La
ndUs
eC l
assif
icat io
n sAd
jac e
ntt o
Lin e
s-- -
------
- --- --
------
-- ----
----
TRANSMISSION COMPANY LIMITEDUGANDA ELECTRICITY
BUY IKWE D ISTR IC T
JIN JA
WAKISISUB-COUNTY
NYENGA
BUDONDO
NAJJEMBESUB-COUNTY
NJERU TOWN
KIMAKAMPUMUDDENALUFENYA
M A B I R AF O R E S T R E S E R V E
M A B I R AF O R E S T R E S E R V E
BujagaliSub-Station
Kawanda-Bujagali Line
New Bujagali-Tororo Line
New Bujagali-Nalubaale Line
495,000
495,000
500,000
500,000
505,000
505,000
510,000
510,000
515,000
515,000
520,000
520,000
40,0
00
40,0
0 0
4 5,0
0 0
4 5,0
0 0
50,0
0 0
5 0,0
0 0
55,0
00
55,0
00
Project Name:
Prepared For:
Date: December, 2006 10045-T-11C Figure 3.5
SOCIO-ECONOMIC FEATURES ALONGPROPOSED TRANSMISSION SYSTEM ROUTE
(MAP 3 OF 3)
BUJAGALI INTERCONNECTIONPROJECT SEA
0 1,000 2,000 3,000 4,000 5,000
Meters
Sub-Station Location
Transmission Line Route
District Boundary
Sub-District Boundary
Protected Area
Broadleaved Tree Plantations
Tropical High Forest Well Stocked
Depleted Tropical High Forest
Woodland
Bush
Grassland
Wetland
subsistance Farmland
Commercial Farmland
Built up Areas
L and
satI
mag
e:P r
ovid
edvi
aLa
ndsa
t.org
-La
ndU
se&
Bo u
ndar
yD
ata :
Gov
ernm
ento
f Uga
nda
1:75,000
------
------
- ---- -
------
- ---- -
-La
ndUs
eC l
assif
icat io
n sAd
jac e
ntt o
Lin e
s-- -
------
- --- --
------
-- ----
----
TRANSMISSION COMPANY LIMITEDUGANDA ELECTRICITY
SOURCE: UEB.
Prepared for:
Project Name:Date: December, 2006 10045-T-12
PRESENT ELECTRICALNETWORK IN UGANDA
BUJAGALI INTERCONNECTIONPROJECT SEA
Figure 4.1
Updated by:
UGANDA ELECTRICITYTRANSMISSION COMPANY LIMITED
NOT TO SCALE
Prepared for:
Project Name:Date: December, 2006 10045-T-13a
SCHEMATIC DIAGRAMS OFPOWER SYSTEM OPTIONS
BUJAGALI INTERCONNECTIONPROJECT SEA
Figure 4.2a
Updated by:
BUJAGALI FALLSGENERATING STATION
KAWANDASUBSTATION
KAMPALA NORTHSUBSTATION
MUTUNDWESUBSTATION
NALUBAALESUBSTATION
KIIRAGENERATING STATION
SECTION OF LINE TO BE REMOVED
JINJA
BUJAGALISWITCHYARD
LUGOGOSUBSTATION
132k
V
132k
V
132k
V13
2kV
132k
V
132k
V
132kV
132k
V
132k
V
132k
V
132k
V
132k
V
33kV 66kV
33kV
132k
V
TO TORORO
TO KABULASOKE
Existing or committed infrastructure
Proposed infrastructure
KAMPALA
NALUBAALEGENERATING STATION
MUKONO LUGAZI
*
Constructed to 220 kV standard but initially operated at 132kV
*
BUJAGALI FALLSGENERATING STATION
KAWANDASUBSTATION
KAMPALA NORTHSUBSTATION
MUTUNDWESUBSTATION
NALUBAALESUBSTATION
KIIRAGENERATING STATION
SECTION OF LINE TO BE REMOVED
JINJA
BUJAGALISWITCHYARD
LUGOGOSUBSTATION
132k
V
132k
V
132k
V13
2kV
132k
V
132k
V
132kV
132k
V
132k
V
132k
V
132k
V
132k
V
33kV 66kV
33kV
132k
V
TO TORORO
TO KABULASOKE
Existing or committed infrastructure
Proposed infrastructure
KAMPALA
NALUBAALEGENERATING STATION
MUKONO LUGAZI
*
**
**
Option 3: Line contructed for 2 circuits at 220kV but only one circuit installed and updated at 132kV.
Option 3a+3aR: Double circuit line constructed at 220kV starndard but operated at 132kV.
Option 3aR: Series Reactors installed at the Bujagali Switchyard
*
Diagram 6Option 3, 3a, 3aR KAMPALA NORTH
SUBSTATION
MUTUNDWESUBSTATION
NALUBAALESUBSTATION
KIIRAGENERATING STATION
JINJALUGOGO
SUBSTATION
132k
V
132k
V13
2kV
132k
V
132k
V
132kV
132k
V
132k
V
132k
V
33kV 66kV
33kV
TO TORORO
TO KABULASOKE
Existing or committed infrastructure
KAMPALA
NALUBAALEGENERATING STATION
MUKONO LUGAZI
Diagram 1Existing Infrastructure
132kV
BUJAGALI FALLSGENERATING STATION
KAWANDASUBSTATION
KAMPALA NORTHSUBSTATION
MUTUNDWESUBSTATION
NALUBAALESUBSTATION
KIIRAGENERATING STATION
SECTION OF LINE TO BE REMOVED
JINJA
BUJAGALISWITCHYARD
LUGOGOSUBSTATION
132k
V
132k
V
132k
V13
2kV
132k
V
132k
V
132kV
132k
V
132k
V
132k
V
132k
V
132k
V
33kV 66kV
33kV
220k
V
TO TORORO
TO KABULASOKE
Existing or committed infrastructure
Proposed infrastructure
KAMPALA
NALUBAALEGENERATING STATION
MUKONO LUGAZI
*
Line built with double circuit towersbut only one circuit installed.
*
Diagram 4Option 1
132kV
BUJAGALI FALLSGENERATING STATION
KAWANDASUBSTATION
KAMPALA NORTHSUBSTATION
MUTUNDWESUBSTATION
NALUBAALESUBSTATION
KIIRAGENERATING STATION
SECTION OF LINE TO BE REMOVED
JINJA
BUJAGALISWITCHYARD
LUGOGOSUBSTATION
132k
V
132k
V
132k
V13
2kV
132k
V
132k
V
132kV
132k
V
132k
V
132k
V
132k
V
132k
V
33kV 66kV
33kV
220k
V
TO TORORO
TO KABULASOKE
Existing or committed infrastructure
Proposed infrastructure
KAMPALA
NALUBAALEGENERATING STATION
MUKONO LUGAZI
*
Diagram 3Base (AESNP) Option
132kV
BUJAGALI FALLSGENERATING STATION
MUTUNDWESUBSTATION
KIIRAGENERATING STATION
JINJA
BUJAGALISWITCHYARD
LUGOGOSUBSTATION
132k
V
132k
V
132k
V13
2kV
132k
V
132k
V
132kV
132k
V13
2kV
132k
V
132k
V
132k
V
132k
V
33kV 66kV
33kV
220k
V
TO TORORO
TO KABULASOKE
TO KARUMA
TO MASAKA WEST
Existing or committed infrastructure
Proposed infrastructure
KAMPALA
NALUBAALEGENERATING STATION
MUKONO LUGAZI
KAWANDASUBSTATION
NAMAVESUBSTATION
NALUBAALESUBSTATION
Diagram 2Long Run System Plan
132kV
KAMPALA NORTHSUBSTATION
BUJAGALI FALLSGENERATING STATION
KAMPALA NORTHSUBSTATION
MUTUNDWESUBSTATION
NALUBAALESUBSTATION
KIIRAGENERATING STATION
SECTION OF LINE TO BE REMOVED
JINJA
BUJAGALISWITCHYARD
LUGOGOSUBSTATION
132k
V
132k
V13
2kV
132k
V
132k
V
132kV
132k
V13
2kV
132k
V
132k
V
132k
V
132k
V
33kV 66kV
33kV
TO TORORO
TO KABULASOKE
Existing or committed infrastructure
Proposed infrastructure
KAMPALA
NALUBAALEGENERATING STATION
MUKONO LUGAZI
Diagram 5Option 2
132kV132kV
SECTION OF LINE TO BE REMOVED
UGANDA ELECTRICITYTRANSMISSION COMPANY LIMITED
NOT TO SCALE
Prepared for:
Project Name:Date: December, 2006 10045-T-13b
SCHEMATIC DIAGRAMS OFPOWER SYSTEM OPTIONS
BUJAGALI INTERCONNECTIONPROJECT SEA
Figure 4.2b
Updated by:
BUJAGALI FALLSGENERATING STATION
KAWANDASUBSTATION
KAMPALA NORTHSUBSTATION
MUTUNDWESUBSTATION
NALUBAALESUBSTATION
KIIRAGENERATING STATION
JINJA
BUJAGALISWITCHYARD
LUGOGOSUBSTATION
Vk231
Vk231
Vk2 31Vk2 31
Vk 231
Vk23 1
132kV
V k231
Vk 231
132k
V
132k
V
132k
V
33kV 66kV
33kV
220k
V
TO TORORO
TO KABULASOKE
Existing or committed infrastructure
Proposed infrastructure
KAMPALA
NALUBAALEGENERATING STATION
MUKONO LUGAZI
*
Line built with double circuit towersbut only one circuit installed.
*
Diagram 3Option 1
132kV
BUJAGALI FALLSGENERATING STATION
KAWANDASUBSTATION
KAMPALA NORTHSUBSTATION
MUTUNDWESUBSTATION
NALUBAALESUBSTATION
KIIRAGENERATING STATION
JINJA
BUJAGALISWITCHYARD
LUGOGOSUBSTATION
Vk231
Vk231
Vk231Vk231
Vk231
Vk23 1
132kV
Vk231
Vk231
132k
V
132k
V
132k
V
33kV 66kV
33kV
220k
V
TO TORORO
TO KABULASOKE
Existing or committed infrastructure
Proposed infrastructure
KAMPALA
NALUBAALEGENERATING STATION
MUKONO LUGAZI
*
Diagram 2Base (AESNP) Option
132kV
SECTION OF LINE TO BE REMOVED
SECTION OF LINE TO BE REMOVED
UGANDA ELECTRICITYTRANSMISSION COMPANY LIMITED
NOT TO SCALE
Prepared for:
Project Name:Date: December, 2006 10045-T-13c
SCHEMATIC DIAGRAMS OFPOWER SYSTEM OPTIONS
BUJAGALI INTERCONNECTIONPROJECT SEA
Figure 4.2c
Updated by:
BUJAGALI FALLSGENERATING STATION
KAWANDASUBSTATION
KAMPALA NORTHSUBSTATION
MUTUNDWESUBSTATION
NALUBAALESUBSTATION
KIIRAGENERATING STATION
SECTION OF LINE TO BE REMOVED
JINJA
BUJAGALISWITCHYARD
LUGOGOSUBSTATION
132k
V
132k
V
132k
V13
2kV
132k
V
132k
V
132kV
132k
V
132k
V
132k
V
132k
V
132k
V
33kV 66kV
33kV
132k
V
TO TORORO
TO KABULASOKE
Existing or committed infrastructure
Proposed infrastructure
KAMPALA
NALUBAALEGENERATING STATION
MUKONO LUGAZI
*
Constructed to 220 kV standard but initially operated at 132kV
*
BUJAGALI FALLSGENERATING STATION
KAWANDASUBSTATION
KAMPALA NORTHSUBSTATION
MUTUNDWESUBSTATION
NALUBAALESUBSTATION
KIIRAGENERATING STATION
JINJA
BUJAGALISWITCHYARD
LUGOGOSUBSTATION
132k
V
132k
V
132k
V13
2kV
132k
V
132k
V
132kV
132k
V
132k
V
132k
V
132k
V
132k
V
33kV 66kV
33kV
132k
V
TO TORORO
TO KABULASOKE
Existing or committed infrastructure
Proposed infrastructure
KAMPALA
NALUBAALEGENERATING STATION
MUKONO LUGAZI
*
**
**
Option 3: Line contructed for 2 circuits at 220kV but only one circuit installed and updated at 132kV.
Option 3a+3aR: Double circuit line constructed at 220kV starndard but operated at 132kV.
Option 3aR: Series Reactors installed at the Bujagali Switchyard
*
Diagram 5Option 3, 3a, 3aR
KAMPALA NORTHSUBSTATION
MUTUNDWESUBSTATION
NALUBAALESUBSTATION
KIIRAGENERATING STATION
JINJALUGOGO
SUBSTATION
132k
V
132k
V13
2kV
132k
V
132k
V
132kV
132k
V
132k
V
132k
V
33kV 66kV
33kV
TO TORORO
TO KABULASOKE
Existing or committed infrastructure
KAMPALA
NALUBAALEGENERATING STATION
MUKONO LUGAZI
Diagram 1Existing Infrastructure
132kV
BUJAGALI FALLSGENERATING STATION
KAWANDASUBSTATION
KAMPALA NORTHSUBSTATION
MUTUNDWESUBSTATION
NALUBAALESUBSTATION
KIIRAGENERATING STATION
SECTION OF LINE TO BE REMOVED
JINJA
BUJAGALISWITCHYARD
LUGOGOSUBSTATION
132k
V
132k
V
132k
V13
2kV
132k
V
132k
V
132kV
132k
V
132k
V
132k
V
132k
V
132k
V
33kV 66kV
33kV
220k
V
TO TORORO
TO KABULASOKE
Existing or committed infrastructure
Proposed infrastructure
KAMPALA
NALUBAALEGENERATING STATION
MUKONO LUGAZI
*
Line built with double circuit towersbut only one circuit installed.
*
Diagram 4Option 1
132kV
BUJAGALI FALLSGENERATING STATION
KAWANDASUBSTATION
KAMPALA NORTHSUBSTATION
MUTUNDWESUBSTATION
NALUBAALESUBSTATION
KIIRAGENERATING STATION
SECTION OF LINE TO BE REMOVED
JINJA
BUJAGALISWITCHYARD
LUGOGOSUBSTATION
132k
V
132k
V
132k
V13
2kV
132k
V
132k
V
132kV
132k
V
132k
V
132k
V
132k
V
132k
V
33kV 66kV
33kV
220k
V
TO TORORO
TO KABULASOKE
Existing or committed infrastructure
Proposed infrastructure
KAMPALA
NALUBAALEGENERATING STATION
MUKONO LUGAZI
*
Diagram 3Base (AESNP) Option
132kV
BUJAGALI FALLSGENERATING STATION
MUTUNDWESUBSTATION
KIIRAGENERATING STATION
SECTION OF LINE TO BE REMOVED
JINJA
BUJAGALISWITCHYARD
LUGOGOSUBSTATION
132k
V
132k
V
132k
V13
2kV
132k
V
132k
V
132kV
132k
V13
2kV
132k
V
132k
V
132k
V
132k
V
33kV 66kV
33kV
220k
V
TO TORORO
TO KABULASOKE
TO KARUMA
TO MASAKA WEST
Existing or committed infrastructure
Proposed infrastructure
KAMPALA
NALUBAALEGENERATING STATION
MUKONO LUGAZI
KAWANDASUBSTATION
NAMAVESUBSTATION
NALUBAALESUBSTATION
Diagram 2Long Run System Plan
132kV
KAMPALA NORTHSUBSTATION
BUJAGALI FALLSGENERATING STATION
KAMPALA NORTHSUBSTATION
MUTUNDWESUBSTATION
NALUBAALESUBSTATION
KIIRAGENERATING STATION
SECTION OF LINE TO BE REMOVED
JINJA
BUJAGALISWITCHYARD
LUGOGOSUBSTATION
132k
V
132k
V13
2kV
132k
V
132k
V
132kV
132k
V13
2kV
132k
V
132k
V
132k
V
132k
V
33kV 66kV
33kV
TO TORORO
TO KABULASOKE
Existing or committed infrastructure
Proposed infrastructure
KAMPALA
NALUBAALEGENERATING STATION
SECTION OF LINE TO BE REMOVED
MUKONO LUGAZI
Diagram 4Option 2
132kV132kV
UGANDA ELECTRICITYTRANSMISSION COMPANY LIMITED
Figure 4.3bREARRANGED 132 kV ENTRIES INTO EXISTING
NALUBAALE SWITCHYARD
Figure 4.3aEXISTING 132 kV ENTRIES INTO NALUBAALE SWITCHYARD
Source: Knight Piésold and Merz & McLellan, 1999
KampalaNorth
KampalaNorth
Tororo
Tororo
Section of existingline to be removed
Nalubaale
Nalubaale
Nile
River
Nile
River
Prepared for:
Project Name:Date: December, 2006 10045-T-15
BUJAGALI PROJECT CONNECTIONTO NATIONAL NETWORK
BUJAGALI INTERCONNECTIONPROJECT SEA
Figure 4.3
Updated by:
UGANDA ELECTRICITYTRANSMISSION COMPANY LIMITED
KIFUFOREST
RESERVE
MABIRAFOREST RESERVE
NAMYOYAFOREST
RESERVE
445,000
445,000
450,000
450,000
455,000
455,000
460,000
460,000
465,000
465,000
470,000
470,000
475,000
475,000
480,000
480,000
485,000
485,000
490,000
490,000
495,000
495,000
500,000
500,000
505,000
505,000
510,000
510,000
515,000
515,000
520,000
520,000
20,0
00
20,0
00
25,0
00
25,0
00
30,0
00
30,0
00
35,0
00
35,0
00
4 0,0
0 0
4 0,0
0 0
45,0
00
45,0
00
50,0
00
50,0
00
55,0
00
55,0
00
60,0
00
60,0
00
65,0
00
65,0
00
Project Name:
Prepared For:
Date: December 2006 10045-T-9 Figure 4.4
LAND USE & STUDY AREA(FALSE COLOUR COMPOSITE IMAGE)
BUJAGALI INTERCONNECTIONPROJECT SEA
0 5,000 10,000
Meters
L and
satI
mag
e:P r
ovid
edvi
aLa
ndsa
t.org
1:200,000
KAMPALA
JINJA
A F A L S E C O L O U R C O M P O S I T E I M A G E I S C R E A T E D B Y S U B S T I T U T I O N O F T H E F A M I L I A R( V I S I B L E ) R E D , G R E E N , A N D B L U E B A N D S O F T H E E L E C T R O - M A G N E T I C S P E C T R U M W I T HO N E O R M O R E N O N - V I R S I B L E B A N D S . T H I S I M A G E S U B S T I T U T E S T H E R E D B A N D W I T HT H E N E A R - I N F R A R E D B A N D . T H I S P R O C E S S I S C O M M O N L Y U S E D T O V I S U A L I Z E I M F O R M A T I O N N O TE A S I L Y D I S T I N G U I S H A B L E B Y T H E H U M A N E Y E .
Dark Red Colour indicates Tropical High Forest Well Stocked;a high density of healthy vegetation.
Medium Red Colour indicates Depleted Tropical High Forest;lower vegetation density.
Light Blue Colour indicates Built-Up areas or exposed earth;concrete, metal, paved, gravel & earth roads, recentlyplowed fields show up in this colour.
A mixture of Light & Royal Blues, and Orange indicate areas underintense cultivation. The different colours indicate different stages inthe farming process and crop maturity. It is the size of the areas whichindicates Commercial Farmlands.
Speckled areas consisting of a mixture of Light & Royal Blues,and Orange indicate areas under Subsistence Cultivation.It is the small size and mixed distribution that differentiates thisland use from Commercial Farming.
Wetlands and Grasslands are indicated by Blue-Grey Colouration.
TRANSMISSION COMPANY LIMITEDUGANDA ELECTRICITY
View of 132kV corridor invicinity of Kampala NorthSubstation.
View of land use in vicinity ofKampala North Substation.
Prepared for:
Project Name:Date: December, 2006 10045-T-16
PHOTOGRAPHS OF LAND USENEAR KAMPALA NORTH
BUJAGALI INTERCONNECTIONPROJECT SEA
Figure 4.5
Updated by:
UGANDA ELECTRICITYTRANSMISSION COMPANY LIMITED
Example of dense land use in vicinity of Nalubaale Substation.
View of squatter settlement inpotential corridor for 132kVBujagali-Nalubaale Line.
Prepared for:
Project Name:Date: December, 2006 10045-T-17
PHOTOGRAPHS OF LAND USENEAR NALUBAALE SUBSTATION
BUJAGALI INTERCONNECTIONPROJECT SEA
Figure 4.6
Updated by:
UGANDA ELECTRICITYTRANSMISSION COMPANY LIMITED
Schoo l
Or igin
a l
P r ope r t
y
Add i t i o na l
P r ope r t y
132 Kv Busbar
220 Kv Busbar
Kawanda-Bujaga l i L ine
Mutundwe-Kawanda L ine
Project Name:
Prepared For:
Date: December, 2006 10045-T-18 Figure 4.7
UGANDA ELECTRICITY ANDTRANSMISSION COMPANY LIMITED
OPTIMIZED LAYOUT FORKAWANDA SUBSTATION
BUJAGALI INTERCONNECTIONPROJECT SEA
0 100 200
Meters1:4,000
Schoo l
Or igin
a l
Prope r t
y
220 Kv Busbar
132 Kv Busbar
Kawanda-Bujaga l i L ine
Mut
undw
e-Kaw
anda
L ine
Figure 4.7a - AES NP Original Layout
Figure 4.7b - Optiomal Route Layout
Kampala NorthLine Sub-Station
KAZO PARISH
MENGO PARISH
LUBYA PARISH
KABOWA PARISH
NDEEBA PARISH
RUBAGA PARISH
BUSEGA PARISH
BUKESA PARISH
SUMBWE PARISH
KASUBI PARISH
WAMALA PARISH
KATWE I PARISH
NATEETE PARISH
NABWERU PARISH
NANSANA PARISH
MAGANJO PARISH
KITEEZI PARISH
KAWANDA PARISH
KIBUYE I PARISH
MUTUNDWE PARISH
KATWE II PARISH
KYENGERA PARISH
NAKIVUBO PARISH
LUNGUJJA PARISH
KAGUGUBE PARISH
MULUKA I PARISH
MULUKA IPARISH
MULUKA I PARISH
MULAGO I PARISH
NAKABUGO PARISH
KYEBANDO PARISH
KYEBANDO PARISH
KANYANYA PARISH
MPERERWE PARISH
NALUVULE PARISH
KIBUYE II PARISH
KISENYI I PARISH
NAMIREMBE PARISH
NAKULABYE PARISH
WANDEGEYAPARISH
MULAGO II PARISH
BWAYISE I PARISH
KAWEMPE I PARISH
KOMAM
MAKINDY
KISENYI II PARISH
NAKASERO I PAR
KOLOLO III PARISH
MAKERERE I PARISH
MULAGO III PARISH
BWAYISE IIPARISH
KAWEMPE II PARISH
MAKINDYE II PARISH
KISENYI III PARISH
NAKASERO IV PARISH
NAKASERO II PARISH
KAMWOKY
MAKERERE IIPARISH
BWAYISE III PARISH
NAKASERO III PARISH
MAKERERE III PARISH
NSA
NAJJANANKUMBI I PARISH
NSAMBYA
NSAMBYA RAILWAYPARISH
NAJJANANKUMBI II PARISH
WAKISO
RUBAGA
NABWERU
KAWEMPE
BUSI RO
KA MP ALA C ITY
Kawanda Sub-Station(Proposed)
Mutundwe Sub-Station
BP 2 (220 kV)
BP 1 (220 kV)
AP 2 (132 kV)
AP 1 (132 kV)
AP 18 (132 kv)
AP 20 (220 kv)
AP 19 (132 kv)
AP 17 (132 kV)
AP 16 (132 kV)
AP 13 (132 kV)
AP 12 (132 kV)
AP 11 (132 kV)
AP 4 (132 kV)
AP 3 (132 kV)
AP 8 (132 kV)
AP 14 (132 kV)
AP 10 (132 kV)
AP 9B (132 kV)
AP 15B (132 kV)
AP 5 (132 kV)
AP 9A (132 kV)
AP 15A (132 kV)
445,000
445,000
450,000
450,000
35,0
00
35,0
0 0
4 0,0
00
4 0,0
00
45,0
00
45,0
00
Project Name:
Prepared For:
Date: December, 2006 10045-T-19 Figure 4.8
LOCATION OF AES NP ROUTE& OPTIMIZED ROUTE
BUJAGALI INTERCONNECTIONPROJECT SEA
0 1,000 2,000
Meters1:40,000
Sub-Station Location
AES NP Route
District Boundary
Sub-District Boundary
Optimized Route
Angle Point
TRANSMISSION COMPANY LIMITEDUGANDA ELECTRICITY
KA MP ALA C ITY
WAKISOSUB-COUNTY
NAKAWA
NABWERUSUB-COUNTY
KAWEMPE
MAKINDYENSANGI
SUB-COUNTY
CENTRALKAMPALABUSEGA PARISH
NATEETE PARISH
LUBYA PARISH
KASUBI PARISH
LUGABA PARISH
Mutundwe Sub-Station
Mutundwe-Kawanda
Line
440,000
440,000
445,000
445,000
450,000
450,000
455,000
455,000
35,0
00
35,0
00
40,0
00
40,0
00
Project Name:
Prepared For:
Date: December, 2006 10045-T-20A Figure 5.1
PREFERED SYSTEM PLAN(MAP 1 OF 5)
BUJAGALI INTERCONNECTIONPROJECT SEA
0 1,000 2,000 3,000
Meters
Sub-Station Location
Transmission Line Route
District Boundary
Sub-District Boundary
L and
satI
mag
e:P r
ovid
edvi
aLa
ndsa
t.org
-Ik
o nos
Imag
es:G
eoEy
e ,A
llR
ight
sR
eser
ved
-Bou
ndar
yD
ata :
Gov
ern m
ento
f Ug a
nda
1:50,000
KAMPALA
JINJA
IKONOS IMAGES OVERLAYED ON LANDSAT -7 IMAGE WHERE AVAILABLE.
TRANSMISSION COMPANY LIMITEDUGANDA ELECTRICITY
KIRASUB-COUNTY
WAKISOSUB-COUNTY
NANGABOSUB-COUNTY
NABWERUSUB-COUNTY
KAWEMPE
Kawanda Sub-Station(Proposed)
Kawanda-Bujagali Line
Mutundwe-Kawanda
Line
450,000
450,000
455,000
455,000
460,000
460,000
465,000
465,000
40,0
00
40,0
00
45,0
00
45,0
00
50,0
00
50, 0
00
Project Name:
Prepared For:
Date: December 2006 10045-T-20B Figure 5.1
PREFERED SYSTEM PLAN(MAP 2 OF 5)
BUJAGALI INTERCONNECTIONPROJECT SEA
0 1,000 2,000 3,000
Meters
Sub-Station Location
Transmission Line Route
District Boundary
Sub-District Boundary
L and
satI
mag
e:P r
ovid
edvi
aLa
ndsa
t.org
-Ik
o nos
Imag
es:G
eoEy
e ,A
llR
ight
sR
eser
ved
-Bou
ndar
yD
ata :
Gov
ern m
ento
f Ug a
nda
1:50,000
KAMPALA
JINJA
IKONOS IMAGES OVERLAYED ON LANDSAT -7 IMAGE WHERE AVAILABLE.
TRANSMISSION COMPANY LIMITEDUGANDA ELECTRICITY
MU KON O DI ST RI CT
MUKONOTOWN
MUKONOSUB-COUNTY
K I F UF O R E S T
R E S E R V E
N A M Y O Y AF O R E S T
R E S E R V E
Kawanda-Bujagali Line
465,000
465,000
470,000
470,000
475,000
475,000
480,000
480,000
40,0
00
40,0
0 0
45,0
00
45,0
00
50, 0
00
50, 0
00
Project Name:
Prepared For:
Date: December, 2006 10045-T-20C Figure 5.1
PREFERED SYSTEM PLAN(MAP 3 OF 5)
BUJAGALI INTERCONNECTIONPROJECT SEA
0 1,000 2,000 3,000
Meters
Sub-Station Location
Transmission Line Route
District Boundary
Sub-District Boundary
L and
satI
mag
e:P r
ovid
edvi
aLa
ndsa
t.org
-Ik
o nos
Imag
es:G
eoEy
e ,A
llR
ight
sR
eser
ved
-Bou
ndar
yD
ata :
Gov
ern m
ento
f Ug a
nda
1:50,000
KAMPALA
JINJA
IKONOS IMAGES OVERLAYED ON LANDSAT -7 IMAGE WHERE AVAILABLE.
TRANSMISSION COMPANY LIMITEDUGANDA ELECTRICITY
NAGOJJESUB-COUNTY
LUGAZITOWN
M A B I R AF O R E S T R E S E R V E
Kawanda-Bujagali Line
485,000
485,000
490,000
490,000
495,000
495,000
500,000
500,000
45,0
00
45,0
00
50, 0
00
50, 0
0 0
Project Name:
Prepared For:
Date: December 2006 10045-T-20D Figure 5.1
PREFERED SYSTEM PLAN(MAP 4 OF 5)
BUJAGALI INTERCONNECTIONPROJECT SEA
0 1,000 2,000 3,000
Meters
Sub-Station Location
Transmission Line Route
District Boundary
Sub-District Boundary
L and
satI
mag
e:P r
ovid
edvi
aLa
ndsa
t.org
-Ik
o nos
Imag
es:G
eoEy
e ,A
llR
ight
sR
eser
ved
-Bou
ndar
yD
ata :
Gov
ern m
ento
f Ug a
nda
1:50,000
KAMPALA
JINJA
IKONOS IMAGES OVERLAYED ON LANDSAT -7 IMAGE WHERE AVAILABLE.
TRANSMISSION COMPANY LIMITEDUGANDA ELECTRICITY
WAKISISUB-COUNTY
BUDONDO
NJERU TOWN
M A B I R AF O R E S T R E S E R V E
M A B I R AF O R E S T R E S E R V E
Bujagali Sub-Station(Proposed)
Nalubaale Sub-Station
Kawanda-Bujagali Line
New Bujagali-Tororo Line
New Bujagali-Nalubaale Line
505,000
505,000
510,000
510,000
515,000
515,000
520,000
520,000
45,0
00
45,0
0 0
50, 0
00
50, 0
00
55,0
00
55,0
00
Project Name:
Prepared For:
Date: December 2006 10045-T-20E Figure 5.1
PREFERED SYSTEM PLAN(MAP 5 OF 5)
BUJAGALI INTERCONNECTIONPROJECT SEA
0 1,000 2,000 3,000
Meters
Sub-Station Location
Transmission Line Route
District Boundary
Sub-District Boundary
L and
satI
mag
e:P r
ovid
edvi
aLa
ndsa
t.org
-Ik
o nos
Imag
es:G
eoEy
e ,A
llR
ight
sR
eser
ved
-Bou
ndar
yD
ata :
Gov
ern m
ento
f Ug a
nda
1:50,000
KAMPALA
JINJA
IKONOS IMAGES OVERLAYED ON LANDSAT -7 IMAGE WHERE AVAILABLE.
TRANSMISSION COMPANY LIMITEDUGANDA ELECTRICITY
Source: Bujagali EPC Consortium, 2000
Prepared for:
Project Name:Date: December, 2006 10045-T-27
TYPICAL DESIGN FOR 220 kVTENSION TOWER
BUJAGALI INTERCONNECTIONPROJECT SEA
Figure 5.2
Updated by:
UGANDA ELECTRICITYTRANSMISSION COMPANY LIMITED
Source: Bujagali EPC Consortium, 2000
Prepared for:
Project Name:Date: December, 2006 10045-T-28
TYPICAL DESIGN FOR 220 kVSUSPENSION TOWER
BUJAGALI INTERCONNECTIONPROJECT SEA
Figure 5.3
Updated by:
UGANDA ELECTRICITYTRANSMISSION COMPANY LIMITED
30 M WAYLEAVE
30 M WAYLEAVE30 M WAYLEAVE 30 M WAYLEAVE
40 M WAYLEAVE*
40 M WAYLEAVE*
5 MetresRIGHT OF WAY132 kV Line
5 Metres
RIGHT OF WAY220 kV Line
5 Metres 5 Metres
serteM51serteM51
12.5 Metres12.5 Metres
RIGHT OF WAY RIGHT OF WAY132 kV Line 132 kV Line
5 Metres
20 Metres
17.5 Metres17.5 Metres
RIGHT OF WAY132 kV Line
5 MetresRIGHT OF WAY220 kV Line
15 Metres
Wayleave through Mabira, Kifuand Namyoya FR's will be limitedto 35m as a mitigation measure.However, compensation willbe based on a 40mwayleave.
*
Prepared for:
Project Name:Date: December, 2006 10045-T-21
R.O.W. AND WAYLEAVE REQUIRMENTS FOR132kV AND 220kV TRANSMISSION LINES
NEMA & InternationalLenders anticipated SEA approval/acceptance
Anticipated financial close/construction start date
UGANDA ELECTRICITYTRANSMISSION COMPANY LIMITED
YAWFOTHGIRYAWFOTHGIRWAYLEAVE WAYLEAVE
SITUATION 1The plot lies partly within the
way leave corridor and ispartly unaffected. No structure.
SITUATION 1Cultivation may continue within thewayleave corridor subject to height
limitations. The loss of value resultingfrom this limitation will be compensated
for in cash.SITUATION 2
The affected plot is partly withinthe right of way corridor, partly
within the way leave corridor, andpartly unaffected. No structure.
SITUATION 2Land in the Way Leave will be subjectto same limitations as in Situation 1
and loss of value will be compensatedon same basis. All rights on land withinthe Right of Way will be compensatedfor as if the land had been acquired.Perennial crops on this strip will becompensated as well. Land for landcompensation will be offered as anoption if the remaining land is not
sufficient for the household.
SITUATION 4There is a structure in theaffected part of the plot.
SITUATION 4As far as land is concerned, situation
4 is same as situation 2, but thehas to be relocated. If the
household can relocate within theunaffected part of their plot and theremainder is sustainable, same assituation 2, with the addition of the
cash compensation for theOtherwise, an option between land forland and cash compensation will beoffered, together with a replacementstructure if the household chooses
land for land compensation.
structure
structure.
SITUATION 6There is a structure in theunaffected part of the plot.
SITUATION 6The does not have to beremoved. Situation 6 is same as
situation 2.
structure
SITUATION 5The whole plot is affected and there
is a structure within the corridor.
SITUATION 5The PAPs must move, they will be
offered land for land compensation anda replacement house. They may prefer
cash compensation and relocatethemselves.
SITUATION 3The whole plot is affected, with a
part within the right of way corridorand another within the way leave
corridor. No structure.
SITUATION 3Same as 2. Land for land
compensation will also be offered asan option if the household does not
have sufficient land elsewhere.
Way Leave: Limitations on land use(no structures, tree height limited to 1.8m)
Land Use RestrictionsRight of Way: Land to be kept clear foraccess purposes.
Structure
STRATEGIES FOR COMPENSATIONOWNERSHIP SITUATIONS
{
PAP's = Project Affected Persons
Prepared for:
Project Name:Date: December, 2006 10045-T-36
RANGE OF OWNERSHIP SITUATIONSENCOUNTERED AND STRATEGIES
FOR COMPENSATION
BUJAGALI INTERCONNECTIONPROJECT SEA
Figure 7.1
Updated by:
UGANDA ELECTRICITYTRANSMISSION COMPANY LIMITED
PRESENT
LakeVictoria
Nile
River
Mabira JINJA
KAMPALA
new substations to be built at Bujagali and Kawanda220 kV line to be built between Bujagali and Kawanda substation, for totaldistance of 70.4 km. 39.6 km will run parallel to, and immediately north of, theexisting 132 kV “northern” line, including 18.0 km that will go through MabiraForest Reserve. Wayleave will be expanded from current 30 m to 70 m (65m inforest reserves.) Wayleave assumed to be maintained by UEB. Extensiveportions of wayleave routinely become inaccessible due to fast-growingvegetation.132 kV line to be built between Mutundwe and Kawanda substations for 17.4km. Entire section will be through greenfield. Transmission line to run alongwestern and southern edges of Lubigi Swamp.transmission line to run parallel to railway for 1.8 km.2x132 kV lines to run parallel to each other from Bujagali substation to Tororoline interface, for 4.9 km.
Major RoadsRailwayExisting Transmission LinesProposed Transmission LinesFuture Transmission Lines
Prepared for:
Project Name:Date: December, 2006 10045-T-38
SCHEMATIC OF CUMULATIVE EFFECTS & PROPOSED TRANSMISSION LINES
WITHIN STUDY AREA
BUJAGALI INTERCONNECTIONPROJECT SEA
Figure 7.3
Updated by:
FUTURE
LakeVictoria
Nile
River
Mabira JINJA
KAMPALA
To TororoTo KarumaHydro Project
To M
asak
a W
est
PRE-1954
LakeVictoria
Nile
River
JINJA
KAMPALA
1950s
LakeVictoria
Nile
River
Mabira JINJA
KAMPALA
BUJAGALI PROPOSAL
LakeVictoria
Nile
River
Mabira JINJA
KAMPALA
▪ Additional 220 kV transmission lines developed between Kawanda and Masaka West, Kawanda and Karuma and Bujagali and Tororo.▪ Operation of Bujagali to Kawanda transmission line switched from 132 kV to 220 kV.
▪ New substations to be built at Bujagali and Kawanda▪ 220 kV line to be built between Bujagali and Kawanda substation, for total distance of 70.4 km. 39.6 km will run parallel to, and immediately north of, the existing 132 kV “northern” line, including 18.0 km that will go through Mabira Forest Reserve. Wayleave will be expanded from current 30 m to 70 m (65m in forest reserves.) Wayleave assumed to be maintained by UEB. Extensive portions of wayleave routinely become inaccessible due to fast-growing vegetation.▪ 132 kV line to be built between Mutundwe and Kawanda substations for 17.4 km. Entire section will be through greenfield. Transmission line to run along western and southern edges of Lubigi Swamp.▪ Transmission line to run parallel to railway for 1.8 km.▪ 2x132 kV lines to run parallel to each other from Bujagali substation to Tororo line interface, for 4.9 km.
▪ 66 kV line is downgraded to 33 kV between Mukono and Lugogo substation, and is decommissioned entirely between Mukono and Lugazi. ▪ 132 kV “DANIDA” line completed, running north of 66 kV line, from Owen Falls substation to Kampala North substation. DANIDA line varies from 50 m to several km from the existing 66 kV line. No public consultation known to have been carried out prior to line being constructed. Ongoing issues associated with compensation.▪ 3 transmission substations (Kampala North, Mutundwe and Lugogo) are saturated and cannot receive additional power or lines.▪ Permanent buildings are sited within wayleave of DANIDA and 66/33 kV lines.Segments of “northern line” wayleave through Mabira Forest Reserve have regenerated and are inaccessible by vehicle.▪ Land use intensified, with much of the region under small-scale farms or large farm estates.
▪ Owen Falls Hydropower station constructed▪ 132 kV transmission line constructed from Owen Falls dam to Kampala North substation, known as “northern line”. Line goes through Mabira, Kifu and Namyoya Forest Reserves. ▪ 66 kV line built from Owen Falls to Lugogo. Line crosses the main Kampala-Jinja Highway 5 times▪ Land use intensifies as population increases.
▪ Main road constructed between Kampala and Jinja▪ Rural settlements scattered throughout area▪ Mabira, Kifu & Namyoya Forest Reserves gazetted▪ Railway built between Kampala and Jinja
Main road constructed between Kampala and JinjaRural settlements scattered throughout areaMabira, Kifu & Namyoya Forest Reserves gazettedRailway built between Kampala and Jinja
Owen Falls Hydropower station constructed132 kV transmission line constructed from Owen Falls dam to Kampala North substation, known as “northern line . Line goes through Mabira, Kifu and Namyoya Forest Reserves. 66 kV line built from Owen Falls to Lugogo. Line crosses the main Kampala-Jinja Highway 5 timesLand use intensifie s as population increases.
66 kV line is downgraded to 33 kV between Mukono and Lugogo substation, and is decommissioned entirely between Mukono and Lugazi. 132 kV DANIDA line completed, running north of 66 kV line, from Owen Falls substation to Kampala North substation. DANIDA line varies from 50 m to several km from the existing 66 kV line. No public consultation known to have been carried out p rior to line b●ngoing issues associated with compensation.3 transmission substations (Kampala North, Mutundwe and Lugogo) are saturated and cannot receive additional power or lines.
Segments of northern line wayleave through Mabira Forest Reserve have regenerated and a re inaccessible by vehicle.Land use intensified, with much of the region under small-scale farms or large farm estates.
new substations to be built at Bujagali and Kawanda220 kV line to be built between Bujagali and Kawanda substation, for total distance of 70.4 km. 39.6 km will run parallel to, and immediately north of, the existing 132 kV “northern” line, including 18.0 km that will go through Mabira Forest Reserve. Wayleave will be expanded from current 30 m to 70 m (65m in forest reserves.) Wayleave assumed to be maintained by UEB. Extensive portions of wayleave routinely become inaccessible due to fast-growing vegetation.132 kV line to be built between Mutundwe and Kawanda substations for 17.4 km. Entire section will be through greenfield. Transmission line to run along western and southern edges of Lubigi Swamp .transmission line to run parallel to railway for 1.8 km.2x132 kV lines to run parallel to each other from Bujagali substation to Tororo line interface, for 4.9 km.
”
“ ”
permanent buildings are sited within wayleave of DANIDA and 66/33 kV lines.“ ”
UGANDA ELECTRICITYTRANSMISSION COMPANY LIMITED
PRE - 1954
1954 - 132kV line
PROPOSED PROJECT
Existing 132kV line Proposed 220kV line
POSSIBLE FUTURE DEVELOPMENT IF PROPOSED LINE WERE BUILT TO 132kV
By building the proposed transmission line (220kV rather than 132kV), the need to build a third 132kV line (with resultant wayleave of 90m)in the future is avoided.
30m
m03m03m03
35m
30m
Prepared for:
Project Name:Date: December, 2006 10045-T-39
SCHEMATIC OF CUMULATIVE EFFECTS OF TRANSMISSION LINE WITHIN STUDY AREA FOREST RESERVES
BUJAGALI INTERCONNECTIONPROJECT SEA
Figure 7.4
Updated by:
UGANDA ELECTRICITYTRANSMISSION COMPANY LIMITED
Prepared for:
Project Name:Date: December, 2006 10045-T-41
SEAP COMPONENT PLANS PROJECT SEA
Figure 8.1
Prepared by:
BUJAGALI INTERCONNECTION
UGANDA ELECTRICITYTRANSMISSION COMPANY LIMITED
Social & Environmental Action Plan (SEAP)
Sponsor’s Action Plan Contractor’s Action Plan
Public Consultation and Disclosure Plan (PCDP)
Assessment of Past Resettlement Activities and Action Plan (APRAP)