Building Project for the Building Project for the Rawls College of Rawls College of Business Business
Jan 03, 2016
Building Project for theBuilding Project for theRawls College of BusinessRawls College of Business
ProgramProgram 22 Classrooms, seating 12 up to 25022 Classrooms, seating 12 up to 250
Texas standard—836 class hours per week (22 x 38 hrs) Texas standard—836 class hours per week (22 x 38 hrs) Available 960 during the normal class week.Available 960 during the normal class week. Current actual varies Fall and Spring.Current actual varies Fall and Spring.
Study seating in student areas.Study seating in student areas. Placement facilities with 16 interview roomsPlacement facilities with 16 interview rooms 7 Conference Rooms7 Conference Rooms Café with indoor & outdoor seating.Café with indoor & outdoor seating. 96 Faculty offices96 Faculty offices 48 Doctoral student/Pt Faculty 48 Doctoral student/Pt Faculty 87 Staff offices87 Staff offices Wireless technology throughout, wired & powered in tiered Wireless technology throughout, wired & powered in tiered
classrooms & offices, printing at stations in student areas.classrooms & offices, printing at stations in student areas.
Progress to DateProgress to Date – Project completion in Fall 2011, occupancy
December 2011. Commissioning next Sept.
– Walls are up with brick started--finish in March.
– Heat/air mechanical will be completed about April, Plumbing is going in now, electrical soon.
– Interior is being finished• Interior walls mostly framed (working on 3rd floor)
• Wallboard completed in lower level and started on the 2nd
ProgressProgressAugust 2August 2ndnd to October 15 to October 15thth