BUILDING THE FINDHORN WIND PARK
14

BUILDING THE FINDHORN WIND PARK. Total capacity of 750kW = 176 kW after capacity factor Findhorn Wind Park.

Dec 29, 2015

Download

Documents

Jordan Manning
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: BUILDING THE FINDHORN WIND PARK. Total capacity of 750kW = 176 kW after capacity factor Findhorn Wind Park.

BUILDING THE FINDHORN WIND PARK

Page 2: BUILDING THE FINDHORN WIND PARK. Total capacity of 750kW = 176 kW after capacity factor Findhorn Wind Park.

Total capacity of 750kW = 176 kW after capacity factor

Findhorn Wind Park

Page 3: BUILDING THE FINDHORN WIND PARK. Total capacity of 750kW = 176 kW after capacity factor Findhorn Wind Park.

The planning process

Cost: £100k- No guarantee!

•Wind resource assessment•Financial model•RAF•Application for planning permission

•Visual impact study•Noise study•Bird study

Page 4: BUILDING THE FINDHORN WIND PARK. Total capacity of 750kW = 176 kW after capacity factor Findhorn Wind Park.

Visibility of the proposed turbines

Page 5: BUILDING THE FINDHORN WIND PARK. Total capacity of 750kW = 176 kW after capacity factor Findhorn Wind Park.

The effect of other windfarms and proposals

Page 6: BUILDING THE FINDHORN WIND PARK. Total capacity of 750kW = 176 kW after capacity factor Findhorn Wind Park.

EXCAVATION

Page 7: BUILDING THE FINDHORN WIND PARK. Total capacity of 750kW = 176 kW after capacity factor Findhorn Wind Park.
Page 8: BUILDING THE FINDHORN WIND PARK. Total capacity of 750kW = 176 kW after capacity factor Findhorn Wind Park.

ROTOR

Page 9: BUILDING THE FINDHORN WIND PARK. Total capacity of 750kW = 176 kW after capacity factor Findhorn Wind Park.
Page 10: BUILDING THE FINDHORN WIND PARK. Total capacity of 750kW = 176 kW after capacity factor Findhorn Wind Park.
Page 11: BUILDING THE FINDHORN WIND PARK. Total capacity of 750kW = 176 kW after capacity factor Findhorn Wind Park.

NARCELLE

Page 12: BUILDING THE FINDHORN WIND PARK. Total capacity of 750kW = 176 kW after capacity factor Findhorn Wind Park.

Generators CapacityContinuousAnnualFactor RunningOperations

kW kWhrThree wind turbines @ 225 kw capacity24% 162 1,419,120One wind turbine @ 75 kw capacity 18% 14 118,260

1,537,380

The annual output is 1,537 megawatt hours per annum

Page 13: BUILDING THE FINDHORN WIND PARK. Total capacity of 750kW = 176 kW after capacity factor Findhorn Wind Park.

1,537 MWhr/annum350 homes

475,000 litres of oil660 tonnes carbon dioxide

Planning permissionGranted 18 Jan. 05

Page 14: BUILDING THE FINDHORN WIND PARK. Total capacity of 750kW = 176 kW after capacity factor Findhorn Wind Park.

Financial Model

•ROC’s & LEC’s are about 50% of income•Cost of generating power = 1.6 to 5.9 pence/kWh